SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D



Similar documents
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

FY08 SEWER POINT REPAIRS BID TABULATION

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount

Special Specification 7021 Water Main and Sewer Line Replacements

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.

How to Do a Water & Sewer System Inventory - Capital Improvements Plan

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report

CD i -STREETS- Detail #

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

Figure 3 Pipe Cracking

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

CID STREET INFRASTRUCTURE ASSESSMENT

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

City of Balch Springs, Texas. Request for Proposal (RFP ) Pipe Bursting Sewer Line Replacement

WATER, SEWER AND TRAFFIC IT S ALL ABOUT THE FLOW

Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction

2014 Sewer Replacement Project

SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline

Riverside County Transportation Department Summary of Bids

UNIT PRICE LIST January 2009

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

Close-Out Documents... 9

DESCRIPTION OF WORK:

SECTION GRAVITY SANITARY SEWERS

EXHIBIT A Accessible Truck Routes Map

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

LS 2540 SEWER LATERALS AND INSPECTION TEES

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

SECTION REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:

Technical Memorandum Cost Criteria for 2010 System Capacity Plan

Beacon Hill Sewer District Standard Specifications

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

Description Quantity Cost Total Cost

ITD Pipe Materials Selection & Specification Procedures. July 2011

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

C. Section TESTING LABORATORY SERVICE.

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

INSTALLATION OF INSITUFORM LINER

CHAPTER 10 PERMIT PROCEDURES AND BONDING REQUIREMENTS FOR CONTRACTORS

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

ADVERTISEMENT FOR BIDDERS

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

February 4, Estimate

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA

Bidding and Contract Requirements:

provided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies:

McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C.

SECTION STORM DRAINAGE TABLE OF CONTENTS

New Road 11.0m Asphalt 23m ROW

2014 Inlet Rehab Project II Various Locations

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Sewer Rehabilitation Design Requirements

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION

SPECIFICATIONS FOR SANITARY SEWER LINE REPLACEMENT IN PIONEER PARK. City of Des Peres, Missouri Manchester Road. Des Peres, Missouri 63131

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016

Let Us Give Utilities the Respect that they Deserve.

CHAPTER 6 - SANITARY SEWER

INVITATION TO BID OFFICE OF THE ORLANDO-ORANGE COUNTY EXPRESSWAY AUTHORITY ORLANDO, FLORIDA

Developer s/consultants Field Services Guidelines

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

Sewer Line Rehabilitation

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

FORM A: BID (See B8) 1. Project Title 2006 COMBINED SEWER RENEWALS - CONTRACT 11

VILLAS OF TRADITIONS AT GREY OAKS

PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS.

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

For a building with a crawl space, see Figure

Guidelines for Fiber Optic Cable Permits

APPENDIX K Capital Costs Methodology Report

W. REYNOLDS ST. (SR 574) SEWER LINE REPLACEMENT BID NO Addendum 3a

SANITARY SEWER MASTER PLAN

Section 4 Pipe and Maintenance Hole Inspection and Condition Assessment Plan

CLEANING, INSPECTION, AND TESTING OF SEWERS

SECTION 7- STORM SEWER

SECTION 5 DRAFTING STANDARDS

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

SECTION 5: SANITARY SEWER SYSTEM DESIGN

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

SANITARY SEWER SPECIFICATIONS

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

SEWER LINE EXTENSION DESIGN CHECKLIST

CONSTRUCTION PERMIT REQUIREMENTS

MDWASD 8/1999 SECTION TRENCHING AND BACKFILLING FOR PIPING SYSTEMS

Transcription:

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS Appendix D

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Rumbi Grill - New Piping - New Piping Project Location: 290' South of manhole B180 to 160' North of manhole B179 Project Number: Project #1 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $15,000.00 $15,000.00 2. Traffic and flagging 10 days $450.00 $4,500.00 3. Removal of existing sewer pipeline 650 lf. $3.50 $2,275.00 4. Remove existing roadway surface materials 650 lf. $9.80 $6,370.00 5. Construct 8" pvc sanitary sewer pipeline 650 lf. $214.00 $139,100.00 6. Construct 4' diameter manhole 3 ea. $2,750.00 $8,250.00 7. Construct 5' diameter manhole 1 ea. $3,000.00 $3,000.00 8. Re-connect service laterals 3 ea. $600.00 $1,800.00 9. Connect to existing system 1 ea. $2,800.00 $2,800.00 10. Furnish trench backfill materials 940 ton $4.50 $4,230.00 11. Furnish bedding materials 240 ton $10.50 $2,520.00 12. Roadway patching 440 sy $27.50 $12,100.00 Subtotal $201,945.00 Engineering and Construction Contingencies (20%) $40,400.00 Estimated Total for Improvements $242,300.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Ruby River to PC Laptops - New Piping Project Location: Manhole B142 to manhole B165 Project Number: Project #2 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $18,000.00 $18,000.00 2. Traffic control and flagging 45 days $450.00 $20,250.00 3. Removal of existing sanitary sewer pipeline 2,250 lf. $3.50 $7,875.00 4. Remove existing roadway surface materials 2,250 lf. $9.80 $22,050.00 5. Construct 8" pvc sanitary sewer pipeline 2,250 lf. $214.00 $481,500.00 6. Construct 4' diameter manhole 3 ea. $2,750.00 $8,250.00 7. Construct 5' diameter manhole 4 ea. $3,000.00 $12,000.00 8. Re-connect service laterals 14 ea. $600.00 $8,400.00 9. Connect to existing system 7 ea. $2,800.00 $19,600.00 10. Removal and installation of sidewalk & handicap ramps 1,200 lf. $26.25 $31,500.00 11. Removal and installation of curb and gutter 1,200 lf. $25.50 $30,600.00 12. Furnish trench backfill materials 3,240 ton $4.50 $14,580.00 13. Furnish bedding materials 810 ton $10.50 $8,505.00 14. Roadway patching 1,350 sy. $27.50 $37,125.00 Subtotal $720,235.00 Engineering and Construction Contingencies (20%) $144,000.00 Estimated Total for Improvements $864,200.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Rumbi Grill to 500 West Riverdale Road Intersection - New Piping Project Location: Manhole B179 to manhole B172 Project Number: Project #3 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $2,500.00 $2,500.00 2. Traffic control and flagging 5 days $450.00 $2,250.00 3. Removal of existing sanitary sewer pipeline 80 lf. $3.50 $280.00 4. Remove existing roadway surface materials 80 lf. $9.80 $784.00 5. Construct 8" pvc sanitary sewer pipeline 80 lf. $214.00 $17,120.00 6. Construct 5' diameter manhole 2 ea. $3,000.00 $6,000.00 7. Connect to existing system 2 ea. $2,800.00 $5,600.00 8. Furnish trench backfill materials 117 ton $4.50 $526.50 9. Furnish bedding materials 60 ton $10.50 $630.00 10. Roadway patching - concrete 55 sy. $245.00 $13,475.00 Subtotal $49,166.00 Engineering and Construction Contingencies (20%) $9,800.00 Estimated Total for Improvements $59,000.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Del Taco to Olive Garden Building - New Piping Project Location: Manhole B159 to manhole B161 Project Number: Project #4 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $14,000.00 $14,000.00 2. Traffic control and flagging 11 days $450.00 $4,950.00 3. Removal of existing sanitary sewer pipeline 795 lf. $3.50 $2,782.50 4. Remove existing roadway surface materials 795 lf. $9.80 $7,791.00 5. Construct 8" pvc sanitary sewer pipeline 795 lf. $214.00 $170,130.00 6. Construct 4' diameter manhole 3 ea. $2,750.00 $8,250.00 7. Re-connect service laterals 4 ea. $600.00 $2,400.00 8. Connect to existing system 1 ea. $2,800.00 $2,800.00 9. Furnish trench backfill materials 1,200 ton $4.50 $5,400.00 10. Furnish bedding materials 288 ton $10.50 $3,024.00 11. Roadway patching - concrete & asphalt 530 sy. $65.00 $34,450.00 Subtotal $255,978.00 Engineering and Construction Contingencies (20%) $51,200.00 Estimated Total for Improvements $307,200.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Colonial Gardens to 700 West Street - New Piping Project Location: Manhole A111 to manhole B104 Project Number: Project #5 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $25,000.00 $25,000.00 2. Traffic control and flagging 60 days $150.00 $9,000.00 3. Removal of existing sanitary sewer pipeline 3,775 lf. $3.50 $13,212.50 4. Remove existing roadway surface materials 3,775 lf $9.80 $36,995.00 5. Construct 8" pvc sanitary sewer pipeline 1,525 lf. $35.75 $54,518.75 6. Construct 10" pvc sanitary sewer pipeline 1,100 lf. $37.25 $40,975.00 7. Construct 12" pvc sanitary sewer pipeline 1,150 lf. $40.00 $46,000.00 8. Construct 4' diameter manhole 9 ea. $2,750.00 $24,750.00 9. Construct 5' diameter manhole 9 ea. $3,000.00 $27,000.00 10. Re-connect service laterals 61 ea. $600.00 $36,600.00 11. Connect to existing system 6 ea. $2,800.00 $16,800.00 12. Removal and installation of 4' wide sidewalk 940 lf. $26.25 $24,675.00 13. Removal and installation of curb and gutter 1,220 lf. $25.50 $31,110.00 14. Furnish trench backfill materials 5,440 ton $4.50 $24,480.00

15. Furnish bedding materials 1,360 ton $10.50 $14,280.00 16. Roadway patching 2,540 sy. $23.50 $59,690.00 17. Landscaping & service restoration 61 ea. $200.00 $12,200.00 Subtotal $485,086.00 Engineering and Construction Contingencies (20%) $97,000.00 Estimated Total for Improvements $582,100.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: South Weber Drive - Pipe Liner Project Location: Manhole C114 to manhole C98 Project Number: Project #6 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $6,600.00 $6,600.00 2. Install 10" sanitary sewer pipeline liner 1,500 ft. $70.00 $105,000.00 3. Cut pipeline liner for lateral connection 8 ea. $250.00 $2,000.00 4. Traffic control and flagging 20 days $150.00 $3,000.00 Subtotal $116,600.00 Engineering and Construction Contingencies (20%) $23,300.00 Estimated Total for Improvements $139,900.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Check City to Wasatch Front Building - Pipe Liner Project Location: Manhole A71 to manhole A67 Project Number: Project #7 Item Description Quantity Units Unit Price Amount 1. Mobilization and UDOT permits 1 ls. $8,500.00 $8,500.00 2. Install 10" sanitary sewer pipeline liner 725 lf. $70.00 $50,750.00 3. Adjust liner to connect to existing manhole 2 ea. $350.00 $700.00 4. Cut pipeline liner for lateral connection 5 ea. $300.00 $1,500.00 5. Traffic control and flagging 4 days $450.00 $1,800.00 Subtotal $63,250.00 Engineering and Construction Contingencies (20%) $12,700.00 Estimated Total for Improvements $76,000.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 4375 South 800 West Street - Spot Liner Project Location: 370 feet to 374 feet East and 116 feet North of manhole B96 Project Number: Project #8 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 2 ea. $3,000.00 $6,000.00 3. Traffic control and flagging 4 days $150.00 $600.00 Subtotal $8,100.00 Engineering and Construction Contingencies (20%) $1,600.00 Estimated Total for Improvements $9,700.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: South Weber Drive - Pipe Liner Project Location: Manhole C120 to manhole C117 Project Number: Project #9 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $6,500.00 $6,500.00 2. Install 10" sanitary sewer pipeline liner 1,500 ft. $70.00 $105,000.00 3. Cut pipeline liner for lateral connection 3 ea. $250.00 $750.00 4. Traffic control and flagging 20 days $150.00 $3,000.00 Subtotal $115,250.00 Engineering and Construction Contingencies (20%) $23,100.00 Estimated Total for Improvements $138,400.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 575 West to end of Cul-de-sac on 5350 South Street Project Location: Manhole D29 to manhole D30 Project Number: Project #10 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 238 ft. $65.00 $15,470.00 3. Cut pipeline liner for lateral connection 8 ea. $250.00 $2,000.00 4. Traffic control and flagging 6 days $150.00 $900.00 Subtotal $19,870.00 Engineering and Construction Contingencies (20%) $4,000.00 Estimated Total for Improvements $23,900.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 564 West 575 West on 5400 South Street - Pipe Liner Project Location: Manhole D27 to manhole D28 Project Number: Project #11 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 216 ft. $65.00 $14,040.00 3. Cut pipeline liner for lateral connection 3 ea. $250.00 $750.00 4. Traffic control and flagging 5 days $150.00 $750.00 Subtotal $17,040.00 Engineering and Construction Contingencies (20%) $3,400.00 Estimated Total for Improvements $20,400.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 575 West to end of Cul-de-sac on 5300 South Street Project Location: Manhole D31 to manhole D32 Project Number: Project #12 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 178 ft. $65.00 $11,570.00 3. Cut pipeline liner for lateral connection 8 ea. $250.00 $2,000.00 4. Traffic control and flagging 6 days $150.00 $900.00 Subtotal $15,970.00 Engineering and Construction Contingencies (20%) $3,200.00 Estimated Total for Improvements $19,200.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 561 West 5275 South Street - Pipe Liner Project Location: Manhole D38 to manhole D39 Project Number: Project #13 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 304 ft. $65.00 $19,760.00 3. Cut pipeline liner for lateral connection 7 ea. $250.00 $1,750.00 4. Traffic control and flagging 5 days $150.00 $750.00 Subtotal $23,760.00 Engineering and Construction Contingencies (20%) $4,800.00 Estimated Total for Improvements $28,600.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 575 West to end of Cul-de-sac on 5225 South Street - Pipe Liner Project Location: Manhole D35 to manhole D36 Project Number: Project #14 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 219 ft. $65.00 $14,235.00 3. Cut pipeline liner for lateral connection 8 ea. $250.00 $2,000.00 4. Traffic control and flagging 5 days $150.00 $750.00 Subtotal $18,485.00 Engineering and Construction Contingencies (20%) $3,700.00 Estimated Total for Improvements $22,200.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 5175 South to 5375 South on 575 West Street - Pipe Liner Project Location: Manhole D37 to manhole D28 Project Number: Project #15 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $5,000.00 $5,000.00 2. Install 8" sanitary sewer pipeline liner 1,152 ft. $65.00 $74,880.00 3. Cut pipeline liner for lateral connection 26 ea. $250.00 $6,500.00 4. Traffic control and flagging 21 days $150.00 $3,150.00 Subtotal $89,530.00 Engineering and Construction Contingencies (20%) $17,900.00 Estimated Total for Improvements $107,400.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 4865 South 600 West Street - Pipe Liner Project Location: Manhole D46 to manhole D47 Project Number: Project #16 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $5,000.00 $5,000.00 2. Install 8" sanitary sewer pipeline liner 225 ft. $65.00 $14,625.00 3. Cut pipeline liner for lateral connection 9 ea. $250.00 $2,250.00 4. Traffic control and flagging 5 days $150.00 $750.00 Subtotal $22,625.00 Engineering and Construction Contingencies (20%) $4,500.00 Estimated Total for Improvements $27,100.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 720 West to 700 West on 4350 South Street - New Piping Project Location: Manhole B87 to manhole B88 Project Number: Project #17 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $2,000.00 $2,000.00 2. Traffic control and flagging 5 days $150.00 $750.00 3. Removal of existing sanitary sewer pipeline 264 lf. $3.50 $924.00 4. Remove existing roadway surface materials 264 lf. $7.50 $1,980.00 5. Construct 8" pvc sanitary sewer pipeline 264 lf. $35.75 $9,438.00 6. Construct 4' diameter manhole 1 ea. $2,750.00 $2,750.00 7. Re-connect service laterals 5 ea. $600.00 $3,000.00 8. Connect to existing system 2 ea. $2,800.00 $5,600.00 9. Furnish trench backfill materials 400 ton $4.50 $1,800.00 10. Furnish bedding materials 100 ton $10.50 $1,050.00 11. Roadway patching 200 sy. $23.50 $4,700.00 12. Landscaping & surface restoration 5 ea. $200.00 $1,000.00 Subtotal $34,992.00 Engineering and Construction Contingencies (20%) $7,000.00 Estimated Total for Improvements $42,000.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 720 West to 751 West on 4350 South Street - Pipe Liner Project Location: Manhole B86 to B87 Project Number: Project #18 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,600.00 $1,600.00 2. Install 8" sanitary sewer pipeline liner 231 lf. $65.00 $15,015.00 3. Adjust liner to connect to existing manhole 2 ea. $350.00 $700.00 4. Cut pipeline liner for lateral connection 6 ea. $300.00 $1,800.00 5. Traffic control and flagging 4 days $150.00 $600.00 Subtotal $19,715.00 Engineering and Construction Contingencies (20%) $3,900.00 Estimated Total for Improvements $23,600.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 3860 South 700 West Street - Spot Liner Project Location: 67 feet North of manhole B8 Project Number: Project #19 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 12" sanitary sewer pipeline liner 1 ls. $3,500.00 $3,500.00 4. Cut pipeline liner for lateral connection 1 ea. $300.00 $300.00 5. Traffic control and flagging 2 days $150.00 $300.00 Subtotal $5,600.00 Engineering and Construction Contingencies (20%) $1,100.00 Estimated Total for Improvements $6,700.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 4350 South 700 West Street - Spot Liner Project Location: 225 feet North of manhole B89 Project Number: Project #20 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 1 ls. $3,000.00 $3,000.00 3. Traffic control and flagging 2 days $150.00 $300.00 Subtotal $4,800.00 Engineering and Construction Contingencies (20%) $1,000.00 Estimated Total for Improvements $5,800.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 783 West 4300 South Street - Spot Repair Project Location: 58 feet to 62 feet East of manhole B84 Project Number: Project #21 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 1 ls. $3,000.00 $3,000.00 3. Traffic control and flagging 2 days $150.00 $300.00 Subtotal $4,800.00 Engineering and Construction Contingencies (20%) $1,000.00 Estimated Total for Improvements $5,800.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Interstate I-84 - Pipe Liner Project Location: Manhole A86 to manhole A85 - approximately 4550 South Project Number: Project #22 Item Description Quantity Units Unit Price Amount 1. Mobilization and UDOT permits 1 ls. $8,500.00 $8,500.00 2. Install 8" sanitary sewer pipeline liner 335 lf. $65.00 $21,775.00 3. Adjust liner to connect to existing manhole 2 ea. $350.00 $700.00 4. Traffic control and flagging 8 days $450.00 $3,600.00 Subtotal $34,575.00 Engineering and Construction Contingencies (20%) $6,900.00 Estimated Total for Improvements $41,500.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 775 West 4375 South Street - New Piping Project Location: 243 feet to 276 feet East of manhole B96 Project Number: Project #23 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $4,500.00 $4,500.00 2. Traffic control and flagging 4 days $150.00 $600.00 3. Removal of existing sanitary sewer pipeline 33 lf. $3.50 $115.50 4. Remove existing roadway surface materials 33 lf. $7.50 $247.50 5. Construct 8" pvc sanitary sewer pipeline 33 lf. $35.75 $1,179.75 6. Re-connect service laterals 4 ea. $600.00 $2,400.00 7. Connect to existing piping system 2 ea. $500.00 $1,000.00 8. Furnish trench backfill materials 50 ton $4.50 $225.00 9. Furnish bedding materials 20 ton $10.50 $210.00 10. Roadway patching 30 sy. $23.50 $705.00 11. Landscaping & surface restoration 4 ea. $200.00 $800.00 Subtotal $11,983.00 Engineering and Construction Contingencies (20%) $2,400.00 Estimated Total for Improvements $14,400.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 1241 West 4575 South Street - Spot Liner Project Location: 4 feet East of manhole A99 Project Number: Project #24 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 1 ls. $3,000.00 $3,000.00 3. Traffic control and flagging 2 days $150.00 $300.00 Subtotal $4,800.00 Engineering and Construction Contingencies (20%) $1,000.00 Estimated Total for Improvements $5,800.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 5109 South to 5100 South on 1200 West Street - New Piping Project Location: Manhole C88 to manhole C45 Project Number: Project #25 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Traffic control and flagging 6 days $150.00 $900.00 3. Removal of existing sanitary sewer pipeline 76 lf. $3.50 $266.00 4. Remove existing roadway surface materials 76 lf. $7.50 $570.00 5. Construct 8" pvc sanitary sewer pipeline 76 lf. $35.75 $2,717.00 6. Construct 4' diameter manhole 2 ea. $2,750.00 $5,500.00 7. Re-connect service laterals 2 ea. $600.00 $1,200.00 8. Connect to existing system 2 ea. $2,800.00 $5,600.00 9. Furnish trench backfill materials 115 ton $4.50 $517.50 10. Furnish bedding materials 30 ton $10.50 $315.00 11. Roadway patching 70 sy. $23.50 $1,645.00 12. Landscaping & surface restoration 2 ea. $200.00 $400.00 Subtotal $21,131.00 Engineering and Construction Contingencies (20%) $4,200.00 Estimated Total for Improvements $25,300.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 1219 West 5050 South Street to 1150 West Intersection - New Piping Project Location: Manhole C38 to manhole C40 Project Number: Project #26 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $4,100.00 $4,100.00 2. Traffic control and flagging 20 days $150.00 $3,000.00 3. Removal of existing sanitary sewer pipeline 490 lf. $3.50 $1,715.00 4. Remove existing roadway surface materials 490 lf. $7.50 $3,675.00 5. Construct 8" pvc sanitary sewer pipeline 490 lf. $35.75 $17,517.50 6. Construct 4' diameter manhole 3 ea. $2,750.00 $8,250.00 7. Re-connect service laterals 12 ea. $600.00 $7,200.00 8. Connect to existing system 3 ea. $2,800.00 $8,400.00 9. Furnish trench backfill materials 710 ton $4.50 $3,195.00 10. Furnish bedding materials 180 ton $10.50 $1,890.00 11. Roadway patching 435 sy. $23.50 $10,222.50 12. Landscaping & surface restoration 12 ea. $200.00 $2,400.00 Subtotal $71,565.00 Engineering and Construction Contingencies (20%) $14,300.00 Estimated Total for Improvements $85,900.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 1200 West 5100 South Street to 5116 South 1100 West Street - New Piping Project Location: Manhole C43 to manhole C45 Project Number: Project #27 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $3,800.00 $3,800.00 2. Traffic control and flagging 14 days $150.00 $2,100.00 3. Removal of existing sanitary sewer pipeline 434 lf. $3.50 $1,519.00 4. Remove existing roadway surface materials 434 lf. $7.50 $3,255.00 5. Construct 8" pvc sanitary sewer pipeline 434 lf. $35.75 $15,515.50 6. Construct 4' diameter manhole 3 ea. $2,750.00 $8,250.00 7. Re-connect service laterals 10 ea. $600.00 $6,000.00 8. Connect to existing system 3 ea. $2,800.00 $8,400.00 9. Furnish trench backfill materials 630 ton $4.50 $2,835.00 10. Furnish bedding materials 160 ton $10.50 $1,680.00 11. Roadway patching 385 sy. $23.50 $9,047.50 12. Landscaping & surface restoration 10 ea. $200.00 $2,000.00 Subtotal $64,402.00 Engineering and Construction Contingencies (20%) $12,900.00 Estimated Total for Improvements $77,300.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 5175 South 1200 West Intersection - New Piping Project Location: 400 feet East of manhole C92 Project Number: Project #28 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Traffic control and flagging 5 days $150.00 $750.00 3. Removal of existing sanitary sewer pipeline 25 lf. $3.50 $87.50 4. Remove existing roadway surface materials 25 lf. $7.50 $187.50 5. Construct 8" pvc sanitary sewer pipeline 25 lf. $35.75 $893.75 6. Construct 4' diameter manhole 2 ea. $2,750.00 $5,500.00 7. Re-connect service laterals 3 ea. $600.00 $1,800.00 8. Connect to existing system 3 ea. $2,800.00 $8,400.00 9. Furnish trench backfill materials 40 ton $4.50 $180.00 10. Furnish bedding materials 30 ton $10.50 $315.00 11. Roadway patching 28 sy. $23.50 $658.00 12. Landscaping & surface restoration 3 ea. $200.00 $600.00 Subtotal $20,872.00 Engineering and Construction Contingencies (20%) $4,200.00 Estimated Total for Improvements $25,100.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 950 West to 739 West on 4300 South Street - Pipe Liner Project Location: Manhole A47 to manhole A46 Project Number: Project #29 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 284 lf. $65.00 $18,460.00 3. Cut pipeline liner for lateral connection 6 ea. $300.00 $1,800.00 4. Traffic control and flagging 5 days $150.00 $750.00 Subtotal $22,510.00 Engineering and Construction Contingencies (20%) $4,500.00 Estimated Total for Improvements $27,000.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 739 West to 783 West on 4300 South Street - Pipe Liner Project Location: Manhole A46 to manhole A45 Project Number: Project #30 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,600.00 $1,600.00 2. Install 8" sanitary sewer pipeline liner 356 lf. $65.00 $23,140.00 3. Cut pipeline liner for lateral connection 8 ea. $300.00 $2,400.00 4. Traffic control and flagging 6 days $150.00 $900.00 Subtotal $28,040.00 Engineering and Construction Contingencies (20%) $5,600.00 Estimated Total for Improvements $33,600.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 827 West 4300 South Street - Spot Repair Project Location: 275 feet East of manhole A45 Project Number: Project #31 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 1 ls. $3,000.00 $3,000.00 3. Traffic control and flagging 2 days $150.00 $300.00 Subtotal $4,800.00 Engineering and Construction Contingencies (20%) $1,000.00 Estimated Total for Improvements $5,800.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 739 West 4300 South Street - New Piping Project Location: 186 feet East of manhole B83 Project Number: Project #32 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Traffic control and flagging 4 days $150.00 $600.00 3. Removal of existing sanitary sewer pipeline 98 lf. $3.50 $343.00 4. Remove existing roadway surface materials 98 lf. $7.50 $735.00 5. Construct 10" pvc sanitary sewer pipeline 98 lf. $37.25 $3,650.50 6. Construct 4' diameter manhole 1 ea. $2,750.00 $2,750.00 7. Re-connect service laterals 5 ea. $600.00 $3,000.00 8. Connect to existing system 2 ea. $2,800.00 $5,600.00 9. Furnish trench backfill materials 1,400 ton $4.50 $6,300.00 10. Furnish bedding materials 45 ton $10.50 $472.50 11. Roadway patching 70 sy. $23.50 $1,645.00 12. Landscaping & surface restoration 5 ea. $200.00 $1,000.00 Subtotal $27,596.00 Engineering and Construction Contingencies (20%) $5,500.00 Estimated Total for Improvements $33,100.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 4399 South to 4375 South on 950 West Street - Pipe Liner Project Location: Manhole A162 to manhole A164 Project Number: Project #33 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 318 ft. $65.00 $20,670.00 3. Cut pipeline liner for lateral connection 7 ea. $250.00 $1,750.00 4. Traffic control and flagging 5 days $150.00 $750.00 Subtotal $24,670.00 Engineering and Construction Contingencies (20%) $4,900.00 Estimated Total for Improvements $29,600.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 4375 South to 4377 South on 950 West Street - Pipe Liner Project Location: Manhole A164 to manhole A163 Project Number: Project #34 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 237 ft. $65.00 $15,405.00 3. Cut pipeline liner for lateral connection 6 ea. $250.00 $1,500.00 4. Traffic control and flagging 4 days $150.00 $600.00 Subtotal $19,005.00 Engineering and Construction Contingencies (20%) $3,800.00 Estimated Total for Improvements $22,800.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 4375 South to 4350 South on 950 West Street - Pipe Liner Project Location: Manhole A164 to manhole A50 Project Number: Project #35 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 337 ft. $65.00 $21,905.00 3. Cut pipeline liner for lateral connection 7 ea. $250.00 $1,750.00 4. Traffic control and flagging 6 days $150.00 $900.00 Subtotal $26,055.00 Engineering and Construction Contingencies (20%) $5,200.00 Estimated Total for Improvements $31,300.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 4362 South to 4382 South on 900 West Street - Pipe Liner Project Location: Manhole A54 to manhole A55 Project Number: Project #36 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 300 ft. $65.00 $19,500.00 3. Cut pipeline liner for lateral connection 8 ea. $250.00 $2,000.00 4. Traffic control and flagging 5 days $150.00 $750.00 Subtotal $23,750.00 Engineering and Construction Contingencies (20%) $4,800.00 Estimated Total for Improvements $28,600.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 4382 South 900 West Street - Spot Repair Project Location: 26 feet to 28 feet South of manhole A55 Project Number: Project #37 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 1 ls. $3,000.00 $3,000.00 3. Traffic control and flagging 2 days $150.00 $300.00 Subtotal $4,800.00 Engineering and Construction Contingencies (20%) $1,000.00 Estimated Total for Improvements $5,800.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 4396 South 800 West Street - Spot Liner Project Location: 3 feet to 11 feet South and 81 feet North of manhole B97 Project Number: Project #38 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 2 ea. $3,000.00 $6,000.00 3. Traffic control and flagging 3 days $150.00 $450.00 Subtotal $7,950.00 Engineering and Construction Contingencies (20%) $1,600.00 Estimated Total for Improvements $9,600.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 1190 West 5175 South Street - Spot Repair Project Location: 125 feet to 126 feet East of manhole C92 Project Number: Project #39 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 1 ls. $3,000.00 $3,000.00 3. Traffic control and flagging 2 days $150.00 $300.00 Subtotal $4,800.00 Engineering and Construction Contingencies (20%) $1,000.00 Estimated Total for Improvements $5,800.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 5175 South 1200 West Street - Spot Repair Project Location: 22 feet West of manhole C92 Project Number: Project #40 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 1 ls. $3,000.00 $3,000.00 3. Traffic control and flagging 2 days $150.00 $300.00 Subtotal $4,800.00 Engineering and Construction Contingencies (20%) $1,000.00 Estimated Total for Improvements $5,800.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 1571 West Ritter Drive - Spot Repair Project Location: 287 feet East of manhole C77 Project Number: Project #41 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 1 ls. $3,000.00 $3,000.00 3. Traffic control and flagging 2 days $150.00 $300.00 Subtotal $4,800.00 Engineering and Construction Contingencies (20%) $1,000.00 Estimated Total for Improvements $5,800.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: 5250 South 1250 West Street - Spot Repair Project Location: 12 feet North of manhole C82 Project Number: Project #42 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 8" sanitary sewer pipeline liner 1 ls. $3,000.00 $3,000.00 3. Cut pipeline liner for lateral connection 1 ea. $250.00 $250.00 4. Traffic control and flagging 2 days $150.00 $300.00 Subtotal $5,050.00 Engineering and Construction Contingencies (20%) $1,000.00 Estimated Total for Improvements $6,100.00

RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: South Weber Drive - Spot Repair Project Location: 160 feet North of manhole C116 (in field of golf course) Project Number: Project #43 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $1,500.00 $1,500.00 2. Install 10" sanitary sewer pipeline liner 1 ls. $3,500.00 $3,500.00 3. Traffic control and flagging 2 days $150.00 $300.00 Subtotal $5,300.00 Engineering and Construction Contingencies (20%) $1,100.00 Estimated Total for Improvements $6,400.00