UNIT PRICE LIST January 2009
|
|
|
- Bruno Hines
- 10 years ago
- Views:
Transcription
1 UNIT PRICE LIST January
2 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only for bonding and permitting purposes. This price list does not reflect the actual project costs. The Unit Price List contains eleven separate sections, which include Private and/or Public items for Earthwork, Drainage, Surface Improvements, Traffic, Water/Wastewater Utilities, Landscaping, and Miscellaneous items. All bond estimates for land development and public improvement must follow the format and requirements of the current City of San Diego Land Development and Public Improvement Preparation Manual. Please note that a 10% contingency factor must be applied for all public improvements and private encroachments within the public R.O.W. The unit price information contained in this publication has been complied from various sources. These sources include private consultants and developers, other city sections and departments, other public agencies and previous City project bid items. If a project proposes improvements that are not included in this Unit Price List, it is the engineer s responsibility to assess the value of the improvements (including labor and mobilization and restoration as applicable) and include the unit cost with respective quantities in the cost estimate. Provisions have been made for adding items to the City s Construction Cost Estimate template within rows labeled ADDITIONAL ITEM. This Unit Price Listing will be updated periodically as needed. If you have any suggestions or comments please contact the Land Development Review Division, plan check section. For those with internet access, a Microsoft Office Excel 2003 spreadsheet has been provided for the industry s use on the City of San Diego website ( Development Services/Guidelines and Template links. This spreadsheet has been prepared as part of a continuing effort to enhance the timely completion of the review and permit process for grading and public improvements within the City of San Diego. The intent is to provide a tool to foster consistency, minimize the duplication of effort by the industry and standardize the policy for preparation and review of cost estimates to be used in the determination of bonding costs and permitting and inspection fees for grading and public improvement permits. 2
3 UNIT PRICE LIST-2009 SECTION 1-EARTHWORK GRADING... 4 BEST MANAGEMENT PRACTICES (BMP"S)... 4 SECTION 2- DRAINAGE RCP CULVERTS... 4 RCP CULVERTS (WITH WATER TIGHT JOINTS)... 4 MISCELLANEOUS DRAINAGE... 5 SECTION 3- SURFACE IMPROVEMENTS CURB AND GUTTER... 6 PAVEMENT... 6 CURB RAMPS & SIDEWALK... 6 MISCELLANEOUS SURFACE IMPROVEMENTS... 7 SECTION 4- TRAFFIC TRAFFIC CONTROLS... 7 SECTION 5- WATER/WASTEWATER UTILITIES WASTEWATER... 8 WATER... 9 WATER VALVES PVC WATER MAINS (ALL MATERIALS)...10 WATER SERVICE...10 SECTION 6-MISCELLANEOUS IMPROVEMENTS MISCELLANEOUS ITEMS SECTION 7-LANDSCAPE & IRRIGATION LANDSCAPE PLANTING LANDSCAPE IRRIGATION
4 SECTION 1-EARTHWORK GRADING CLEAR AND GRUB CONTAMINATED SOIL REMOVAL AND DISPOSAL EXCAVATE AND EXPORT EXCAVATE AND FILL IMPORT AND FILL SUB DRAIN (4" DIAMETER) SUB DRAIN (6" DIAMETER) SUB DRAIN (8" DIAMETER) SUB DRAIN HEADWALL SHORING (SUBSURFACE STRUCTURE) 0-1,000 1,001-20,000 20, , , ,000 >350, ,000 1,001-20,000 >20, ,000 1,001-20,000 >20,000 CY $ SF $0.72 CY $ CY GRADED CY $44.28 CY $35.42 CY $26.57 CY $17.71 CY $11.51 CY GRADED CY $32.20 CY $18.52 CY $10.47 CY GRADED CY $45.08 CY $35.42 LF $19.32 LF $45.08 LF $48.30 LF $56.35 EA $4, SF $40.25 BEST MANAGEMENT PRACTICES (BMP"S) GRAVEL BAG JUTE MAT STRAW MAT STRAW BALES SILT FENCE FIBER ROLLS FIBER MATT HYDRO-SEED HYDRAULIC MULCH STABILIZED CONSTRUCTION ENTRANCE CONCRETE WASHOUT INLET PROTECTION (SEDIMENT) INLET MARKER SECTION 2- DRAINAGE RCP CULVERTS EA $1.82 SF $0.66 SF $0.46 EA $8.25 LF $2.64 LF $3.71 SF $0.66 SF $0.33 SF $0.50 SF $8.66 EA $ EA $ EA $ " RCP STORM DRAIN LF $
5 24" RCP STORM DRAIN 30" RCP STORM DRAIN 36" RCP STORM DRAIN 42" RCP STORM DRAIN 48" RCP STORM DRAIN 54" RCP STORM DRAIN 60" RCP STORM DRAIN 72" RCP STORM DRAIN LF $ LF $ LF $ LF $ LF $ LF $ LF $ LF $ RCP CULVERTS (WITH WATER TIGHT JOINTS) 18" RCP STORM DRAIN (WATER TIGHT JOINTS) 24" RCP STORM DRAIN (WATER TIGHT JOINTS) 30" RCP STORM DRAIN (WATER TIGHT JOINTS) 36" RCP STORM DRAIN (WATER TIGHT JOINTS) 42" RCP STORM DRAIN (WATER TIGHT JOINTS) 48" RCP STORM DRAIN (WATER TIGHT JOINTS) 54" RCP STORM DRAIN (WATER TIGHT JOINTS) 60" RCP STORM DRAIN (WATER TIGHT JOINTS) 72" RCP STORM DRAIN (WATER TIGHT JOINTS) LF $ LF $ LF $ LF $ LF $ LF $ LF $ LF $ LF $ MISCELLANEOUS DRAINAGE AC SPILLWAY (D-22) PCC BOX CULVERT CATCH BASIN, PER D-7 ( TYPE F ) 'CATCH BASIN, PER D-8 ( TYPE G ) 'CLEAN OUT, PER D-9 ( TYPE A ) 'CLEAN OUT, PER D-10 (TYPE B ) CATCH BASIN, PER D-29 ( TYPE I ) CONCRETE (STRUCTURAL) CONCRETE ENERGY DISSIPATER, PER D-41 CONCRETE LUG, PER D-63 CONCRETE PIPE COLLAR, PER D-62 CURB INLET, PER D-1 ( TYPE A ) CURB INLET, PER D-2 ( TYPE B ) CURB INLET, PER D-3 ( TYPE C ) CURB INLET, PER D-45 ( TYPE J ) CURB OUTLET, PER D-25 ( TYPE A ) CURB OUTLET-SIDEWALK UNDER DRAIN, PER D-27 EA CURTAIN WALL, PER D-38 CUTOFF WALL, PER D-72 PCC DRAINAGE CHANNEL, PER D-70 & 71 DRAINAGE DITCH, PER D-75 HEC-2 STUDY & FEMA REVISION STRAIGHT HEAD WALL PER D-30&31 (TYPE A) STRAIGHT HEAD WALL PER D-32&33 (TYPE A-GRAVITY) EA WING/U TYPE HEAD WALL PER D-34/35A&B (18" TO 36"/36" TO 60") WING/U TYPE HEAD WALL PER D-35A&B (60" TO 84") EA EA $ CY $1, EA $5, EA $6, EA $6, EA $7, EA $6, CY $ EA $13, EA $1, EA $4, EA $6, EA $6, EA $7, EA $5, EA $4, EA $ EA $ EA $ LF $1, LF $24.00 LS $48, EA $4, EA $4, EA $6, EA $7,
6 L TYPE HEADWALL PER D-36 & 37 INLET APRON, PER D-39 CONCRETE ENERGY DISSIPATER, PER D-41 RIP RAP, PER D-40 ( 2 TON) RIP RAP, PER D-40 ( TON ) RIP RAP, PER D-40 ( NO. 2 BACKING ) CONNECT TO EXISTING S.D. EA $6, EA $2, EA $13, EA $4, EA $3, EA $2, EA $ SECTION 3- SURFACE IMPROVEMENTS CURB AND GUTTER CURB & GUTTER REMOVAL AND DISPOSAL MEDIAN CURB & GUTTER, PER G-6 ( TYPE B-1 ) MEDIAN CURB & GUTTER, PER G-6 ( TYPE B-2 ) 6" CURB & GUTTER PER G-2 (TYPE G) 8" CURB & GUTTER PER G-2 (TYPE G) 6" CURB & GUTTER, PER G-2 ( TYPE H ) 8" CURB & GUTTER, PER G-2 ( TYPE H ) ROLLED CURB, PER G-4 4" AC BERM, PER G-5 6" AC BERM, PER G-5 8" AC BERM, PER G-5 LF $3.30 LF $13.20 LF $22.00 LF $22.00 LF $26.40 LF $27.50 LF $33.00 LF $28.60 LF $8.80 LF $10.45 LF $12.10 PAVEMENT PAVEMENT DESIGN, PER SDG-113 (SCHEDULE J) AC PAVING (1" SURFACE) AC PAVING (2" SURFACE) AC PAVING (3" SURFACE) AC PAVING (4" SURFACE) AC PAVING (5" SURFACE) CTB PAVING (4" SURFACE) CTB PAVING (6" SURFACE) CTB PAVING (8" SURFACE) CTB PAVING (12" SURFACE) CTB PAVING (14" SURFACE) CTB PAVING (16" SURFACE) CTB PAVING (18+" SURFACE) PCC PAVING (5" THICK) PCC PAVING (5.5" THICK) PCC PAVING (6" THICK) PCC PAVING (8" THICK) PCC PAVING (9" THICK) PAVING SUBGRADE PREPARATION AC PAVEMENT REMOVAL SF $8.40 SF $1.26 SF $1.68 SF $2.18 SF $2.94 SF $3.61 SF $1.68 SF $1.76 SF $2.10 SF $2.69 SF $2.77 SF $2.94 SF $3.11 SF $8.40 SF $9.24 SF $10.08 SF $10.92 SF $12.60 SF $0.84 SF $3.36 6
7 CURB RAMPS & SIDEWALK CURB RAMPS, PER SDG132 (TYPE A & B, NEW CONSTRUCTION) EA $1, CURB RAMPS, PER SDG (TYPE C1, C2 & A-EXIST SIDEWALK) EA $2, CURB RAMPS, ALLEY, PER SDG-136 (TYPE D) EA $2, SIDEWALK REMOVAL AND DISPOSAL SF $2.01 4" PCC SIDEWALK, PER G-7 SF GRADED SF $8.00 >5000 SF $6.40 RELOCATE CONTRACTOS/HISTORIC STAMP EA $300 MISCELLANEOUS SURFACE IMPROVEMENTS CUT-OFF END OF PAVEMENT, PER G-22 & 23 EA $1, CROSS-GUTTER, PER G-12 & 13 SF $13.20 DRIVEWAY, PER G-14A,B,C, & SDG-114 SF $11.55 MEDIAN, PER SDG-112 ( STAMPED CONCRETE ) SF $8.25 MEDIAN, PER SDG-112 ( DECORATIVE CONCRETE ) SF $10.73 MEDIAN, PER SDG-112 ( PAVERS ) SF $17.33 TRENCH RESURFACING, PER SDG-107&108 LF $41.25 NARROW TRENCHING, PER G LF $ " AC BERM, PER G-5 LF $ " AC BERM, PER G-5 LF $ " AC BERM, PER G-5 LF $15.43 AC OVERLAY (1"-2") SF $0.74 AC SLURRY SEAL SF $0.99 ALLEY APRON, PER G-17 SF $11.55 ADJUST TO GRADE EA $1, AGGREGATE BASE (AB) SF $1.65 MEDIAN PCC, PER SDG-112 (DECORATIVE) SF $18.15 MEDIAN PCC, PER SDG-112 (STAMPED CONCRETE) SF $13.20 MEDIAN PCC, PER SDG-112 (INTERLOCKING PAVERS) SF $19.80 GRIND & OVERLAY SF $4.13 COLD MILLING AC PAVEMENT (SDG 139) LF $2.38 PAVEMENT FABRIC FOR ASPHALT SF $2.60 AC PATCHING TON $ CRACK SEALING LF $2.50 SECTION 4- TRAFFIC TRAFFIC CONTROLS DETECTOR LOOPS EA $ PULL BOX, PER SDI-105 (ALL TYPES) EA $ PULL BOX RELOCATION EA $ REMOVE STRIPING LF $ 3.63 STREET LIGHT, PER SDE-101, E-2 L.P. SODIUM EA $ 7, STREET LIGHT, PER SDE-101, E-2 H.P. SODIUM EA $ 7, STREET NAME SIGN, PER SDM-102 EA $ STREET STRIPING ( More than 4000 L.F) LF $ 0.61 STREET STRIPING LF $ 0.79 TRAFFIC SIGNAL (2X2 INTERSECTION) LS $ 127,050 7
8 TRAFFIC SIGNAL (4X2 INTERSECTION) LS $ 139,150 TRAFFIC SIGNAL (4X4 INTERSECTION) LS $ 145,200 TRAFFIC SIGNAL (4X6 INTERSECTION) LS $ 157,300 TRAFFIC SIGNAL (6X6 INTERSECTION) LS $ 169,400 TRAFFIC SIGNAL (8X6 INTERSECTION) LS $ 278,300 TRAFFIC SIGNAL INTERCONNECTION LF $ BIKE LANE SIGNING AND STRIPING MI $ 2, FLASHING ARROW BOARD/ELECTRIC MESSAGE SIGN LS $ 2, SECTION 5- WATER/WASTEWATER UTILITIES WASTEWATER CONCRETE ANCHOR, PER S-9 LF $ 1, CONCRETE CRADLE, PER S-6 (8" SWR MAIN) LF $ CONCRETE CRADLE, PER S-6 (10" SWR MAIN) LF $ CONCRETE CRADLE, PER S-6 (12" SWR MAIN) LF $ CONCRETE CRADLE, PER S-6 (15" SWR MAIN) LF $ CONCRETE CRADLE, PER S-6 (18" SWR MAIN) LF $ CONCRETE CRADLE, PER S-6 (21" SWR MAIN) LF $ CONCRETE CRADLE, PER S-6 (24" SWR MAIN) LF $ CONCRETE CRADLE, PER S-6 (27" SWR MAIN) LF $ CONCRETE CRADLE, PER S-6 (30" SWR MAIN) LF $ CONCRETE CRADLE, PER S-6 (36" SWR MAIN) LF $ CONCRETE CRADLE, PER S-6 (42" SWR MAIN) LF $ CONCRETE CRADLE, PER S-6 (48" SWR MAIN) LF $ CONCRETE ENCASEMENT, PER S-7 (8" SWR MAIN) LF $ CONCRETE ENCASEMENT, PER S-7 (10" SWR MAIN) LF $ CONCRETE ENCASEMENT, PER S-7 (12" SWR MAIN) LF $ CONCRETE ENCASEMENT, PER S-7 (15" SWR MAIN) LF $ CONCRETE ENCASEMENT, PER S-7 (18" SWR MAIN) LF $ CONCRETE ENCASEMENT, PER S-7 (21" SWR MAIN) LF $ CONCRETE ENCASEMENT, PER S-7 (24" SWR MAIN) LF $ CONCRETE ENCASEMENT, PER S-7 (27" SWR MAIN) LF $ CONCRETE ENCASEMENT, PER S-7 (30" SWR MAIN) LF $ CONCRETE ENCASEMENT, PER S-7 (36" SWR MAIN) LF $ CONCRETE ENCASEMENT, PER S-7 (42" SWR MAIN) LF $ CONCRETE ENCASEMENT, PER S-7 (48" SWR MAIN) LF $ CUTOFF WALL, PER S-10 (TYPE B) EA $ 1, SEWER MANHOLE, PER S-2 (3'x5') EA $ 4, SEWER MANHOLE, PER S-2 (3'x5' W/LOCKING COVER) EA $ 5, SEWER MANHOLE, PER S-2 (3'x5' PVC-LINER) EA $ 7, SEWER MANHOLE, PER S-2 (3'x5' W/PVC-LINER & LOCKING COVER) EA $ 8, SEWER MANHOLE, PER S-17 (3'x4') EA $ 4, SEWER MANHOLE, PER S-17 (3'x4' W/LOCKING COVER) EA $ 6, SEWER MANHOLE, PER S-17 (3'x4' PVC-LINER) EA $ 5, SEWER MANHOLE, PER S-17 (3'x4' W/PVC-LINER & LOCKING COVER) EA $ 7, SEWER MANHOLE LOCKING COVER, PER M-4 EA $ 1, " PRESSURE PVC SEWER LF $ " PRESSURE PVC SEWER LF $ SEWER ACCESS ROAD (4" DECOMPOSED GRANITE) SF $
9 SEWER ACCESS ROAD, PER SDG-113 (AC ) SF $ SEWER ACCESS ROAD, PER SDG-113 (CONCRETE ) SF $ STREET SEWER LATERAL, PER S-13 (4", 40' LONG ) EA $ 1, STREET SEWER LATERAL, PER S-13 (6" - 40' LONG) EA $ 3, STREET SEWER LATERAL, PER S-13 (8" - 40' LONG) EA $ 4, ALLEY SEWER LATERAL, PER S-13 (4" - 40' LONG) EA $ 1, ALLEY SEWER LATERAL, PER S-13 (6" - 40' LONG) EA $ 2, " PVC SEWER MAIN, PER S-4 LF $ " PVC SEWER MAIN, PER S-4 LF $ " PVC SEWER MAIN, PER S-4 LF $ " PVC SEWER MAIN, PER S-4 LF $ " PVC SEWER MAIN, PER S-4 LF $ " PVC SEWER MAIN, PER S-4 LF $ " PVC SEWER MAIN, PER S-4 LF $ " PVC SEWER MAIN, PER S-4 LF $ " PVC SEWER MAIN, PER S-4 LF $ " PVC SEWER MAIN, PER S-4 LF $ " PVC SEWER MAIN, PER S-4 LF $ " ESVC SEWER MAIN, PER S-4 LF $ " ESVC SEWER MAIN, PER S-4 LF $ " ESVC SEWER MAIN, PER S-4 LF $ " ESVC SEWER MAIN, PER S-4 LF $ " ESVC SEWER MAIN, PER S-4 LF $ " ESVC SEWER MAIN, PER S-4 LF $ " ESVC SEWER MAIN, PER S-4 LF $ " ESVC SEWER MAIN, PER S-4 LF $ " ESVC SEWER MAIN, PER S-4 LF $ " ESVC SEWER MAIN, PER S-4 LF $ " ESVC SEWER MAIN, PER S-4 LF $ " STEEL CASING LF $ " STEEL CASING LF $ " STEEL CASING LF $ " STEEL CASING LF $ " STEEL CASING LF $ " STEEL CASING LF $ " STEEL CASING LF $ " STEEL CASING LF $ " STEEL CASING LF $ " STEEL CASING LF $ " STEEL CASING LF $ " STEEL CASING LF $ SEWER PUMP STATION EA $ 335,000 ADJUST MANHOLE FRAME & COVER TO GRADE EA $450 6" SEWER MAIN CLEANOUT EA $633 CONNECT TO EXISTING MANHOLE AND RECHANNEL IF NEEDED EA $1,883 ABANDON EXISTING MANHOLE (OUTSIDE TRENCH) EA $1,616 9
10 WATER AIR & VACUUM VALVE, PER W-4 (1") EA $ 2, AIR & VACUUM VALVE, PER W-4 (2") EA $ 3, BLOW-OFF ASSEMBLY, PER W-6 (2" TYPE A) EA $ 1, BLOW-OFF ASSEMBLY, PER SDW-106 (3" TYPE A) EA $ 2, BLOW-OFF ASSEMBLY PER W-7 (2" TYPE B, C & D) EA $2, RELOCATE FIRE HYDRANT EA $3, BACKFLOW PREVENTION ASSEMBLY (W/ENCLOSURE) EA $2, FIRE HYDRANT ASSY PER W-10 ( 2-WAY) EA $5, FIRE HYDRANT ASSY PER W-10 ( 3-WAY) EA $5, MULTIPLE SERVICE PER W-23 EA $ THRUST BLOCK, PER W-17 SF $ WATER METER BOX EA $406 THRUST ANCHOR EA $447 DUAL ABOVE GROUND METER & B.F PREVENTER (SDW119) EA $5,000 ADJUST VALVE COVER TO GRADE EA $300 4" FIRE SERVICE EA $800 WATER SERVICE CONNECTION EA $1,000 WATER VALVES 4" GATE VALVE EA $ " GATE VALVE EA $1, " GATE VALVE EA $1, " GATE VALVE EA $2, " GATE VALVE EA $3, " GATE VALVE EA $4, " GATE VALVE EA $5, " PRESSURE REDUCER W/BOX EA $9, PVC WATER MAINS (ALL MATERIALS) 4" PVC WATER MAIN PER W-21 LF $ " PVC WATER MAIN PER W-21 LF $ " PVC WATER MAIN PER W-21 LF $ " PVC WATER MAIN PER W-21 LF $ " PVC WATER MAIN PER W-21 LF $ " PVC WATER MAIN PER W-21 LF $ " PVC WATER MAIN PER W-21 LF $ WATER SERVICE WTR SERV. PER W-1 (1" W/1"X 0.75" METER) EA $2, WTR SERV. PER W-1 (1" W/1"X 1" METER) EA $ 2, WTR SERV. PER W-2 (2" W/1.5" METER) EA $ 2, WTR SERV. PER W-2 ( 2" W/2" METER) EA $2, WTR SERV. PER W-2 ( 2-2" W/2-2" METER, MANIFOLD) EA $4, WTR SERV. PER W-1 (1" W/O METER) EA $2, WTR SERV. PER W-2 (1" W/O METER) EA $2,
11 WTR SERV. PER W-2 (2-2" W/O METER) RELOCATE WATER SERVICE (k093345a) WATER SERVICE ABANDONMENT EA $3, EA $2,400 EA $500 SECTION 6-MISCELLANEOUS IMPROVEMENTS MISCELLANEOUS ITEMS VEHICULAR BRIDGE PEDESTRIAN BRIDGE CRASH CUSHION (G.R.E.A.T.) EXCAVATION (FOR STRUCTURES) FENCE, PER M-6 (4' HIGH CHAIN LINK) FENCE, PER M-6 (5' HIGH CHAIN LINK) FENCE, PER M-6 (6' HIGH CHAIN LINK) GUARD RAIL METAL BEAM, PER M GUARD RAIL POST, PER M-9 GUARD BARRICADE, PER M-9 PCC MEDIAN BARRIER (TYPE 50) SAW CUT EXISTING (AC/PCC) TRENCH SHORING (5'-10' DEEP) TRENCH SHORING (11'-15' DEEP) TRENCH SHORING (16'-20' DEEP) SURVEY MONUMENT, PER M-10 MASONRY RETAINING WALL CAST IN PLACE RETAINING WALL GRAVITY RETAINING WALL CRIB-BLOCK RETAINING WALL PEDESTRIAN BARRICADE, PER SDE 103 CONSTRUCTION FENCING SF $ SF $ EA $ 47,104 CY $ LF $ LF $ LF $ LF $ EA $ EA $ EA $ LF $ 5.12 LF $ LF $ LF $ EA $ 1, SF $ CY $ SF $ SF $ EA $ LF $4.00 SECTION 7-LANDSCAPE & IRRIGATION LANDSCAPE PLANTING SHRUBS (1 GALLON) SHRUBS (5 GALLON) SLOPE PLANTING (GROUND COVER) SLOPE PLANTING (GROUND COVER + TREES) SLOPE PLANTING (HYDRO-SEEDING) TREE (5 GALLON) TREE (15 GALLON) TREE (24" BOX) TREE (36" BOX) TREE (48" BOX) TREE GRATE (W/2FRAME) TREE MAINTENANCE (TREES/YEAR) TREE RELOCATION TREE REMOVAL AND DISPOSAL EA $6.00 EA $20.00 SF $ 0.48 SF $ 0.79 SF $ 0.20 EA $ EA $ EA $ EA $ EA $ EA $ TREE/YR $ EA $1, EA $
12 LANDSCAPE IRRIGATION IRRIGATION BACKFLOW PREVENTION ASSEMBLY (W/ENCLOSURE) EA $1, SLOPE IRRIGATION SF $
Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets
Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection
CD i -STREETS- Detail #
-STREETS- Detail # 3000 Vertical Curb, Gutter and Sidewalk 3010 Low-Profile Curb, Gutter and Sidewalk 3020 Rolled Curb, Gutter and Sidewalk 3030 Separated Sidewalk, Curb & Gutter 3040 Sidewalk Staged Construction
A. Structures Quantity Item Price Cost @ $3,500 EA
PRINCE WILLIAM COUNTY Department of Development Services Land Development Division UNIT PRICE LIST (Performance Bonds, Landscaping Escrows, and Siltation & Erosion Control Escrows) Revised: November 17,
CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)
CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW) January, 2013 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS DRAINAGE STRUCTURES DRN-01 Corrugated metal pipe drop inlet DNR-02 Storm Drain
Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate
Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5
Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts
SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required
PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
FY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
FDOT Specifications List
FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...
Unit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
Special Specification 7021 Water Main and Sewer Line Replacements
Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,
SECTION 02221 SELECTIVE DEMOLITION
SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on
NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW
NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in
WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)
BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
Riverside County Transportation Department Summary of Bids
Bids Open: 2 pm Date: Wednesday, March 4, 2015 BASE BID SCHEDULE 1 - Rudell Road Reconstruction Project NO. CODE CONTRACT PROJECT No. B3-0470 and C4-0069 COUNTY'S ESTIMATE 1 All American Asphalt Corona,
MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA
MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA Department of Planning and Development 107 North Kent Street, Suite 202 Winchester, Virginia 22601 Phone: (540) 665-5651 Fax: (540) 665-6395
MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016
SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016 102.5 Bid Deposits The City of Madison bid deposit form is required for all bids unless a Biennial Bid Bond is on file or check deposit is used.
CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03
CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT
FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES
NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and
TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African
TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African Regional Office 01 CHAPTER ONE Checklist Page 2 of 8
Figure 3 Pipe Cracking
The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D
SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS Appendix D RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Rumbi Grill -
CHAPTER 5. Storm Sewer
CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water
DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES
SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing
SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN
S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain
PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth
TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20
Description Quantity Cost Total Cost
APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE Description Quantity Cost Total Cost 1 CASCADE FALLS 1a Existing Cascade Falls Upgrades Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000
1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP
5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'
VDOT 2001 Road and Bridge Standards Section 100 - Drainage Items
VDOT 2001 Road and Bridge s Page Title EW-1 EW-1A 101.01 Endwall for Pipe Culverts 12" - 36" Circular and 23" X 14" - 53" X 34" Elliptical Pipes EW-1PC EW-1APC 101.02 Precast Endwall for Pipe Culverts
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
City of La Quinta Public Works Department - Storm Drain Plan Review Checklist
Tract or Parcel Project Name PCN Checked By Date City of La Quinta Public Works Department - Storm Drain Plan Review Checklist SUBMITTAL REQUIREMENTS Approved Tentative Tract Map Conditions of Approval
How To Build A Road In A Townhouse
FDOT DBE CERTIFICATION SPECIALTY/ SHEET WITH CAP SIZES Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway $ 22.41 Application of prime and tack coats, leveling surfaces and
Implementing a Work Order and. Asset Management System? Learning Objectives. What We Have. The City of Colleyville
A Small City s Story of Implementing a Work Order and Asset Management System American Public Works Association 2013 Congress August 28, 2013 Introductions Public Works Department City of Colleyville,
Local Road Assessment and Improvement Drainage Manual
Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University
in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works
Planned Public Works Projects in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Projects in Marina Del Rey Waterline Projects Phase II Phase III Roadway Projects Admiralty
New Road 11.0m Asphalt 23m ROW
New Road 11.0m Asphalt 23m ROW Granular A - 150 mm sq. m. $5.35 $69.53 Granular B - 300 mm sq. m. $7.35 $95.54 Concrete Curb and Gutter m. $44.67 $89.34 HL3 Asphalt - 40 mm sq. m. $7.66 $84.23 HL 4 or
City of Hilshire Village Pine Creek Ln Reconstruction
City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project
SECTION 4Aggegate Subbase
The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages
Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR
FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration
CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST
CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST NOTE: The following list shall only be used as a guide and shall not be used in lieu of the specifications found in the CITY OF ANN ARBOR PUBLIC
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
Let Us Give Utilities the Respect that they Deserve.
Water & Sewer Utilities Miscellaneous Design and Plan Preparation Guidelines Issued by: Ray Mowla, P.E. Jefferson Parish Department of Engineering, Utilities Section The purpose of issuing these miscellaneous
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
SECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK
13.01 SCOPE OF WORK Under this item, the Contractor will restore all lawns, trees, gardens, landscape plantings, sidewalks, ramps, trails, fences, commercial signs, water courses and sand, gravel, dirt,
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
SECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
Storm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water
Storm Drain Inlet Protection
Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
Storm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
Herbicide Application. Irrigation System (Only) Sanitary System Testing & Inspections
NAICS Code Work Description Work Item 115310 - Support Activities for Forestry 221310 Water Supply and Irrigation Systems 221320 - Sewage Treatment Facilities 236118 Residential Remodelers 236220 Commercial
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
Exhibit A Scope of Work
Exhibit A Scope of Work The agreement for S.P. 3116-142 (T.H. 169-Cross Range Expressway) includes final design plans for a 1.55 mile length of a 2 lane to 4 lane expansion project located 0.66 miles SW
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:
Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section
CITY OF COLTON PUBLIC WORKS/ENGINEERING DEPARTMENT STORM DRAIN PLAN REVIEW CHECKLIST (PROVIDE SEPARATE ON-SITE & OFF-SITE STORM DRAIN PLAN SETS)
CITY OF COLTON PUBLIC WORKS/ENGINEERING DEPARTMENT STORM DRAIN PLAN REVIEW LIST (PROVIDE SEPARATE ON-SITE & OFF-SITE STORM DRAIN PLAN SETS) PROJECT NAME: TRACT, PARCEL MAP OR PROJECT ID NO. PLAN ED BY:
Developer s/consultants Field Services Guidelines
Developer s/consultants Field Services Guidelines 2007 Engineering and Works Department DEVELOPER S/CONSULTANT S FIELD SERVICES GUIDELINES Fourth Electronic Edition February 2007 STATEMENT OF COMPLETION
SECTION 5 DRAFTING STANDARDS
SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.
Chapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
Item No. 432S Portland Cement Concrete Sidewalks. 432S.1 Description
Item No. 432S Portland Cement Concrete Sidewalks 432S.1 This item shall govern the construction of Portland cement concrete sidewalks (Standard Detail No. 432S-1), as herein specified, on an approved subgrade
OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY
Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic
2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS
2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS Water system improvements proposed for inclusion into Western s service area shall be designed in accordance with all appropriate AWWA standards, include
Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, 2012. Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?
Pipe Bursting Case Study at Zeeland, MI Collections Seminar September 6, 2012 By: Brian Hannon, PE and John Racek, PE Presentation Agenda What is Pipe Bursting? History of Pipe Bursting Types of Pipe Bursting
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
CHAPTER 8 CIVIL DESIGN
CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical
VILLAS OF TRADITIONS AT GREY OAKS
Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard
SECTION 7- STORM SEWER
SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...
LS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
SECTION III DRAINAGE
SECTION III DRAINAGE TOC-III.1 of 5 TABLE OF CONTENTS DRAINAGE FACILITIES No. Title D-1 Standard Underdrains D-2 Longitudinal Underdrain for Flexible Paving D-3 Spring Control Method & Detail D-4 Trench
UNIT PRICE LIST (09/30/2012) DIVISION I -EARTHWORK
LIST (09/30/2012) DIVISION I -EARTHWORK 100.1 MOBILIZATION L.S. - 11% 100.2 INSURANCE & BOND L.S. - 3% 101.1 PREPARING RIGHT OF WAY L.S. - 4% 102.1 OBLITERATING ABANDONED STREET ( < 25,000 S.Y.) S.Y. 6
CITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING 2015-16 STANDARD FEE LIST (updated 10/3/2015)
SURCHARGE [1] A surcharge of 7% or $1, whichever is greater will be added to the listed fee pursuant to Los Angeles Municipal Code (LAMC) Section 61.03; [2] A surcharge of 2% or $1, whichever is greater
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
Pervious Pavement SYSTEMS THINKING. THE NEW DESIGN PROBLEM and the Role of the Civil Engineer. LOW IMPACT DEVELOPMENT Introduction
Pervious Pavement Options and Design Guidelines (with LID example projects) SYSTEMS THINKING Need to think differently about the problem Whole System Design Site & Project Relationships Integrated Design
City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014
City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
Preventing Storm Water Pollution: What We Can Do
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Streets and Drainage Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
Section 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
Storm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
ADA POST INSPECTION CHECKLIST. Job No. Route County Location
ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks
CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON
Council Meeting Date: August 11, 2014 Agenda Item: 7(c) CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON AGENDA TITLE: Motion Authorizing the City Manager to Execute a Contract with Transmap Corporation
