1 Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for an upgrade using trenchless construction methods. The existing pipe is located under the paved street from 4 th Avenue to Pine Street. At manhole M22, the incoming upstream storm water flow will be diverted around this pipe section to be rehabilitated. A new parallel storm sewer will be constructed in a new alignment. The new parallel storm pipe would convey the incoming upstream runoff while the trenchless portion is being built. With the proposed reduced design flow capacity, the existing storm pipe from M22 to M12 can be rehabilitated with a smaller diameter pipe. The existing CMP storm pipes will be reduced to an inside diameter 24-inches. The 24-inch pipe will have the capacity to convey the storm flow from the adjacent nearby drainage area. Two trenchless repair options were evaluated: Traditional sliplining with a HDPE pipe and grout in the annular space Cured in place pipe liner with grout in the annular space Existing Pipe Condition The 1,930 feet of existing storm pipe has the following characteristics: There are 9 manholes total. Five of the manholes are constructed of CMP and four are precast concrete. There is 652 feet of perforated 40-inch CMP pipe in the section along 4 th Avenue. The 40-inch CMP is perforated with ¾ holes located at the bottom of the pipe at the 4:30 and 7:30 positions. There is 1,278 feet of 42-inch CMP pipe. Portions of the existing CMP have significant metal loss in the invert. Two sanitary sewer service pipes penetrate through the existing 42-inch CMP in the 330 foot segment between MH17 and MH15. One electric or phone utility cable penetrates the CMP pipe between MH15 and MH13. A number of localized defects were observed in the existing pipe including rough joints, holes, offset joints and debris piles. The invert grade is fairly uniform. Overall the pipe is fairly round and is not collapsing at this time. Two catch basin leader pipes connect directly into the storm pipe (no manhole at these connections). 1
2 The pipe is buried in the street, under 4 feet to 8 feet of cover. The storm pipe has a constant flow of approximately 8 to 10-inches. Sliplining with a HDPE Pipe In this trenchless repair alternative, a 28-inch SDR 17 HDPE butt-fused pipe with an inside diameter of approximately 24.7-inches would be inserted inside the existing 40 and 42-inch CMP storm drain pipe. The annular space between the two pipes would be filled with a cement grout. The five existing CMP manholes would be removed and replaced with modern concrete manholes. The end result would be a strong, long-lasting HDPE storm sewer. This pipe rehabilitation method includes: Pipe cleaning and pre-construction CCTV inspection Storm flow bypassing Modify three utility crossings Install HDPE slipliner from excavated access pits Connect two catch basin leaders Install cement grout in the annular space Surface restoration Pipe cleaning and pre-construction CCTV inspection Prior to starting rehabilitation work, the pipe will be thoroughly cleaned by the construction contractor and inspected with a camera. The purpose of the pre-construction CCTV is to identify any defects that may restrict the insertion process and confirm the pipe is ready for sliplining. Storm flow bypassing A new parallel storm pipe system will be constructed from M22 to M12 prior to performing the sliplining work. All runoff that is collected upstream of M22 will be diverted through the new parallel pipe. Therefore, the only storm flow that will need to be controlled during the sliplining work will be local runoff coming from the immediate surrounding streets and drainage areas. The design flow for this section of the storm system is 6.5 cubic feet per second or 3,000 gallons per minute (gpm). The storm flow must be bypassed around the work area to prevent washout of the cement grout in the annular space and reduce complications with water flowing through the pipe when the HDPE liner is being installed. The primary bypass pump shall have a minimum capacity of 3,000 gpm and a standby pump of the same capacity shall be available at the site. It is anticipated that two 8-inch dri-prime type pumps would be needed. Bypassing would be accomplished by installing pumps and a temporary bypass pipe between manholes that are upstream and downstream of the pipe being lined. Typically, the sewage is pumped from the next manhole upstream of 2
3 the segment being lined and discharged into the next manhole downstream of the segment being worked on. There are intermediate catch basins that contribute runoff flow to the storm sewer being rehabilitated. Water would be collected with individual pumps that would be placed at each one of these points as the work progresses through the site. Modify Three Utility Crossings Two sanitary sewer services and one electric/phone cable penetrate and cut through the existing CMP storm pipe in three separate places along the pipe alignment. The electrical/phone cable that is approximately 14 feet upstream of M13 will need to be protected from damage during the HDPE liner installation. This can be accomplished by having a man enter the storm pipe and temporarily raise the flexible conduit up and support it from the crown of the 42 inch CMP host pipe. An excavation will not be needed here. The existing electric/phone conduit can remain inside the CMP host pipe. After the liner is installed it will be encased and protected in the annular space grout. Excavations will be required to expose the two sanitary sewer pipes that cross through the 42 inch storm pipe between M17 and M15. From the video image, it is estimated that there is approximately 24 to 30 inches of space between the bottom of the CMP casings and the invert of the 42 inch CMP host pipe. Prior to inserting the HDPE liner, the small CMP casings will be removed and the sanitary sewer lines temporarily removed. After the HDPE liner is in place, the sanitary pipes can be reinstalled, without the CMP casings around them. The new grout in the annular space will support the sanitary sewer crossings. Therefore the CMP casing around the sewer services is not required. This will provide additional space below the existing sanitary pipes. Some slight downward deflection of the HDPE crown may be needed to make this fit. The overall impact to the new HDPE liner capacity will be minimal. Install HDPE slipliner Sliplining the existing storm pipe would involve insertion of a continuous butt-fused HDPE liner into the existing CMP host pipes. A 28-inch SDR 17 HDPE liner would provide an interior pipe diameter of approximately 24.7-inches. The 24.7-inch pipe would have adequate capacity to convey the future design flows. Sliplining with a continuous butt-fused pipe requires the excavation of insertion pits at strategic points along the storm pipe to provide access points for the pipe insertion. The insertion pits would be approximately 40 feet long and 15 feet wide at the ground surface. Four insertion pits would be required along the CMP host pipe alignment. Additional excavations would be required to reconnect the two directly connected storm pipes to the new HDPE liner. Insertion pits can be located where other excavations are already required for other work such as new manholes, utility crossings or reconnection of catch 3
4 basin leaders. The final location may be adjusted depending on the Contractor s method of construction. We anticipate that the five sliplining insertion pits would be constructed in conjunction with manhole removal and replacement work. It is assumed that the slipline pit excavations would be at the following manholes: M13 M15 M17 M19 M22 These five proposed pit locations also have adequate space behind them to layout the long butt-fused HDPE pipe during the initial insertion process. Two Direct Storm Pipe Connections Excavations will be needed to connect two existing catch basin leaders to the new HDPE liner. One is located downstream of M17 and the other is located downstream of M15. The tie-in between the new HDPE and the existing CMP leaders would be completed before the annular space grout is installed. Install cement grout in the annular space The entire annular space between the liner and host pipe will be filled with light-weight flowable cement grout. This will prevent ground water from entering the annular space, prevent the liner from floating inside the carrier pipe, prevent collapse of the liner due to hydrostatic pressure and will also provide a structurally sound storm pipe system when complete. A special light-weight flowable grout is required to prevent the HDPE liner from floating during installation and also to fill the entire space when injected from one end of the pipe run. This specialized grout is available locally and has been used successfully on other projects in Anchorage. Post-rehabilitation CCTV inspection A post-construction CCTV inspection by the contractor will be reviewed by the engineer to confirm that the work has been completed as required and that the pipe is clean and functioning properly. Surface Restoration Restoration of the surface will be required after the work is completed. Asphalt repair and landscaping repairs would be needed at the excavation areas as well as surrounding surface that is damaged during the work. 4
5 Estimated Cost Sliplining in conjunction with grouting of the annular space will provide a structural rehabilitation of the pipe. The overall construction cost to complete this rehabilitation method is estimated to be $1,020,000. A more detailed description of the cost is contained in the following table. PROJECT: Pine Street Storm Sewer Upgrade OPTION: HDPE Sliplining NO. DESCRIPTION QTY UNIT UNIT TOTAL COST 1 Type II & II-A classified fill and backfill 1400 Ton $20 $28,000 2 Bedding material 100 Ton $25 $2,500 3 Disposal of unusable or surplus material 800 CY $18 $14,400 4 Adjust Sanitary Sewer Crossing 2 EA $10,000 $20,000 5 Adjust Electric/Phone Utility Crossing 1 EA $3,000 $3,000 6 F&I Type I Storm Manhole 5 EA $7,000 $35,000 7 Furnish and Install 28" SDR 17 HDPE Slipliner 1930 LF $180 $347,400 8 Storm Sewer Flow Control 1 LS $35,000 $35,000 9 Connect Existing Catch Basin Leaders 2 EA $5,000 $10, Annular Space Grouting 380 CY $600 $228, Pre-rehabilitation Sewer Pipe Television Inspection 1930 LF $7 $13, Post-rehabilitation Sewer Pipe Television Inspection 1930 LF $4 $7, Remove and Replace Existing Pavement 900 SY $60 $54, Construction Survey Measurement 1 LS $5,000 $5, Traffic Maintenance 1 LS $15,000 $15,000 SUBTOTAL $818,530 CONTINGENCY 25% $204,633 TOTAL ESTIMATED CONSTRUCTION COST $1,020,000 Lining with a Cured in Place (CIPP) Pipe 5
6 In this trenchless repair alternative, a 24-inch CIPP liner pipe would be inserted inside the existing 40 and 42-inch CMP storm drain pipe. The annular space between the new liner and the host pipe would be filled with a cement grout. The existing CMP manholes would be removed and replaced with modern concrete manholes. The end result would be a strong, long-lasting storm sewer. This pipe rehabilitation method includes: Pipe cleaning and pre-construction CCTV inspection Storm flow bypassing Install CIPP from existing manholes Connect existing catch basin leaders Install cement grout in the annular space Surface restoration Pipe cleaning and pre-construction CCTV inspection Prior to starting rehabilitation work, the pipe will be thoroughly cleaned by the construction contractor and inspected with a camera. The purpose of the pre-construction CCTV is to identify any defects that may restrict the insertion process and confirm the pipe is clean and ready for sliplining. Storm flow bypassing A new parallel storm pipe system will be constructed from M22 to M12 prior to performing the sliplining work. All runoff that is collected upstream of MH22 will be diverted through the new parallel pipe. Therefore, only local storm flow coming from the immediately surrounding streets and drainage areas will need to be controlled during the lining work. The design flow for this section of the storm system is 6.5 cubic feet per second or 3,000 gallons per minute (gpm). The storm flow must be bypassed around the work area to prevent washout of the cement grout in the annular space and reduce complications with water flowing through the pipe when the CIPP liner is being installed. The primary bypass pump shall have a minimum capacity of 3,000 gpm and a standby pump of the same capacity will be available at the site. It is anticipated that two 8-inch dri-prime type pumps would be needed. Typically, the sewage is pumped from the next manhole upstream of the segment being lined and discharged into the next manhole downstream of the segment being worked on. There are two intermediate catch basins that contribute runoff flow to the storm sewer being rehabilitated. Water would be collected with individual pumps that would be placed at each one of these points as the work progresses through the site. Three Utility Crossings 6
7 Two sanitary sewer services and one electric/phone cable penetrate and cut through the existing CMP storm pipe in three separate places along the pipe alignment. The electrical/phone cable that is approximately 14 feet upstream of M13 will need to be protected from damage during the CIPP liner installation. This can be accomplished by having a man enter the storm pipe and temporarily raise the flexible conduit up and support it from the crown of the 42 inch CMP host pipe. An excavation will not be needed. The existing electric/phone conduit can remain inside the CMP host pipe. After the liner is installed, the utility would be encased in the grout that is pumped into the annular space. Two sanitary sewer pipes cross through the 42 inch storm pipe between M17 and M15. From the video image, it is estimated that there is approximately 24 to 30 inches of space between the bottom of the CMP casings and the invert of the 42 inch CMP host pipe. The small CMP casings would be left in place during the CIPP liner installation work and during the grouting work. The new grout in the annular space will provide additional support to the sanitary sewer crossings. Install CIPP liner Rehabilitating the existing storm pipe with a cured in place liner would involve inverting a resin impregnated CIPP liner into the existing CMP host pipes and filling the annular space with grout after the liner has cured and is rigid. The 24-inch CIPP liner would provide an interior pipe diameter of approximately 24-inches. The CIPP liner wall is relatively thin in comparison to the HDPE pipe option. The CIPP liner would be supported by the surrounding low strength grout. The CIPP liner has a smooth interior wall and would provide excellent flow characteristics and would have adequate capacity to convey the future design flows. This proposed trenchless rehabilitation method is unique. The CIPP lining process itself is standard and is proven. The annular space grouting is a common construction practice. The combination of the two is unique. The advantage to this process is the ability to reduce the number and size of the excavation areas, no need for a long layout area for the insertion pipe and a reduced impact to the public due to the smaller project footprint. The challenge with this process is inflating the liner bag and curing it into a round shape. One option is to add a rigid liner bag on the outside of the resin impregnated CIPP liner. The rigid bag would prevent the liner from stretching and help it maintain a round pipe shape. Two Direct Storm Pipe Connections Excavations will be needed to connect two existing catch basin leaders to the new CIPP liner. One is located downstream of M17 and the other is located downstream of M15. 7
8 The tie-in between the new CIPP and the existing CMP leaders would be completed before the annular space grout is installed. Install cement grout in the annular space The entire annular space between the liner and host pipe will be filled with cement grout. This will prevent ground water from entering the annular space, prevent the liner from floating inside the carrier pipe, prevent collapse of the liner due to hydrostatic pressure and will also provide a structurally sound pipe system when complete. A special lightweight flowable grout is required to prevent the CIPP liner from floating. It will also to fill the entire space when injected from one end of the pipe run. This unique grout is available locally and has been used successfully on other projects in Anchorage. The CIPP liner will be filled with water during the grout process to keep it from floating. The new CIPP liner will rest on the CMP host pipe invert when the grout work is complete and cured. Post-rehabilitation CCTV inspection A post-construction CCTV inspection by the contractor will be reviewed by the engineer to confirm that the work has been completed as required and that the pipe is clean and functioning properly. Surface Restoration Restoration of the surface will be required after the work is completed. Asphalt repair and landscaping repairs would be needed at the excavation areas as well as surrounding surface that is damaged during the work. Estimated Cost CIPP lining in conjunction with grouting of the annular space will provide a structural rehabilitation of the pipe. The overall construction cost to complete this rehabilitation method is estimated to be $1,320,000. A more detailed description of the cost is contained in the following table. 8
9 PROJECT: Pine Street Storm Sewer Upgrade OPTION: Cured In Place Pipe and Grouting NO. DESCRIPTION QTY UNIT UNIT TOTAL COST 1 Type II & II-A classified fill and backfill 1100 Ton $20 $22,000 2 Bedding material 70 Ton $25 $1,750 3 Disposal of unusable or surplus material 600 CY $18 $10,800 4 Adjust Electric/Phone Utility Crossing 1 EA $3,000 $3,000 5 F&I Type I Storm Manhole 5 EA $7,000 $35,000 6 Furnish and Install 24" CIPP Liner 1930 LF $250 $482,500 7 Storm Sewer Flow Control 1 LS $35,000 $35,000 8 Connect Existing Catch Basin Leaders 2 EA $5,000 $10,000 9 Annular Space Grouting 470 CY $800 $376, Pre-rehabilitation Sewer Pipe Television Inspection 1930 LF $7 $13, Post-rehabilitation Sewer Pipe Television Inspection 1930 LF $4 $7, Remove and Replace Existing Pavement 700 SY $60 $42, Construction Survey Measurement 1 LS $5,000 $5, Traffic Maintenance 1 LS $15,000 $15,000 SUBTOTAL $1,059,280 CONTINGENCY 25% $264,820 TOTAL ESTIMATED CONSTRUCTION COST $1,320,000 Storm Sewer Trenchless Repair Recommendations The traditional HDPE sliplining process is the recommended trenchless option. This is the lowest cost trenchless method and is also a proven process that can be constructed by any number of construction contractors in Anchorage. A trenchless upgrade of the existing storm system from manholes M22 to M12 using HDPE sliplining is estimated to cost $1,020,000 to construct. 9
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer
FY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS
ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located
53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:
Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
FY15 Gravity Sewer and Manhole Rehabilitation
Contract Drawings For FY15 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. -030 BASIN 850 Greenville, South Carolina April 2015 BASIN 700A GREENVILLE BASIN 700B FIVE
San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS
ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by
SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
DIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
INSTALLATION OF INSITUFORM LINER
PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.
SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and
SPR PE Steel Reinforced Liner
ENGINEERED SOLUTIONS SPR PE Steel Reinforced Liner Reline Done Right Contech is your single source for rehabilitation of sanitary & storm sewers, culverts and bridges. Contech Engineered Solutions has
SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D
SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS Appendix D RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Rumbi Grill -
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection
Special Specification 7021 Water Main and Sewer Line Replacements
Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,
Rehabilitation or Replacement? That Is The Question
Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections
Section 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS
SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and
San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION
ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,
TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth
TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20
Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority
Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority
Repair or Replacement - Band-Aids vs. Surgery
Repair or Replacement - Band-Aids vs. Surgery Using RCP for the Replacement of Failed or Undersized Culverts www.concrete-pipe.org Introduction and Background Our Nation s infrastructure owners are facing
SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE
SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final
Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006
Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 1.0 Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM)
SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
CLEANING, INSPECTION, AND TESTING OF SEWERS
CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and
PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY
PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene
Sewer Rehabilitation Design Requirements
Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared
Sewer Line Rehabilitation
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing sanitary sewers using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD
SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials
PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
1.3.2 Method of construction and restoration of existing water service connections. This shall include:
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES
North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper C-4-04 CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES Brad Jenson
CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R
CCTV PIPE INSPECTION AND EVALUATION For RUNWAY 17L-35R At ST. PETERSBURG CLEARWATER INTERNATIONAL AIRPORT February 2011 CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R ST. PETERSBURG CLEARWATER INTERNATIONAL
Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology
2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)
UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS
U UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS 3. COMPANY PROFILE A growing company excelling in the fields of infrastructure repair and maintenance. 6. MANDREL TESTING Individually approved
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.
MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade
Let Us Give Utilities the Respect that they Deserve.
Water & Sewer Utilities Miscellaneous Design and Plan Preparation Guidelines Issued by: Ray Mowla, P.E. Jefferson Parish Department of Engineering, Utilities Section The purpose of issuing these miscellaneous
Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe
Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe September 11, 2012 NEWEA Collection Systems Conference Presented by: Laurie L. Perkins, PE Dennis A. Dievert, PE C. Frederick
REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542
1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated
12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA.
Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA. 1 Pipe Bursting A Mature and Diverse Trenchless Technology December 10, 2014 1:00 3:00 pm Eastern How to Participate Today
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE
6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction
Section 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009
Rehabilitation Alternatives MWEA Collection System Seminar October 1, 2009 Overview Types of Rehabilitation Trenchless Categories On-Line Replacement In-Situ Options Selecting the Best Solution Types of
SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.
SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION
Annular Space Grouting of Slipline Products
Annular Space Grouting of Slipline Products by David Gellings(, M.APWA & John Jurgens(, M.WWCPA Traditional methods of using neat cement slurries, (Portland cement and water, cement with fly ash or cement
Memorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis
Memorandum CRW Engineering Group, LLC 3940 Arctic Blvd. Suite 300 Anchorage, AK 99503 (907) 562-3252 FAX 561-2273 TO: Mike Lee, P.E., Chief Engineer, ADOT/ANC FROM: Shane Blanchard, P.E. THRU: Mike Rabe,
Beacon Hill Sewer District Standard Specifications
Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions
DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES
SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing
Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam
Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Education Master of Business Administration University of Houston, 1985 Bachelor of Science, Civil Engineering University
A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.
PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223
STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. Description This section describes the installation of gravity sewer pipelines fabricated of vitrified
PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET
PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET Name of Municipality or Sewer District Name of Project Original Township and Lot Number Name of Engineer of Firm Preparing Plans
San Antonio, TX July 28, 2011
Rehabilitation of a Deteriorated 60 RCP Wastewater Interceptor Using Competing Trenchless Technologies Bruce Cole, PE Corey Anderson, EIT TAWWA/WEAT Summer Seminar San Antonio, TX July 28, 2011 Wendy Martinez,
City of Mill Valley Sewer Capital Improvement Plan 2012 2016
City of Mill Valley Sewer Capital Improvement Plan 2012 2016 I. BACKGROUND Between December 2004 and February 2008, the ed States Environmental Protection Agency (EPA) conducted inspections of the SASM
LS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
See Appendix A for additional information, or contact ASTM directly.
DEFINITIONS Wherever used in these specification guidelines, the following words and terms have the meanings indicated. AREAWAY: A paved surface, serving as an entry area to a basement or subsurface portion
CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING
North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 16-19, 2007 CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING Robert K. Lee, P.E. 1 1
STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS
STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements to execute internal closed
SECTION 810 SEWER LINE CLEANING
SECTION 810 SEWER LINE CLEANING I. GENERAL 1.1 DESCRIPTION OF WORK The work covered by this section consists of providing all labor, equipment, material and supplies and performing all operations required
Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation
Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation Salam Khan*, P.E. and Christoph Dobson, P.E. Sacramento County Sanitation District 1 (CSD-1) 10545 Armstrong Avenue,
STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS
STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements to execute internal closed
REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION
REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION ABSTRACT Chris L. Windley PE, McKim & Creed, Inc. Ben R. Latino, Jr., PE, McKim & Creed, Inc. Greg Anderson, PE, McKim & Creed, Inc. When designing to
SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)
CHAPTER 9 SEWER / STORM DRAIN / IRRIGATION LINES SECTION 9.01 GENERAL This section covers the requirements for piping materials and installation of Lehi City sewer, storm drainage and irrigation collection
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
How To Install An Overhead Sewer
Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD
www.norcalpug.com LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD Bob Fisher and Lance Stracner Ameron Protective Lining J.R. Pipeline Co Inc. Abstract: The
SECTION IX SLIP LINING PIPELINES
AN SECTION IX SLIP LINING PIPELINES February, 2008 TABLE OF CONTENTS SECTION IX - SLIP LINING PIPELINES 9.01.00 GENERAL...2 9.01.01 SCOPE... 2 9.02.00 MATERIAL...2 9.03.00 CONSTRUCTION...2 9.03.01 REQUIREMENTS...
Figure 3 Pipe Cracking
The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.
REHABILITATION OF THE LONG WHARF SEWER FORCE MAIN USING SLIPLINING METHODOLOGY IN NEWPORT, RHODE ISLAND
North American Society for Trenchless Technology (NASTT) No-Dig Show 2011 Washington, D.C. March 27-31, 2011 Paper A-5-04 REHABILITATION OF THE LONG WHARF SEWER FORCE MAIN USING SLIPLINING METHODOLOGY
CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General
General All sanitary sewers, manholes and force mains shall be acceptance tested, as hereinafter specified in the presence of a City representative. Acceptance testing shall be performed after backfilling
Sanitary Sewer Overflow (SSO) Incident Report Form
Submit completed form to EHS. Date of SSO spill: Sanitary Sewer Overflow (SSO) Incident Report Form Identify the SSO category (check one): Category 1 SSO Spills of any volume that reach surface water Category
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
SECTION 5: SANITARY SEWER SYSTEM DESIGN
SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities
ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING
ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, material and supplies, insurance, accessories, tools, transportation,
SECTION 802 GRAVITY SEWER PIPE
SECTION 802 GRAVITY SEWER PIPE 802-1 DESCRIPTION: This Work shall consist of furnishing all labor, materials, equipment, and incidentals required to remove and dispose of existing gravity sewer pipe if
CHAPTER 5. Storm Sewer
CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water
City of Balch Springs, Texas. Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement
City of Balch Springs, Texas Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement Balch Springs is a city in Dallas County, Texas, United States. It is a suburb of Dallas and part
Platte River Interceptor Slipline Rehabilitation
Platte River Interceptor Slipline Rehabilitation Owner: Metro Wastewater Reclamation District Contractor: American West, Denver CO Slipline Pipe Manufacturer : Hobas Pipe USA Presented by: Tom Furie, Area
SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section 01 33 00 - Submittals.
SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS PART 1: GENERAL 1.01 SCOPE A. Abandonment in place, by cutting and capping, of existing water mains, hydrants, service lines, and valves. B. Abandonment in
SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER
Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
SEWER BACKUP PREVENTION PROGRAM