VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

Size: px
Start display at page:

Download "VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL"

Transcription

1 VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial Park Pavement Rehabilitation project within 165 calendar days from the date of the Notice to Proceed in accordance with the provisions, instructions, and specifications of the Village of Lombard for the prices as follows: NO. ITEM QUAN. UNIT UNIT PRICE TOTAL PRICE TREE REMOVAL (6 TO 15 UNITS DIAMETER) 50 UNIT TREE REMOVAL (OVER 15 UNITS DIAMETER) 50 UNIT TEMPORARY FENCE 5960 FOOT TREE ROOT PRUNING 32 EACH TREE PRUNING (1 TO 10 INCH DIAMETER) 10 EACH TREE PRUNING (OVER 10 INCH DIAMETER) 10 EACH EARTH EXCAVATION 2724 CUYD REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL 1400 CUYD FURNISHED EXCAVATION 972 CUYD POROUS GRANULAR EMBANKMENT, SUBGRADE 1400 CUYD TRENCH BACKFILL, SPECIAL 9 CUYD GEOTECHNICAL FABRIC FOR GROUND STABILIZATION 1400 SQYD TOPSOIL FURNISH AND PLACE, SQ YD SUPPLEMENTAL WATERING 199 UNIT SODDING, SPECIAL SQYD TEMPORARY EROSION CONTROL SEEDING 753 POUND TEMPORARY DITCH CHECKS 144 FOOT

2 SUB-BASE GRANULAR MATERIAL, TYPE B SQYD PREPARATION OF BASE SQYD AGGREGATE BASE REPAIR 1311 TON BITUMINOUS MATERIALS (PRIME COAT) 7509 GAL AGGREGATE (PRIME COAT) 21 TON LEVELING BINDER (HAND METHOD), N50 30 TON HOT-MIX ASPHALT SURFACE REMOVAL BUTT JOINT 138 SQYD TEMPORARY RAMP 102 SQYD HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N TON HOT-MIX ASPHALT SURFACE COURSE, MIX C, N TON PROTECTIVE COAT SQYD PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 8 INCH 6784 SQYD PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 8 INCH, SPECIAL 1339 SQYD PORTLAND CEMENT CONCRETE SIDEWALK, 5 INCH, SPECIAL 1328 SQFT PAVEMENT REMOVAL 6971 SQYD HOT-MIX ASPHALT SURFACE REMOVAL, ½ SQYD HOT-MIX ASPHALT SURFACE REMOVAL, SQYD HOT-MIX ASPHALT SURFACE REMOVAL, VARIABLE DEPTH 236 SQYD DRIVEWAY PAVEMENT REMOVAL 6540 SQYD CURB REMOVAL 323 FOOT COMBINATION CURB AND GUTTER REMOVAL FOOT

3 SIDEWALK REMOVAL 1453 SQFT PAVEMENT REMOVAL (SPECIAL) SQYD PORTLAND CEMENT CONCRETE SHOULDERS SQYD 550A0040 STORM SEWERS, CLASS A, TYPE 1, FOOT 550A0050 STORM SEWERS, CLASS A, TYPE FOOT STORM SEWER REMOVAL FOOT STORM SEWER REMOVAL FOOT FIRE HYDRANT EXTENSION 2 FOOT PIPE UNDERDRAINS, FABRIC LINED TRENCH, FOOT CATCH BASINS, TYPE A, 4 - DIAMETER, TYPE 3 FRAME AND GRATE 3 EACH MANHOLES, TYPE A, 5 - DIAMETER, TYPE 1 FRAME, CLOSED LID 1 EACH INLETS, TYPE A, TYPE 3 FRAME AND GRATE 3 EACH INLETS, TYPE A, TYPE 8 GRATE 5 EACH LIDS, TYPE 1, CLOSED LID 1 EACH FRAMES AND GRATES, TYPE 3 36 EACH FRAMES AND LIDS, TYPE 1, OPEN LID 19 EACH FRAMES AND LIDS, TYPE 1, CLOSED LID 10 EACH REMOVING MANHOLES 1 EACH REMOVING CATCH BASINS 2 EACH REMOVING INLETS 2 EACH CONCRETE CURB, TYPE B 697 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE B FOOT

4 COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.12 (SPECIAL) 1364 FOOT NON-SPECIAL WASTE DISPOSAL 100 CUYD ENGINEER S FIELD OFFICE, TYPE A 7 CAL MO TRAFFIC CONTROL AND PROTECTION 1 L. SUM TRAFFIC CONTROL AND PROTECTION FOR TEMPORARY DETOUR 1 EACH PREFORMED PLASTIC PAVEMENT MARKING, TYPE B LETTERS AND SYMBOLS 123 SQFT PREFORMED PLASTIC PAVEMENT MARKING, TYPE B LINE FOOT X X X TEMPORARY INFORMATION SIGNING 100 SQFT STRUCTURE INLET FILTER CLEANING 172 EACH TEMPORARY ACCESS (COMMERCIAL ENTRANCE) 162 EACH X TEMPORARY ACCESS (ROAD) 4 EACH XX Z Z PRECONSTRUCTION VIDEO TAPING 1 L. SUM DRAINAGE & UTILITY STRUCTURE TO BE ADJUSTED 96 EACH DRAINAGE & UTILITY STRUCTURE TO BE RECONSTRUCTED 11 EACH Z DUST CONTROL WATERING 350 UNIT PORTLAND CEMENT CONCRETE OVERLAY SQYD PORTLAND CEMENT CONCRETE OVERLAY, FURNISHED 3252 CUYD BITUMINOUS DRIVEWAY PAVEMENT, 10 INCH 393 SQYD

5 CLASS D PATCHES, 8 INCH 1892 SQYD STRUCTURE INLET FILTER VILLAGE OWNED 10 EACH STRUCTURE INLET FILTER CONTRACTOR SUPPLIED 86 EACH EXPLORATION TRENCH, SPECIAL 100 CUYD PREMIUM WORK HOURS 150 HOURS CONCRETE PAVEMENT GRINDING FOR PAVEMENT MARKING 17 FOOT UNDERCUTTING FOR UTILITIES 10 CUYD TOTAL BID TOTAL BID PRICE IN WORDS:

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount Engineer's Estimate DiPaolo Company 4350 DiPaolo Center Glenview, IL 60025 Stark Excavating, Inc. 1805 W. Washington Street Bloomington, IL 61701 Rowe Construction 1523 N. Cottage Avenue Bloomington, IL

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

SECTION 4Aggegate Subbase

SECTION 4Aggegate Subbase The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages

More information

New Road 11.0m Asphalt 23m ROW

New Road 11.0m Asphalt 23m ROW New Road 11.0m Asphalt 23m ROW Granular A - 150 mm sq. m. $5.35 $69.53 Granular B - 300 mm sq. m. $7.35 $95.54 Concrete Curb and Gutter m. $44.67 $89.34 HL3 Asphalt - 40 mm sq. m. $7.66 $84.23 HL 4 or

More information

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection

More information

SECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK

SECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK 13.01 SCOPE OF WORK Under this item, the Contractor will restore all lawns, trees, gardens, landscape plantings, sidewalks, ramps, trails, fences, commercial signs, water courses and sand, gravel, dirt,

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

FDOT Specifications List

FDOT Specifications List FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in

More information

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14 Solcitation No: DTFH71-14-B-00008 Division: Eastern Federal Lands State: DC County: Federal Land: 1 out of 9 Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date:

More information

IN ACCORDANCE WITH THE APPLICABLE STATUTES OF THE STATE OF ILLINOIS AND ORDINANCES OF THE VILLAGE OF WHEELING, NOTICE IS HEREBY GIVEN THAT

IN ACCORDANCE WITH THE APPLICABLE STATUTES OF THE STATE OF ILLINOIS AND ORDINANCES OF THE VILLAGE OF WHEELING, NOTICE IS HEREBY GIVEN THAT PUBLIC NOTICE IN ACCORDANCE WITH THE APPLICABLE STATUTES OF THE STATE OF ILLINOIS AND ORDINANCES OF THE VILLAGE OF WHEELING, NOTICE IS HEREBY GIVEN THAT THE SPECIAL MEETING OF THE PRESIDENT AND BOARD OF

More information

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

A. Structures Quantity Item Price Cost @ $3,500 EA

A. Structures Quantity Item Price Cost @ $3,500 EA PRINCE WILLIAM COUNTY Department of Development Services Land Development Division UNIT PRICE LIST (Performance Bonds, Landscaping Escrows, and Siltation & Erosion Control Escrows) Revised: November 17,

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices

More information

How To Build A Road In A Townhouse

How To Build A Road In A Townhouse FDOT DBE CERTIFICATION SPECIALTY/ SHEET WITH CAP SIZES Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway $ 22.41 Application of prime and tack coats, leveling surfaces and

More information

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Bids Open: 2 pm Date: Wednesday, March 4, 2015 BASE BID SCHEDULE 1 - Rudell Road Reconstruction Project NO. CODE CONTRACT PROJECT No. B3-0470 and C4-0069 COUNTY'S ESTIMATE 1 All American Asphalt Corona,

More information

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT

More information

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued) BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST

More information

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions

More information

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016 SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016 102.5 Bid Deposits The City of Madison bid deposit form is required for all bids unless a Biennial Bid Bond is on file or check deposit is used.

More information

SECTION 02221 SELECTIVE DEMOLITION

SECTION 02221 SELECTIVE DEMOLITION SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on

More information

Stormwater/Wetland Pond Construction Inspection Checklist

Stormwater/Wetland Pond Construction Inspection Checklist : Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION Section Number Title 401 GENERAL 402 AMENDMENTS TO WSWS PART I - GENERAL CONDITIONS

More information

CONSTRUCTION PERMIT REQUIREMENTS

CONSTRUCTION PERMIT REQUIREMENTS CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

Local Road Assessment and Improvement Drainage Manual

Local Road Assessment and Improvement Drainage Manual Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required

More information

How To Get A Street Opening Permit In Belham

How To Get A Street Opening Permit In Belham TOWN OF BELLINGHAM STREET OPENING SPECIFICATION December 2004 - Revisions I. GENERAL A. Definitions and Abbreviations: Town Street shall mean a Town owned right of way or public travel way that the Town

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA

MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA Department of Planning and Development 107 North Kent Street, Suite 202 Winchester, Virginia 22601 Phone: (540) 665-5651 Fax: (540) 665-6395

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS Appendix D RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Rumbi Grill -

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

DIVISION 200 - EARTHWORK SECTION 201 - CLEARING RIGHT-OF-WAY

DIVISION 200 - EARTHWORK SECTION 201 - CLEARING RIGHT-OF-WAY DIVISION 200 - EARTHWORK SECTION 201 - CLEARING RIGHT-OF-WAY 201.01 Description This work shall consist of clear cutting, selective clearing and thinning, tree trimming, removing single trees, including

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

SECTION 33 41 00 REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:

SECTION 33 41 00 REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section: SECTION 33 41 00 REINFORCED CONCRETE PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

SECTION 200: STORM SEWER CONSTRUCTION STANDARDS

SECTION 200: STORM SEWER CONSTRUCTION STANDARDS SECTION 200: STORM SEWER CONSTRUCTION STANDARDS Page No. Description 200-2 201 GENERAL 200-2 201.1 SPECIFICATIONS 200-2 201.2 CONNECTION TO EXISTING FACILITIES 200-3 202 MATERIALS 200-3 202.1 PIPES 200-4

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS FOR

CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS FOR PH 231.946.5874 FAX 231.946.3703 WWW.gourdiefraser.com CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS FOR Little Traverse Bay Bands of Odawa Indians Nine Mile Point Boat Launch Hayes Township, Charlevoix

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems

More information

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm

More information

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT ADDENDUM NO. 2 Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT Bridge No. 1460008 (existing) Bridge No. 06806 (new) TO ALL BIDDERS: Anchor Engineering

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

CD i -STREETS- Detail #

CD i -STREETS- Detail # -STREETS- Detail # 3000 Vertical Curb, Gutter and Sidewalk 3010 Low-Profile Curb, Gutter and Sidewalk 3020 Rolled Curb, Gutter and Sidewalk 3030 Separated Sidewalk, Curb & Gutter 3040 Sidewalk Staged Construction

More information

Storm Drain Inlet Protection - IP

Storm Drain Inlet Protection - IP Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior

More information

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW) CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW) January, 2013 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS DRAINAGE STRUCTURES DRN-01 Corrugated metal pipe drop inlet DNR-02 Storm Drain

More information

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS for (PVC) SANITARY SEWER MAIN CONSTRUCTION VI(A).1 General VI(A).2 Materials and Equipment VI(A).3 Installation of Sanitary Sewer Mains VI(A).4 Laying of

More information

Chapter 22. Lump Sum Project Guidelines

Chapter 22. Lump Sum Project Guidelines Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11

More information

CHAPTER 5. Storm Sewer

CHAPTER 5. Storm Sewer CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water

More information

GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH

GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH JULY 2015 BIOSWALE/HYBRID DITCH SCALABLE TOOL AND DESIGN TEMPLATE This tool and associated design files are one section of a larger toolkit: Green Infrastructure

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

West Thornhill Stormwater Flood Remediation Phase 1 Construction. Community Information Meeting

West Thornhill Stormwater Flood Remediation Phase 1 Construction. Community Information Meeting West Thornhill Stormwater Flood Remediation Phase 1 Construction Community Information Meeting Thornhill C.C. May 7, 2014 Purpose To advise residents and businesses of 2014 and 2015 construction activities

More information

SECTION 200 EARTHWORK 1 EXCESS MATERIAL DISPOSAL 1 RESTORATION OF DISTURBED AREAS 1 SAW CUTTING 1 SIDEWALK REMOVAL ADJACENT TO BUILDINGS 2 BORROW 2

SECTION 200 EARTHWORK 1 EXCESS MATERIAL DISPOSAL 1 RESTORATION OF DISTURBED AREAS 1 SAW CUTTING 1 SIDEWALK REMOVAL ADJACENT TO BUILDINGS 2 BORROW 2 TECHNICAL SPECIFICATIONS INDEX PAGE NO. SECTION 200 EARTHWORK 1 EXCESS MATERIAL DISPOSAL 1 RESTORATION OF DISTURBED AREAS 1 SAW CUTTING 1 SIDEWALK REMOVAL ADJACENT TO BUILDINGS 2 BORROW 2 BORROW PITS 3

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE. 5.01 Design

STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE. 5.01 Design SECTION 5 - STORM DRAINAGE 5.01 Design Storm drainage facilities shall be designed in accordance with the goals and guidelines set forth in the Unified Development Ordinance. The goal shall be to collect

More information

Solutions Library Solution 4: Permeable Pavement

Solutions Library Solution 4: Permeable Pavement SOILS TREES RAINGARDENS Solutions Library Solution 4: "Think like water. Go with the flow." -Frances Kato, Issaquah School District Student 59 60 How Works? Explanation of Diagram The most significant

More information

STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES

STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES CITY OF PETALUMA STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES AUGUST 1999 Revised 10/98 City of Petaluma Petaluma, California STORM DRAIN INSTALLATION DETAIL

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

Section 600 Incidental Construction

Section 600 Incidental Construction Table of Contents 1. Pipe Culverts... 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes... 600-5 2. Grade Adjustment of Existing Miscellaneous Structures... 600-8 3. Rebuilt Miscellaneous Structures...

More information

Porous Pavement Alternatives Cost Analysis

Porous Pavement Alternatives Cost Analysis Porous Pavement Alternatives Cost Analysis Prepared by Century West Engineering for Metro This cost analysis compares the construction costs of six different types of pavement for three different scenarios.

More information

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished

More information

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

900 SEWERAGE WORK ITEM 901 - PIPE SEWERS COMPLETE IN PLACE

900 SEWERAGE WORK ITEM 901 - PIPE SEWERS COMPLETE IN PLACE 900 SEWERAGE WORK ITEM 901 - PIPE SEWERS COMPLETE IN PLACE 901.01 Description 901.02 Materials and Material Handling 901.03 Excavation 901.04 Limit as to Width of Trench 901.05 Unauthorized Excavation

More information

STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200

STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200 STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES PART 1 - GENERAL A. Description This section includes materials, testing, and installation of precast concrete

More information

CID STREET INFRASTRUCTURE ASSESSMENT

CID STREET INFRASTRUCTURE ASSESSMENT ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for

More information

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall

More information

SECTION 7- STORM SEWER

SECTION 7- STORM SEWER SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...

More information

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION Using the Full Range of Tools for a Challenging Job Report To: TTI Committee May 13, 2014 1 Pavement Management - Suggested Treatments

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON

CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON Council Meeting Date: August 11, 2014 Agenda Item: 7(c) CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON AGENDA TITLE: Motion Authorizing the City Manager to Execute a Contract with Transmap Corporation

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

City of Hilshire Village Pine Creek Ln Reconstruction

City of Hilshire Village Pine Creek Ln Reconstruction City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project

More information

Permeable Pavement Construction Guide

Permeable Pavement Construction Guide Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce

More information

Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices

Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Amy H. Brennan (440) 975-3870 www.crwp.org abrennan@crwp.org Chagrin River Watershed Partners Formed

More information

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch. To Prospective Bidders: CITY OF TOLEDO, OHIO PARKSIDE AREA SSO ELIMINATION PHASE 2 GRAVITY RELIEF SEWER NO. 2011 Addendum No. 2 December 8, 2011 Information disclosed and/or questions raised since issuing

More information

SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES

SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES BOARD OF COUNTY COMMISSIONERS ST. MARY S COUNTY LEONARDTOWN, MARYLAND SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES APRIL, 1991 AMENDED: JUNE, 2002 DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION

More information

Private storm drain inlet retrofitting requirements - Purpose. Sec.13-21.1. Private storm drain inlet retrofitting requirements - Definitions.

Private storm drain inlet retrofitting requirements - Purpose. Sec.13-21.1. Private storm drain inlet retrofitting requirements - Definitions. 2011-7 AN ORDINANCE ESTABLISHING STANDARDS FOR THE PRIVATE STORM DRAIN INLET RETROFITTING AND AMENDING THE "CODE OF THE TOWNSHIP OF PRINCETON, NEW JERSEY, 1968". BE IT ORDAINED by the Township Committee

More information

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH Hoyle, Tanner Project No. 093145 ADDENDUM NO. 1 Manchester Boston Regional Airport, City of Manchester, NH Construct Relocated Roadway Airport Service Rd. Outside Runway Object Free Area (ROFA); Construct

More information

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with

More information

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...

More information