SECTION 5 DRAFTING STANDARDS
|
|
|
- Cleopatra Meghan Snow
- 9 years ago
- Views:
Transcription
1 SECTION 5 DRAFTING STANDARDS 1
2 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS GENERAL DRAFTING STANDARDS DRAFTING MINIMUM REQUIREMENTS HANDOUT
3 GENERAL 1. All final plans shall be prepared on mylar, or reproducible paper. The standard sheet size is 24 inches x 36 inches, additional plan sizes may be accepted with the approval of the Public Works Department. Final plans shall also be submitted in electronic form on CD media in a format readable by the City s current version of AutoCAD. 2. The Professional Engineer's seal, signature, address and phone number shall be placed in the title block area, along the bottom of the page. 3. The drawing shall be in ink on approved mylar, or reproducible paper. 4. At least 2 coordinates matching Washington State Plane Coordinate System (NAD 83 South) is required. To be supplied with Base Drawing, preferably with basis of bearing. Use of NAVD 88 vertical datum is required. 5. Scales: The scale shall be a standard engineering ratio (10, 20, 30, 40, or 50 scale). 6. Draw the plan so the North Arrow points to the left or to the top of the sheet. 7. The minimum lettering size is 1/10 th inch. This is to ensure the plan is legible after microfilming or reduction. 8. Use the City of Ellensburg Standard Drawing Symbols located at the end of this chapter, the Washington State Chapter of the American Public Works Association symbols, or others approved by the City of Ellensburg. 9. Match lines with matched sheet number shall be provided where plan is drawn on two or more sheets. Where plan is shown on three or more sheets, include a total site plan key map at scale 1 = 100' or 1 = 200' to cross reference portions of the project with their corresponding plan sheet location. 10. All division or phase lines shall be indicated showing proposed limits of construction. 11. Existing and proposed topography contours shall cover the entire site and a minimum of 30' beyond the site boundary. Topography contours should be shown at one (1) foot intervals (5 foot intervals for slopes greater than 15%, 10 foot intervals for slopes greater than 40%) unless otherwise approved. Elevation labeling shall be shown at 10 foot intervals maximum for one (1) foot contour intervals, maximum 25 feet for 5 foot contour intervals. 12. Show and clearly label property lines, right-of-way lines, sensitive areas and set backs and all existing and proposed easements with their recording numbers. Show existing and proposed building footprints. 3
4 13. Label all streets by City of Ellensburg names. 14 Plans shall include a key for abbreviations and a legend for symbols where such are used. Where symbols are used, they shall be consistent with City of Ellensburg s standard drawing symbols. 15. Record Drawings are to be submitted to the Public Works Department from the Contractor, upon project completion. The Contractor shall be responsible for maintaining a paper copy of the Record Drawings, by red lining the approved plans. The submitted copy of Record Drawings shall be neat and legible. The record drawings shall meet the requirement as determined in appropriate sections of this document and shall encompass any changes or alterations to the approved design plans. 16. Preliminaries should be submitted on a standard size paper. Refer to the Drafting Minimum Requirements handout at the end of this Section for paper sizes. All drawings should be the same size. If reduced sized sets are supplied in addition to the original set, these reduced sized drawings shall be fully scaleable. An electronic copy of the preliminary shall also be submitted on CD media in a form readable by the City s current version of AutoCAD (.dwg or.dxf). 17. Preliminary plans should also be submitted in electronic format, readable by AutoCAD to the Energy Services Office for the design of gas and electrical utilities. 18. When both plan and profile views are necessary, they will be on the same page with the plan view for a particular segment appearing just above the profile of that segment. 19. Prior to beginning work on concrete curbs, water, sewer and storm drainage, cut sheets shall be delivered to engineer for inspection. Cut sheets shall also be required for other portions of work on the project which require survey control to stake them. The cut sheets shall be in stationing and elevations consistent with the approved design plans on the project. 20. A general note shall be placed on all design plans which states: When design standards permit, all utilities constructed on public right of way shall contain a minimum of 6 inches of risers for all features that reach ground surface including catch basins, manholes and vaults, ect. The minimum of 6 inches of risers shall also be placed on all City water, sewer and storm drainage features that reach ground surface on private property. 21. Developer s licensed surveyor shall comply with the City s monument protection plan. The submittals shall reference all monuments and survey control data as required by the plan monument protection plan, RCW title 58, and WAC
5 In addition to the drafting standards listed above, the following information should be included within the utility and transportation plans as appropriate: DRAFTING STANDARDS (Plan, Profile and Cross Section Information Required): 1. Each submittal shall contain the following project information on the cover sheet or first sheet: a. Title: Project name (add explanatory note if project name has changed). b. Table of Contents (if more than 3 sheets). c. Vicinity Map (Scale sufficient to cover project limits on one sheet or 1 = 200' whichever is greater). d. General description of site, including Quarter Section, Township and Range. e. Name and phone number of architect/engineering firm preparing plans. 2. Existing Improvements and Topography: Show all existing underground and surface improvements and topography in proximity to the project. The information must be shown for the full width of the right of way or the easement and for a sufficient distance on either side of the right of way or easement to show possible impacts on adjacent properties and/or the relationship to related facilities, including adjacent parking lots, curbs, ditches, ect. Information of existing surface and underground City of Ellensburg facilities may be obtained from the Public Works Office for water, sewer, storm drainage, while natural gas and electricity information may be obtained from the City s Energy Services Department. The one call utility locate information number is The one call number should be utilized when obtaining field survey information. Other utility providers known to be in the area are Charter Communications (cable television), Ellensburg Telephone (telephone), Puget Sound Energy (natural gas and power), Kittitas County Public Utility District (Power). 3. a. Sewer, Water and Drainage Improvements: Provide profiles of all proposed sewer, water and drain lines. Show existing underground improvements within ten (10) feet of where they cross or connect to the new improvements. Show the storm water drainage discharge point to a public system or natural water course. Provide drainage system details whether or not detention of storm water is required, including biofiltration swales. b. Gas and Electric Improvements: The provision of Plan, Profile, and Crosssections of proposed gas and electrical work is optional. The design of both may be requested from the Energy Services Office. 4. Grades: All profiles and cross sections will show the proposed and the existing grade. For developments where road work is required on an existing road, development plans will be required to submit cross sections of existing road. 5. Infrastructure not within street right of way shall be within easements granted to the 5
6 City or the appropriate utility. 6. Easements shall be shown on plan sheets. 7. Label all manholes, clean outs and catch basins in sequential number. Label rim and invert elevations and catch basin and manhole size and type adjacent to the component on plan view in addition to the profile sheet. 8. Include flow direction arrows on all gravity lines. 9. Label pipe size, length, material and slope. 10. Include datum and benchmark information on each plan and/or profile sheet. 11. Plans shall include a minimum of two horizontal control points and a minimum of one vertical control point, which can be tied to plan stationing and control. 12. Indicate on plans the locations of monuments to be installed. Installation of monuments and monument cases shall be per Ellensburg City Code, section (C), Place at centerline of street intersections, the beginning and ending points of all curves, the center of cul-de-sacs and other points as directed by the City Engineer. 13. Record Drawings are to be submitted to the Public Works Department from the Contractor, upon project completion. The Contractor shall be responsible for maintaining a paper copy of the Record Drawings, by red lining the approved plans. The submitted copy of Record Drawings shall be neat and legible. The record drawings shall meet the requirement as determined in appropriate sections of this document and shall encompass any changes or alterations to the approved design plans. 14. Show spot elevations of pavement in parking lots, and run off flow direction arrows. 15. Show roof leaders and footing drains connecting into conveyance system. 16. Show all stub-out locations for future connections. 17. Include section details for rockeries in grading/paving plans. 18. Show the following for all storm water facilities: a. Show location and detail of emergency overflows and spillways. b. Provide invert elevations of all pipes, inlets, tanks, vaults and spot elevations of the pond bottom. Call out pond volume and dimensions, and design surface elevation. 6
7 c. Provide plan and section views and details of all rock protection and energy dissipaters. d. Section and plan view on restrictor/control structure must be shown and adequately detailed, including size and elevation of orifices, overflow weirs, etc. e. Show length, width, and bottom width dimensions for all biofiltration and water quality swales and storm water conveyance swales. Include sectional view, showing side slopes and design depth of flow. f. Include seeding material information. 19. Plans should include the following for Gas and Electric Utilities for multifamily and commercial projects, if known: 20. a. Gas and electric meter locations on the site plan. b. Gas and electric loads for each meter. c. A cut-and-fill plan for the site. When water main construction is included on a project, plans shall include required static and test pressures. Contractor s engineer shall place hydrostatic water system pressure on civil drawing as well as test pressure requirement. Hydrostatic water system pressure is available from City s Public Works Department. 7
8 GENERAL DRAFTING GUIDELINES for APPLICATION SUBMITTAL MATERIALS The following information is a general guideline for applicant submittals, the City of Ellensburg reserves the right to require additional items if necessary. Depending upon the project description, the minimum required Construction Plans shall be categorized into Tier I, Tier II, or Tier III, based on the following Criteria. The minimum requirements for each Tier are included at the end of this handout: Tier I or II: Single-Family Residential (New Construction & Additions Exceeding 50% of the value of existing structure): Tier I submittals will be allowed for a project which does not include the following Public Works Improvements: water or sewer main extensions, a storm drainage plan, curb/gutter, sidewalk, street lighting, and asphalt installation. The City of Ellensburg Engineering staff, if time allows, may upon written request, complete the design for curb and gutter, sidewalk installation, and water and sewer extension under 100 for Single Family Residential applicants and Short Plats up to 4 lots, which would allow the applicants to remain in Tier I if no other Public Works Improvements were required. The applicants permit will include the cost of any design work to be performed by City personnel. Tier II submittals will be required for any project which includes the Public Works Improvements stated above. Tier I or II: Multi-Family Residential: Tier I submittal will be allowed for a project which does not include the following Public Works Improvements: water or sewer main extensions, a storm drainage plan, parking plan, curb and gutter, sidewalk, street lighting, and asphalt installation. Tier II submittals will be required for any project which includes the Public Works Improvements stated above. Tier III: Tier III: Tier III: Tier III: Commercial and Industrial: See Tier III information Short Plat: See Tier III information Long Plat: See Tier III information Subdivision: See Tier III information 8
9 Tier I Drafting Guidelines Drawn to scale site plan showing accurate representation of the size and shape of the subject parcel(s) including easements, lot dimensions, and parcel orientation. Include appropriate scale and north arrow. The minimum paper size shall be 11 x 17. Locations, dimensions and height of all existing and proposed buildings and structures, existing utilities, fences, ect. Show dimensions from property lines. Existing and proposed curb, sidewalks, curb cuts and street trees. Location and layout of the required off street parking. Location and layout of existing or proposed utilities and utility services, including water, sewer, gas, electric, telephone, cable locations and street lights. Standard Detail Drawings: Shall be included in one of the following manners: 1.) Included on the engineering plans and profile sheets, if the finished product does not become cluttered. 2.) Included on a separate detail sheet. 3.) Referenced by specific City of Ellensburg Standard Drawing name and numbers in the construction notes on the plans and profile sheets. General Notes of the construction. 9
10 Tier II Drafting Guidelines All required information from Tier I as superceded by Tier II Plans shall be stamped and signed by a Professional Civil Engineer, registered in the State of Washington. All final plans shall be prepared on mylar, or reproducible paper. The standard sheet size is 24 inches x 36 inches, additional plan sizes may be accepted with the approval of the Public Works Department. Final plans shall also be submitted in electronic form on CD media in a format readable by the City s current version of AutoCAD. At a minimum the following information is required: Cover sheet (required for projects with 4 or more sheets), with vicinity map, legal description, datum and benchmark reference, and Engineers and Developer s name, address, telephone and fax numbers. If no cover sheet is submitted all information listed above shall be included on the other sheets. Civil plans and profiles sheet(s) shall show the layout of existing structures, utilities, sidewalks, curbs, rights-of-ways, easements, parking, property lines, ect. in fine gray lines and text. The proposed improvements, such as water and sewer mains, storm drainage systems, roadway (private or public), curbs, sidewalks, illumination poles, structures, utility services, ect. shall be in bold and black lines and text. Parking plan is required for any applicant who will be required to have 5 or more parking stalls. Standard Detail Drawings: Shall be included in one of the following manners: 1.) Included on the engineering plans and profile sheets, if the finished product does not become cluttered. 2.) Included on a separate detail sheet. 3.) Referenced by specific City of Ellensburg Standard Drawing name and numbers in the construction notes on the plans and profile sheets. 10
11 Tier III Drafting Guidelines Plans shall be stamped and signed by a Professional Civil Engineer, registered in the state of Washington. All final plans shall be prepared on mylar, or reproducible paper. The standard sheet size is 24 inches x 36 inches, additional plan sizes may be accepted with the approval of the Public Works Department. Final plans shall also be submitted in electronic form on CD media in a format readable by the City s current version of AutoCAD. Each of the following sheets which pertain to proposed project shall be included in submittal. The applicant has the option of merging plans in the following combination, if the finished product does not become cluttered: Water and Sewer Plan Storm, Road, and Parking Plan Clearing and Grading Plan Cover sheet: (required for projects with 4 or more sheets), with vicinity map, legal description, datum and benchmark reference, and Engineers and Developer s name, address, telephone and fax numbers. If no cover sheet is submitted all information listed above shall be included on the other sheets. Detailed Clearing and Grading Sheet: Dimensions of all property lines, easements, and abutting streets, location and dimensions of all on site structures, accurate contour lines at 1ft. intervals, location of any watercourses, top and toe of critical slopes, setback areas, existing drainage channels or detention ponds, location of trees clearly marked remove or save, and limits of clearing and grading. Sewer Sheet: Showing existing topography, limits of existing and proposed asphalt, curb and sidewalk alignments, existing utilities, rights-of-way, existing or proposed easements in fine gray lines and text. A detailed sanitary sewer plan in bold, black lines and text shall include size, length, slope, and type of pipe, location, size, and depth or elevation of any cleanouts and/or manholes, location and design depth of stub outs provided, typical trench backfill section, and connection to existing main. Sewer sheet shall also include a profile of the sewer construction. Water Sheet: Showing existing topography, limits of existing and proposed asphalt, curb and sidewalk alignments, existing utilities, rights-of-way, existing or proposed easements in fine gray lines and text. A detailed water plan in bold, black lines and text shall include location of new and existing water meters with meter sizes and service line size from meter to public main, connection to existing 11
12 water mains, pipe size and length, type of pipe, type and size of fittings, appurtenances, hydrants (location, type, and port direction), valves (location, size, and type), pipe restraint requirements and/or thrust blocking. Calculations showing the detention and treatment of stormwater meeting the requirements set forth in the Storm Drainage section of the Development Standards shall be submitted by a Professional Civil Engineer, registered in the state of Washington. Storm Drainage Control Plan: Showing existing topography, limits of existing and proposed asphalt, curb and sidewalk alignments, existing utilities, rights-ofway, existing or proposed easements in fine gray lines and text. A detailed storm drainage plan in bold, black lines and text shall include existing and proposed storm systems specifying all pipe (type, size, length, and slope), existing and proposed structures (catch basin type, size, rim and invert elevations), detention systems, details of control manholes, and water quality mitigation. Public and Private Access Drives: Showing existing topography, limits of existing edge of asphalt and curb and sidewalk alignments, existing utilities, rights-of-way, existing or proposed easements in fine gray lines and text. A detailed road plan in bold, black lines and text shall include limits of new right-ofway, construction centerline, horizontal and vertical alignment of new road(s) and how it meets existing roads, curb and sidewalk locations, street trees, channelization and signing plan, new construction referenced to the construction centerline (station and offset), and typical road sections showing thickness and type of base course, top course, asphalt. Parking Plan: Commercial and Industrial construction shall be required to submit an engineered parking plan. Standard Detail Drawings: Shall be included in one of the following manners: 1.) Included on the engineering plans and profile sheets, if the finished product does not become cluttered. 2.) Included on a separate detail sheet. 3.) Referenced by specific City of Ellensburg Standard Drawing name and numbers in the construction notes on the plans and profile sheets. The City of Ellensburg reserves the right to request additional pertinent information 12
The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:
Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section
TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African
TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African Regional Office 01 CHAPTER ONE Checklist Page 2 of 8
UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Civil. Topographical Survey. Design Evaluation. Construction Submittals
This section applies to design standards and procedures involved in the field location and plotting of all natural objects and surface improvements. This section also includes the requirements for submittal
CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT
Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering
SITE IMPROVEMENT PLANS CHECKLIST
REVIEW SERVICES TEAM SITE IMPROVEMENT PLANS CHECKLIST (Also for SITE DEVELOPMENT PERMIT applications) GENERAL REQUIREMENTS This checklist applies to commercial building site work involving engineering,
SEWER LINE EXTENSION DESIGN CHECKLIST
SEWER LINE EXTENSION DESIGN CHECKLIST SWLE# Utilities Staff Date DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling design plans for
CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST
CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST NOTE: The following list shall only be used as a guide and shall not be used in lieu of the specifications found in the CITY OF ANN ARBOR PUBLIC
SECTION 01 78 29 AS-BUILT DOCUMENTATION
SECTION 01 78 29 AS-BUILT DOCUMENTATION PART 1: GENERAL 1.01 AS-BUILTS Where identified as a product of the Work, provide as-built drawings adhering to the criteria provided here and in the special conditions.
WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24
Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS
ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE
ORDINANCE NO. 2013 -
ORDINANCE NO. 2013 - AN ORDINANCE OF BREVARD COUNTY, FLORIDA AMENDING CHAPTER 62, LAND DEVELOPMENT REGULATIONS SECTION 62-2891, LOT DRAINAGE, AND CHAPTER 22 BUILDINGS AND BUILDING REGULATIONS, SECTION
FIBER-OPTIC CABLE PLAN CHECK
Engineering Division 201 North Broadway, Escondido, CA 92025 (760) 839-4651, FAX (760) 839-4597 FIBER-OPTIC CABLE PLAN CHECK To: Date: Project: Project No. Address: Check No. Attn: Via: The attached plans
CHAPTER 6 SEWER SYSTEM DESIGN STANDARDS
CHAPTER 6 SEWER SYSTEM DESIGN STANDARDS TABLE OF CONTENTS CHAPTER 6 SEWER SYSTEM DESIGN STANDARDS 6.00 Objective Page 1 6.01 Additional Referenced Standards Page 2 6.02 Special Design Problems Page 2 6.03
CHAPTER 5. Storm Sewer
CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water
STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND AND WATER. GENERAL SURVEY INSTRUCTIONS EASEMENTS Authority 11 AAC 53
STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND AND WATER GENERAL SURVEY INSTRUCTIONS EASEMENTS Authority 11 AAC 53 These instructions define the survey and platting criteria unique
Brevard County Public Works Finance and Contracts Administration
Brevard County Public Works Finance and Contracts Administration Public Works Survey & Mapping Division Review Check Sheet for Land Acquisition, Drainage, Roadway and Pedway Expansion, Asbuilts, Maintenance
Chapter 9 Sanitary Sewers
Chapter 9 Sanitary Sewers S:/Engineering/Design Standards/Chapter 9 12/29/2014 Section 9.1 Topic General Requirements Chapter 9 Sanitary Sewers Page 9-1 9.2 Plan Submittals 9-1 9.3 Determination of Flow
Requirements for Building Application Submission
THE DEVELOPMENT CONTROL AND PLANNING BOARD P O Box 597 Phone: 869 465-2277 Bladen Commercial Development Fax: 869 465-5842 Basseterre, St. Kitts Email: [email protected] To: Architects, Designers
CITY OF TUCSON, WATER DEPARTMENT DESIGN STANDARD NO. 8-07 WATER PLAN DRAFTING STANDARDS TABLE OF CONTENTS
TABLE OF CONTENTS 8-07.0.0... 3 8-07.1.0 GENERAL... 3 1.1 Purpose... 3 1.2 Definitions... 3 1.3 Applicability... 3 8-07.2.0 CONTENT REQUIREMENTS, WATER PLAN SHEETS... 3 2.1 Content Requirements, All Plan
PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
City of Colleyville Community Development Department. Site/Landscape Plan Application Packet
City of Colleyville Community Development Department Site/Landscape Plan Application Packet Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning
Preliminary Plan Application and Checklist
ALL APPLICATIONS ARE DUE AT 12:00 NOON ON THE FILING DATE Office Use Only PRELIMINARY / REVISED PRELIMINARY PLAN $300.00 Fee Paid: $ Date Paid: ALL FIELDS HIGHLIGHTED IN RED ARE REQUIRED FIELDS Case No.:
CITY OF FARMERSVILLE, TEXAS
CITY OF FARMERSVILLE, TEXAS MANUAL FOR THE DESIGN OF WATER AND SANITARY SEWER LINES Subdivision Ordinance #2007-08 Exhibit B February 13, 2007 TABLE OF CONTENTS Description Page No. General... 1 Water
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
Basic Elements of Reading Plans
Center for Land Use Education and Research at the University of Connecticut Basic Elements of Reading Plans University of Connecticut. The University of Connecticut supports all state and federal laws
Guidelines for Fiber Optic Cable Permits
Guidelines for Fiber Optic Cable Permits NOVA District (Fairfax/Arlington) Permits www.virginiadot.org/business/fairfax-permits-main.asp Email: [email protected] 14685 Avion Parkway
SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR
SERVICES THAT MAY ONLY BE PERFORMED BY A NEW JERSEY PROFESSIONAL LAND SURVEYOR 1. ANY MAP OR PLAN THAT SHOWS: Property Lines. NJSA 45:8-28(e), NJAC 13:40-1.3, 13:40-5.1 Locations of Existing Buildings
Washington City Subdivision Development Application Checklist 435-656-6325
Application Checklist 1 Washington City Subdivision Development Application Checklist 435-656-6325 1) Wednesday Staff and Developer Meeting. *Call to schedule an appointment. A. Statement of project intent
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
APPLICATION FOR TENTATIVE MAPS
APPLICATION FOR TENTATIVE MAPS Planning Division 38250 Sierra Highway Palmdale, CA 93550 (661) 267-5200 [email protected] Tentative Case No.: Date: Received by: Print Name INSTRUCTIONS TO
City of Houston Department of Public Works and Engineering INFRASTRUCTURE DESIGN MANUAL JULY 2009 TABLE OF CONTENTS
City of Houston Department of Public Works and Engineering INFRASTRUCTURE JULY 2009 TABLE OF CONTENTS Chapter No. of Pages 1 General Requirements...8 2 Survey Requirements...8 3 Graphic Requirements...13
3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
City of La Quinta Public Works Department - Storm Drain Plan Review Checklist
Tract or Parcel Project Name PCN Checked By Date City of La Quinta Public Works Department - Storm Drain Plan Review Checklist SUBMITTAL REQUIREMENTS Approved Tentative Tract Map Conditions of Approval
CITY OF COLTON PUBLIC WORKS/ENGINEERING DEPARTMENT STORM DRAIN PLAN REVIEW CHECKLIST (PROVIDE SEPARATE ON-SITE & OFF-SITE STORM DRAIN PLAN SETS)
CITY OF COLTON PUBLIC WORKS/ENGINEERING DEPARTMENT STORM DRAIN PLAN REVIEW LIST (PROVIDE SEPARATE ON-SITE & OFF-SITE STORM DRAIN PLAN SETS) PROJECT NAME: TRACT, PARCEL MAP OR PROJECT ID NO. PLAN ED BY:
SECTION 15410 GROUND WATER STORAGE TANKS
SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design
SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
SECTION 5: SANITARY SEWER SYSTEM DESIGN
SECTION 5: SANITARY SEWER SYSTEM DESIGN 5.01 GENERAL Sanitary sewer improvements shall be designed to serve the ultimate level of City development as defined in the General Plan and the Wastewater Facilities
Site Development Information Worksheet for single family residential development
Site Development Information Worksheet for single family residential development Project description: Address: Owner Name: Phone No. Date Signature & phone number of Individual who Completed this Worksheet
Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans
APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may
INDEX STORM DRAINAGE PRE-APPROVED NOTES, DESIGN CRITERIA, & PLANS
INDEX STORM DRAINAGE POLICIES D-1 NOT USED D-2 Small Project Drainage Review Requirements D-3 Targeted and Full Drainage Review Requirements D-4 Prohibited and Allowed Discharges to the Storm Drainage
City of West Linn Public Works Design Standards 2010. Table of Contents
City of West Linn Public Works Design Standards Table of Contents SECTION TWO STORM DRAIN REQUIREMENTS... 1 2.0000 STORM DRAINS... 1 2.0010 General Design Requirements...1 2.0011 Site Drainage Plans...2
PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations
Gas Meter Clearances and Service Installation Requirements
March 2015 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE s Customer Construction Services 1-888-321-7779 or visit PSE.com/CustomerConstruction
I. Project Initiation Sheet (if any information changed since Concept Plan submittal)
Development Services 201 W. Colfax Avenue, Dept. 203 Denver, CO 80202 P: 720-865-2982 www.denvergov.org/developmentservices Formal Site Development Plan Submittal Checklist General Submittal Requirements
Gas Meter Clearances and Service Installation Requirements
March 2016 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE's Customer Construction Services 1 888 321 7779 or visit PSE.com/CustomerConstruction
2005 MINIMUM STANDARD DETAIL REQUIREMENTS FOR ALTA/ACSM LAND TITLE SURVEYS
2005 MINIMUM STANDARD DETAIL REQUIREMENTS FOR ALTA/ACSM LAND TITLE SURVEYS as adopted by American Land Title Association and National Society of Professional Surveyors (a member organization of the American
DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods
DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the
Storm Drainage Systems 11.9-1
Storm Drainage Systems 11.9-1 11.9 Gutter Flow Calculations 11.9.1 Introduction Gutter flow calculations are necessary in order to relate the quantity of flow (Q) in the curbed channel to the spread of
Beacon Hill Sewer District Standard Specifications
Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions
SITE PLAN REVIEW APPLICATION
SITE PLAN REVIEW APPLICATION 405 Martin Luther King Jr. Blvd phone (919) 968-2728 fax (919) 969-2014 www.townofchapelhill.org Parcel Identifier Number (PIN): Date: Section A: Project Information Section
ADA POST INSPECTION CHECKLIST. Job No. Route County Location
ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
G.S. 47-30 Mapping Requirements for Recordable Maps
G.S. 47-30 Mapping Requirements for Recordable Maps 47-30. Plats and subdivisions; mapping requirements. (a) Size Requirements. All land plats presented to the register of deeds for recording in the registry
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)
DATE: March 8, 2006 TO: FROM: SUBJECT: Plan Commission Larry D. Nelson, P.E., City Engineer 5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) The City Engineering
SECTION 3 SANITARY SEWER DESIGN
SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary
8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:
. Introduction Presented in this chapter are the criteria and methodology for design and evaluation of storm sewer inlets located in Town of Castle Rock. The review of all planning submittals will be based
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...
SECTION 7 UNDERDRAIN SERVICE
SECTION 7 UNDERDRAIN SERVICE ARTICLE I USE OF THE PUBLIC UNDERDRAIN SYSTEM 7.100 The purpose of the District s underdrain system is to provide a method for conveying ground water from around building foundations
1161.01 CONFORMITY WITH PLANS; DRAINAGE.
CHAPTER 1161 Subdivision Requirements 1161.01 Conformity with plans; drainage 1161.07 Easements 1161.02 Trees 1161.08 Streets 1161.03 Subdivision name 1161.09 Blocks 1161.04 Street names 1161.10 Lots 1161.05
THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:
THE CORPORATION OF THE CITY OF GUELPH By-law (1993)-14515 A by-law respecting storm water disposal from private property in the City of Guelph, to amend By-law (1987)-12602 and to adopt Municipal Code
SECTION 108 - INLETS 108.1 INLET LOCATIONS
Greene County Design Standards -Adopted April 5, 1999 SECTION 108 - INLETS SECTION 108 - INLETS 108.1 INLET LOCATIONS 108.2 INLET INTERCEPTION CAPACITIES 108.2.1 Clogging Factors 108.3 INTERCEPTION AND
BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS
Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter
SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
STORMWATER MANAGEMENT CHECKLIST
STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative
SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN
S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
Standards for Water, Sewer, and Sewage Lift Station Design
Standards for Water, Sewer, and Sewage Lift Station Design February 2015 Edition I. Plan Format Requirements General Requirements Water Line Requirements Sewer Line Requirements II. III. IV. Water Design
STORM DRAINS CHAPTER 7
CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect
MUNICIPAL ENGINEERING RESIDENTIAL SUBDIVISON STANDARDS
Infrastructure and Public Works Department Engineering Services City of Mount Pearl Telephone: (709) 748-1018 3 Centennial Street Fax: (709) 748-1150 Mount Pearl, NL E-mail: [email protected]
Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow
AutoCAD Civil 3D 2008 Using Hydraflow Storm Sewers Extension with AutoCAD Civil 3D 2008: A Recommended Workflow The ability to perform storm water hydrology and hydraulic (H&H) tasks is crucial to civil
Right-of-Way Permit Application Process (Plans that affect District owned or maintained right-of-way)
Flood Control District of Maricopa County (District) 2801 W. Durango Street Phoenix, AZ 85009 Telephone: 602-506-4583 or 602-506-5476 Fax: 602-506-1663 Right-of-Way Permit Application Process (Plans that
720 Contour Grading. General. References. Resources. Definitions
720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable
ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.
ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets
Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST
CHAPTER 11 STORM DRAINAGE
CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be
Electronic Signature and Fee Payment Confirmation
Jeff Levine, AICP, Director Planning & Urban Development Department Electronic Signature and Fee Payment Confirmation Notice: Your electronic signature is considered a legal signature per state law. By
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
CHAPTER 3 STORM DRAINAGE SYSTEMS
CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next
SOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33,100. 3 Mile: Population: 80,200 Median HH Income: $34,900
Walmart Outparcels For Sale College Station, TX Store # 1150 1815 Brothers Blvd FM 2818 W SOLD Texas Ave S/ Hwy 6 Longmire Dr Brothers Blvd Lot 1 For more information about this site, contact: Lot 1: ±2.41
City of Lubbock Public Works Engineering Design Standards and Specifications
City of Lubbock Public Works Engineering Design Standards and Specifications Department of Public Works Engineering City of Lubbock, Texas January 1, 2012 These Standards and Specifications are general
CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
TITLE VIII ST. ROBERT CODE OF ORDINANCES INFRASTRUCTURE DEVELOPMENT REGULATIONS OF THE CITY OF ST. ROBERT, MISSOURI
TITLE VIII ST. ROBERT CODE OF ORDINANCES INFRASTRUCTURE DEVELOPMENT REGULATIONS OF THE CITY OF ST. ROBERT, MISSOURI A UNIFIED REGULATION GOVERNING THE DEVELOPMENT OF STREET, WATER, SANITARY SEWER INFRASTRUCTURE
OAKLAND COUNTY WATER RESOURCES COMMISSIONER ENGINEERING DESIGN STANDARDS FOR STORM WATER FACILITIES
OAKLAND COUNTY WATER RESOURCES COMMISSIONER ENGINEERING DESIGN STANDARDS FOR STORM WATER FACILITIES Requirements, Rules and Design Criteria for Storm Water Management January 1, 2006 Revised May 13, 2013
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
Close-Out Documents... 9
Water and Sanitary Sewer Service Connection Requirements Service Connection Requirements... 1 Application for Services... 2 Water Meter Application... 2 Wet Tap/Tie-in Connection Requirements... 3 Meter
MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3
TOWN OF SIDNEY Multi-Family, Commercial, Industrial and Institutional Building Permit Guide The information provided is intended as a guide only and does not replace current bylaws and regulations. Complete
CITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.