1 and Condition Assessment Plan 4.1 Introduction Purpose This addresses the requirements of Section IV.A. of the EPA Order. The plan documents the progress that each agency has made to date regarding sewer inspection, and also documents the practices and schedules that the Sewerage Agency of Southern Marin (SASM), Almonte Sanitary District, Alto Sanitary District, City of Mill Valley, Homestead Valley Sanitary District (HVSD), Richardson Bay Sanitary District (RBSD), and Tamalpais Community Services District (TCSD) will follow when they inspect sewer pipes and manholes in the future in order to assess the condition of inspected facilities Requirements of the EPA Amended Order for Compliance The EPA Order, Section IV.A. includes the following requirements: IV. COLLECTION SYSTEM ASSESSMENTS A. Sewer and Condition Assessment: 1. By April 15, 2009, SASM and the member agencies each shall submit a plan to EPA for periodic inspection and assessment of the condition of gravity sewers and maintenance holes throughout the agency s collection system. The inspection and condition assessment program shall be sufficient to evaluate the condition of pipes following blockage-related spills, identify pipes in need of emergency repair, and provide a schedule for completion of a system-wide condition assessment no later than April 15, The requirements for system-wide condition assessment may be satisfied with reliable data obtained from an inspection and assessment conducted within the last five years. The plan shall describe: a. Inspection methods to be used, including direct visual inspection, closed circuit television (CCTV) inspection, and whether SASM and the member agencies will purchase, lease or contract for CCTV inspection equipment;. b. An inspection schedule including an estimation of the miles of sewer pipe and number of maintenance holes that will be inspected each year for the next two years; and c. A system for timely evaluation of inspection findings and documentation of the assessed condition. 2. By October 15, 2008, SASM and the member agencies each shall submit a report to EPA summarizing inspections and condition assessments completed during the previous five years. The report shall include activities conducted to complete an inspection and condition assessment plan by April 15, By October 15, 2009, SASM and the member agencies each shall submit an annual progress report to EPA summarizing the inspection methods and findings of sewer pipe condition assessments conducted during the previous year and the estimated miles of sewer pipe and number of maintenance holes to be inspected during the current year. August

2 4. By October 15, 2010, SASM and the member agencies shall submit a final report summarizing the findings of the inspections and condition assessments required by Paragraph IV.A.1. This Inspection addresses the requirements of the EPA Order. August

3 4.2 Sewerage Agency of Southern Marin Recent Sewer Inspection and Condition Assessment Activities Previously Inspected Areas During the five years prior to issuance of the Order, SASM has collected a significant quantity of sewer inspection data. Figure 4-1 summarizes which sewers have been previously inspected Evaluation Methods SASM typically utilizes a defect coding system to identify the type and severity of each defect in each sewer pipe that has been inspected. The following section summarizes the defect coding system and the defect rating system that was utilized in the past. Defect Coding Systems SASM utilized a customized defect coding system utilized by several agencies in Northern California. This defect rating system identifies the type and severity of defects and also has a rating score associated with some defects. The defect coding system that will be utilized in the future is described below. Condition Rating Systems The condition rating system for sewer pipe inspections performed prior to April 10, 2008 is known as the fault ratio. The fault ratio is calculated by taking the sum of the rating scores for all defects found in one pipe segment divided by the lineal feet of pipe in the pipe segment, or: Fault Ratio = (Sum of DEFECT RATING SCORES) / (LINEAL FEET OF PIPE SEGMENT) The fault ratio system was designed to quickly determine the relative condition of each line segment that had been inspected. The following fault ratio ranges were developed to assign a condition rating: < 5 Good condition > 5 and <10 Marginal condition >10 Poor condition Utilizing this formula and these condition rating definitions, Table 4-1 summarizes the condition ratings for the pipes in the SASM service area that have previously been inspected. August

4 Figure 4-1: SASM Pipes Inspected after April 10, 2003 and prior to April 10, 2008 August

5 Table 4-1: SASM Condition Rating Summary Pipes Inspected April 10, 2003 to April 10, 2008 Condition Rating Rating Description # of Pipe Segments Lineal Feet of Sewer Mains Good Does not require repair or rehabilitation ,175 Marginal Some deterioration but should not require rehabilitation in the near future. 9 3,289 Poor Significant deterioration. Should be considered for rehabilitation in the Rehabilitation and Replacement Plan Totals 70 15,453 The condition rating system that will be utilized for inspection data collected after April 10, 2008 is described below. Also, a more detailed method to identify non-emergency sewer repair, rehabilitation and replacement projects will be documented in the plan for short-term and long-term repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, Documentation and Recordkeeping All defects observed have been documented. A copy of all defect code data and the video will be retained for evaluation and to support preparation of the plan for short-term and long-term repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, Planned Inspection and Condition Assessment Program SASM plans to inspect the remaining gravity sewer pipes and manholes that have not been recently inspected. These remaining sewers will be inspected prior to April 15, Table 4-2 summarizes the quantity of sewers that have been inspected and the quantity of pipes in the planned inspection program. Table 4-2: SASM Inspection and Condition Assessment Program Summary SASM Sewer Mains Lineal Feet of Sewer Mains Pipes Database 61,850 Agency Force Mains (Remove) (33,767) Gravity Pipes Subtotal 28,083 Inspected between April 13, 2003 and April 10, 2008 (15,453) Total Lineal Feet to be Inspected Prior to April 15, ,630 Table 4-3 summarizes the schedule for future sewer inspections through April 15, Table 4-3: SASM Inspection Schedule through April 15, 2010 Planned Inspection Lineal Feet of Sewer Mains Between April 10, 2008 and April 15, Between April 16, 2009 and April 15, ,630 Totals 12,630 Manholes will typically be inspected at the same time that the pipe downstream of the manhole is inspected. August

6 Planned Inspection Methods The current intention is to utilize inspection contractors to collect all CCTV inspection data discussed in this Inspection. For mains with maintenance holes located in readily accessible locations, CCTV data will be collected with the use of fully equipped CCTV vehicles. The vehicles will be equipped with a digital or VHS recording device. Each vehicle will carry all of the inspection, video capture, and recording equipment needed to televise a sewer pipe. CCTV contractors will use pan and tilt cameras which allow the operator to remotely rotate the camera in the sewer pipe and focus on the object being observed. Pan and tilt cameras are preferred because they give the inspectors increased flexibility in identifying and assessing the main infrastructure as well as the service lateral connections. For mains with maintenance holes that are located in remote or difficult to access areas, inspection contractors may need to utilize a portable push camera set up. This camera may not have a prehensile head, but will still be capable of viewing, recording and identifying defects located in the pipe Evaluation Procedure The inspection data will be used to assign a condition grade based on the quantity and the types of defects found in each pipe section. Defect Rating System This inspection program will utilize the Pipeline Assessment and Certification Program (PACP) and the Manhole Assessment and Certification Program (MACP) defect rating systems, which was developed by the National Association of Sewer Service Companies (NASSCO). The PACP and MACP systems require CCTV operators to code defects either by structural or maintenance defect. Each defect code is assigned a grade of 1 to 5, with 1 being the least severe and 5 being the most severe defect. These grades only consider the internal pipe conditions obtained from the televised inspection. After a sewer segment or manhole has been inspected, a grading system will be applied to evaluate the overall condition of the system and to identify pipe segments and manholes with the most severe defects. Other defect rating systems may be utilized. If an alternate defect rating system is utilized, the system will be identified in the annual progress reports for the Inspection. Condition Grading System To evaluate the current condition of the system, this inspection and condition assessment program will utilize a Quick Rating for each pipe segment or manhole. The quick rating will indicate the number of occurrences for the two highest severity grades for each pipe segment for either maintenance or structural defects. A grade of 1 indicates that a pipe segment or manhole is in excellent condition with minor defects and failure is unlikely in the foreseeable future, while a grade of 5 indicates that a pipe segment may require immediate attention. An example of a quick rating may be: 5249, where there are two defects with a grade 5 rating, and 9 defects with a grade 4 rating. Other condition grading systems may be utilized. If an alternate condition grading system is utilized, the system will be identified in the annual progress reports for the Inspection. The method to identify non-emergency sewer repair, rehabilitation and replacement projects will be documented in the plan for short-term and long-term repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, Documentation and Recordkeeping All defects observed will be documented by the inspection contractor. A copy of all defect code data and the video will be retained for evaluation and to support preparation of the plan for short-term and long- August

7 term repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, The final format of the defect code data to be archived may vary depending on the selected contractor s documentation practices, but the data will be in the form of a written report, electronic spreadsheet or an electronic database that can be readily accessed and reviewed Inspection Schedule 2008 through April 15, 2010 Table 4-2 summarizes the overall status of the collection system inspection and rehabilitation program, and Figure 4-1 shows the locations of the pipes and manholes that were excluded from the current inspection program. The remaining pipes (12,630 lineal feet) and manholes in the system are scheduled for inspection before April 15, 2010, and are also shown in Figure 4-1. Table 4-3 shows that 12,630 lineal feet are scheduled for inspection prior to April 15, August

8 4.3 Almonte Sanitary District Recent Sewer Inspection and Condition Assessment Activities Previously Inspected Areas During the five years prior to issuance of the Order, Almonte collected some sewer inspection data. However, when the inspections were performed, Almonte s contractor was primarily visually inspecting the sewers to identify and repair defects. When major defects were found, a repair was performed. However, detailed defect code data and condition rating data was not collected during these inspections. Therefore, Almonte has elected to re-inspect the entire gravity sewer system after the Order was issued on April 10, 2008 and prior to the April 15, 2010 deadline for completion of the inspection program as stated in the Order Evaluation Methods Defect Coding Systems The defect coding system that will be utilized in the future is covered below. Condition Rating Systems The condition rating system that will be utilized for inspection data collected after April 10, 2008 is documented below. Also, a more detailed method to identify non-emergency sewer repair, rehabilitation and replacement projects will be documented in the plan for short-term and long-term repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, Documentation and Recordkeeping As documented above, records of past inspection of sufficient detail to support preparation of the plan for short-term and long-term repair, rehabilitation and replacement of sewers does not exist. Future inspection will be detailed as detailed below Planned Inspection and Condition Assessment Program Almonte plans to inspect the entire gravity sewer system prior to April 15, Table 4-4 summarizes the schedule for future sewer inspections through April 15, Table 4-4: Almonte Inspection Schedule through April 15, 2010 Planned Inspection Lineal Feet of Sewer Mains Between April 10, 2008 and April 15, ,303 Between April 16, 2009 and April 15, Totals 34,303 Manholes will typically be inspected at the same time that the pipe downstream of the manhole is inspected Planned Inspection Methods The current intention is to utilize inspection contractors to collect all CCTV inspection data discussed in this Inspection. For mains with maintenance holes located in readily accessible locations, CCTV data will be collected with the use of fully equipped CCTV vehicles. The vehicles will be equipped with a digital or VHS recording device. Each vehicle will carry all of the inspection, video capture, and recording equipment needed to televise a sewer pipe. CCTV contractors will use pan and tilt cameras which allow the operator August

9 to remotely rotate the camera in the sewer pipe and focus on the object being observed. Pan and tilt cameras are preferred because they give the inspectors increased flexibility in identifying and assessing the main infrastructure as well as the service lateral connections. For mains with maintenance holes that are located in remote or difficult to access areas, inspection contractors may need to utilize a portable push camera set up. This camera may not have a prehensile head, but will still be capable of viewing, recording and identifying defects located in the pipe Evaluation Procedure The inspection data will be used to assign a condition grade based on the quantity and the types of defects found in each pipe section. Defect Rating System This inspection program will utilize the Pipeline Assessment and Certification Program (PACP) and the Manhole Assessment and Certification Program (MACP) defect rating systems, which was developed by the National Association of Sewer Service Companies (NASSCO). The PACP and MACP systems require CCTV operators to code defects either by structural or maintenance defect. Each defect code is assigned a grade of 1 to 5, with 1 being the least severe and 5 being the most severe defect. These grades only consider the internal pipe conditions obtained from the televised inspection. After a sewer segment or manhole has been inspected, a grading system will be applied to evaluate the overall condition of the system and to identify pipe segments and manholes with the most severe defects. Other defect rating systems may be utilized. If an alternate defect rating system is utilized, the system will be identified in the annual progress reports for the Inspection. Condition Grading System To evaluate the current condition of the system, this inspection and condition assessment program will utilize a Quick Rating for each pipe segment or manhole. The quick rating will indicate the number of occurrences for the two highest severity grades for each pipe segment for either maintenance or structural defects. A grade of 1 indicates that a pipe segment or manhole is in excellent condition with minor defects and failure is unlikely in the foreseeable future, while a grade of 5 indicates that a pipe segment may require immediate attention. An example of a quick rating may be: 5249, where there are two defects with a grade 5 rating, and 9 defects with a grade 4 rating. Other condition grading systems may be utilized. If an alternate condition grading system is utilized, the system will be identified in the annual progress reports for the Inspection. The method to identify non-emergency sewer repair, rehabilitation and replacement projects will be documented in the plan for short-term and long-term repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, Documentation and Recordkeeping All defects observed will be documented by the inspection contractor. A copy of all defect code data and the video will be retained for evaluation and to support preparation of the plan for short-term and longterm repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, The final format of the defect code data to be archived may vary depending on the selected contractor s documentation practices, but the data will be in the form of a written report, electronic spreadsheet or an electronic database that can be readily accessed and reviewed Inspection Schedule 2008 through April 15, 2010 Table 4-4 shows that 34,303 lineal feet are scheduled for inspection prior to April 15, August

10 4.4 Alto Sanitary District Recent Sewer Inspection and Condition Assessment Activities Previously Inspected Areas During the five years prior to issuance of the Order, Alto did not collect detailed sewer inspection data. Therefore, Alto has elected to inspect the entire system between April 10, 2008 and April 15, 2010, the deadline for completion of the inspection program as stated in the Order Evaluation Methods Defect Coding Systems The defect coding system that will be utilized in the future is covered below. Condition Rating Systems The condition rating system that will be utilized for inspection data collected after April 10, 2008 is documented below. Also, a more detailed method to identify non-emergency sewer repair, rehabilitation and replacement projects will be documented in the plan for short-term and long-term repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, Documentation and Recordkeeping As documented above, records of past inspection of sufficient detail to support preparation of the plan for short-term and long-term repair, rehabilitation and replacement of sewers does not exist. Future inspection will be detailed as detailed below Planned Inspection and Condition Assessment Program Alto plans to inspect the entire gravity sewer system prior to April 15, Table 4-5 summarizes the schedule for future sewer inspections through April 15, Table 4-5: Alto Inspection Schedule through April 15, 2010 Planned Inspection Lineal Feet of Sewer Mains Between April 10, 2008 and April 15, ,874 Between April 16, 2009 and April 15, Totals 14,874 Manholes will typically be inspected at the same time that the pipe downstream of the manhole is inspected Planned Inspection Methods The current intention is to utilize inspection contractors to collect all CCTV inspection data discussed in this Inspection. For mains with maintenance holes located in readily accessible locations, CCTV data will be collected with the use of fully equipped CCTV vehicles. The vehicles will be equipped with a digital or VHS recording device. Each vehicle will carry all of the inspection, video capture, and recording equipment needed to televise a sewer pipe. CCTV contractors will use pan and tilt cameras which allow the operator to remotely rotate the camera in the sewer pipe and focus on the object being observed. Pan and tilt cameras are preferred because they give the inspectors increased flexibility in identifying and assessing the main infrastructure as well as the service lateral connections. August

11 For mains with maintenance holes that are located in remote or difficult to access areas, inspection contractors may need to utilize a portable push camera set up. This camera may not have a prehensile head, but will still be capable of viewing, recording and identifying defects located in the pipe Evaluation Procedure The inspection data will be used to assign a condition grade based on the quantity and the types of defects found in each pipe section. Defect Rating System This inspection program will utilize the Pipeline Assessment and Certification Program (PACP) and the Manhole Assessment and Certification Program (MACP) defect rating systems, which was developed by the National Association of Sewer Service Companies (NASSCO). The PACP and MACP systems require CCTV operators to code defects either by structural or maintenance defect. Each defect code is assigned a grade of 1 to 5, with 1 being the least severe and 5 being the most severe defect. These grades only consider the internal pipe conditions obtained from the televised inspection. After a sewer segment or manhole has been inspected, a grading system will be applied to evaluate the overall condition of the system and to identify pipe segments and manholes with the most severe defects. Other defect rating systems may be utilized. If an alternate defect rating system is utilized, the system will be identified in the annual progress reports for the Inspection. Condition Grading System To evaluate the current condition of the system, this inspection and condition assessment program will utilize a Quick Rating for each pipe segment or manhole. The quick rating will indicate the number of occurrences for the two highest severity grades for each pipe segment for either maintenance or structural defects. A grade of 1 indicates that a pipe segment or manhole is in excellent condition with minor defects and failure is unlikely in the foreseeable future, while a grade of 5 indicates that a pipe segment may require immediate attention. An example of a quick rating may be: 5249, where there are two defects with a grade 5 rating, and 9 defects with a grade 4 rating. Other condition grading systems may be utilized. If an alternate condition grading system is utilized, the system will be identified in the annual progress reports for the Inspection. The method to identify non-emergency sewer repair, rehabilitation and replacement projects will be documented in the plan for short-term and long-term repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, Documentation and Recordkeeping All defects observed will be documented by the inspection contractor. A copy of all defect code data and the video will be retained for evaluation and to support preparation of the plan for short-term and longterm repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, The final format of the defect code data to be archived may vary depending on the selected contractor s documentation practices, but the data will be in the form of a written report, electronic spreadsheet or an electronic database that can be readily accessed and reviewed Inspection Schedule 2008 through April 15, 2010 Table 4-5 shows that 14,874 lineal feet are scheduled for inspection prior to April 15, August

12 4.5 City of Mill Valley Recent Sewer Inspection and Condition Assessment Activities Previously Inspected Areas During the five years prior to issuance of the Order, Mill Valley has collected a significant quantity of sewer inspection data. Figure 4-2 summarizes which sewers have been previously inspected Evaluation Methods Rather than collecting defect coding data in the past, Mill Valley had each inspection video reviewed by a qualified consultant to determine the condition of each pipe segment and to recommend future action to correct the deficiencies found in each pipe segment. The recommendations are documented in the City s current Clean and CCTV Sanitary Sewer Records. The following section summarizes how these decisions have been adapted to generate sewer condition ratings. Defect Coding Systems As noted above, Mill Valley did not utilize a formal defect coding system for past sewer inspections. The defect coding system that will be utilized in the future is described below. Condition Rating Systems The condition rating system selected for sewer pipe inspections performed prior to April 10, 2008 is as follows: A (Excellent): Has been recently removed and replaced via open trench or pipe bursting, or if the pipe is newly installed. B (Good): Generally good condition but required one or more point repairs. C (Fair): Some deterioration and has been referred for cleaning, root cutting or chemical root treatment. D (Poor): Indicates that the pipe has significant deterioration and that the pipe requires further analysis to determine whether a rehabilitation project is needed. These pipes have the following comment rehabilitation to be determined in the CCTV database. Utilizing these condition rating definitions, Table 4-6 summarizes the condition ratings for the pipes in the Mill Valley service area that have previously been inspected. August

13 and Condition Assessment Plan Figure 4-2: Mill Valley Pipes Inspected after April 10, 2003 and prior to April 10, 2008 August

14 Pipe and Maintenance Hole Inspection and Condition Assessment Plan Table 4-6: Mill Valley Condition Rating Summary Pipes Inspected April 10, 2003 to April 10, 2008 Condition Rating Rating Description # of Pipe Segments Lineal Feet of Sewer Mains A Excellent ,675 B Good C Fair 36 4,106 D Poor 12 2,465 Totals ,195 The condition rating system that will be utilized for inspection data collected after April 10, 2008 is documented below. Also, a more detailed method to identify non-emergency sewer repair, rehabilitation and replacement projects will be documented in the plan for short-term and long-term repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, Documentation and Recordkeeping All defects observed have been documented. A copy of all future defect code data and the video will be retained for evaluation and to support preparation of the plan for short-term and long-term repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, Analysis and Inspection Schedule Development Section IV.A.1 of the Order requires Mill Valley to submit a schedule for completion of a system-wide condition assessment no later than April 15, Mill Valley will not be able to meet this aggressive inspection schedule due to current budget limitations. To correct this situation, the City plans to establish a new sewer rate to be able to accomplish the sewer inspection and condition assessment program and other necessary programs. However, Mill Valley needs to fully identify future operating costs, maintenance costs, capital improvement program costs (including sewer rehabilitation and replacement), and SASM treatment costs, prior to establishment of a new rate. It is estimated that a new sewer rate will take effect by July 1, In an effort to reduce the number and severity of SSOs from the Mill Valley system, it was decided to focus limited near-term resources on sewer cleaning efforts to meet the 3-year cleaning and hot spot cleaning program required by the Order. Some limited funding does remain for sewer inspection, so Mill Valley plans to inspect a minimum of 10 miles of sewers in the elevated risk zones by April 15, In order to identify which sewers should be inspected first, Mill Valley undertook a risk analysis of the system to identify areas with elevated risk of SSOs and to identify areas with lower risk of SSOs. Figure 4-3 identifies the low SSO risk zones in Mill Valley, which include areas that were constructed more recently with modern PVC sewer pipes. The low SSO risk zones also include areas with fewer households and very low flows, and the low SSO risk zones include portions of the system that have been recently rehabilitated. Due to the fact that very few SSOs have occurred in the low SSO risk zones, Mill Valley plans to begin the sewer inspection and condition assessment program with inspection all pipes in the elevated risk zones as funding becomes available. Once the sewers in the elevated SSO risk zones have been inspected, then Mill Valley will re-evaluate the low SSO risk zones. If it is determined that SSO rates are beginning to increase in the low SSO risk zones, then Mill Valley will prepare a plan to inspect the appropriate portions of the low SSO risk zones. Mill Valley asserts that this approach will meet the intent of the Order while taking the City s budget constraints into consideration. August

15 Figure 4-3: Mill Valley Low SSO Risk Zones August

16 4.5.3 Planned Inspection and Condition Assessment Program The City of Mill Valley plans to inspect all gravity sewer pipes and manholes in the elevated risk zones prior to June 30, Some of pipes in the overall system were not scheduled for CCTV inspection because they have already been inspected, because they have already been rehabilitated or replaced, or because they fall into the low risk zones. Table 4-7 summarizes the planned inspection program: Table 4-7: Mill Valley Planned Inspection and Condition Assessment Program Summary Sewer Mains GIS Database Lineal Feet of Mains Mill Valley Pipes Database 331,778 Remove: Private Lines (9,020) Mill Valley Pipes and Pipes from Other Agencies 322,758 Remove: Owned by Others: (28,083) Mill Valley Pipes 294,675 Remove: Force Mains: (2,552) Mill Valley Gravity Pipes Subtotal: 292,123 Remove: Remove: Remove: Previously Inspected with no Rehabilitation or Replacement to Date: (24,464) Recently Rehabilitated or Replaced with Inspection Data (7,731) Recently Rehabilitated and Replaced without Inspection Data (978) Remaining Pipes in the Mill Valley System: 258,949 Remove: Pipes in Low Risk Zones: (111,008) Pipes in Elevated Risk Zones that have Not Been Inspected, Rehabilitated or Replaced: 147,941 Length of Sewers in Elevated Risk Zones to be Inspected Prior to April 15, 2010 (10 miles): 52,800 Remaining Sewers in Elevated Risk Zones to be Inspected Prior to June 30, 2013: 95,141 Table 4-8 summarizes the schedule for future sewer inspections through June 30, August

17 Table 4-8: Mill Valley Inspection Schedule through June 30, 2013 Planned Inspection Lineal Feet of Sewer Mains Between April 10, 2008 and April 15, Between April 16, 2009 and April 15, ,800 Between April 16, 2010 and April 15, ,714 Between April 16, 2011 and April 15, ,714 Between April 16, 2012 and June 30, ,713 Totals 147,941 Manholes will typically be inspected at the same time that the pipe downstream of the manhole is inspected Planned Inspection Methods CCTV data will be collected both by City crews and with CCTV contractors. CCTV data will be collected with fully equipped CCTV vehicles or with push cameras. If a CCTV contractor is utilized, the vehicles will be equipped with a digital or VHS recording device. Each vehicle will carry all of the inspection, video capture, and recording equipment needed to televise a sewer pipe. CCTV contractors will use pan and tilt cameras which allow the operator to remotely rotate the camera in the sewer pipe and focus on the object being observed. City crews and inspection contractors may also utilize portable push cameras. This type of camera may not have a prehensile head, but will still be capable of viewing and identifying defects located in the pipe Evaluation Procedure The inspection data will be used to assign a condition grade based on the quantity and the types of defects found in each pipe section. Defect Rating System This inspection program will utilize the Pipeline Assessment and Certification Program (PACP) and the Manhole Assessment and Certification Program (MACP) defect rating systems, which was developed by the National Association of Sewer Service Companies (NASSCO). The PACP and MACP systems require CCTV operators to code defects either by structural or maintenance defect. Each defect code is assigned a grade of 1 to 5, with 1 being the least severe and 5 being the most severe defect. These grades only consider the internal pipe conditions obtained from the televised inspection. After a sewer segment or manhole has been inspected, a grading system will be applied to evaluate the overall condition of the system and to identify pipe segments and manholes with the most severe defects. Other defect rating systems may be utilized. If an alternate defect rating system is utilized, the system will be identified in the annual progress reports for the Inspection. Condition Grading System To evaluate the current condition of the system, this inspection and condition assessment program will utilize a Quick Rating for each pipe segment or manhole. The quick rating will indicate the number of occurrences for the two highest severity grades for each pipe segment for either maintenance or structural defects. A grade of 1 indicates that a pipe segment or manhole is in excellent condition with minor defects and failure is unlikely in the foreseeable future, while a grade of 5 indicates that a pipe segment may require immediate attention. An example of a quick rating may be: 5249, where there are two defects with a grade 5 rating, and 9 defects with a grade 4 rating. Other condition grading systems may be utilized. If an August

18 alternate condition grading system is utilized, the system will be identified in the annual progress reports for the Inspection. The method to identify non-emergency sewer repair, rehabilitation and replacement projects will be documented in the plan for short-term and long-term repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, Documentation and Recordkeeping All defects observed will be documented by the inspection contractor or by City crews. A copy of all defect code data will be retained for evaluation and to support preparation of the plan for short-term and long-term repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, The final format of the defect code data to be archived may vary depending on the equipment utilized by City crews or the selected contractor s documentation practices, but the data will be in the form of a written report, electronic spreadsheet or an electronic database that can be readily accessed and analyzed Inspection Schedule 2008 through April 15, 2010 The City s planned sewer inspection schedule is shown in Table 4-8. Table 4-8 shows that a minimum of 52,800 lineal feet are scheduled for inspection prior to April 15, This is due to the City s funding constraints detailed in.5.2. Table 4-8 also shows that an additional 95,141 lineal feet of sewers will be inspected prior to June 30, August

19 4.6 Homestead Valley Sanitary District Recent Sewer Inspection and Condition Assessment Activities Previously Inspected Areas During the five years prior to issuance of the Order, Homestead Valley collected sewer inspection data. Figure 4-4 summarizes which sewers have been previously inspected Evaluation Methods Homestead Valley typically utilizes a defect coding system to identify the type and severity of each defect in each sewer pipe that has been inspected. The following section summarizes the defect coding system and the defect rating system that was utilized in the past. Defect Coding Systems Homestead Valley utilized a customized defect coding system utilized by several agencies in Northern California. This defect rating system identifies the type and severity of defects and also has a rating score associated with some defects. The defect coding system that will be utilized in the future is covered below. Condition Rating Systems The condition rating system for sewer pipe inspections performed prior to April 10, 2008 is known as the fault ratio. The fault ratio is calculated by taking the sum of the rating scores for all defects found in one pipe segment divided by the lineal feet of pipe in the pipe segment, or: Fault Ratio = (Sum of DEFECT RATING SCORES) / (LINEAL FEET OF PIPE SEGMENT) The fault ratio system was designed to quickly determine the relative condition of each line segment that had been inspected. The following fault ratio ranges were developed to assign a condition rating: < 5 Good condition > 5 and <10 Marginal condition >10 Poor condition Utilizing this formula and these condition rating definitions, Table 4-9 summarizes the condition ratings for the pipes in the Homestead Valley service area that have previously been inspected. August

20 Figure 4-4: HVSD Pipes Inspected after April 10, 2003 and prior to April 10, 2008 August

21 Table 4-9: HVSD Condition Rating Summary Pipes Inspected April 10, 2003 to April 10, 2008 Condition Rating Rating Description # of Pipe Segments Lineal Feet of Sewer Mains Good Does not require repair or rehabilitation ,151 Marginal Poor Some deterioration but should not require rehabilitation in the near future ,230 Significant deterioration. Should be considered for rehabilitation in the Rehabilitation and Replacement Plan. 57 8,034 Totals ,415 The condition rating system that will be utilized for inspection data collected after April 10, 2008 is documented below. Also, a more detailed method to identify non-emergency sewer repair, rehabilitation and replacement projects will be documented in the plan for short-term and long-term repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, Documentation and Recordkeeping All defects observed have been documented. A copy of all defect code data and the video will be retained for evaluation and to support preparation of the plan for short-term and long-term repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, Planned Inspection and Condition Assessment Program Prior to April 15, 2010, Homestead Valley Sanitary District plans to inspect the gravity sewer pipes and manholes that have not been recently inspected, rehabilitated, or replaced. Table 4-10 summarizes the quantity of sewers that have been inspected, rehabilitated or replaced, and the quantity of pipes in the planned inspection program. Table 4-10: HVSD Planned Inspection and Condition Assessment Program Summary HVSD Pipes Database Sewer Mains GIS Database Remove: Remove: Remove: Lineal Feet of Mains 66,080 a Previously Inspected with no Rehabilitation or Replacement to Date (32,684) Recently Rehabilitated or Replaced with Inspection Data (2,731) Recently Rehabilitated and Replaced without Inspection Data (1,379) HVSD Lines Planned for Inspection: 29,286 Footnotes: a. Excluding any abandoned or private lines. Table 4-11 summarizes the schedule for future sewer inspections through April 15, August

22 Table 4-11: HVSD Inspection Schedule through April 15, 2010 Planned Inspection Lineal Feet of Sewer Mains Between April 10, 2008 and April 15, Between April 16, 2009 and April 15, ,286 Totals 29,286 Manholes will typically be inspected at the same time that the pipe downstream of the manhole is inspected Planned Inspection Methods The current intention is to utilize inspection contractors to collect all CCTV inspection data discussed in this Inspection. For mains with maintenance holes located in readily accessible locations, CCTV data will be collected with the use of fully equipped CCTV vehicles. The vehicles will be equipped with a digital or VHS recording device. Each vehicle will carry all of the inspection, video capture, and recording equipment needed to televise a sewer pipe. CCTV contractors will use pan and tilt cameras which allow the operator to remotely rotate the camera in the sewer pipe and focus on the object being observed. Pan and tilt cameras are preferred because they give the inspectors increased flexibility in identifying and assessing the main infrastructure as well as the service lateral connections. For mains with maintenance holes that are located in remote or difficult to access areas, inspection contractors may need to utilize a portable push camera set up. This camera may not have a prehensile head, but will still be capable of viewing, recording and identifying defects located in the pipe Evaluation Procedure The inspection data will be used to assign a condition grade based on the quantity and the types of defects found in each pipe section. Defect Rating System This inspection program will utilize the Pipeline Assessment and Certification Program (PACP) and the Manhole Assessment and Certification Program (MACP) defect rating systems, which was developed by the National Association of Sewer Service Companies (NASSCO). The PACP and MACP systems require CCTV operators to code defects either by structural or maintenance defect. Each defect code is assigned a grade of 1 to 5, with 1 being the least severe and 5 being the most severe defect. These grades only consider the internal pipe conditions obtained from the televised inspection. After a sewer segment or manhole has been inspected, a grading system will be applied to evaluate the overall condition of the system and to identify pipe segments and manholes with the most severe defects. Other defect rating systems may be utilized. If an alternate defect rating system is utilized, the system will be identified in the annual progress reports for the Inspection. Condition Grading System To evaluate the current condition of the system, this inspection and condition assessment program will utilize a Quick Rating for each pipe segment or manhole. The quick rating will indicate the number of occurrences for the two highest severity grades for each pipe segment for either maintenance or structural defects. A grade of 1 indicates that a pipe segment or manhole is in excellent condition with minor defects and failure is unlikely in the foreseeable future, while a grade of 5 indicates that a pipe segment may require immediate attention. An example of a quick rating may be: 5249, where there are two defects with a grade August

23 5 rating, and 9 defects with a grade 4 rating. Other condition grading systems may be utilized. If an alternate condition grading system is utilized, the system will be identified in the annual progress reports for the Inspection. The method to identify non-emergency sewer repair, rehabilitation and replacement projects will be documented in the plan for short-term and long-term repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, Documentation and Recordkeeping All defects observed will be documented by the inspection contractor. A copy of all defect code data and the video will be retained for evaluation and to support preparation of the plan for short-term and longterm repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, The final format of the defect code data to be archived may vary depending on the selected contractor s documentation practices, but the data will be in the form of a written report, electronic spreadsheet or an electronic database that can be readily accessed and reviewed Inspection Schedule 2008 through April 15, 2010 Table 4-10 summarizes the overall status of the collection system inspection and rehabilitation program, and Figure 4-4 summarizes the pipes and manholes that were excluded from the current inspection program. The remaining pipes (29,286 lineal feet) and manholes in the system are scheduled for inspection before April 15, 2010, and are also shown in Figure 4-4. Table 4-11 shows that 29,286 lineal feet are scheduled for inspection prior to April 15, August

24 4.7 Richardson Bay Sanitary District Recent Sewer Inspection and Condition Assessment Activities Previously Inspected Areas During the five years prior to issuance of the Order, Richardson Bay has collected a significant quantity of sewer inspection data. Figure 4-5 summarizes which sewers have been previously inspected Evaluation Methods Richardson Bay had two methods for evaluation of sewer inspection data collected during the period between April 10, 2003 and April 10, Early in the inspection program, Richardson Bay inspected pipes but did not record detailed defect code data. However, every time a serious defect was found, the defect was corrected through a sewer repair and rehabilitation program. Therefore, if a pipe was inspected during this time period and was not repaired or rehabilitated, the pipe was in generally good condition. Later in the program, Richardson Bay began to utilize a more structured defect coding system to identify the type and severity of each defect in each sewer pipe that has been inspected. The following section summarizes the defect coding system and the defect rating system that was utilized in the past. Defect Coding Systems For the inspections where defect codes were collected, Richardson Bay utilized a customized defect coding and rating system utilized by several agencies in Northern California. This defect coding and rating system identifies the type and severity of defects and also has a rating score associated with some defects. The defect coding system has been included in Appendix L, and the condition rating system that utilizes these defect codes is described below. The defect coding system and the defect rating system that will be utilized in the future is covered below. Condition Rating Systems The condition rating system for sewer pipe inspections performed prior to April 10, 2008 is known as the fault ratio. The fault ratio is calculated by taking the sum of the rating scores for all defects found in one pipe segment divided by the lineal feet of pipe in the pipe segment, or: Fault Ratio = (Sum of DEFECT RATING SCORES) / (LINEAL FEET OF PIPE SEGMENT) The fault ratio system was designed to quickly determine the relative condition of each line segment that had been inspected. The following fault ratio ranges were developed to assign a condition rating: < 5 Good condition > 5 and <10 Marginal condition >10 Poor condition Utilizing this formula and these condition rating definitions, Table 4-12 summarizes the condition ratings for the pipes in the SASM service area that have previously been inspected. August

25 and Condition Assessment Plan Figure 4-5: RBSD Pipes Inspected after April 10, 2003 and prior to April 10, 2008 August

26 Table 4-12: RBSD Condition Rating Summary Pipes Inspected April 10, 2003 to April 10, 2008 Condition Rating Rating Description # of Pipe Segments Lineal Feet of Pipe Good Does not require repair or rehabilitation ,724 Marginal Some deterioration but should not require rehabilitation in the near future ,506 Poor Significant deterioration. Should be considered for rehabilitation in the Rehabilitation and Replacement Plan ,447 Totals 1, ,677 The condition rating system that will be utilized for inspection data collected after April 10, 2008 is documented below. Also, a more detailed method to identify non-emergency sewer repair, rehabilitation and replacement projects will be documented in the plan for short-term and long-term repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, Documentation and Recordkeeping All defects observed have been documented. A copy of all defect code data and the video will be retained for evaluation and to support preparation of the plan for short-term and long-term repair, rehabilitation and replacement of sewers that will be submitted to EPA by October 15, Inspection and Condition Assessment Program Richardson Bay plans to inspect the remaining gravity sewer pipes and manholes that have not been recently inspected. These remaining sewers will be inspected prior to April 15, Table 4-13 summarizes the quantity of sewers that have been inspected and the quantity of pipes in the planned inspection program. Table 4-13: RBSD Inspection and Condition Assessment Program Summary Sewer Mains GIS Database Lineal Feet of Mains RBSD Pipes 242,630 a Remove: Force Mains: (18,118) RBSD Gravity Pipes Subtotal: 224,512 Remove: Previously Inspected: (214,667) RBSD Lines Planned for Inspection: 9,835 Footnotes: a. Excluding any abandoned or private lines. Table 4-14 summarizes the schedule for future sewer inspections through April 15, Table 4-14: RBSD Inspection Schedule through April 15, 2010 Planned Inspection Lineal Feet of Sewer Mains Between April 10, 2008 and April 15, Between April 16, 2009 and April 15, ,835 Totals 9,835 August

City of Mill Valley Sewer Capital Improvement Plan 2012 2016

City of Mill Valley Sewer Capital Improvement Plan 2012 2016 City of Mill Valley Sewer Capital Improvement Plan 2012 2016 I. BACKGROUND Between December 2004 and February 2008, the ed States Environmental Protection Agency (EPA) conducted inspections of the SASM

More information

SEWER CLEANING, INSPECTION AND ASSESSMENT

SEWER CLEANING, INSPECTION AND ASSESSMENT 3.1 OVERVIEW Chapter 3 SEWER CLEANING, INSPECTION AND ASSESSMENT Preventive maintenance protects the investment of the sanitary sewer collection system infrastructure. Higher frequency cleaning of gravity

More information

Request for Proposals Sanitary Sewer System Condition Assessment (PILOT PROJECT)

Request for Proposals Sanitary Sewer System Condition Assessment (PILOT PROJECT) Request for Proposals Sanitary Sewer System Condition Assessment (PILOT PROJECT) Utilizing CCTV equipment, equipment use training, NASSCO PACP defect coding, and infrastructure program management software

More information

CCTV INSPECTION OF SEWER LINES. A. Section 02730 Sanitary Gravity Sewer Lines. B. Section 02731 Sanitary Gravity Sewer Line Testing

CCTV INSPECTION OF SEWER LINES. A. Section 02730 Sanitary Gravity Sewer Lines. B. Section 02731 Sanitary Gravity Sewer Line Testing CCTV INSPECTION OF SEWER LINES PART 1 GENERAL 1.1 SECTION INCLUDES A. CCTV Inspections 1.2 RELATED SECTIONS A. Section 02730 Sanitary Gravity Sewer Lines B. Section 02731 Sanitary Gravity Sewer Line Testing

More information

ATTACHMENT 2: SPECIFICATION FOR SEWER CCTV VIDEO INSPECTION

ATTACHMENT 2: SPECIFICATION FOR SEWER CCTV VIDEO INSPECTION ATTACHMENT 2: SPECIFICATION FOR SEWER CCTV VIDEO INSPECTION 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, insurance, accessories, tools, transportation, supplies,

More information

Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06

Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06 Almonte Sanitary District Sewer System Management Plan Adopted by the ALMONTE Board of Directors on_08/28/06 1. Goals The goal of this SSMP is to provide a plan and schedule to properly manage, operate,

More information

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

City of Bakersfield Public Works Department Sewer System Management Plan December 2014 City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals

More information

Integrate CCTV data to enterprise GIS work flows. Otay Water District

Integrate CCTV data to enterprise GIS work flows. Otay Water District Integrate CCTV data to enterprise GIS work flows Otay Water District Introduction Background of Otay Water District GIS at Otay CCTV for Sewer Collection System Integrate CCTV and Inspection data with

More information

REVISED SHORT TERM AND LONG TERM SEWER PIPE INSPECTION AND CONDITION ASSESSMENT PROGRAM SOUTH COAST WATER DISTRICT. June 2005

REVISED SHORT TERM AND LONG TERM SEWER PIPE INSPECTION AND CONDITION ASSESSMENT PROGRAM SOUTH COAST WATER DISTRICT. June 2005 REVISED SHORT TERM AND LONG TERM SEWER PIPE INSPECTION AND CONDITION ASSESSMENT PROGRAM SOUTH COAST WATER DISTRICT FOR SOUTH COAST WATER DISTRICT Prepared with the requirements identified in the United

More information

COLLECTION SYSTEM SETTLEMENT AGREEMENT

COLLECTION SYSTEM SETTLEMENT AGREEMENT COLLECTION SYSTEM SETTLEMENT AGREEMENT Wastewater Collection System Rehabilitation and Replacement Report and Plan A deliverable of the Settlement Agreement and Final Order between the city of Los Angeles

More information

Using Frequent Sewer Inspection to Prioritize Asset Management. May 1, 2014. John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E.

Using Frequent Sewer Inspection to Prioritize Asset Management. May 1, 2014. John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E. Using Frequent Sewer Inspection to Prioritize Asset Management May 1, 2014 John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E. Agenda Rationale and Goals for Sewer Re-inspection How and why

More information

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Building the Foundation for an Effective Asset Management Program Scott D. Kelly, P.E. Assistant City Administrator

More information

4 Steps for Quality Sewer Performance in Perpetuity

4 Steps for Quality Sewer Performance in Perpetuity 4 Steps for Quality Sewer Performance in Perpetuity By Gerhard Gerry P. Muenchmeyer, P. E. Principal Muenchmeyer Associates, LLC E-mail gerry@muenchmeyerassoc.com INTRODUCTION A well maintained and functional

More information

Condition Assessment of Underground Pipes April 2015 With excerpts from: Condition Assessment of Wastewater Collection Systems, EPA/600/R-09/049

Condition Assessment of Underground Pipes April 2015 With excerpts from: Condition Assessment of Wastewater Collection Systems, EPA/600/R-09/049 Condition Assessment of Underground Pipes April 2015 With excerpts from: Condition Assessment of Wastewater Collection Systems, EPA/600/R-09/049 EPA New England Water Infrastructure Outreach provides tools,

More information

INTRODUCTION. WASTEWATER MANAGEMENT PLAN MAY 2009 Metropolitan North Georgia Water Planning District 7-1

INTRODUCTION. WASTEWATER MANAGEMENT PLAN MAY 2009 Metropolitan North Georgia Water Planning District 7-1 INTRODUCTION There are approximately 16,000 miles of sewers and more than 450,000 manholes within the Metro Water District. Sewers and manholes within the Metro Water District range in age from new to

More information

STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS

STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements to execute internal closed

More information

Phased Assessment Strategy for Sewers

Phased Assessment Strategy for Sewers Phased Assessment Strategy for Sewers A plan for understanding sewer system condition quicker, with fewer resources. Venay Sehgal Bhatia Digital Marketing Manager Envirosight Are deteriorating infrastructure

More information

Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective

Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective An Owner Operator s Approach for Asset Management on a Budget Lane Longley, City of St. Petersburg Presented by the April

More information

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE Submit Proposals to: Town of Woodside Public Works Department 2955 Woodside

More information

CLEANING, INSPECTION, AND TESTING OF SEWERS

CLEANING, INSPECTION, AND TESTING OF SEWERS CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and

More information

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final

More information

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General General All sanitary sewers, manholes and force mains shall be acceptance tested, as hereinafter specified in the presence of a City representative. Acceptance testing shall be performed after backfilling

More information

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer

More information

STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS

STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS STANDARD SPECIFICATIONS SECTION 02956 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements to execute internal closed

More information

Section 2651 Television Inspection

Section 2651 Television Inspection Section 2651 Television Inspection PART 1: General 1.1 Description Provide all labor, materials, tools, equipment and incidentals as shown, specified, and required to perform television (TV) inspection

More information

Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan

Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan Amanda Lei - City of San Jose Alex Palmatier - HDR 2014 HDR, Inc., all rights reserved. Background Forecasting and Budget Data

More information

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,

More information

Gravity Line Preventative Maintenance Program

Gravity Line Preventative Maintenance Program Gravity Line Preventative Maintenance Program Lexington-Fayette Urban County Government Department of Environmental Quality Division of Water Quality December 2011 Gravity Line Preventative Maintenance

More information

Sewer System Management Plan (SSMP) Development Guide

Sewer System Management Plan (SSMP) Development Guide J U L Y 2 0 0 5 SAN FRANCISCO BAY REGIONAL WATER QUALITY CONTROL BOARD in cooperation with BAY AREA CLEAN WATER AGENCIES Sewer System Management Plan (SSMP) Development Guide San Francisco Bay Regional

More information

City of Los Altos Sewer System Management Plan

City of Los Altos Sewer System Management Plan City of Los Altos Sewer System Management Plan February 2015 This page intentionally left blank. LIST OF REVISIONS Revision No. 2 3 4 Description of Revision Revision of telephone numbers and text issues,

More information

Interactive Decision Tree Automates Sewer Rehabilitation Planning

Interactive Decision Tree Automates Sewer Rehabilitation Planning Interactive Decision Tree Automates Sewer Rehabilitation Planning IWPCA Annual Conference June 5, 2008 Rodney Moeller, P.E., John Schroeder, P.E. BCEE, C. Timothy Fallara, P.E. & Mel Meng, P.E. Agenda

More information

DRAFT Public Outreach Document for What s an SSMP?

DRAFT Public Outreach Document for What s an SSMP? DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials

More information

Contracting Opportunities Vendor Day May 17, 2011

Contracting Opportunities Vendor Day May 17, 2011 Customer Care Team Contracting Opportunities Vendor Day May 17, 2011 Customer Care Team: What We Do Team Office customer advocacy and contracting Customer Relations Group call centers, claims, special

More information

WEAT Collections Conference January 22, 2014 NASSCO PACP/MACP/LACP- The Trainer s Perspective. Gerald Boman NASSCO PACP/MACP/LACP Certified Trainer

WEAT Collections Conference January 22, 2014 NASSCO PACP/MACP/LACP- The Trainer s Perspective. Gerald Boman NASSCO PACP/MACP/LACP Certified Trainer WEAT Collections Conference January 22, 2014 NASSCO PACP/MACP/LACP- The Trainer s Perspective Gerald Boman NASSCO PACP/MACP/LACP Certified Trainer What is NASSCO? National Association of Sewer Service

More information

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan Monterey Regional Water Pollution Control Agency Sewer System Management Plan March 31, 2013 Sewer System Management Plan Introduction I. Goals II. Organization III. Legal Authority IV. Operation and Maintenance

More information

Utilizing Remaining Useful Life for Asset Management of Critical Wastewater Assets

Utilizing Remaining Useful Life for Asset Management of Critical Wastewater Assets *Jessica Brown, P.E., Freese and Nichols, Inc., (817) 312-6980; Jessica.Brown@freese.com Mazen Kawasmi, Freese and Nichols, Inc. ABSTRACT The City of Fort Worth s wastewater collection system includes

More information

CORPORATION OF THE CITY OF BURLINGTON SPECIFICATION INDEX FOR CCTV VIDEO INSPECTION OF PROPOSED STORM SEWERS (SPEC. NO. SS7) 1. Scope of Work SS7-1

CORPORATION OF THE CITY OF BURLINGTON SPECIFICATION INDEX FOR CCTV VIDEO INSPECTION OF PROPOSED STORM SEWERS (SPEC. NO. SS7) 1. Scope of Work SS7-1 CORPORATION OF THE CITY OF BURLINGTON SPECIFICATION INDEX FOR CCTV VIDEO INSPECTION OF PROPOSED STORM SEWERS (SPEC. NO. SS7) INDEX PAGE 1. Scope of Work SS7-1 2. Contractor Certification SS7-1 3. Flushing

More information

Sanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention

Sanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention Sanitation District No. 1 of Northern Kentucky SD1's Sanitary and Storm Water Asset Management Program KSPE Annual Convention April 28, 2011 Background Outline CSAP Program Development CSAP Program Implementation

More information

Presented By: Justin Cira MTech Company. Your future, Condition Assessment and Sewer Asset Management tool

Presented By: Justin Cira MTech Company. Your future, Condition Assessment and Sewer Asset Management tool Presented By: Justin Cira MTech Company Your future, Condition Assessment and Sewer Asset Management tool Digital Side Scanning Camera Digital Side Scanning WhaT is it? New generation of HD High Definition

More information

2016 - SECTION 25 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER LINES

2016 - SECTION 25 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER LINES 2016 - SECTION 25 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER LINES 25.1 GENERAL This section of the specifications shall form a part of the contract documents and should be read in conjunction with

More information

Guidelines for closed circuit television (CCTV) inspection of newly constructed sewers

Guidelines for closed circuit television (CCTV) inspection of newly constructed sewers Guidelines for closed circuit television (CCTV) inspection of newly constructed sewers These guidelines outline inspection, reporting and acceptance requirements for newly constructed rigid and flexible

More information

THE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs

THE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs THE BIG FIX: San Diego s Sewer Renewal Program By Steve Gibbs Public works administration would be easy if infrastructure lasted forever. It does not. Roads, bridges and sewers eventually wear out. Even

More information

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana

More information

TOWN OF HILLSBOROUGH Compliance with Regulatory Mandates. Private Sewer Lateral Inspection and Repair Program

TOWN OF HILLSBOROUGH Compliance with Regulatory Mandates. Private Sewer Lateral Inspection and Repair Program TOWN OF HILLSBOROUGH Compliance with Regulatory Mandates Private Sewer Lateral Inspection and Repair Program SEWER SYSTEM- BACKGROUND 116 miles of gravity sanitary sewer pipelines 1 mile of force main

More information

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, material and supplies, insurance, accessories, tools, transportation,

More information

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

Sewer System Management Plan SSMP

Sewer System Management Plan SSMP Sewer System Management Plan SSMP Revised August 2014 Originated July 2009 TABLE OF CONTENTS Introduction... 1 System Description... 1 Document Organization... 1 Goal... 3 Organization... 4 Authorized

More information

GIS Applications for Regulatory Compliance

GIS Applications for Regulatory Compliance 4 GIS Applications for Regulatory Compliance Uzair (Sam) M. Shamsi Many cities in the world especially in the United States and Canada are dealing with regulatory enforcement actions for sewer overflows,

More information

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene

More information

STANDARD OPERATING INSTRUCTION SOI-GVW-198 CCTV Inspection of Sewerage Reticulation Works 1 PURPOSE 2 REFERENCES 3 DEFINITIONS

STANDARD OPERATING INSTRUCTION SOI-GVW-198 CCTV Inspection of Sewerage Reticulation Works 1 PURPOSE 2 REFERENCES 3 DEFINITIONS 1 PURPOSE The purpose of this SOI is to provide instruction and guidance for closed circuit television survey (CCTV) inspection, which the Corporation requires to be undertaken by the constructor as part

More information

Dry Weather Flow from Footing Drains and Service Connections

Dry Weather Flow from Footing Drains and Service Connections Wastewater Master Plan DWSD Project No. CS-1314 Dry Weather Flow from Footing Drains and Service Connections Technical Memorandum Original Date: May 2, 2002 Revision Date: September 2003 Author: CDM Table

More information

Sanitary Sewer Master Plan

Sanitary Sewer Master Plan , Illinois Sanitary Sewer Master Plan EXECUTIVE SUMMARY Prepared by September 9, 2010 1670 South Taylorville Road Decatur, Illinois 62521 www.bgmengineering.com Sanitary Sewer Master Plan A. SCOPE OF STUDY

More information

MEMORANDUM. Doug Monn, Public Works Director Jim App, City Manager. Matt Thompson, Wastewater Resources Manager. Date: January 24, 2011

MEMORANDUM. Doug Monn, Public Works Director Jim App, City Manager. Matt Thompson, Wastewater Resources Manager. Date: January 24, 2011 MEMORANDUM To: From: Doug Monn, Public Works Director Jim App, City Manager Matt Thompson, Wastewater Resources Manager Date: January 24, 2011 Subject: Audit of 2010 Wastewater Collection Performance City

More information

VERIFICATION TESTING GUIDELINES FOR CONTRACTORS

VERIFICATION TESTING GUIDELINES FOR CONTRACTORS Public Works Department Engineering Division VERIFICATION TESTING GUIDELINES FOR CONTRACTORS CITY OF BERKELEY PRIVATE SEWER LATERAL ORDINANCE BMC Chapter 17.24 Effective November 3, 2014 A consent decree

More information

South Tahoe Public Utility District Job Description

South Tahoe Public Utility District Job Description South Tahoe Public Utility District Job Description JOB TITLE: Underground Sewer Repair I & II UPDATED: 1/18/12 EFFECTIVE: 1/1/12 DEPT: Underground Sewer Repair APPROVED STPUD: NH APPROVED LOCAL 39: CS

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

SAWS SSO Reduction Program

SAWS SSO Reduction Program SAWS SSO Reduction Program Jeff Haby, P.E. Director Sewer System Improvements February 20, 2014 TMDL Implementation Plan Technical Committee Overview Sanitary Sewer Overflows Consent Decree Overview Major

More information

City of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING

City of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING 1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of testing wastewater and/or storm mains to ensure construction conforms to the proper line, grade, cross section and performance. 2.1 The

More information

M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to

M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to M E M O R A N D U M DATE: August 7, 2015 TO: FROM: SUBJECT: Metropolitan Wastewater Management Commission (MWMC) Matt Stouder, MWMC General Manager Capacity Management, Operations, and Maintenance (CMOM)

More information

Sewer System Management Plan University of California Kearney Agricultural Research & Extension Center 9240 S. Riverbend Ave.

Sewer System Management Plan University of California Kearney Agricultural Research & Extension Center 9240 S. Riverbend Ave. Sewer System Management Plan University of California Kearney Agricultural Research & Extension Center 9240 S. Riverbend Ave. Parlier, CA 93648 Wastewater ID # 5SSO11453 1 Goals 1.1 Regulatory Requirements

More information

ESRI CONFERENCE, JULY 2014, SAN DIEGO

ESRI CONFERENCE, JULY 2014, SAN DIEGO QUEBEC 'S CITY EFFICIENT DATA MAN OF THE SEWER SYSTEMS and its global approach to data m of municipal infrastructure asse ESRI CONFERENCE, JULY 2014, SAN DIEGO QUEBEC CITY 'SEFFICIENT DATA MANAGE THE SEWER

More information

Sanitary Sewer Smoke Testing

Sanitary Sewer Smoke Testing Sanitary Sewer Smoke Testing Beginning March 31, 2014 The City of Brunswick will be conducting smoke testing on the City s sanitary sewer system beginning March 31, 2014. Smoke testing will occur over

More information

Evaluation of Rapid Acoustic Pipe Inspection for Prioritizing Cleaning and CCTV Resources

Evaluation of Rapid Acoustic Pipe Inspection for Prioritizing Cleaning and CCTV Resources Evaluation of Rapid Acoustic Pipe Inspection for Prioritizing Cleaning and CCTV Resources George Selembo InfoSense, Inc. Stephen Orticello Directrik, Inc. Silvano Piluso Toronto Water Colbert Clifford

More information

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced

More information

Element 4: FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM

Element 4: FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM Element 4: FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM This section of the SSMP discusses the City s FOG control measures, including identification of problem areas, focused cleaning, and source control.

More information

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade

More information

Sewer System Management Plan (SSMP) 2009. Eastern Municipal Water District

Sewer System Management Plan (SSMP) 2009. Eastern Municipal Water District Sewer System Management Plan (SSMP) 2009 Eastern Municipal Water District Table of Contents 1.0 SSMP Goals... 3 Goal 1A:... 3 Goal 1B:... 3 2.0 Organizational Structure... 3 3.0 Legal Authority... 4 4.0

More information

Sewer Scope Inspection Report

Sewer Scope Inspection Report Sewer Scope Inspection Report James E Jones Property Address: CO Inspection Date: 5/5/2015 General Information This confidential report is furnished for the use of the client only. It is not intended to

More information

Bridges & Culverts Condition by Quantity

Bridges & Culverts Condition by Quantity 3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received

More information

City of Suisun City. Sewer System Management Plan

City of Suisun City. Sewer System Management Plan City of Suisun City Sewer System Management Plan FEBRUARY 2014 Table of Contents INTRODUCTION... I I. GOALS... I-1 II. ORGANIZATION... II-1 III. LEGAL AUTHORITY... III-1 IV. OPERATION & MAINTENANCE PROGRAM...

More information

GRAVITY SEWER REPAIR MARINE DRIVE CONSTRUCTION COMPLETION REPORT

GRAVITY SEWER REPAIR MARINE DRIVE CONSTRUCTION COMPLETION REPORT GRAVITY SEWER REPAIR MARINE DRIVE CONSTRUCTION COMPLETION REPORT PREPARED OCTOBER 9, 2001 PREPARED BY: CITY OF BLAINE, PUBLIC WORKS DEPARTMENT 1200 YEW AVENUE BLAINE, WA 98230 Introduction This completed

More information

Sewer System Management Plan (SSMP)

Sewer System Management Plan (SSMP) Sewer System Management Plan (SSMP) City of Santa Ana Water Resources Division 4/10/2014 Prepared Under the Supervision of: Nabil Saba, P.E. Water Resources Manager Table of Contents/Definitions/Abbreviations

More information

Seattle Public Utilities Mainline Sewer Pipe Maintenance/Backup Strategy June, 2005

Seattle Public Utilities Mainline Sewer Pipe Maintenance/Backup Strategy June, 2005 Seattle Public Utilities Mainline Sewer Pipe Maintenance/Backup Strategy June, 2005 1 of 30 Executive Summary Seattle Public Utilities (SPU) currently experiences an average of 80 mainline sanitary sewer

More information

VIDEO INSPECTION AND LASER PROFILING IN FLORIDA. AASHTO SOC Conference Larry Ritchie, FDOT August 14, 2013

VIDEO INSPECTION AND LASER PROFILING IN FLORIDA. AASHTO SOC Conference Larry Ritchie, FDOT August 14, 2013 VIDEO INSPECTION AND LASER PROFILING IN FLORIDA AASHTO SOC Conference Larry Ritchie, FDOT August 14, 2013 PIPE INSPECTION Over the last 5 years, the Department has spent approximately 175 million dollars

More information

INSTALLATION OF INSITUFORM LINER

INSTALLATION OF INSITUFORM LINER PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation

More information

Jeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda

Jeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda SAWS Sanitary Sewer Overflow Reduction Program Jeff Haby, P.E. Director Sewer System Improvements SA Military Engineers Meeting Agenda SAWS Overview Consent Decree CD Compliance Programs Program Transition

More information

Sewer System Asset Management Implementation Plan

Sewer System Asset Management Implementation Plan CITY OF PIEDMONT CALIFORNIA Sewer System Asset Management Implementation Plan EPA Conditional Approval May 13, 2013 Revised per Consent Decree and Final Adoption by City Council: August 4, 2014 120 VISTA

More information

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 1/12/2007 1 Briefing Purpose Provide update on Wastewater Collection Activities

More information

INTRODUCTION AND BACKGROUND

INTRODUCTION AND BACKGROUND Chapter 1 INTRODUCTION AND BACKGROUND 1.1 INTRODUCTION The City of Lincoln s Sewer System Management Program (SSMP) generally describes the City s sanitary sewer system operation and maintenance procedures,

More information

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542 1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated

More information

San Antonio, TX July 28, 2011

San Antonio, TX July 28, 2011 Rehabilitation of a Deteriorated 60 RCP Wastewater Interceptor Using Competing Trenchless Technologies Bruce Cole, PE Corey Anderson, EIT TAWWA/WEAT Summer Seminar San Antonio, TX July 28, 2011 Wendy Martinez,

More information

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC What is really out there? DO YOU DIG IT? INDUSTRY CONCERNS UNEXPECTED DEVELOPMENTS

More information

Sewer System Management Plan

Sewer System Management Plan City of Piedmont Sewer System Management Plan August, 2008 Current Revision: August, 2014 Approved by City Council: August 04, 2014 120 VISTA AVE. / PIEDMONT, CA 94611 / (510) 420-3050 / FAX (510) 658-3167

More information

City of Sebastopol. Sewer System Management Plan

City of Sebastopol. Sewer System Management Plan Sewer System Management Plan Original Approval by City Council Resolution No. 5812, August 3, 2010 Recertified by City Council on March 17, 2015, Resolution No. 6031 WDID #1SSO10017 Prepared in Conjunction

More information

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems Please see the DEFINITIONS of terms at the end of this section. If you have any questions about these definitions, do not understand a question,

More information

CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW JANUARY, 2014

CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW JANUARY, 2014 CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW JANUARY, 2014 Fenton Township receives numerous inquiries regarding the relatively high sewer use fees that Township residents have been paying

More information

Emergency Response Plan

Emergency Response Plan Emergency Response Plan Third revised version placed in the Public Document Repository on July 1, 2011 I certify under penalty of law that this document and all attachments were prepared under my direction

More information

Sewerage Agency of Southern Marin Cash For Sewers Program

Sewerage Agency of Southern Marin Cash For Sewers Program Sewerage Agency of Southern Marin Cash For Sewers Program Do you have back-up problems? Blockage in your lateral line is the most common reason people have backup problems with their plumbing system. Toilets

More information

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology 2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)

More information

SEWER SYSTEM MANAGEMENT PLAN

SEWER SYSTEM MANAGEMENT PLAN EL TORO WATER DISTRICT SEWER SYSTEM MANAGEMENT PLAN STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS FOR SANITARY SEWER SYSTEMS STATE WATER RESOURCES CONTROL BOARD ORDER NO. 2006-0003-DWQ OCTOBER 2014 TABLE

More information

PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS.

PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS. North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 15-20, 2007 Paper # PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING

More information

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN TOWN OF GRIMSBY ASSET MANAGEMENT PLAN August 20, 2014 DFA Infrastructure International Inc. Executive Summary ES1 Background The Town of Grimsby (Town) with a population of approximately 25,325 is located

More information

Sewer Line Rehabilitation

Sewer Line Rehabilitation 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing sanitary sewers using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

Appendix 5-B Private Sewer Lateral Testing Program

Appendix 5-B Private Sewer Lateral Testing Program Appendix 5-B Private Sewer Lateral Testing Program CITY OF UKIAH AND UKIAH VALLEY SANITATION DISTRICT Permit Number: SLTP 07- For District Use Only Located within City Limits: Yes No CCTV SEWER LATERAL

More information

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS Appendix D RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Rumbi Grill -

More information

Sanitary Sewer Overflow (SSO) Incident Report Form

Sanitary Sewer Overflow (SSO) Incident Report Form Submit completed form to EHS. Date of SSO spill: Sanitary Sewer Overflow (SSO) Incident Report Form Identify the SSO category (check one): Category 1 SSO Spills of any volume that reach surface water Category

More information

PROJECT NAME BACKGROUND STATUS

PROJECT NAME BACKGROUND STATUS Utilities Department Projects This report reflects the status of Utility Capital Improvement Projects, Rehabilitation and Maintenance Programs of the City s water, wastewater, and reclaimed infrastructure

More information

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority

More information

FY15 Gravity Sewer and Manhole Rehabilitation

FY15 Gravity Sewer and Manhole Rehabilitation Contract Drawings For FY15 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. -030 BASIN 850 Greenville, South Carolina April 2015 BASIN 700A GREENVILLE BASIN 700B FIVE

More information