SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2016
|
|
|
- Willis Fowler
- 10 years ago
- Views:
Transcription
1 SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS Bid Deposits The City of Madison bid deposit form is required for all bids unless a Biennial Bid Bond is on file or check deposit is used Bidders Understanding Added language on Tax Exempt status on public works contracts Ban the Box Arrest and Criminal Background Checks (Sec 39.07, MGO) New section on hiring practices by prequalified contractors. Application and interviews can t make inquires on arrest and conviction record. There are some exemptions (i) Insurance for the Construction of Buildings and Structures Changed from being carried by City to being the responsibility of the Contractor. Contractor is now required to carry Builders Risk insurance on all projects for the construction of Buildings and Structures, and remodeling projects where square footage is being added Liquidated Damages Added language defining liquidated damages when driveway access is not restored in the required 20 days, working outside of 7a 7p and working during peak hours Payment Withheld Revised language that payments to sub contractors shall be made in a timely fashion Clearing and Grubbing Trees Added station, square yard and lump sum as units of measurement (c) Mulching Material. Deleted the use of Asphalt material as mulching material. 210 Erosion Control Deleted Erosion Control Implementation Plan Added Dust Control, Turbidity Barrier & Silt Curtain Inspections by contractor to include holidays. Photos and video need to notate location (a) Engineered Soil. Deleted Topsoil from the Engineered Soil mixture Crushed Aggregate Base Course Contractor is required to maintain a gravel surface throughout project Placing Asphalt Mixtures Revised language on cold weather paving Asphalt Tack Coat Added language on requirements for placing tack coat Grinding Added language that removing ramping is included in the price for ramping SAS Undercut Revised method of measurement from SY to CY Adjust Access Structure Casting Resurfacing Added language that limits adjustment to 9. If more adjustment is needed then the bid item will be Rebuild Access Structure Top Resurfacing.
2 Adjust Catchbasin Casting Resurfacing Added language that limits adjustment to 9. If more adjustment is needed then the bid item will be Rebuild Access Structure Top Resurfacing Adjust Inlet Casting Type H Resurfacing Concrete is allowed vs mortar if engineer approves. Revised what work is included under this bid item Adjust Inlet Casting Tub Type Resurfacing Concrete is allowed vs mortar if engineer approves. Revised what work is included under this bid item Adjust Valve Casting, Method #1-3 Resurfacing Contractor to furnish and install replacement valve box castings (top sections, and if necessary, mid sections) at all valve locations. MWU to furnish bottom sections, if necessary. Delete reference to Sigma materials from Method 3; reference Part 7 for material requirements Rebuild Inlet Resurfacing Revised detail drawing to reference vs Storm Sewer Main Testing Revised testing for non RCP pipe (c) Sanitary Sewer Access Structures Revised scope of work. Any work on the bench or flowline within six (6) inches of the inside wall shall be incidental to connecting the pipe to the SAS d Bedding of Sewer Pipes Revised bedding material. Revised hand backfill and compaction requirements & Storm Sewer Materials Revised pipe materials to include HP storm pipe Castings Added approved equal castings Construction Methods. Revised private storm sewer reconnects & laterals. Added language that a core n seal boot or approved equal is required when connecting plastic pipe to new or existing concrete pipe or structure Ductile Iron Pipe Field welding of conductivity bonding straps is permitted Curb Boxes Valve boxes manufactured by East Jordan are listed as acceptable materials Excavation Added new Sections: Trench Bottom, and Bell Holes to align specifications with DIPRA installation recommendations for ductile iron pipe Backfilling and Compaction Added new section for the placement and compaction requirements of pipe bedding material, Section Pipe Bedding and Cover Mechanical Joint Pipe and Fittings Any or equal to Megalug Series 1100 Retainer Glands must be approved prior to acceptance.
3 Thrust Restraint Concrete thrust blocking is required behind cut-in connections, tee branch connections and livetaps, in addition to the required MJ fitting restraint. Concrete thrust blocking must be at least 2-ft thick over the required bearing area Polyethylene Encasement Wrap the pipe with tape and tap through the tape instead of cutting the polywrap to tap the main Flushing Flushing segments may not exceed 1,200-feet unless approved by Engineer. Flushing must achieve a velocity of 2.5 ft/sec provided table for discharge opening guidance Conductivity Testing. Energized utility locating devices are now an acceptable method for conductivity tests Horizontal Directional Drill Pipe Deleted the cast-in-place concrete collar requirement at HDPE to DI connections. Do not connect DI pipe or fittings to the fused HDPE adaptor for at least 24-hours after pull-in. Center the tracer wire valve box over the fused HDPE adaptor Furnish & Install Water Valve Valve boxes manufactured by East Jordan are listed as acceptable materials. Box covers/lids with ridges or grooves are not permitted, only smooth drop-in lids are permitted. Set tolerance of ¾ (any direction) for valve box centering over nut, matches new SDD Furnish and Install Hydrant / Salvage Existing Hydrants Require concrete masonry block set under hydrant lead valve Furnish and Install Water Service Laterals Set boxes 1-inch below grade when located in unpaved areas (formerly set flush). Set boxes between flush and ¼ below grade when located in paved areas (formerly set flush). Tubular insulation is permitted when rigid board insulation is not feasible (tunneled laterals, etc) Replace Service Lateral Change method of measurement from LF to EACH Cut-In or Connect-To Existing Water System Concrete blocking is required behind all cut-in connections and tee branch connections Furnish Excavation and Ditch for Live Tap Concrete blocking is required behind the live tap Furnish and Install Insulation Tubular insulation is permitted when rigid board insulation is not feasible (tunneled laterals, etc) Rock Excavation Threshold of rock excavation during water main installation is 2 CY Removal of Excess Amounts of Boulders Boulders up to ½ CY are incidental to water main installation. Boulders between ½ CY and 2 CY may be considered for payment if approved by Engineer. When authorized for payment, $20/CY for ½-1 CY, and $50/CY for 1-2 CY size (formerly $6/CY). Boulders over 2 CY will be considered Rock Excavation and will be paid under that Bid Item. BID ITEMS Deleted Items GRUBBING I.D.
4 20404 GRUBBING STA EROSION CONTROL PLAN & IMPEMENTATION LUMP SUM PRIVATE STORM SEWER LATERAL EACH REPLACE 1-INCH COPPER SERVICE LATERAL L.F REPLACE 1 ½-INCH COPPER SERVICE LATERAL L.F REPLACE 2-INCH COPPER SERVICE LATERAL L.F Deleted storm sewer pipe bid items. New Items CLEARING SY CLEARING LUMP SUM GRUBBING I.D GRUBBING STA GRUBBING SY GRUBBING LUMP SUM INLET PROTECTION, TYPE A COMPLETE EACH INLET PROTECTION, TYPE A PROVIDE & INSTALL EACH INLET PROTECTION, TYPE A MAINTAIN EACH INLET PROTECTION, TYPE A REMOVE EACH TURBIDITY BARRIER COMPLETE LF SILT CURTAIN COMPLETE LF INLET PROTECTION, TYPE B COMPLETE EACH INLET PROTECTION, TYPE B PROVIDE & INSTALL EACH INLET PROTECTION, TYPE B MAINTAIN EACH INLET PROTECTION, TYPE B REMOVE EACH PAVEMENT JOINT GRINDING L.F PRIVATE STORM SEWER RECONNECT, TYPE 3 EACH PRIVATE STORM SEWER LATERAL EACH EXTERNAL SEWER ACCESS STRUCTURE JOINT SEAL EACH REPLACE 1-INCH COPPER SERVICE LATERAL EACH REPLACE 1 ½-INCH COPPER SERVICE LATERAL EACH REPLACE 2-INCH COPPER SERVICE LATERAL EACH Added storm sewer pipe bid items. DETAIL DRAWINGS SDD 3.02 MADISON STANDARD CURB CUT DETAILS Clarified 6 of Crushed Gravel is required under drive aprons and sidewalks that are 7 thick. SDD 3.06 MADISON STANDAD CONCRETE CURB & GUTTER Added traffic circle mountable concrete curb & gutter. SDD 3.14 BIKE/PED RAMP CURB RAMP DETAIL Renamed detail drawing. Referenced SDD 3.06 for typical section through curb & gutter. SDD 4.01 TYPCIAL SECTION 32 WIDE STREET Removed redundant information. SDD 4.03 TYPCIAL SECTION BOULEVARD STREETS Removed redundant information. SDD PIPE BEDDING AND BACKFILL Text and spec change to bedding for storm pipes SDD 5.2.1A PIPE BEDDING AND BACKFILL Text and spec change for bedding
5 SDD STORM SEWER FIELD POURED SAS AND CATCH BASINS Added a concrete ring to casting SDD ADJUST TUB INLET Renamed from Reconstruct to Adjust. Revised associated language in Section SAS CHIMNEY AND CASTING Revised so concrete is allowed for top adjusting ring SDD A SAS LOCKING FRAME & LOGO COVER Text changed to CLASS 35B SDD R-3067 FRAME Text changed to CLASS 35B SDD Text change FLEXIBLE PIPE TO S.A.S. CONNECTOR SDD 6.12 LB-1 BASE DETAIL Revised drawing. SDD 6.45 LB-9 BASE DETAIL Revised drawing. Deleted Items SDD 7.01 SDD 7.01A SDD 7.01B SDD 7.02 SDD 7.03 SDD 7.03A SDD 7.03B SDD 7.03C SDD 7.04 SDD 7.05 SDD 7.06A SDD 7.06B SDD 7.06C SDD 7.07 SDD 7.08 SDD 7.09 SDD 7.10 SDD 7.11 SDD 7.12 SERVICE INSTALLATION - PRIVATE CONTRACT SERVICE INSTALLATION PRIVATE CONTRACT LOCATION OF WATER SERVICES STANDARD THREADED RODDING STANDARD THRUST BLOCKING STANDARD CONCRETE BLOCK THRUST RESTRAINT GRAVITY BLOCK THRUST RESTRAINT FOR VERTICAL DOWN BENDS ROD & CONCRETE BLOCK THRUST RESTRAINT FOR VERTICAL BENDS TYPICAL HYDRANT INSTALLATION TYPICAL STYROFOAM INSTALLATION WATER METER PIT CONSTRUCTION WATER METER PIT DIMENSIONS WATER METER PIT CONSTRUCTION NOTES WATER MAIN VALVE ACCESS STRUCTURE STANDARD HDPE PIPE RESTRAINTS CASING SPACERS JOINT RESTRAINT LENGTHS FOR VERTICAL BENDS TYPICAL WATER PIPE TRENCH OFFSETTING EXISTING WATER MAIN UNDER UTILITY CONFLICTS New Items SDD 7.01 TYPICAL WATER PIPE TRENCH SDD 7.02 (new) FIELD INSTALLATION POLYETHYLENE WRAP/TAPPING POLYETHYLENE WRAP SDD 7.03 TYPICAL STYROFOAM INSTALLATION SDD 7.04 TYPICAL HYDRANT INSTALLATION SDD 7.05 WATER MAIN VALVE ACCESS STRUCTURE SDD 7.06 (new) WATER VALVE BOX ALIGNMENT SDD 7.07 (vacant - reserved for future use) SDD 7.08 (vacant - reserved for future use) SDD 7.09 LOCATION OF WATER SERVICES SDD 7.10 SERVICE INSTALLATION - PRIVATE CONTRACT
6 SDD 7.11 (vacant - reserved for future use) SDD 7.12 (vacant - reserved for future use) SDD 7.13 STANDARD CONCRETE BLOCK THRUST RESTRAINT SDD 7.14 GRAVITY BLOCK THRUST RESTRAINT FOR VERTICAL BENDS SDD 7.15 ROD & CONCRETE BLOCK THRUST RESTRAINT FOR VERTICAL BENDS SDD 7.16 JOINT RESTRAINT LENGTHS FOR VERTICAL BENDS SDD 7.17 THREADED ROD - JOINT RESTRAINT SDD 7.18 (vacant - reserved for future use) SDD 7.19 (vacant - reserved for future use) SDD 7.20 (new) STANDARD HDPE TRACER WIRE VALVE BOX SDD 7.21 CASING SPACERS SDD 7.22 OFFSETTING EXISTING WATER MAIN UNDER UTILITY CONFLICTS SDD 7.23 (new) CLAY TRENCH PLUG SDD 7.24 (vacant - reserved for future use) SDD 7.25 (vacant - reserved for future use) SDD 7.26 (vacant - reserved for future use) SDD 7.27 (vacant - reserved for future use) SDD 7.28 (vacant - reserved for future use) SDD 7.29 (vacant - reserved for future use) SDD 7.30 WATER METER PIT CONSTRUCTION SDD 7.31 WATER METER PIT DIMENSIONS SDD 7.32 WATER METER PIT CONSTRUCTION NOTES SDD 7.33 (new) WATER METER ENCLOSURE SDD 7.34 (new) YARD HYDRANT / DRINKING FOUNTAIN STANDARD INSTALLATION SDD 7.35 (new) STANDARD 5/8", 3/4", 1" METER SET INSTALLATION SDD 7.36 (new) STANDARD 1 1/2", 2" METER SET INSTALLATION SDD 7.37 (new) STANDARD BADGER COMPOUND METER INSTALLATION SDD 7.38 (new) STANDARD OMNI COMPOUND METER INSTALLATION SDD 7.39 (new) STANDARD MAG METER INSTALLATION SDD 7.40 (new) STANDARD BADGER TURBINE METER INSTALLATION SDD 7.41 (new) STANDARD OMNI TURBINE METER INSTALLATION SDD 7.42 (new) SEWER DEDUCT METER / WATER ONLY STANDARD INSTALLATION SDD (vacant - reserved for future use)
FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
FY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth
TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20
Special Specification 7021 Water Main and Sewer Line Replacements
Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,
Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts
SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required
3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial
Section 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014
City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions
CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS
August 2010 CW 2130 - GRAVITY SEWERS TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications... 1 1.4 Referenced Standard Details...
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES
SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION Section Number Title 401 GENERAL 402 AMENDMENTS TO WSWS PART I - GENERAL CONDITIONS
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
CD i -STREETS- Detail #
-STREETS- Detail # 3000 Vertical Curb, Gutter and Sidewalk 3010 Low-Profile Curb, Gutter and Sidewalk 3020 Rolled Curb, Gutter and Sidewalk 3030 Separated Sidewalk, Curb & Gutter 3040 Sidewalk Staged Construction
Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets
Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST
UNIT PRICE LIST January 2009
UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only
A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.
PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,
CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
Beacon Hill Sewer District Standard Specifications
Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
LS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223
STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. Description This section describes the installation of gravity sewer pipelines fabricated of vitrified
SECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General
SECTION 15 AIR RELEASE VALVE ASSEMBLIES 15-1.01 Scope 15-1 General This section describes the requirements for furnishing and installing Air Release Valve Assemblies of the size and type shown on the plans,
32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.
SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and
SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.
SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water
The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
Sewer Rehabilitation Design Requirements
Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared
EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection
EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED
EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines
EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding
SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
SECTION 200: STORM SEWER CONSTRUCTION STANDARDS
SECTION 200: STORM SEWER CONSTRUCTION STANDARDS Page No. Description 200-2 201 GENERAL 200-2 201.1 SPECIFICATIONS 200-2 201.2 CONNECTION TO EXISTING FACILITIES 200-3 202 MATERIALS 200-3 202.1 PIPES 200-4
08003-1 WATER SERVICE 2
08003_Mar08_2011.pdf Page 1 of 7 INDEX Page 08003-1 WATER SERVICE 2 1.1 Pipe 2 1.1.1 Copper 2 1.1.2 Polyethylene 2 1.2 Valves and Fittings 2 1.2.1 Main Stops 3 1.2.2 Curb Stops 3 1.2.3 Curb Box 3 1.2.4
SECTION 603 SANITARY SEWER FORCE MAINS
SECTION 603 SANITARY SEWER FORCE MAINS 1. GENERAL Pipelines for sanitary sewer force main systems shall conform to the following specifications and shall be installed at the locations indicated on the
SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE
6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction
SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
Standard Specifications for Installation and Repairs of Water and Sewer Service Lines
Standard Specifications for Installation and Repairs of Water and Sewer Service Lines Effective December 1, 2013 Approved /S/ Kyle Mathis Kyle Mathis City Engineer /S/ Robert Glenn Robert Glenn Water/Wastewater
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
SECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK
13.01 SCOPE OF WORK Under this item, the Contractor will restore all lawns, trees, gardens, landscape plantings, sidewalks, ramps, trails, fences, commercial signs, water courses and sand, gravel, dirt,
1.3.2 Method of construction and restoration of existing water service connections. This shall include:
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL
155 E. Front Street (rear) Lititz, PA 17543 Phone (717) 625-1930 Fax (717) 625-1931 Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL CONSTRUCTION SPECIFICATIONS AND DETAILS
550 PIPE CULVERTS, SEWERS AND DRAINS
551.01 550 PIPE CULVERTS, SEWERS AND DRAINS 551 GENERAL 551.01 Description 551.02 Materials 551.03 Excavation 551.04 Protection of Excavation 551.05(a) Bedding for Rigid Pipe 551.05(b) Bedding for Non-Rigid
New Road 11.0m Asphalt 23m ROW
New Road 11.0m Asphalt 23m ROW Granular A - 150 mm sq. m. $5.35 $69.53 Granular B - 300 mm sq. m. $7.35 $95.54 Concrete Curb and Gutter m. $44.67 $89.34 HL3 Asphalt - 40 mm sq. m. $7.66 $84.23 HL 4 or
CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03
CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT
CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST
CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST NOTE: The following list shall only be used as a guide and shall not be used in lieu of the specifications found in the CITY OF ANN ARBOR PUBLIC
SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN
S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain
Town House 11265 Center Highway North Huntingdon, PA 15642
APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House
Storm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
Let Us Give Utilities the Respect that they Deserve.
Water & Sewer Utilities Miscellaneous Design and Plan Preparation Guidelines Issued by: Ray Mowla, P.E. Jefferson Parish Department of Engineering, Utilities Section The purpose of issuing these miscellaneous
STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200
STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES PART 1 - GENERAL A. Description This section includes materials, testing, and installation of precast concrete
INDEX STORM DRAINAGE PRE-APPROVED NOTES, DESIGN CRITERIA, & PLANS
INDEX STORM DRAINAGE POLICIES D-1 NOT USED D-2 Small Project Drainage Review Requirements D-3 Targeted and Full Drainage Review Requirements D-4 Prohibited and Allowed Discharges to the Storm Drainage
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES
CITY OF PETALUMA STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES AUGUST 1999 Revised 10/98 City of Petaluma Petaluma, California STORM DRAIN INSTALLATION DETAIL
ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION
ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS for (PVC) SANITARY SEWER MAIN CONSTRUCTION VI(A).1 General VI(A).2 Materials and Equipment VI(A).3 Installation of Sanitary Sewer Mains VI(A).4 Laying of
CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements
16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications
San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS
San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these
SECTION 7- STORM SEWER
SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...
STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE. 5.01 Design
SECTION 5 - STORM DRAINAGE 5.01 Design Storm drainage facilities shall be designed in accordance with the goals and guidelines set forth in the Unified Development Ordinance. The goal shall be to collect
SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS
SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS PART 1: GENERAL 1.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of AW facilities. Closely coordinate construction work
SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW
NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in
SECTION 5 DRAFTING STANDARDS
SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.
WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION
WATER MAIN CONSTRUCTION TECHNIQUES Overview Water Main - Materials Specifications Installation Future? Water Main Materials Material Types There are various material types used for water mains, these include:
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
SECTION 02221 SELECTIVE DEMOLITION
SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on
SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE
SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes all labor, materials, equipment, and incidentals required and installation of Polyvinyl Chloride
505.3.6 For a building with a crawl space, see Figure 10. 505-1
505 WATER SERVICE INSTALLATION 505.1 DEFINITION A service line is comprised of the piping and related appurtenances including the connection installed from the Des Moines Water Works water main to the
Storm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE POTABLE WATER DISTRIBUTION SYSTEM
North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper D-4-02 LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE
Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer
Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer The user may choose to adopt part or all of this Model Specification; however, the user should ensure that all parts
STANDARD SPECIFICATIONS FOR STORM SEWER CONSTRUCTION CITY OF PLYMOUTH, MINNESOTA
STANDARD SPECIFICATIONS FOR STORM SEWER CONSTRUCTION CITY OF PLYMOUTH, MINNESOTA MARCH 2014 ENGINEERING DIVISION 3400 PLYMOUTH BLVD. PLYMOUTH, MN USA 55447-1482 TELEPHONE (763) 509-5500 Doran M. Cote,
SECTION G SEWERS (STORM, SANITARY AND FDC)
G-1 GENERAL SECTION G SEWERS (STORM, SANITARY AND FDC) The Consulting Engineer is to monitor all specified pipe and granular materials, pipe slopes and run lengths and ensure the outlined criteria below
FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES
NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and
SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D
SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS Appendix D RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Rumbi Grill -
3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.
To Prospective Bidders: CITY OF TOLEDO, OHIO PARKSIDE AREA SSO ELIMINATION PHASE 2 GRAVITY RELIEF SEWER NO. 2011 Addendum No. 2 December 8, 2011 Information disclosed and/or questions raised since issuing
SECTION 16402 UNDERGROUND ELECTRIC SERVICE
SECTION 16402 UNDERGROUND ELECTRIC SERVICE PART 1 GENERAL 1.1 SUMMARY A. Description of System 1. Furnish all labor, materials, and equipment for below grade work external to buildings as required, and
Section C-1 Pipes and Fittings
Section C-1 Pipes and Fittings C1.00 Work Included The work under this Division of the Specifications shall include all labor, materials, and equipment necessary to furnish and install all piping, pipelines,
The Manitoba Water Services Board SECTION 027030 Standard Construction Specifications September 2013 Page 1 of 21
September 2013 Page 1 of 21 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of sewers including: the supply and installation of pipe, saddles, tees,
Section 3510: Reclaimed water Pipes, Valves, and Appurtenances February 11, 2011
STANDARDS AND CONSTRUCTION MANUAL : Reclaimed water Pipes, Valves, and Appurtenances February 11, 2011 PART 1 - GENERAL 1.01 SCOPE OF WORK A. These specifications cover the pipes, fittings, and appurtenances
STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS
STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains
CONSTRUCTION PERMIT REQUIREMENTS
CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department
SECTION 15105 DUCTILE IRON PIPE AND FITTINGS
SECTION 15105 DUCTILE IRON PIPE AND FITTINGS PART 1 GENERAL.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of Owner facilities. Closely coordinate construction work and connections
C. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
Rules and Regulations for Water Service Lines Water Services Department
Rules and Regulations for Water Service Lines Water Services Department MAY 2015 1 These regulations are established to provide for an orderly growth of the City's water system and to assure equitable
SECTION 33 41 00 REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:
SECTION 33 41 00 REINFORCED CONCRETE PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including
High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines
High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial