Grounding Practice at Data and Communications Centers. David Brender, P.E., CPQ National Program Manager Copper Development Association Inc.
|
|
- Eleanor Poole
- 8 years ago
- Views:
Transcription
1 Grounding Practice at Data and Communications Centers David Brender, P.E., CPQ National Program Manager Copper Development Association Inc.
2 Overview of This Presentation Elements of building wiring and grounding that can alleviate or cure power quality problems before they affect operations
3 Basic Tenet Grounding and bonding are the foundations of a facility. Without a solid foundation, a building will collapse.
4 It s starting point National Electrical Code But not sufficient for power quality
5 Plan For Today: Power quality fundamentals Case study on surge suppressors Case study of data center Case studies of communications facilities Recommended practice
6 What Constitutes a Good Data Center? 1. Above-code grounding 2. Above-code wiring 3. Attention to detail
7 Larger Data Center Involta. Cedar Rapids, Iowa - 18,000 sq. ft. Akron, OH 26,400 sq. ft.
8 Substation is Next Door
9 Dual Electric Circuits Dual utility feeds, kva transformers, kva generators, A&B circuitry
10 Exterior Grounding 500 kcmil ground ring surrounds entire building Vertical electrode (rod) approx. every 100 feet Inspection wells
11 A and B Circuits Dual circuitry throughout building
12 A and B circuits
13 Dual Feed to Cabinets
14 Cabinets to Overhead Collector 3/0 copper grounding conductor over each rack Each rack is bonded with #6 AWG
15 Collectors go to SGB 3/0 AWG grounds from each row collect at bus in each room
16 Where required - Tinning Tinned copper bus Stainless steel hardware
17 From SGB to MGB 3/0 from each SGB bus collect at MGB, then 500 Kcmil to outdoor ground ring
18 Standards 5 Ohm maximum grounding standard Annual inspection Copper conductors only for reliability
19 Very Large Center Markley Group, 800,000 Sq. Ft. in Boston
20 2 Utility Vaults, 5 MVA each
21 Each Rack to Overhead Bus
22 Each Room has Ground Bus then to MGB
23 Separate Runs to Master Ground Bus
24 Master Ground Bus (MGB) in Basement Note that all conduits are labelled. MGB located at lowest point in building.
25 Imagine a Joint Every 10 Feet Never Rely on Conduit as Ground Path Always use a full-sized separate ground conductor
26 A Well Grounded Communications Center
27 Note tower in rear
28 Gas piping is bonded
29 Labeled so no one removes
30 Conductor welded to base, not tower leg
31 Coax braid bonded on vertical run
32 Then to strap at bulkhead
33 Inside radio room
34 Halo ground with all cabinets bonded
35 One Mistake
36 Recommended Practices
37 Leads as short as possible Surge Suppressors
38 Surge Suppressors - at the service - at the panel board - at the load
39 Surge Suppressors at the service level Category C devices 150 ka per mode minimum
40 at the feeder level Category B devices 75 ka per mode Surge Suppressors
41 Surge Suppressors at the device level Category A devices 25 ka per mode
42 Importance of Surge Suppressors and Robust Low Resistance Grounding Florida Data Center
43 Runs ATM network Florida Data Center
44 Direct lightning hit Meter was blown off wall
45 Everything was bonded together No ring ground but low resistance
46 Surge Suppressors All-mode protection: φ-φ, φ-g, φ-n, N-G Listed to UL 1449, Version 3 High Joule rating Have filtering, fuses, indication Must be well-grounded
47 Separate Circuits Sensitive loads should be separated: Separate branch circuits Separate ground conductors Separate panelboards Separate feeders Separate transformers BUT everything must be bonded together
48 Voltage Drop Limit receptacles to 3-6 per circuit Limit voltage drop to <3% or less wire gage circuit length Check for ground loops Check for N-G bonds
49 Breakers and Plugs Bolt-in circuit breakers Twist-lock plugs/receptacles
50 Double Nuts and Lockwashers Help control vibration
51 Do Not Daisy Chain Grounding Earth must never be used as a conductor
52 Grounding in Star Pattern
53 Shielded Isolation Transformer Electrostatic shield between primary and secondary Delta primary but Wye secondary traps harmonics
54 Safely Handling Harmonics Use double size neutral or one neutral per phase conductor
55 have double-sized neutrals Harmonic rated panels
56 Shielded isolation transformer or K-rated transformer (K-13 or higher) Transformers
57 Bentonite is the recommended backfill Backfill Materials Be wary of anything containing graphite
58 Check resistance of grounding electrode system annually (or more often as conditions dictate) Our ground-resistance requirement was four ohms, but we like to maintain a maximum of two ohms at this point, and that s checked once a year to make sure it hasn t risen. CoSentry Data Center
59 Human Failures People make changes to the electrical system all the time They seldom document the changes Have a Written Plan Insist contractors follow it!
60 Compare Orange County Large diameter sweeping turns
61 Start With Low R Grounding
62 Lightning Protection
63 Connect All Metal Conduits Together To the Ground Ring: multiple ground rods tie-in building steel connect all metallic underground pipes lightning protection system
64 Surge Suppression
65 Building Steel is an Antenna Don t use building steel as the down conductor or bonding point Like asking for trouble
66 Equipment Grounding Conductor Use a full-sized EGC and 200% neutral, or separate neutrals Don t rely on conduit
67 Ground Resistance is Important Lightning protection and surge devices MUST have a low impedance ground to discharge the energy Lightning system without good grounding system may make matters worse than none
68 Interior: Conduit is Poor Ground Path Always use a full size copper neutral and equipment grounding conductor Conduit has joints every 10 feet
69 Interior: Voltage Drop Limit receptacles to 3-6 per circuit Limit voltage drop to <3% or less wire gage circuit length Check for ground loops Check for N-G bonds
70 Power quality isn t taught in school A man s got to know his limitations. - Clint Eastwood as Dirty Harry Call in a professional when there is doubt.
71 True-isms 1. Exceed the Code, but don t violate the Code! (Code minimum is one step above illegal) 2. You don t get what you expect, you only get what you inspect. 3. Have a written plan and procedures. Insist contractors follow it. 4. Get the grounding and bonding right before anything else. Most lightning and transient problems can be cured at minimal cost.
72 Free Educational Materials/Seminars Case Histories Recommendations Bibliography DVDs Seminars with PDH s
73 Thanks for your attention David Brender Office: Cell:
David Brender Copper Development Association Inc. david.brender@copperalliance.us. Miramar, March 8, 2013
Grounding and Bonding in Communications Systems David Brender Copper Development Association Inc. david.brender@copperalliance.us Ennes Workshop Miramar, March 8, 2013 MMXIII This talk concentrates on:
More informationElectrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial
More informationServices. Three Phase Service
Services Primary Service vs Secondary Service Overhead vs Underground Common Service Types Three Phase Wye Closed Open Delta Corner Grounded Center Tapped Open Single Phase Three Phase Service Wye Delta
More informationTHE COPPER SOLUTION: Power Quality
THE COPPER SOLUTION: Power Quality Copper Ensures Reliability, Power Quality at Boston Data Center Data centers have quietly become a significant portion of the national electrical infrastructure. The
More informationChapter 9. Bonding and Grounding
Chapter 9 Bonding and Grounding Objectives Describe why the cable should be bonded Describe bonding and grounding procedures Define Bonding and Grounding Explain Safety Benefits and intent of bonding and
More informationGrounding & Bonding Why it is done And How to Install Properly
Grounding & Bonding Why it is done And How to Install Properly The technical information provided herein is to assist qualifi ed persons in planning and installing electric service to farms and residences.
More informationSECTION 22 LIGHTNING PROTECTION SYSTEM
SECTION 22 LIGHTNING PROTECTION SYSTEM 22.01 SCOPE: A. These Specifications shall form a part of the Contract Documents and shall govern construction work for all buildings to be built or modified for
More informationHyperlinks are Inactive
Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)
More informationPOWER QUALITY. Involta TM Data Centers Avoid Upsets with 100% Copper Robust Power & Grounding Systems. Copper Applications.
Copper Applications A Case Study Involta TM Data Centers Avoid Upsets with 100% Copper Robust Power & Grounding Systems POWER QUALITY Involta's Marion, Iowa data center is one of seven that the company
More informationGrounding of Electrical Systems NEW CODE: Grounding and Bonding
Grounding of Electrical Systems NEW CODE: Grounding and Bonding Presented By Scott Peele PE Grounding of Electrical Systems Outline Defining the Terms Why should I Ground? Types of Grounding Systems Separately
More informationCopper Applications A Case Study
Copper Applications A Case Study P O W E R Q U A L I T Y Florida Credit Union Data Center Shrugs Off Direct Lightning Hit Solid Copper Grounding System, In-Depth Surge Protection Keep System On-Line http://www.copper.org
More information270526-TC Grounding and Bonding for Telecommunications Systems
270526-TC Grounding and Bonding for Telecommunications Systems Part 1 - General Related Documents The following related sections of the OT standards shall also be applicable to this section. OT Engineer
More informationCHAPTER 2 EXAMPLES AND TABLES
CHAPTER 2 EXAMPLES AND TABLES COMMENTARY AT 210.20(A) EXCEPTION An overcurrent device that supplies continuous and noncontinuous loads must have a rating that is not less than the sum of 100 percent of
More informationIRRIGATION PUMPING Table of Contents - Section 900
IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS
More informationEngineers Edge, LLC PDH & Professional Training
510 N. Crosslane Rd. Monroe, Georgia 30656 (770) 266-6915 fax (678) 643-1758 Engineers Edge, LLC PDH & Professional Training Copyright, All Rights Reserved Engineers Edge, LLC An Introduction to Interior
More informationCoaxial Cable Entry Panels, Coax and Grounding Connectors. Technical Note
Coaxial Cable Entry Panels, Coax and Grounding Connectors Technical Note Coaxial Cable Entry Panels, Coax and Grounding Connectors Surge Protection Solutions for PTC 2 Coaxial Cable Entry Panels, Coax
More informationELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:
ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: Chapter 12 of the Burlington Code of ordinances allows owner occupants of single family homes to do their own wiring if they choose. If you choose to
More informationSTREETLIGHT SYSTEM GROUNDING AND BONDING
Page: 1 of 8 STREETLIGHT SYSTEM GROUNDING AND BONDING 1. Scope This Construction Standard covers the grounding and bonding requirements for single phase streetlight systems served by the Looped Radial
More informationPXL-250: Network Wiring
This document provides the network wiring requirements for a PXL-250 access control network. Network Requirements The PXL-250 uses a half-duplex, RS-485 communication bus. Per the RS-485 specification,
More informationApplication Bulletin 103 - NEC Reference Guide for SolarBridge-Enabled AC Module Installers
9229 Waterford Centre Dr. Bldg C, Suite 110 Austin, Tx 78758 Application Bulletin 103 - NEC Reference Guide for SolarBridge-Enabled AC Module Installers Current Version: 13 AC Modules are a new product
More informationElectrical Grounding. Appendix C
Appendix C Electrical Grounding Low-Voltage Equipment Grounding The most frequently cited Office of Safety and Health Administration (OSHA) electrical violation is improper occupational grounding of equipment
More information1. Franklin Rod Performance 2. LEC/DAS Performance
THREE ESSENTIALS OF LIGHTNING PROTECTION: BONDING, GROUNDING AND SURGE PROTECTION by Richard Kithil, President and Orlando Alzamora, Vice-President National Lightning Safety Institute (NLSI) 1.0 Summary.
More informationGROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264
BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used
More informationLightning Protection for Comrex Equipment
Lightning Protection for Comrex Equipment Lightning protection is not an exact science: You can follow all the rules and still lose equipment in a severe storm. This paper attempts to separate the desired
More information2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property
2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical
More informationELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01)
ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01) Rule 28-900 Standby Generator Installations Due to the increasing number of standby generator installations being established to maintain continuity
More informationSERVICE - GENERAL Residential, Commercial, Industrial
PAGE 1 OF 9 USE: Rules and procedures for overhead or underground services. PREVIOUS REVISION 10-01-01 ORIGINATED 03-94 PREVIOUS NUMBER ER 1-290-B, 07-15-93 LATEST REVISION: Remove details of Facility
More information16300 MEDIUM VOLTAGE DISTRIBUTION
16300 MEDIUM VOLTAGE PART 1: GENERAL 1.01 SYSTEM DESCRIPTION A. Most new loads will be served from the underground electric distribution system. This system is a primary open loop configuration served
More informationRESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS:
RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS: Signed completed Electrical Permit application form. Minnesota law requires all electrical work is to be performed by licensed,
More informationVideo Camera Installation Guide
Video Camera Installation Guide The intent of this guide is to provide the information needed to complete or modify a video camera installation to avoid lightning and induced power surge damage. This guide
More informationMISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS
MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS 01. SAFETY INSPECTION of service equipment at FPL Power Source 02. Construction GFI power outlets (Temp Pole for Construction) 03. 90 day temporary power
More informationCONSTRUCTION STANDARD ELECTRIC OPERATIONS ORGANIZATION
Page 1 of 11 ****This Standard Supercedes BECo CS2.13-2.3 & ComElectric OH Construction Manual, System Grounding Section, drawings CGND, GRDSUM, and C2**** 1.0 Bill of Materials GROUNDING AND BONDING POLE-MOUNTED
More information3. TYPES OF SERVICE AVAILABLE. 3.1 Scope
3. TYPES OF SERVICE AVAILABLE 3.1 Scope UI supplies 60 hertz, alternating current with different voltage and ampere ratings. Not all voltage and ampere ratings are available throughout the entire service
More informationHow To Get A Power Line Extension
GUIDELINES FOR COMMERCIAL ELECTRIC SERVICE HOOKUP 1 Steps to Commercial Service Pay the Design Deposit Commercial Buildings: Up to 1, sq ft = $1,. 1, 5, sq ft = $2,. Over 5, sq ft = $3,. Commercial jobs
More informationTransient and Lightning Protection for the Water Industries
Transient and Lightning Protection for the Water Industries Mike Nager Phoenix Contact mnager@phoenixcon.com 5 th ISA Water/Wastewater Automatic Controls Division Symposium (WWAC) August 3-5, Orlando,
More informationHOUSTON COMMUNITY COLLEGE HCC ALIEF CAMPUS MAIN BUILDING, FIRST, SECOND & FOURTH FLOORS RENOVATION ISSUE DATE: 10.17.12
SECTION 27 05 26 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes grounding and bonding products, design requirements and installation for communications
More information800 Communications Circuits
ARTICLE 800 Communications Circuits INTRODUCTION TO ARTICLE 800 COMMUNICATIONS CIRCUITS This article has its roots in telephone technology. Consequently, it addresses telephone and related systems that
More informationRequirements for Electrical Installations
ARTICLE 110 Requirements for Electrical Installations INTRODUCTION TO ARTICLE 110 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS Article 110 sets the stage for how you ll implement the rest of the NEC. This
More informationwww.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 13 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia ELECTIRAL GROUNDING TABLE OF CONTENT
More informationELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS
Prepared by: ABB1 ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS 052521 Asset Type: Electric Metering Function: Construction Issued by: Quoc Hoang (QxH1) Date: 07-01-16 Rev. #06: This document
More informationElectrical Code Regulation
Electrical Code Regulation St. Clair County has adopted the 2005 National Electrical Code in its entirety for the unincorporated areas of the county and all communities that have contracted with the county
More informationMOBILE HOME SERVICE REQUIREMENTS GAS
ELECTRIC AND GAS 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL 4.0 REFERENCE MATERIAL 5.0 TYPICAL UNDERGROUND UTILITY LAYOUT 6.0 METER PAD DETAILS 7.0 GENERAL INSTALLATION PROCEDURES 8.0 PEDESTAL SPECIFICATIONS
More informationNovember 2014. Stray Voltage Test Procedure for Electrical Contractors
Stray Voltage Test Procedure for Electrical Contractors 1 LIMITATION OF LIABILITY AND DISCLAIMER Any person who uses, relies on, or otherwise deals with this document and the information herein, does so
More informationElectrical Service Guidelines
Electrical Service Guidelines Middle Tennessee Electric Membership Corporation Revised: May 23, 2013 MTEMC's Electrical Guidelines TABLE OF CONTENTS Right-of-Way Clearance Guide 3 MTEMC Requirements 4
More informationSURGE PROTECTIVE DEVICES (SPDs) LOW VOLTAGE AC INTEGRATED SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION SYSTEMS SECTION 16671A SECTION 16671A
SURGE PROTECTIVE DEVICES (SPDs) INTEGRATED UNITS LOW VOLTAGE AC SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION SYSTEMS PART 1 GENERAL 01 02 03 SCOPE The Contractor shall furnish and install the Surge Protective
More informationOur data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.
AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled
More informationWhite Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5
White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code June 2015 Revision 1.5 Shalhevet Bar-Asher; SolarEdge Technologies, Inc. Bill Brooks, PE; Brooks Engineering LLC
More informationDESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES 33 70 00
SECTION 33 70 00 - ELECTRICAL DISTRIBUTION CONCRETE ENCASED PRIMARY DUCTBANK SYSTEMS Duct Banks shall be installed by qualified electrical contractors. Provide type EB PVC 5 inch duct equal to Carlon #68716
More informationPower surges can also be generated by equipment in your facility such as:
Power Quality Surge Suppressors What is Surge Protection A surge suppressor can be the first and best defense against the instant or gradual destruction of electrical equipment. Compared to the replacement
More informationElectrical. This section applies to the design and installation of building power distribution systems.
Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions
More informationSecurity Cameras, CATV, GPS & Satellite Protection. White Paper
Security Cameras, CATV, GPS & Satellite Protection White Paper Security Cameras, CATV, GPS & Satellite Protection Surge Protection Solutions for PTC 1 Security Cameras, CATV, GPS & Satellite Protection
More informationData Bulletin. Communications Wiring for POWERLINK G3 Systems Class 1210 ABOUT THIS BULLETIN APPLICATION INTRODUCTION.
Data Bulletin 1210DB0002R3/05 03/2005 LaVergne, TN, USA Communications Wiring for POWERLINK G3 Systems Class 1210 Retain for future use. ABOUT THIS BULLETIN This data bulletin describes the proper wiring
More informationThe National Armored Cable Manufacturers Association Presents. Installation Standard for Types AC and MC Cables
The National Armored Cable Manufacturers Association Presents Installation Standard for Types AC and MC Cables An ANSI Standard Original document jointly produced by NECA and NACMA as Standard for Installing
More informationHow Much Voltage Drop Is Acceptable?
How Much Voltage Drop Is Acceptable? Article supplied by Ideal The National Electrical Code (NEC) recommends that the combined voltage drop of the electrical system (branch circuit and feeders) not exceed
More informationINDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION
INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION February 2013 NOTE: If conflict exists between St. Thomas Energy s Conditions of Service and this document, the Conditions
More informationIntersection Preassembled 19-inch Rack
Intersection Preassembled 19-inch Rack The intersection preassembled 19-inch rack comes fully assembled, wired and ready to be installed in a server rack. The rack provides communications, power conversion
More informationSection 27 05 26 Grounding and Bonding for Communications
Part 1 General 1.1 General 1.1.1 Summary A. This section governs the products and execution requirements relating to furnishing and installing grounding and bonding for the communication systems. B. Description
More informationSpecifications for Lightning Protection. ASAE Engineering Practice
Chapter 8: Lightning Specifications for Lightning Protection ASAE safety standards are not laws. They are recommended voluntary standards used by designers, engineers, manufacturers and users of the equipment,
More informationGUIDELINES FOR WIRING SINGLE FAMILY DWELLING UNITS
GUIDELINES FOR WIRING SINGLE FAMILY DWELLING UNITS This guideline has been prepared to assist the owner/occupant of a single family dwelling with compliance to the requirements of the National Electrical
More informationSOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings
*** Provide this document to the inspector along with ALL system installation instructions *** Project Address: Scope: Standard plan for the installation of grounded microinverter solar PV systems, not
More informationPresented by: The Electrical Association of Philadelphia 527 Plymouth Road, Suite 408 Plymouth Meeting, PA 19462 (610) 825-1600 www.eap.
Continuing Education Courses Presented by: The Electrical Association of Philadelphia **New Jersey licensees, you MUST have your 34 hours of continuing education completed by MARCH, 2012. This includes
More informationQuestions and Answers for Heating and A/C Contractors
1. How do we accomplish grounding of furnaces and / or water heaters on two wire circuits? 250.134 Equipment Fastened in Place or Connected by Permanent Wiring Methods (Fixed) Grounding. Unless grounded
More informationEarth Ground Resistance
Principles, testing methods and applications Diagnose intermittent electrical problems Avoid unnecessary downtime Learn earth ground safety principles Earth Ground Resistance Why Ground, Why Test? Why
More informationGUIDELINES HAS/PDC/DESIGN DIVISION TITLE
SECTION 270526 TELECOMMUNICATIONS GROUNDING & BONDING (-TAB) PART 1 GENERAL 1.01 SCOPE SUMMARY Designer shall provide a detailed narrative of the tasks to be performed under this specification section.
More informationPower Plant Electrical Distribution Systems
PDH Course E184 Power Plant Electrical Distribution Systems Gary W Castleberry, PE 2008 PDH Center 2410 Dakota Lakes Drive Herndon, VA 20171-2995 Phone: 703-478-6833 Fax: 703-481-9535 www.pdhcenter.com
More informationElectricity for the Entertainment Electrician Ef Technician
Electricity for the Entertainment Electrician Ef Technician Richard Cadena ЩШ ' AMSTERDAM BOSTON HEIDELBERG LONDON NEW YORK JPPwlffl OXFORD PARIS SAN DIEGO SAN FRANCISCO л»еж SINGAPORE SYDNEY TOKYO ELSEVIER
More informationBUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE Toll Free Telephone Numbers Residential Services 800.454.3853 Commercial Services 800.653.5307 Utility Locating Company N.C. 800.632.4949 S.C. 888.721.7877
More informationMultiple Meter Installation - 200 Amperes Per Position -Single Phase, Self-contained
Overhead Meters TABLE OF CONTENTS D D Consumer Service Pole for Mobile Home Park Temporary Service -wire Single Phase D. Overhead Meter Installation - Single Phase D. Connection Diagram - Single Phase
More informationIntroduction to Data Centre Design
Introduction to Data Centre Design Barry Elliott BSc RCDD MBA CEng Earthing, grounding and bonding November 09 Earthing what s the point Safety from electrical hazards Reliable signal reference within
More information337500 MEDIUM VOLTAGE DISTRIBUTION
337500 MEDIUM VOLTAGE DISTRIBUTION PART 1: GENERAL 1.01 SYSTEM DESCRIPTION A. Most new loads will be served from the underground electric distribution system. This system is a primary selective open loop
More informationAll work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.
DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,
More informationCellular Wireless Antennas
Cellular Wireless Antennas A Technical Brief GarrettCom Inc., November 2010 Overview The Cellular Wireless Antenna Technical brief is provided to assist with the design and deployment of the DX940 Cellular
More informationSECTION 26 09 13 - POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL
SECTION 26 09 13 - POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL 1.1 SUMMARY A. This section describes the requirements for the installation of Power Monitors and associated
More informationPower Quality for Information Technology System
Power Quality for Information Technology System ITS OBVIOUS THE TOLERANCE IS DIFFRENT But What isn t Tobvious? HOW MANY OF YOU HAVE : A COMPUTER AT HOME? = Computers are not screens and Keyboards COMPUTERS
More informationParallel Redundant Uninterruptible Power Supply
9 315 Parallel Redundant Uninterruptible Power Supply Installation/Operation Manual 164202013 Rev. D ------------------------------------------------------------------------ ------------------------------------------------------------------------
More informationDoc Ref: 2015.06.01.002. 602.783.1112 baselayer.com 2015 BASELAYER TECHNOLOGY, LLC
TM 602.783.1112 baselayer.com 2015 BASELAYER TECHNOLOGY, LLC TM D400E Data Module (60Hz) The EDGE D400E is designed to meet high power density requirements for both the HPC and Web Scale environments while
More informationCONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements
16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications
More informationVoltage Drop (Single-Phase)
Voltage Drop (Single-Phase) To Find: To Find Voltage Drop Formula: 2 x K x L x I V.D. = ------------------- C.M. Variables: C.M. = Circular Mill Area (Chapter 9, Table 8) To Find Voltage Drop Percentage
More informationSURGE PROTECTIVE DEVICES (SPDs) LOW VOLTAGE AC EXTERNAL SIDEMOUNT SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION SYSTEMS SECTION 16671B SECTION 16671B
SURGE PROTECTIVE DEVICES (SPDs) EXTERNAL SIDEMOUNT UNITS LOW VOLTAGE AC SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION PART 1 GENERAL 01 02 03 SCOPE The Contractor shall furnish and install the Surge Protective
More informationAT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)
AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) Site Biography Market Area: Washington, DC Area Location: Ashburn, VA 20147-6011 Address: All deliveries should be sent to
More informationNo Phone Line II-48 System
Used in conjunction with an EntraGuard Telephone Entry System, the -48 provides No Phone Line communication and door or gate control through existing building telephone lines without the need to purchase
More informationThis presentation to be used in conjunction with:
1 This presentation to be used in conjunction with: Spec Sheets: SA-GRSP10, SA-GRSP09, SA-GRSP11 Samples in DC-GROUND-KIT 8/16/2012 2 Network Bonding and Grounding: TIA-607-B Generic Telecommunications
More informationDENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION 17650 SECURITY SYSTEMS
PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. Inspections and observations by the Owner do not relieve the A/E of contract responsibilities. B. Chain of command 1. The DPS Project Manager is
More informationHomeowner Information Guide Electrical Safety. British Columbia Safety Authority
Homeowner Information Guide Electrical Safety British Columbia Safety Authority The following information should be carefully reviewed before performing any electrical work. The information contained in
More informationDouglas J. Reinemann, Ph.D. University of Wisconsin-Madison, Department of Agricultural Engineering Madison, Wisconsin. and
Paper o. 953623 An ASAE Meeting Presentation ELECTRICAL SERVICE TO AGRICULTURAL BUILDIGS: FOUR- WIRE AD THREE-WIRE SYSTEMS by Mark A. Cook, Daniel M. Dasho P. E., and Richard Reines Public Service Commission
More informationPRIMARY SERVICE LINE: The Company's conductors which connect the supply line with a transformer located on private property.
INTRODUCTION These rules are issued for use by Customers, builders, electrical contractors, architects, engineers, etc. The rules require the installation of safe and adequate wiring and electrical equipment,
More informationAT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding
AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding A Guide for California Developers of Com m ercial Property This guide consists of
More informationGROUNDING AND BONDING ELECTRICAL SYSTEMS
GROUNDING AND BONDING ELECTRICAL SYSTEMS Produced and Distributed By Engineer Educators, Inc. 857 East Park Avenue Tallahassee, FL 32301 2007-2008 EngineerEducators.com / Tallahassee, FL GROUNDING AND
More informationFFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid
Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars Presented By: Greg Pelster & Robert Schmid FFI Ferrie, Franzmann Industries LOW VOLTAGE SWITCHGEAR & LOW VOLTAGE
More informationSection B: Electricity
Section B: Electricity We use mains electricity, supplied by power stations, for all kinds of appliances in our homes, so it is very important to know how to use it safely. In this chapter you will learn
More informationHPS Universal. Single and Three Phase Potted. Buck-Boost Transformers. Buck-Boost Applications & Standard Specification... 80
Buck-Boost Transformers Single and Three Phase Potted Buck-Boost Transformers Buck-Boost Applications & Standard Specification... 80 Selecting Buck-Boost Transformers... 81 Single Phase Selection Tables...
More informationResidential Electrical Inspection. Checklist
443 Lafayette Road N. St. Paul, Minnesota 55155 www.doli.state.mn.us Residential Electrical Inspection (651) 284-5064 1-800-DIAL-DLI Fax: (651) 284-5743 TTY: (651) 297-4198 Checklist Generally, Minnesota
More informationHow To Wire Wire Wire For A Decoder System
The Paige Irrigation Wiring Guide for Systems Background: The decoder system was first introduced to the irrigation industry in the late 1960s. It was invented by the world renowned golf course architect,
More informationRule 5.500 Fast Track Analysis for National Life Insurance Co.
Rule 5.500 Fast Track Analysis for National Life Insurance Co. For a 500 kw Solar array to be located at 155 Northfield Street in Montpelier, Vermont Green Mountain Power Pam Allen Date: 5/31/13 SECTION
More informationInstallation Guide Content for P250xV-240 microinverters
A C M o d u l e Installation Guide Content for P250xV-240 microinverters May 15, 2012 2011-2012 SolarBridge Technologies, Inc. All Rights Reserved. No part of this publication may be reused in any manner
More informationE-Version SECTION 15318 - CHLORINATION SYSTEM PART 1 - GENERAL PART 2 - PRODUCT
SECTION 15318 - CHLORINATION SYSTEM PART 1 - GENERAL 1.1. SCOPE OF WORK A. Under this item the Contractor shall furnish and install a sodium hypochlorite solution metering system complete with all accessories
More informationElectric Service Rules
2016 Electric Service Rules GENERAL INFORMATION TEMPORARY SERVICES OVERHEAD SERVICES UNDERGROUND SERVICES DISTRIBUTED GENERATION METERING HUD MANUFACTURED HOMES FARM SERVICES UTILITY/CATV SERVICES PRIMARY
More informationBuilding Maintenance - Understanding Ground Isolation and Network Safety
TEMPEST Engineering and Hardware Design Dr. Bruce C. Gabrielson, NCE 1998 Power/Ground Isolation and Control in Boxes, Systems, and Facilities Chapter 15 (Note: Much of this chapter is taken from existing
More informationNo Phone Line System. Quick Start Guide NPL II. 1.0 Installation
Used in conjunction with EntraGuard Gold Telephone Entry Systems, the provides No Phone Line communication and door or gate control through existing building telephone lines without the need purchase phone
More informationBASIC NEC CODE RULES AND DESIGN PRACTICE
BASIC NEC CODE RULES AND DESIGN PRACTICE Wire Ampacity and Size Circuit Breaker Size 1. Maximum loading for any branch circuit is 80% of rating of circuit for ampacity of wire for any load. NEC 220-2,
More information