1 SECTION ELECTRICAL DISTRIBUTION CONCRETE ENCASED PRIMARY DUCTBANK SYSTEMS Duct Banks shall be installed by qualified electrical contractors. Provide type EB PVC 5 inch duct equal to Carlon #68716 and EB PVC 2 inch duct equal to Carlon # Terminate duct with end bells equivalent to OZ/Gedney Type TNS. After the trench is excavated and properly graded a concrete base shall be installed. The concrete base shall be a minimum of 4 inches thick with rebar reinforcement. Included in the base shall be rebar that shall be used for the purpose of tying down the PVC conduits thus preventing any floating of the duct sections when the concrete is installed. Electrical ducts shall be installed by an electrical contractor. Steel conduits are required as follows: Out of all manholes and buildings for a distance of approximately 10 feet, or as shown on the plans. At all construction joints if concrete pours are interrupted. Under all surfaces used for motor vehicle travel. With these exceptions, the raceway system shall consist of Poly-vinyl-chloride(PVC) ducts in sections as noted on the drawings. All sections shall be encased with concrete. PVC shall equal Carlon Type EB, 5 inches = 5.56 inches O.D., and minimum wall.125 inch and 2 inches = 2.37 inches O.D. and minimum wall.06 inch. Base and intermediate spacers shall be Carlon catalog #S288PL and S289PL or equivalent. Spacers shall be provided on maximum 5 foot centers and closer where required. Ducts shall be furnished in minimum 10 foot lengths. Use compound on all duct and conduit couplings. All duct and conduit couplings shall be watertight. After ducts are installed, they shall be tied down to prevent floating. Ties shall consist of reinforcing rods only and must conform to details shown on drawings. All mud and debris shall be removed from ducts, conduits, spacers, etc., before concrete is poured. Tape steel conduit couplings only. Duct run must pitch a minimum of 6 inches per 100 feet. Use large sweeps in primary ducts and conduits where primary lines are not straight. All duct shall be installed in such a manner to prevent accumulation of water. All conduits shall terminate 2 inches inside walls with end bells in all primary manholes. All conduits shall be evenly spaced and aligned with each other. Install #10 solid copper fish line in all ducts and conduits. It is the intent that each section of line (from manhole to manhole or from manhole to building) shall be poured complete in one operation. No construction joints shall be permitted between manholes. In case unusual conditions require a construction joint, furnish and install steel conduit for a minimum of 5 feet on either side of the joint. Concrete shall be poured at construction joints per the details indicated on the drawings. The top of the concrete encasement shall be a minimum of 24 inches below final grade. In special cases, this requirement shall be waived where field conditions require. However, such conditions must be approved by the Construction Manager and University Utilities and shall be considered the last resort in correcting the situation. CONCRETE Concrete shall cover the duct a minimum of 3 in all directions, and a maximum of 6. UPDATED - JULY 23, 2009 Page 1 of 10

2 Concrete shall be 4,000 psi and shall have the color additive Colorcron - Tile Red as manufactured by Masterbuilders, Solomon Grind Chemical Services #140 Red, or approved equal. The color additive shall have a minimum concentration of 9 lbs. per bag of cement and shall be mixed throughout all of the duct bank concrete. Maximum aggregate size shall be 3/4. Concrete shall NOT be placed with the aid of a mechanical vibrator. If trench erosion occurs, use of forms may be required to prevent overly large masses of concrete. A red warning tape that is a minimum of 6 wide shall be installed 18 above all duct banks. There shall be a minimum of 3 inches of homogeneous, waterproof concrete around all ducts and conduits. Encasement shall be poured complete and continuous from one manhole to another and from manholes to buildings. Minimum reinforcing of the concrete shall be #4. Reinforcing shall be installed longitudinally, at each corner of the duct (in cross section) and along the top, bottom, and sides at a maximum of 6 on center. All reinforcing steel shall have a minimum concrete cover of 1½. Reinforcing shall be installed latitudinal, as needed to hold the above in place during placement of the concrete. After duct encasement is placed, and before backfill is installed, pull a mandrel through the ducts 1/4 inch in diameter less than the ducts. If this test indicates that there are obstructions or water in the duct system, that section of the system shall be removed and a new section installed at no additional cost to the University. Duct bank penetrations into manholes shall continue completely through the wall of the manhole and shall use one larger hole rather than several small holes. If above method is not practical, the concrete may stop outside the manhole but must be pinned to the manhole with steel pins to prevent differential settlement. All unused duct shall have a nylon or polypropylene pull string installed for future use. The pull string shall be Greenlee or equal with a minimum of 240 lbs. tensile strength, and shall be rot and mildew resistant. Wire shall not be used. Duct bank penetrations of foundation wall shall comply with the following: Concrete encased duct banks shall terminate at the exterior surface of the foundation wall. The conduit shall make individual penetrations of the foundation wall. All duct banks shall be attached to the foundation wall in one of two manners. In new construction, the reinforcing steel of the foundation wall may be extended into the concrete encasement of the duct bank at the time of placement. Alternately, reinforcing steel may be drilled into the foundation wall and extended into the duct bank concrete. The steel that is inserted into the foundation wall shall be attached through the use of epoxy capsules, similar to those supplied by Hilti. All duct bank conduit within 8 of the foundation wall penetration shall be rigid steel conduit. The conduit shall be installed with a grade away from the building. The conduit shall penetrate the foundation wall in the following manner: For new construction, the foundation wall shall have a steel sleeve installed that is 2 larger in diameter than the conduit to be installed. For existing construction, the hole shall be core drilled. In multiple duct situations, sufficient space shall remain between the penetrations to maintain the structural integrity of the foundation wall. A rubber seal, equal to Link-Seal, shall be installed in the space between the conduit and the sleeve or drilled hole, near the interior surface of the foundation wall. The same space shall have waterproofing installed on the exterior side of the rubber seal. MEDIUM VOLTAGE (601 volts - 69,000 volts) UPDATED - JULY 23, 2009 Page 2 of 10

3 Medium voltage cables shall be furnished and installed by the University. Medium voltage switch gear and primary transformers shall be furnished and installed by the University Facilities department. PACKAGED GENERATOR ASSEMBLIES Generator Fire Safety: Generator assemblies should be located outside the building when possible. If generators have to be located indoors, they shall be located in three (3) hour cutoff rooms provided with doorway curbing and emergency drainage. Generator room fuel day tanks shall be at most 660 gallon, provided with spill containment and leak detection. All fuel piping shall exit the top of the tank. All fuel piping from the outside of the building for day tank filling and venting shall be hard piped. A high liquid level device shall be provided for day tank overflow protection. A generator fuel system shall be arranged to automatically shut down upon a fire, detected leak or high day tank level. All generators 750 KW and larger require a Utility grade relay package. Consult with Facilities Management- Environmental Services for information on generator operating permits and Spill Prevention Control and Countermeasures (SPCC). All generator sets shall be located to disperse exhaust fumes, vibration and noise without affecting the normal functions of the building and surrounding site. On-site fuel source shall provide for a minimum of 8 hours of run time. Generator type and fuel type shall be evaluated on an individual project basis. All generators shall have a closed transition transfer switch. Provide startup services and training for Owner s personnel by a factory certified service representative. Minimum training time shall be 4 hours. Acceptable Manufacturers - Any manufacturer with a service center within a 100 mile radius of the University of South Alabama is acceptable. Generator assemblies should be located outside the building. If generators must be located indoors, they should be located in three hour cutoff rooms provided with doorway curbing and emergency drainage. Generator room fuel day tanks should be at most 660 gallon, provided with spill containment and leak detection. All fuel piping should exist the top of the tank. All fuel piping from the outside of the building for day tank filling and venting should be hard piped. A high liquid level device should be provided for day tank overflow protection. The generator fuel system should be arranged to automatically shut down upon a fire, detected leak or high day tank level. Battery Equipment Sealed batteries shall be used for emergency lighting systems when an emergency generator is not available. UPDATED - JULY 23, 2009 Page 3 of 10

4 Provide adequate ventilation and cooling of battery rooms and battery cabinets to maintain full life expectancy. Batteries on racks or in cabinets shall be accessible for maintenance. Vertical access above batteries shall be a minimum of 6 inches. Transfer Switches All transfer switches shall be the closed transition type. Provide a minimum of two sets of auxiliary form C contacts for normal and emergency transfer switch positions. Transient Voltage Suppression Some users may require transient voltage surge suppression. The Design Professional shall review options with the user to determine specific needs. When suppression equipment protects an entire panelboard, locate this equipment inside the panelboard enclosure. Provide a disconnecting means to isolate the suppression equipment for repair and replacement. Low Voltage Conductors Aluminum conductors are prohibited. The minimum wire size for lighting and power branch circuits is #12 AWG. The minimum wire size for Class 1 control circuits is #14 AWG. Any conductors installed in flexible conduit at terminal connections of rotating, vibrating or moveable equipment shall be of stranded wire. Normal, emergency, life safety, 120/208, and 277/480 shall not occupy the same raceways. Exception: normal and emergency conductors of the same voltage in G4000 wiremold. Neutral conductor capacity shall be increased as necessary for harmonics. Grounding and Bonding for Electrical Systems All grounding system conductors shall be copper. Provide a grounding conductor with all circuits. SECONDARY CIRCUITS Secondary service protector switchgear will be furnished and installed by the University Facilities department in conjunction with the contractor. Color code secondary service, feeder, and branch circuit conductors with factory applied color as follows: 208/120 Volts Phase 480/277 Volts Black A Brown Red B Orange Blue C Yellow White Neutral White or Gray Green Ground Green UPDATED - JULY 23, 2009 Page 4 of 10

5 Service Entrance At the points where conduit penetrates concrete that is in contact with soil, that conduit shall be Schedule 80 PVC conduit bedded in sand. If the PVC is a bend of greater than 45 degrees, the bend shall be completely encased in concrete. Switchboards Phase, neutral and ground bus shall be copper. The phase arrangement on three phase bus shall be A-B-C from left to right, top to bottom, front to back as viewed from the front of the switchboard. Provide a minimum 20% spare, usable space in new switchboards for future increases in electrical requirements. Provide continuous ground bus the full length of the switchboard. In existing buildings, new switchboards shall match existing switchboards. Acceptable Manufacturers Square D General Electric Cutler-Hammer Panelboards Provide 5 spare conduit stubs from flush panels into suspended ceiling space or other accessible space. Provide a minimum 20% spare circuit space in new panelboards. Phase, neutral and ground bus shall be copper. All panelboards shall have separate neutral and grounding busses. All grounding and neutral wiring shall be terminated on the proper bus. In existing buildings, new panelboards shall match existing panelboards. Provide each panel with a clear, plastic covered, typed circuit schedule. The schedule shall identify circuits by room number and location in room using final room numbers provided by the Owner. Provide a label on the inside of the panelboard door with panel ID and power origin. Circuit breakers on branch circuit panelboards shall be bolt-on type. Covers to consist of full-length hinge. (Door within a door) Acceptable Manufacturers Square D General Electric Cutler-Hammer MOTOR CONTROL CENTERS Starters shall have fusible disconnects rather than circuit breakers. Control circuit voltage shall be 120 volts or less. Provide a minimum of two auxiliary contacts (1 N.O. and 1 N.C.) in magnetic starters in addition to what is being used. UPDATED - JULY 23, 2009 Page 5 of 10

6 Design each motor control center section so starter units may be rearranged, removed or added. Provide a minimum 20% spare, usable space in each new motor control center. In existing buildings, new motor control centers shall match existing motor control centers. Acceptable Manufacturers Square D General Electric Cutler-Hammer ELECTRICITY METERING Locate low voltage watt-hour metering (e.g. sidewalk, parking lot, and roadway lighting) near the primary building metering or provide a raceway (3/4 in. conduit minimum) from the low voltage meter to the primary metering location. Place a disconnecting means ahead of any low voltage watt-hour meter. All contactors shall be on the load side of low voltage watt-hour meters. Line voltage must be connected to the line side of low voltage watt-hour meters at all times for the display to function and shall not be tied to building control systems. FUSES Renewable fuses shall not be used. As much as possible, equipment should be specified with fuse holders that shall accept fuses dimensionally the same as Class H fuses. Each project shall supply one set of three spare fuses for each type and size fuse installed. Designer shall evaluate the need for a box for storage of spare fuses. If a box is installed, it shall be a metal box, designed to store fuses, mounted in a highly visible location, and labeled appropriately. SAFETY SWITCHES AND CIRCUIT BREAKERS Safety switches shall be heavy duty. To provide an immediate and observable point of electrical disconnect, locate a disconnect switch near each piece of fixed electrical equipment. Tandem branch circuit breakers are prohibited. Circuit breakers in branch circuit panelboards shall be bolt-on type. In existing buildings, new enclosed switches and circuit breakers shall match existing enclosed switches and circuit breakers. All safety switches shall have a durable label permanently attached to the inside of the cover describing the fuse size, type, current limiting ability and devices controlled. All safety switches intended for use on circuits where current limiting fuses are required shall be specified with rejection clips designed to permit installation of Class R fuses only. UPDATED - JULY 23, 2009 Page 6 of 10

7 Covers on safety switches shall be provided with a method of opening the cover without opening the switch. All safety switches shall have a grounding bar. Safety switches in mechanical rooms shall have NEMA 3R enclosures unless the environment or usage requires a more restrictive enclosure. Acceptable Manufacturers Square D General Electric Cutler-Hammer ADJUSTABLE SPEED DRIVES (ASD) VARIABLE FREQUENCY DRIVES (VFD) The design shall address the effects of VFD input current harmonics on the distribution system. Specify harmonic criteria and require field testing of harmonic performance where appropriate. Manufacturer shall provide harmonic analysis of the supplied VFD, total harmonics are not to exceed 3%. Provide VFD s that are compatible with the motors they control. Provide bypass switching capability when back-up equipment is not provided. Provide three (3) contactor bypass switching capability when back-up equipment is not provided. A variable frequency motor controller shall not serve more than one piece of equipment. In existing buildings, new variable frequency motor controllers shall match existing variable frequency motor controllers. Provide startup services for the Owner s personnel by a factory certified service representative. Minimum training time shall be 4 hours. Where motors are 40 HP and larger, VFD shall be 480 volts with step up transformers as required. Where we are not trying to maintain consistency with existing ASDs, acceptable manufacturers are: ABB Toshiba Square D Drives shall include manual bypass of the VFD for the following: 480 volt drives 125 HP and larger 208 volt drives 60 HP and larger Critical applications Drive Isolation Transformer (where required for changing voltage): General: factory assembled and tested, air cooled dry type transformer, having characteristics and ratings as indicated. Units shall be designed for 60 Hz service. Transformer shall be a three-phase, Delta Wye, or Delta-Delta unit. Grounding: the transformer shall operate with an ungrounded delta primary and a grounded wye secondary, or a corner grounded Delta secondary. UPDATED - JULY 23, 2009 Page 7 of 10

8 Core: Grain Oriented, non-aging silicon steel. Coils: continuous windings with no splices except for taps. Insulation system: UL recognized 220ºC. Performance shall be obtained without exceeding 150ºC temperature rise while operating in 30ºC ambient (24 hour average). Enclosure: constructed of heavy gauge steel with electrostatic applied finish. Enclosure shall be ventilated, dripproof with lifting holes. Sound levels shall not exceed 55 db. Non-linear rating: harmonic rating shall be equal to or greater than the harmonic distortion produced by the supplied VFD, as determined by the harmonic analysis supplied by the VFD manufacturer. IDENTIFICATION All switching, protective devices and metering on main distribution panels shall be identified with labels. Labels shall be adhesive backed vinyl or plastic with ½ inch letters. Identification labels are required for all distribution equipment from the service through branch circuit panelboards and motor control centers. The Design Professional shall specify the wording of identification labels. Label all receptacles on the cover plate with self-adhesive labels. Label shall indicate panel name and circuit number. All light fixtures shall be labeled with the panel number and circuit number from which they are fed. Place label out of public view. Coordinate label location with the Owner. All junction box covers shall be labeled with the panel number and circuit numbers contained in the junction box. Exposed boxes in finished areas: label on inside of cover. Exposed boxes in unfinished areas: label on outside of cover. Concealed boxes above accessible ceilings: label on outside of cover. FEEDERS All feeders shall have a separate copper grounding conductor installed. In no case shall the conduit or raceway be used as the grounding conductor. All conduit sizes and conductor numbers and sizes shall be shown on the drawings. All panelboards shall have separate grounding and neutral busses. All grounding and neutral wiring shall be terminated on the proper buss. No snap-in breakers shall be allowed. Bolt-in type breakers shall be used. Square D I-Line and GE Spectra Series are acceptable. BRANCH CIRCUITS All wiring systems shall be installed using conduit. Flexible wiring systems shall not be used. A separate grounding conductor shall be installed. Use of the conduit or raceway is not an acceptable grounding method. UPDATED - JULY 23, 2009 Page 8 of 10

9 All general purpose power circuits shall be a minimum of 20 amps. No piggyback breakers shall be allowed. General purpose power circuits in office areas shall not have shared neutrals. CONDUIT AND BOXES Conduit shall be supported from the building structure. Attachment to other pipes, conduits, ductwork, etc. shall not be allowed. Non-metallic conduit or boxes shall not be used except in wet locations. In cases where it is used, conduit 2 and smaller shall be a minimum of Schedule 80. Conductors carrying more than 150v to ground shall not be installed in conduits with conductors carrying less than 150v to ground. Schedule 80 PVC conduit will be utilized 1. Schedule 80 PVC conduit shall be utilized anywhere conduit emerges from concrete or where conduit may receive physical abuse. EMT shall not be used outdoors, in wet locations, in floor crawl spaces, or below 5 AFF. For Branch Circuits, the minimum conduit size shall be 3/4. For Feeders, conduit is to be sized at least one size above the NEC requirement of wire being installed or anticipated to be installed, with minimum size of 1. PVC conduit shall be used for underground electric circuits less than 600 volts that are: Under paved areas and areas scheduled to be paved. Next to permanent buildings, under formal planting beds and in extremely high ` areas that would be difficult to excavate due to regular heavy use. All other applications shall be direct bury. A red plastic tracer tape is to be buried 18 above the cable or conduit in all installations. PVC conduit for Blue Cap phones and parking gates shall be sized a minimum of 1. PVC conduit shall be Schedule 40 minimum weight and to be designed for electric application with all connections solvent welded. All metallic fittings shall be compression type rated for ground connection. Thin wall indenter fittings are prohibited. All fittings shall be galvanized steel or malleable iron. The use of flexible metal conduit shall be limited to recessed lighting fixtures. Six foot length maximum. Liquid Tight flexible metal conduit shall be used to connect rotating, vibrating or moveable equipment. Empty conduits shall have nylon pull cords installed with temporary caps or plugs. Raceways, boxes and their supports shall be compatible with the atmosphere of the area in which they are installed. UPDATED - JULY 23, 2009 Page 9 of 10

10 To reduce sound transmission, wall outlet boxes shall not be installed back-to-back in partitions. UPDATED - JULY 23, 2009 Page 10 of 10

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations. DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,

More information

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage: Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial

More information

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements 16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications

More information

IRRIGATION PUMPING Table of Contents - Section 900

IRRIGATION PUMPING Table of Contents - Section 900 IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS

More information

A. Shop Drawing submittals shall include, but not be limited to, the following:

A. Shop Drawing submittals shall include, but not be limited to, the following: SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical

More information

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property 2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical

More information

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: Chapter 12 of the Burlington Code of ordinances allows owner occupants of single family homes to do their own wiring if they choose. If you choose to

More information

METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D

METER REQUIREMENTS GENERAL REQUIREMENTS SECTION D 12 - ELECTRIC SERVICE HANDBOOK SECTION D METER REQUIREMENTS This chapter gives you information on Central Lincoln s metering requirements. It's divided into three sections: General requirements This section

More information

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING Revised October, 2013 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 REQUIRED DRAWINGS... 3 2.1 Site Plan... 3

More information

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...

More information

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding A Guide for California Developers of Com m ercial Property This guide consists of

More information

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum

More information

ELECTRIC METERING COMMERCIAL & INDUSTRIAL

ELECTRIC METERING COMMERCIAL & INDUSTRIAL ELECTRIC METERING COMMERCIAL & 1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 METER LOCATIONS 5.0 UNDERGROUND TERMINATIONS 6.0 METERING TRANSFORMER ENCLOSURES 7.0 SINGLE CUSTOMER METER INSTALLATIONS

More information

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

Submit shop drawings for equipment provided under this section Shop drawings shall indicate: Section 16435 - SWITCHBOARDS Introduction Part 1 - General Reference The work under this section is subject to requirements of the Contract Documents including the General Conditions, Supplementary Conditions,

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264 BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

Engineers Edge, LLC PDH & Professional Training

Engineers Edge, LLC PDH & Professional Training 510 N. Crosslane Rd. Monroe, Georgia 30656 (770) 266-6915 fax (678) 643-1758 Engineers Edge, LLC PDH & Professional Training Copyright, All Rights Reserved Engineers Edge, LLC An Introduction to Interior

More information

RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS:

RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS: RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS: Signed completed Electrical Permit application form. Minnesota law requires all electrical work is to be performed by licensed,

More information

Hyperlinks are Inactive

Hyperlinks are Inactive Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes

Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes CANTEX INC. 301 Commerce Ste 2700 Fort Worth, Texas 76102 817-215-7000 Fax: 817-215-7001 Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes YOUR FULL

More information

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION SPECIFICATION EO-5023 REVISION 3 MARCH 2003 REQUIREMENTS FOR

More information

The National Armored Cable Manufacturers Association Presents. Installation Standard for Types AC and MC Cables

The National Armored Cable Manufacturers Association Presents. Installation Standard for Types AC and MC Cables The National Armored Cable Manufacturers Association Presents Installation Standard for Types AC and MC Cables An ANSI Standard Original document jointly produced by NECA and NACMA as Standard for Installing

More information

800 Communications Circuits

800 Communications Circuits ARTICLE 800 Communications Circuits INTRODUCTION TO ARTICLE 800 COMMUNICATIONS CIRCUITS This article has its roots in telephone technology. Consequently, it addresses telephone and related systems that

More information

Town House 11265 Center Highway North Huntingdon, PA 15642

Town House 11265 Center Highway North Huntingdon, PA 15642 APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information

Top Commercial / Residential Electrical Requirements *

Top Commercial / Residential Electrical Requirements * Department of Community Development Building Division 4800 West 92 nd Avenue Westminster, Colorado 80031 For Information call (303) 658-2075 Fax (303) 706-3922 www.westminsterpermits.com Top Commercial

More information

SECTION 16402 UNDERGROUND ELECTRIC SERVICE

SECTION 16402 UNDERGROUND ELECTRIC SERVICE SECTION 16402 UNDERGROUND ELECTRIC SERVICE PART 1 GENERAL 1.1 SUMMARY A. Description of System 1. Furnish all labor, materials, and equipment for below grade work external to buildings as required, and

More information

26 0533 Raceway and Boxes for Electrical Systems Page 1 of 7

26 0533 Raceway and Boxes for Electrical Systems Page 1 of 7 Last Update: November, 2015 A. Conduits: Consultant s Handbook Page 1 of 7 1. All conductors for each and every electrical system shall be installed in a raceway except communications and A/V systems which

More information

READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY!

READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY! READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY! The main power to any existing system must be disconnected prior to the

More information

GENERAL ELECTRICAL REQUIREMENTS

GENERAL ELECTRICAL REQUIREMENTS GENERAL ELECTRICAL REQUIREMENTS RECEPTACLE SPACING Within 6-feet of the edge of any door HABITABLE Not more than 12-feet apart along wall ROOMS: At all wall spaces 24 or more wide Within 24 of edge of

More information

Electrical Grounding. Appendix C

Electrical Grounding. Appendix C Appendix C Electrical Grounding Low-Voltage Equipment Grounding The most frequently cited Office of Safety and Health Administration (OSHA) electrical violation is improper occupational grounding of equipment

More information

Questions and Answers for Heating and A/C Contractors

Questions and Answers for Heating and A/C Contractors 1. How do we accomplish grounding of furnaces and / or water heaters on two wire circuits? 250.134 Equipment Fastened in Place or Connected by Permanent Wiring Methods (Fixed) Grounding. Unless grounded

More information

COMMERCIAL CONDUIT RULES AND REGULATION

COMMERCIAL CONDUIT RULES AND REGULATION Electric Engineering Division COMMERCIAL CONDUIT RULES AND REGULATION S:\COO_ACM_US_Electric_Telecommunications\COO_ET_Engineering\Conduit Policies\Residential 1805 NE 30th Ave., Bldg. 400 Ocala, FL 34470-4875

More information

SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings

SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings *** Provide this document to the inspector along with ALL system installation instructions *** Project Address: Scope: Standard plan for the installation of grounded microinverter solar PV systems, not

More information

261000 Medium Voltage Electrical Distribution

261000 Medium Voltage Electrical Distribution Sections Included In This Standard: 1.1 General 1.2 Underground Cable 1.3 Medium Voltage Switches 1.4 Transformers 1.5 Electrical Manholes 1.6 Switch Vaults 1.7 Distribution Switchgear/Switchboards This

More information

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1 City of Cotati Building Division 201 W. Sierra Ave. Cotati, CA 94931 707 665-3637 Fax 792-4604 INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1 Any PV system on a new structures should be included

More information

SECTION 18370 SIGNAL WIRE AND CABLE

SECTION 18370 SIGNAL WIRE AND CABLE SECTION 18370 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for all cable and wire required for signal and signal power system wiring to wayside shelters, junction boxes, and factory

More information

SECTION 16720 - FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

SECTION 16720 - FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines PART 1 -- GENERAL 1.1 WORK OF THIS SECTION SECTION 16720 - City of San Diego, CWP Guidelines A. The WORK of this Section includes providing manual and automatic fire alarm and smoke detection systems meeting

More information

BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET

BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET Berthold Electric Company s Generator Connection Cabinet provides a quick and convenient station to connect a portable generator to a facility s main service

More information

Generator DoCKInG StatIonS

Generator DoCKInG StatIonS Generator DOCKING STATIONS TRYSTAR Portable Power Cable Cam to cam cable extensions 2000V, 100A-400A rated to NEC table 400.5 (B) All portable power cable sold is highly flexible and UL & C-UL or CSA Listed

More information

MONTGOMERY COUNTY EXECUTIVE REGULATION Offices of the County Executive. 101 Monroe Street. Rockville, Maryland 20850

MONTGOMERY COUNTY EXECUTIVE REGULATION Offices of the County Executive. 101 Monroe Street. Rockville, Maryland 20850 Montgomery County Regulation on: ADOPTION OF THE 2008 NATIONAL ELECTRICAL CODE DEPARTMENT OF PERMITTING SERVICES Issued by County Executive Regulation # 15-09 Authority: Code Section 17-2 and 17-3 Supersedes:

More information

Mobile Home Pre-Inspection Checklist

Mobile Home Pre-Inspection Checklist Mobile Home Pre-Inspection Checklist TWO (2) STEP INSPECTION PROCESS STEP ONE: CALL FOR THE FIRST INSPECTION WHEN THESE ITEMS ARE COMPLETE. 1. Septic tank installed and plumbing complete. (SEE PLUMBING

More information

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope 3. TYPES OF SERVICE AVAILABLE 3.1 Scope UI supplies 60 hertz, alternating current with different voltage and ampere ratings. Not all voltage and ampere ratings are available throughout the entire service

More information

Electrical Wiring Technical Bulletin

Electrical Wiring Technical Bulletin Electrical Wiring Technical Bulletin Overview In general, SIP construction is easier and more cost effective when things are planned and thought out before the panels are manufactured. This process will

More information

ELECTRICAL CONTRACTORS, SUPPLIERS AND DISTRICT ENGINEERING, CONSTRUCTION & OPERATIONS PERSONNEL

ELECTRICAL CONTRACTORS, SUPPLIERS AND DISTRICT ENGINEERING, CONSTRUCTION & OPERATIONS PERSONNEL January 2, 2014 ATTENTION: SUBJECT: ELECTRICAL CONTRACTORS, SUPPLIERS AND DISTRICT ENGINEERING, CONSTRUCTION & OPERATIONS PERSONNEL Electrical Service Manual (ESR) Several revisions have been made to the

More information

Merrimac Municipal Light Department. Residential Developments Policy

Merrimac Municipal Light Department. Residential Developments Policy Merrimac Municipal Light Department Residential Developments Policy General: This document provides specific instructions for the provision of underground electrical facilities associated with the construction

More information

2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1. 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1. 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. 2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. Relays) Part 1 General 1.1 CONDITIONS AND REQUIREMENTS: A. Refer to

More information

Element D Services Electrical

Element D Services Electrical Service and PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as

More information

505.3.6 For a building with a crawl space, see Figure 10. 505-1

505.3.6 For a building with a crawl space, see Figure 10. 505-1 505 WATER SERVICE INSTALLATION 505.1 DEFINITION A service line is comprised of the piping and related appurtenances including the connection installed from the Des Moines Water Works water main to the

More information

Cable/Conduit Conversion

Cable/Conduit Conversion Cable/Conduit Conversion Busway can be used in many applications where cable and conduit are more commonly used. The question arises, Why use busway instead of conventional cable and conduit? Benefits

More information

HOUSTON COMMUNITY COLLEGE HCC ALIEF CAMPUS MAIN BUILDING, FIRST, SECOND & FOURTH FLOORS RENOVATION ISSUE DATE: 10.17.12

HOUSTON COMMUNITY COLLEGE HCC ALIEF CAMPUS MAIN BUILDING, FIRST, SECOND & FOURTH FLOORS RENOVATION ISSUE DATE: 10.17.12 SECTION 27 05 26 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes grounding and bonding products, design requirements and installation for communications

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

Underground Service Requirements and Instructions

Underground Service Requirements and Instructions This packet includes all FKEC underground service requirements, instructions, procedures and drawings. If you are considering underground power service please review this document in its entirety (3 page

More information

Residential Electrical Inspection. Checklist

Residential Electrical Inspection. Checklist 443 Lafayette Road N. St. Paul, Minnesota 55155 www.doli.state.mn.us Residential Electrical Inspection (651) 284-5064 1-800-DIAL-DLI Fax: (651) 284-5743 TTY: (651) 297-4198 Checklist Generally, Minnesota

More information

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS Prepared by: ABB1 ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS 052521 Asset Type: Electric Metering Function: Construction Issued by: Quoc Hoang (QxH1) Date: 07-01-16 Rev. #06: This document

More information

Electrical Code Regulation

Electrical Code Regulation Electrical Code Regulation St. Clair County has adopted the 2005 National Electrical Code in its entirety for the unincorporated areas of the county and all communities that have contracted with the county

More information

Extension Cord Safety Policy

Extension Cord Safety Policy NATIONAL HIGH MAGNETIC FIELD LABORATORY Operated by Florida State University, University of Florida, Los Alamos National Laboratory Florida State University, 1800 East Paul Dirac Drive, Tallahassee, Florida

More information

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1

More information

Introduction. Safety Guidelines. Part Numbers. Operation and Maintenance Manual. Operation and Maintenance Manual

Introduction. Safety Guidelines. Part Numbers. Operation and Maintenance Manual. Operation and Maintenance Manual Operation and Maintenance Manual Introduction Read all instructions thoroughly. Installation of the OilTector must comply with all Federal, State and Local Codes, Regulations and Practices. The OilTector

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

Electrical Service Guidelines

Electrical Service Guidelines Electrical Service Guidelines Middle Tennessee Electric Membership Corporation Revised: May 23, 2013 MTEMC's Electrical Guidelines TABLE OF CONTENTS Right-of-Way Clearance Guide 3 MTEMC Requirements 4

More information

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS TYPICAL FIRE SAFETY INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility, to

More information

BASIC NEC CODE RULES AND DESIGN PRACTICE

BASIC NEC CODE RULES AND DESIGN PRACTICE BASIC NEC CODE RULES AND DESIGN PRACTICE Wire Ampacity and Size Circuit Breaker Size 1. Maximum loading for any branch circuit is 80% of rating of circuit for ampacity of wire for any load. NEC 220-2,

More information

ELECTRIC SERVICE GUIDELINES (For Indiana)

ELECTRIC SERVICE GUIDELINES (For Indiana) ELECTRIC SERVICE GUIDELINES (For Indiana) FOR COMMERCIAL / INDUSTRIAL DEVELOPMENTS ELECTRIC SERVICE GUIDELINES FOR COMMERCIAL/INDUSTRIAL DEVELOPMENTS INTRODUCTION... 2 WHAT YOU NEED TO OBTAIN ELECTRIC

More information

Learning Module 13: Panelboards and Switchboards. 101 Basic Series

Learning Module 13: Panelboards and Switchboards. 101 Basic Series Learning Module 13: Panelboards and Switchboards 101 Basic Series What You Will Learn We ll step through each of these topics in detail: Introduction 4 Definitions 4 Similarities Between Panelboards and

More information

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS: Carefully read these instructions before installing your new air-conditioner. AUSTRALIAN AUTOMOTIVE AIR AL00500054E 1 Table

More information

Residential Electrical Inspection Checklist

Residential Electrical Inspection Checklist Residential Electrical Inspection Checklist Based on the 2008 National Electrical Code Generally, Minnesota law requires all electrical work to be performed by licensed, bonded and insured electrical contractors

More information

Electrical. This section applies to the design and installation of building power distribution systems.

Electrical. This section applies to the design and installation of building power distribution systems. Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions

More information

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval. Polk School District Specifications for the New Fire Alarm in the Existing Building Eastside Elementary School FIRE ALARM SYSTEM 1.01 SUBMITTALS A. Shop drawings shall be submitted as follows: 1. Manufacturer's

More information

SECTION 807 PUMP STATION REHABILITATION

SECTION 807 PUMP STATION REHABILITATION SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but

More information

Requirements for Electrical Installations

Requirements for Electrical Installations ARTICLE 110 Requirements for Electrical Installations INTRODUCTION TO ARTICLE 110 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS Article 110 sets the stage for how you ll implement the rest of the NEC. This

More information

INSPECTION GUDELINES

INSPECTION GUDELINES GENERAL REQUIREMENTS Building permit and approved set of plans Building permit on the card is the same as on the route "If this is not the first inspection, read inspection records and notes on permit

More information

VOYAGER 570G. 744A Sprayer Control

VOYAGER 570G. 744A Sprayer Control VOYAGER 570G 744A Sprayer Control U S E R M A N U A L U S E R M A N U A L Table of Contents CHAPTER 1 - INTRODUCTION...1 SYSTEM CONFIGURATIONS...1 KIT CONTENTS...3 CONTROL HOUSING ASSEMBLY...5 CHAPTER

More information

Customer Low-Voltage Switchboards Service Cable Terminal Compartment Arrangements and Clearances

Customer Low-Voltage Switchboards Service Cable Terminal Compartment Arrangements and Clearances Page 50 of 100 Customer Low-Voltage Switchboards Service Cable Terminal Compartment Arrangements and Clearances (Replaces A-190556) THIS CUSTOMER REFERENCE SPECIFICATION (CRS) IS PART OF THE RULES FOR

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

DIVISION 26 - ELECTRICAL SECTION 26 05 20 CABLES FOR INSTRUMENTATION

DIVISION 26 - ELECTRICAL SECTION 26 05 20 CABLES FOR INSTRUMENTATION DIVISION 26 - ELECTRICAL PART 1 - GENERAL 1.01 SUMMARY A. Section Includes 1. Instrumentation Cables 1.02 SUBMITTALS A. Submit in accordance with requirements of Section 01 33 00. B. Product Data: Submit

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

Roof Top Air Conditioner INSTALLATION AND OPERATING INSTRUCTIONS

Roof Top Air Conditioner INSTALLATION AND OPERATING INSTRUCTIONS Roof Top Air Conditioner INSTALLATION AND OPERATING INSTRUCTIONS Ducted System RECORD THIS UNIT INFORMATION FOR FUTURE REFERENCE: Model Number: Serial Number: Date Purchased: This manual must be read and

More information

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word

More information

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

1.3.2 Method of construction and restoration of existing water service connections. This shall include: 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

Cooktop Low-Profile Ventilation Hoods

Cooktop Low-Profile Ventilation Hoods INSTALLATION GUIDE Cooktop Low-Profile Ventilation Hoods Contents Wolf Cooktop Low-Profile Ventilation Hoods........ 3 Cooktop Low-Profile Hood Specifications.......... 4 Cooktop Low-Profile Hood Installation............

More information

MCC Ratings. Voltage Rating

MCC Ratings. Voltage Rating MCC Ratings In addition to the various ratings of individual components used in motor control centers, the overall ratings of the motor control center must also be considered. Voltage Rating Motor control

More information

MOBILE HOME SERVICE REQUIREMENTS GAS

MOBILE HOME SERVICE REQUIREMENTS GAS ELECTRIC AND GAS 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL 4.0 REFERENCE MATERIAL 5.0 TYPICAL UNDERGROUND UTILITY LAYOUT 6.0 METER PAD DETAILS 7.0 GENERAL INSTALLATION PROCEDURES 8.0 PEDESTAL SPECIFICATIONS

More information

East Central College 14434.03 HANSEN HALL LEVEL 300/400 RENOVATIONS PACKAGE

East Central College 14434.03 HANSEN HALL LEVEL 300/400 RENOVATIONS PACKAGE SECTION 260519 - BUILDING WIRE AND CABLE PART 1 - GENERAL 1.1 WORK INCLUDES A. Base and Alternate Bids: 1. Contractor Provide: a. Building wire and cable as shown on drawings or specified including feeders,

More information

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,

More information

GUIDELINES FOR WIRING SINGLE FAMILY DWELLING UNITS

GUIDELINES FOR WIRING SINGLE FAMILY DWELLING UNITS GUIDELINES FOR WIRING SINGLE FAMILY DWELLING UNITS This guideline has been prepared to assist the owner/occupant of a single family dwelling with compliance to the requirements of the National Electrical

More information

Common Electrical Hazards in the Workplace Including Arc Flash. Presented by Ken Cohen, PhD, PE & CIH (Ret.)

Common Electrical Hazards in the Workplace Including Arc Flash. Presented by Ken Cohen, PhD, PE & CIH (Ret.) Common Electrical Hazards in the Workplace Including Arc Flash Presented by Ken Cohen, PhD, PE & CIH (Ret.) 1 What s New In February 1972, OSHA incorporated the 1971 edition of the National Fire Protection

More information

CONSTRUCTION STANDARD ELECTRIC OPERATIONS ORGANIZATION

CONSTRUCTION STANDARD ELECTRIC OPERATIONS ORGANIZATION Page 1 of 11 ****This Standard Supercedes BECo CS2.13-2.3 & ComElectric OH Construction Manual, System Grounding Section, drawings CGND, GRDSUM, and C2**** 1.0 Bill of Materials GROUNDING AND BONDING POLE-MOUNTED

More information

ADDENDUM NO. 2 TO PROJECT NO. 43153

ADDENDUM NO. 2 TO PROJECT NO. 43153 ADDENDUM NO. 2 TO PROJECT NO. 43153 CONSTRUCTION WORK, MECHANICAL WORK, PLUMBING WORK, ELECTRICAL WORK PROVIDE VISITOR CENTER BUILDING AND SITE IMPROVEMENTS FIVE RIVERS ENVIRONMENTAL EDUCTION CENTER 56

More information

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2

More information

AMFA-27 AMFA-29. Operator s Manual & Installation Instructions. Rev. 2.5

AMFA-27 AMFA-29. Operator s Manual & Installation Instructions. Rev. 2.5 AMFA-27 AMFA-29 Operator s Manual & Installation Instructions Rev. 2.5 Date: 17 July, 2010 Permanently-connected, utility Interactive, single-phase, inverters Model AMFA-27 WIND TURBINE INVERTER (240 VAC

More information

NEC 2014 Code Changes

NEC 2014 Code Changes NEC 2014 Code Changes Articles 400-408.55 CHANGES FROM 2011 TO 2014 CODE ARE IN RED Chapter 4 Equipment for General Use ARTICLE 400 Flexible Cords and Cables 400.4 Types Flexible cords and flexible cables

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

Sample - No Commercial Use

Sample - No Commercial Use COMPLETE REVISION October 2010 Electrical PIP ELSSG01 Design and Fabrication of Low-Voltage Metal-Enclosed AC Power Circuit Breaker Switchgear PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort

More information

Utility Distribution Systems

Utility Distribution Systems Utility Distribution Systems 6/2012 A0011037 1 WARRANTY This equipment is warranted to be free from defects in materials and workmanship, under normal use and service, for a period of 12 months from date

More information

Name Of Occupancy Date. Yes No Describe

Name Of Occupancy Date. Yes No Describe FIRE PREVENTION INSPECTION CHECKLIST For Class A Occupancy (For Assembly Buildings, Bars, Restaurants, Gyms, Churches, Arenas, Theatres or wherever people gather) Name Of Occupancy Date Physical Address

More information

Power Management Module 2. Installation

Power Management Module 2. Installation Power Management Module 2 30 300 kva Installation Table of Contents Safety... 1 Safety Instructions... 1 Certification Standards Three Phase... 1 Product Safety... 2 Special Precautions... 2 System Description...

More information

Gas Meter Clearances and Service Installation Requirements

Gas Meter Clearances and Service Installation Requirements March 2015 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE s Customer Construction Services 1-888-321-7779 or visit PSE.com/CustomerConstruction

More information

Exhibit C Design Review Guidelines

Exhibit C Design Review Guidelines Exhibit C Design Review Guidelines January 2015 Included in this Exhibit for Design Guidelines includes: Electrical Design Guidelines Electrical and Mechanical /Plumbing Construction Requirements Temporary

More information

SECTION 26 09 13 - POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL

SECTION 26 09 13 - POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL SECTION 26 09 13 - POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL 1.1 SUMMARY A. This section describes the requirements for the installation of Power Monitors and associated

More information