Application Bulletin NEC Reference Guide for SolarBridge-Enabled AC Module Installers

Size: px
Start display at page:

Download "Application Bulletin 103 - NEC Reference Guide for SolarBridge-Enabled AC Module Installers"

Transcription

1 9229 Waterford Centre Dr. Bldg C, Suite 110 Austin, Tx Application Bulletin NEC Reference Guide for SolarBridge-Enabled AC Module Installers Current Version: 13 AC Modules are a new product in the Renewable Energy marketplace. Questions have come up from installers, PV System Inspectors, and First Responders as these modules are being specified for new installations on homes and businesses across the United States. First, it is important to distinguish between discrete microinverters installed in the field and the AC module as 1 defined in the NFPA 70 National Electrical Code (NEC), Section (see below). A discrete microinverter (with AC connectors rated for disconnect under load) is packaged separately and will be ready for connection to a DC GEC/EGC, a DC PV Module(s) and an AC dedicated branch circuit in the field per all applicable requirements in Article 690 of the NEC (including those for PV DC circuits such as grounding, disconnects and GFDI). The AC module is a manufactured product tested and listed as a complete unit by a Nationally Recognized Test Laboratory (NRTL). The manufactured product includes the PV module, the microinverter, cables and connectors. The product is packaged and shipped as a single listed unit from the factory & 2011 edition of the National Electric Code (NEC) Section 690.2: Definitions -2 Inverter: The NEC defines an inverter as "a device that changes DC input to an AC output". This definition is accurate whether the inverter is rated at hundreds of kw's or more and contained in a large, actively ventilated cabinet (typical of central or "string" inverters) or it is rated as low as a 100 Watts and contained in a small, sealed enclosure (typical of microinverters). AC Module: The NEC defines an AC module as a "complete, environmentally protected unit consisting of solar cells, optics, inverter and other components, exclusive of tracker, designed to generate AC power when exposed 3 to sunlight". The microinverter used with an AC module assembly is evaluated to the same Underwriters Laboratory (UL ) 1741 requirements as a central inverter with the exception that the environmental protection of the microinverter enclosure and PV module is evaluated to UL1703 and the AC Module section of UL1741 (instead of using the UL50 type ratings such as 3R). The PV module is evaluated to UL

2 Section 690.6: Alternating Current (AC) Modules This section of the NEC defines the electrical output of an AC module and provides guidance on how AC modules will be installed in the field (A): "Requirements of Article 690 pertaining to PV source circuits shall not apply to AC modules" (such as: multiplying short circuit DC currents by 125 percent, DC disconnects, DC grounding, DC ground fault detect and interrupt, protection by a listed PV type (DC) arc-fault circuit interrupter, and application of DC voltage correction factors). When installing AC modules, there is no need for protection or installation of DC wiring in the field (B): "The output of an AC module shall be considered an inverter output circuit". However, there are differences between how an AC module is interconnected to the utility service on site versus centralized (i.e. string) inverters. AC modules are always considered "utility interactive" devices and will stop producing power when disconnected from the external source of AC power. A single overcurrent protector is only required on the utility side of the dedicated feed to an AC module branch circuit. NOTE: In addition to IEEE utility interactive requirements, each SolarBridge microinverter provides electronic overcurrent regulation / protection. The instructions and marking for the AC module contains information about the dedicated branch circuit it can be connected to, including maximum overcurrent protector rating on the branch circuit to the AC modules and maximum number of AC modules that can be attached to that branch circuit so the combined rated current does not exceed 80% of the branch circuit protector rating. AC modules are provided with interconnecting cables and connectors per 690.6(C) that are listed with the assembly for the application. These interconnecting cables allow the modules to be combined together up to the maximum allowed and allow for connection to the dedicated branch circuit wiring (per NEC and local codes) (C): "A single disconnecting means in accordance with and , shall be permitted for the 6 combined AC output of one of more AC modules". An excellent example of this would be a properly rated, readily accessible, externally operable AC circuit breaker with Open/Closed indicator or any other wiring device listed as a disconnect. "Additionally, each AC module in a multiple AC module system shall be provided with a 7 connector, bolted or terminal type disconnecting means". SolarBridge AC plugs and receptacles, included with each AC module are rated for disconnect under load by the NRTL and are "dead front" type connectors, ensuring that operators are not exposed to live parts when separating or inserting the plugs and receptacles (D): "AC module systems shall be permitted to use a single ground fault detection device to detect only 8 AC ground faults and to disable the array by removing AC power to the AC module(s)". A properly rated and listed AC branch circuit breaker will fulfill this requirement. 2

3 690.6 (E): "The output circuits of AC modules shall be permitted to have overcurrent protection and conductor 9 sizing in accordance with 240.5(B)(2)". This section is for fixture wiring and allows for sizing wires tapped off branch circuit conductors based on length and branch circuit protector rating. The SolarBridge interconnecting cabling and connectors are listed and tested with the microinverter. Sizing of conductors and connectors are based on end product testing by the NRTL, 240.5(B)(2) and Section The dedicated branch circuit wiring to the group of AC modules will need to be performed to Chapter 3 of the NEC and per local codes. Arc Fault Detection SolarBridge-enabled AC modules operate with internal DC voltages less than 80 VDC and therefore are not subject to any of the Arc Fault Protection requirements detailed in Article 690 of the 2011 edition of the National Electrical Code. SolarBridge-Enabled AC Module Cables A SolarBridge-enabled AC module is tested and listed with a microinverter cable that includes an AC module interconnecting (i.e. "trunk") cable as part of the complete unit. The AC module interconnecting cables are rated as Tray Cable Extended Run (TC-ER) outdoor rated. They are rated for -40C to 90C, insulated for direct burial and they are sunlight resistant. The SolarBridge-enabled AC module cables are 4-conductor cables rated for 20 2 amps (AWG #12, 3.31 mm ). The cable contains 2 current-carrying conductors (black and red), a single (white) Neutral conductor and a single (green) Ground conductor (EGC). These cables have plug and receptacle connectors rated for disconnect under load. SolarBridge AC cable receptacles and plugs are locking type and require a tool to separate. They are not rated or designed for use in conduit. Installers will use exterior-rated cable tray (solid or mesh) to manage cables within the array field where the cables cannot be secured to the module support rails. Cable tray is also recommended for managing cables as they leave the array field and are routed to electrical work boxes or interconnection points. It is recommended that the cable tray be fitted with an opaque cover. It is required that the tray be properly secured and supported against environmental pressure such as strong wind or heavy snow accumulation and movement. Metallic tray must be grounded. Nonmetallic tray is acceptable if properly secured and supported against environmental pressures. Grounding AC Modules NEC Chapters 1-4 always apply for grounding PV systems however requirements of Article 690 pertaining to PV source circuit grounding shall not apply to AC modules [see 690.6(A)]. This paper will address three topics related to grounding of AC modules; 1. Equipment safety grounding (i.e. EGC) 2. Establishing a supply reference (i.e. grounding the neutral), and 3

4 3. Lightning / surge protection Equipment Safety Grounding An equipment grounding conductor (EGC) must be provided with the dedicated branch circuit (installed within the same raceway, conduit or cable as the phase conductors) to the AC modules per Article 250 sections VI and VII in order to provide a low impedance path back to the AC module branch circuit breaker. This EGC must be properly connected to the SolarBridge-enabled AC module interconnecting cable system using suitable field wiring devices. It also must be connected to any other metallic devices that could become energized by the AC circuits, such as: wiring boxes and AC module support structures). It should be verified that this EGC has been installed properly all the way back to the site's service entrance system and ground rod. The SolarBridge-enabled AC module includes an equipment grounding conductor within the AC module interconnecting cables and cable receptacles and plugs. The SolarBridge microinverter cable with integral EGC is evaluated as part of the AC module listing with the NRTL. The transition cable's green conductor is connected to the EGC from the utility dedicated branch circuit. All plugs have ground pins that are longer than the circuit pins. This extra length ensures the ground is the first to make contact when connecting modules and the last to break contact when disconnecting modules. The AC ground wire inside the microinverter makes a bolted termination to the chassis and is environmentally sealed. The microinverter chassis is bonded at the factory to the module frame with stainless steel hardware. Establishing a Supply Reference Supply systems (AC or DC) must establish a local reference to ground. This helps keep voltages (with respect to ground) within safe equipment operating levels. The type of supply system and how it attaches to the building supply system will determine what requirements of the NEC apply. AC module systems are utility interactive, do not contain any field wiring DC circuits and are connected into the load side of the site's service entrance. Article 690 of the NEC pertaining to the DC PV circuits does not apply to AC modules since the DC is considered internal to the listed assembly. AC module arrays do not require a grounding electrode conductor (GEC) since there are no DC circuits to reference to the grounding electrode. The AC reference must only be at the site's service entrance. Guidance on the proper installation of the site's AC grounding electrode system (and AC GEC) is provided in Article 250, Section III of the NEC. It should be verified that the site has the grounded conductor (neutral) properly bonded to the site's ground electrode system. Since the site already has the neutral connected to ground, the AC module will always have the neutral isolated from ground like the phase conductors. The AC neutral MUST NOT be connected to ground anywhere else within the AC module system. 4

5 Local permitting agencies and electrical inspectors across the country have become familiar with PV systems that utilize PV modules wired in series and connected to single (or small numbers of) central inverters (i.e. "string" inverters). The 2011 edition of the NEC and NEC Handbook provide excellent guidance on the installation of grounding systems for these types of systems. Below is an excerpt from a John Wiles article in Home Power #103, Code Corner explaining common practices when grounding PV systems with DC PV modules and wall-mounted central inverters. JW: Because most inverters have transformers that isolate the DC-grounded conductors from the AC-grounded conductors, two grounding systems are usually required. Conductors are routed from a single main bonding point in the DC system and a single main bonding point in the AC system to grounding electrodes (the part of the grounding system that is in physical contact with the earth, such as a ground rod). The conductors from these main bonding points to the grounding electrode(s) are called the "grounding-electrode conductors" (GECs). JW: There will usually be a DC grounding-electrode conductor and an AC grounding-electrode conductor in systems with an inverter. In a PV installation where there is an existing AC electrical system, the AC grounding electrode is already installed. The DC grounding-electrode conductor may be connected to the AC grounding electrode or it may be connected to a new DC grounding electrode. This new DC grounding electrode must be bonded to the AC grounding electrode. Grounding-electrode conductors may be either bare or insulated. No color is specified for this conductor (if insulated), but conventional practice suggests that it be black and not white, green, or green with yellow stripes. The smallest allowable size is #8 (8 mm2); however, a grounding electrode conductor this small must be installed in conduit for physical protection. Many inspectors allow a #6 (13 mm2) grounding-electrode conductor to be installed without conduit if it is attached to a building surface. The #8 and #6 conductors are normally allowed when the GEC is connected to a ground rod. Lightning / Surge Protection Lightning or surge protection equipment provides an attractive path to ground for high current events such as direct or nearby lightning strikes. In areas where lightning strikes are possible (e.g. 8 strikes per year per square mile, confirm with local authorities), installers can bond the AC module array together and run a separate, suitably sized wire from the array directly to the home or building's AC grounding electrode system / grounding electrode. It is recommended that PV system designers specify lightning arrestors at the utility service panel to help suppress electrical surges coming in on the utility service conductors. A best practice for all solar module installers, especially those in areas with frequent lightning, is to secure each module to the rack using grounding hardware that has been certified to meet requirements for grounding systems. Connect the entire grounded structure to a grounding electrode system using a dedicated, suitably sized, copper conductor. Safety 5

6 Safety is important for the installer. If the PV system components are safe to handle, the installer can work with confidence and at a high rate of speed. PV module DC conductors are captured within the AC module. This ensures installers are not exposed to DC current and voltage from the PV module. AC modules are OFF during installation. Although the microinverter will detect current and voltage from the PV module when exposed to sunlight, microinverter AC plugs and receptacles will not be energized until connected to a stable utility power source (5 minute re-connect time). Safety is important for the system owner. AC modules are connected to the building's electrical system using standard AC wiring practices. AC module systems do not require field wired, high-voltage DC conductors to be routed through the building (from the roof to the AC breaker box). AC module systems eliminate specialized DC equipment and rely on standard AC wiring components Safety is important for First Responders. Fire Fighters, Police Officers and Security personnel understand or are familiar with typical AC wiring hazards in homes and buildings. When responding to fire or other life-threatening situations on site, electrical hazards can be reduced to a minimum by cutting power to the building at the Utility service entrance. When the Utility service has been disconnected from the building, all appliances in the building, including the AC modules, will be thrown into the OFF position and all associated building wiring will be de-energized. Footnotes: 1 National Electrical Code and NEC are registered trademarks of the National Fire Protection Association, Inc., Quincy MA NFPA 70, National Electrical Code 2011, National Fire Protection Association, Quincy, MA

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE 2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE PAGE 1 OF 5 This Reference provides a very comprehensive list of aspects of a solar PV installation that could be reviewed, clarifying

More information

Installation Guide Content for P250xV-240 microinverters

Installation Guide Content for P250xV-240 microinverters A C M o d u l e Installation Guide Content for P250xV-240 microinverters May 15, 2012 2011-2012 SolarBridge Technologies, Inc. All Rights Reserved. No part of this publication may be reused in any manner

More information

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5 White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code June 2015 Revision 1.5 Shalhevet Bar-Asher; SolarEdge Technologies, Inc. Bill Brooks, PE; Brooks Engineering LLC

More information

Enphase Microinverters and Ungrounded Renewable Energy Systems: Canadian Electrical Code Compliance

Enphase Microinverters and Ungrounded Renewable Energy Systems: Canadian Electrical Code Compliance WHITE PAPER Enphase Microinverters and Ungrounded Renewable Energy Systems: Canadian Electrical Code Compliance Overview Enphase has developed a new microinverter family that includes the M250 and new

More information

What are the basic electrical safety issues and remedies in solar photovoltaic installations?

What are the basic electrical safety issues and remedies in solar photovoltaic installations? What are the basic electrical safety issues and remedies in solar photovoltaic installations? Presented by: Behzad Eghtesady City of Los Angeles Department of Building and Safety Topics Covered Photovoltaic

More information

CITY OF LOS ANGELES CALIFORNIA

CITY OF LOS ANGELES CALIFORNIA BOARD OF BUILDING AND SAFETY COMMISSIONERS VAN AMBATIELOS PRESIDENT E. FELICIA BRANNON VICE-PRESIDENT JOSELYN GEAGA-ROSENTHAL GEORGE HOVAGUIMIAN JAVIER NUNEZ CITY OF LOS ANGELES CALIFORNIA ERIC GARCETTI

More information

SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings

SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings *** Provide this document to the inspector along with ALL system installation instructions *** Project Address: Scope: Standard plan for the installation of grounded microinverter solar PV systems, not

More information

AC Module Installation Guide Content

AC Module Installation Guide Content AC Module Installation Guide Content for ET-P660250AC May 9, 2012 2011-2012 ET Solar Group All Rights Reserved. No part of this publication may be reused in any manner nor in any form or format without

More information

AC Module Installation Guide Content

AC Module Installation Guide Content AC Module Installation Guide Content for ET-P660250AC May 9, 2012 2011-2012 ET Solar Group All Rights Reserved. No part of this publication may be reused in any manner nor in any form or format without

More information

Photovoltaic System Grounding

Photovoltaic System Grounding Photovoltaic System Grounding Prepared by: John C. Wiles, Jr. Southwest Technology Development Institute College of Engineering New Mexico State University October 2012 Solar America Board for Codes and

More information

Electrical Grounding. Appendix C

Electrical Grounding. Appendix C Appendix C Electrical Grounding Low-Voltage Equipment Grounding The most frequently cited Office of Safety and Health Administration (OSHA) electrical violation is improper occupational grounding of equipment

More information

STREETLIGHT SYSTEM GROUNDING AND BONDING

STREETLIGHT SYSTEM GROUNDING AND BONDING Page: 1 of 8 STREETLIGHT SYSTEM GROUNDING AND BONDING 1. Scope This Construction Standard covers the grounding and bonding requirements for single phase streetlight systems served by the Looped Radial

More information

Ontario Electrical Safety Code 25 th Edition/ 2012

Ontario Electrical Safety Code 25 th Edition/ 2012 Ontario Electrical Safety Code 25 th Edition/ 2012 Ted Olechna Director, Codes and Standard Chief Engineer 1 What I Will Cover ESA s role is as the regulator Highlight of 2012 Code changes The Code and

More information

Grounding & Bonding Why it is done And How to Install Properly

Grounding & Bonding Why it is done And How to Install Properly Grounding & Bonding Why it is done And How to Install Properly The technical information provided herein is to assist qualifi ed persons in planning and installing electric service to farms and residences.

More information

Safety and Installation Instructions for AC Modules

Safety and Installation Instructions for AC Modules Safety and Installation Instructions for AC Modules United States and Canada Contents of this manual are subject to change without notice. For the latest guide please refer to www.sunpower.com/pvinstallguideacmodule

More information

12 SOLAR PHOTOVOLTAIC POWER SUPPLY SYSTEMS by John Ware. PV modules are current-limiting

12 SOLAR PHOTOVOLTAIC POWER SUPPLY SYSTEMS by John Ware. PV modules are current-limiting 12 SOLAR PHOTOVOLTAIC POWER by John Ware IT IS PLANNED for BS 7671:2008 to include a new Section 712 providing additional requirements for safety applicable to solar photovoltaic (pv) power supply systems.

More information

The National Armored Cable Manufacturers Association Presents. Installation Standard for Types AC and MC Cables

The National Armored Cable Manufacturers Association Presents. Installation Standard for Types AC and MC Cables The National Armored Cable Manufacturers Association Presents Installation Standard for Types AC and MC Cables An ANSI Standard Original document jointly produced by NECA and NACMA as Standard for Installing

More information

PERMIT APPLICATION REQUIREMENTS FOR RESIDENTIAL ROOF MOUNTED PHOTOVOLTAIC SYSTEMS

PERMIT APPLICATION REQUIREMENTS FOR RESIDENTIAL ROOF MOUNTED PHOTOVOLTAIC SYSTEMS Butte County Department of Development Services PERMIT CENTER 7 County Center Drive, Oroville, CA 95965 Main Phone (530)538-7601 Permit Center Phone (530)538-6861 Fax (530)538-7785 FORM NO DBP-71 PERMIT

More information

How To Plan Out An Array Of Solar Panels

How To Plan Out An Array Of Solar Panels CITY OF DOWNEY COMMUNITY DEVELOPMENT, BUILDING AND SAFETY 11111 Brookshire Avenue Downey, CA 90241 562.904.7142 (www.downeyca.org) B SECTION 01/01/2011 EFFECTIVE DATE PHOTOVOLTAIC 032 FORM NUMBER 2013

More information

ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01)

ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01) ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01) Rule 28-900 Standby Generator Installations Due to the increasing number of standby generator installations being established to maintain continuity

More information

City of San Diego Residential Photovoltaic Systems Inspection Guidelines

City of San Diego Residential Photovoltaic Systems Inspection Guidelines City of San Diego Residential Photovoltaic Systems Inspection Guidelines The purpose of inspections by DSD staff is to ensure compliance with the California Electrical Code (CEC), other applicable codes

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 13 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia ELECTIRAL GROUNDING TABLE OF CONTENT

More information

Chapter 9. Bonding and Grounding

Chapter 9. Bonding and Grounding Chapter 9 Bonding and Grounding Objectives Describe why the cable should be bonded Describe bonding and grounding procedures Define Bonding and Grounding Explain Safety Benefits and intent of bonding and

More information

DC disconnects for solar photovoltaic installations. Connecting the. power of the sun

DC disconnects for solar photovoltaic installations. Connecting the. power of the sun DC disconnects for solar photovoltaic installations Connecting the power of the sun Solar energy is heating up Interest in renewable energy sources has never been greater, and the fastest growing of these

More information

INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE SAFETY BULLETIN #23

INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE SAFETY BULLETIN #23 INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE SAFETY BULLETIN #23 GUIDELINES FOR WORKING WITH PORTABLE POWER DISTRIBUTION SYSTEMS AND OTHER ELECTRICAL EQUIPMENT "ADDENDUM C" WORKING WITH 480 VOLT SYSTEMS

More information

Grounding of Electrical Systems NEW CODE: Grounding and Bonding

Grounding of Electrical Systems NEW CODE: Grounding and Bonding Grounding of Electrical Systems NEW CODE: Grounding and Bonding Presented By Scott Peele PE Grounding of Electrical Systems Outline Defining the Terms Why should I Ground? Types of Grounding Systems Separately

More information

PV System Disconnect PV System Discon-

PV System Disconnect PV System Discon- PV System Disconnect PV System Discon- INSTALLATION & OPERATION MANUAL 97-600100-06-A02 Preface PV Powered PV Powered designs, manufactures, and markets the solar power industry s most reliable photovoltaic

More information

Solar Photovoltaic (PV) Systems

Solar Photovoltaic (PV) Systems ARTICLE 690 Solar Photovoltaic (PV) Systems INTRODUCTION TO ARTICLE 690 SOLAR PHOTOVOLTAIC (PV) SYSTEMS You ve seen, or maybe own, photocell-powered devices such as night lights, car coolers, and toys.

More information

270526-TC Grounding and Bonding for Telecommunications Systems

270526-TC Grounding and Bonding for Telecommunications Systems 270526-TC Grounding and Bonding for Telecommunications Systems Part 1 - General Related Documents The following related sections of the OT standards shall also be applicable to this section. OT Engineer

More information

PORTABLE GENERATORS AND OSHA CONSTRUCTION REGULATIONS

PORTABLE GENERATORS AND OSHA CONSTRUCTION REGULATIONS PORTABLE GENERATORS AND OSHA CONSTRUCTION REGULATIONS Monograph by: John Grizzy Grzywacz, Professor OSHA National Training Institute Arlington Heights, Illinois Contributing: Michael Kovacic, President

More information

Connecting the Power of the Sun. DC Disconnects for Solar Photovoltaic Installations. DC disconnects for. solar photovoltaic installations

Connecting the Power of the Sun. DC Disconnects for Solar Photovoltaic Installations. DC disconnects for. solar photovoltaic installations Connecting the Power of the Sun DC Disconnects for Solar Photovoltaic Installations DC disconnects for solar photovoltaic installations Solar energy is heating up Interest in renewable energy sources has

More information

Model Number Electrical Compatibility Module Connector Type. M250-60-2LL-S22 60 cell PV module MC-4 Type 2 Locking

Model Number Electrical Compatibility Module Connector Type. M250-60-2LL-S22 60 cell PV module MC-4 Type 2 Locking TECHNICAL BRIEF M250 Microinverter System Installation Planning The M250 Microinverter The Enphase M250 Microinverter is a powerful and efficient grid-tied microinverter. It is compatible with most 60-cell

More information

PV and the Electrical Code Page 1 PV and the Electrical Code

PV and the Electrical Code Page 1 PV and the Electrical Code PV and the Electrical Code Page 1 PV and the Electrical Code Canadian Solar Industries Association (CanSIA) PV and the Electrical Code Page 2 This course was prepared by the Canadian Solar Industries Association

More information

Doe Residence - 5.64 kw DC Roof Mounted Photovoltaic System

Doe Residence - 5.64 kw DC Roof Mounted Photovoltaic System EQUIPMENT SUMMARY 20 LG 300W solar panels 1 SMA SE6000AUS Inverter Everest Solar Systems Cross Rail Racking System QuickMount PV Quick Hook Curved Tile Mount QMCTH SHEET INDEX T01 COVER PV01 SITE MAP &

More information

Title: Grounding and Bonding Rev-01

Title: Grounding and Bonding Rev-01 Procedure No.: BMEHS-002-012 Page: 1 of 12 Preparer: Owner: Approver: EHS Team Member S/H Manager Site Manager Signed Copy on File Signed Copy on File Signed Copy on File Document Revision Change Table

More information

Video Camera Installation Guide

Video Camera Installation Guide Video Camera Installation Guide The intent of this guide is to provide the information needed to complete or modify a video camera installation to avoid lightning and induced power surge damage. This guide

More information

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property 2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical

More information

Errata NFPA 70. Proposed 2014 Edition

Errata NFPA 70. Proposed 2014 Edition Errata NFPA 70 National Electrical Code (Report on Proposals) Reference: 12-109 (Log #1618) Panel Meeting Action Proposed 2014 Edition The National Electrical Code Technical Correlating Committee notes

More information

Utility Distribution Systems

Utility Distribution Systems Utility Distribution Systems 6/2012 A0011037 1 WARRANTY This equipment is warranted to be free from defects in materials and workmanship, under normal use and service, for a period of 12 months from date

More information

Contractors Guide Central Inverter System Installation

Contractors Guide Central Inverter System Installation Contractors Guide Central Inverter System Installation Step By Step Procedures 2,200 Watt/VA 6 Step Installation 1. Mount Bottom Cabinet 2. Mount Top Cabinet 3. Install Batteries 4. Install Conduit 5.

More information

800 Communications Circuits

800 Communications Circuits ARTICLE 800 Communications Circuits INTRODUCTION TO ARTICLE 800 COMMUNICATIONS CIRCUITS This article has its roots in telephone technology. Consequently, it addresses telephone and related systems that

More information

AC Unison Installation Guide

AC Unison Installation Guide BenQ Solar AC Unison Solar Power Systems Installation guide AC Unison Installation Guide BenQ Solar AC Unison Solar Power Systems Installation guide Table of Contents 1. AC Unison Solar Power System Overview...2

More information

Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured.

Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured. SOLAR ALTERATIONS REQUIREMENTS August 2015 These requirements address typical alterations to solar installations; they cannot address every scenario. In Victoria, an alteration to a solar installation

More information

Application Note: Modbus/RS485 Wiring for Conext Core XC Series Inverters

Application Note: Modbus/RS485 Wiring for Conext Core XC Series Inverters Application Note: Modbus/RS485 Wiring for Conext Core XC Series Inverters AP-XC-025 Revision B DANGER RISK OF ELECTRIC SHOCK, EXPLOSION, ARC FLASH, AND FIRE This Application Note is in addition to, and

More information

Solar Panel Installations

Solar Panel Installations Solar Panel Installations Page 1 of 6 SINGLE-FAMILY RESIDENTIAL CHECKLIST City of Hayward Development Services Department Revised: 7-09-15 PERMIT REQUIREMENTS Permits are required for all solar panel installations.

More information

AMFA-27 AMFA-29. Operator s Manual & Installation Instructions. Rev. 2.5

AMFA-27 AMFA-29. Operator s Manual & Installation Instructions. Rev. 2.5 AMFA-27 AMFA-29 Operator s Manual & Installation Instructions Rev. 2.5 Date: 17 July, 2010 Permanently-connected, utility Interactive, single-phase, inverters Model AMFA-27 WIND TURBINE INVERTER (240 VAC

More information

Arc Fault Circuit Interrupters Frequently Asked Questions

Arc Fault Circuit Interrupters Frequently Asked Questions Contents My AFCI is tripping! What do I do? What is the difference between branch feeder and combination type Arc Fault Circuit Interrupters? What is new with the 2008 NEC versus the 2005 NEC with respect

More information

Canopy Surge. User Manual

Canopy Surge. User Manual Canopy Surge Suppressor User Manual SS00-UM-en Issue 2 May 2003 2003 Motorola, Inc. All rights reserved. Printed in the U.S.A Notices Safety Precautions: Before beginning your installation, please read

More information

READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY!

READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY! READ THIS MANUAL BEFORE PROCEEDING WITH THE INSTALLATION. FAILURE TO FOLLOW THE INSTALLATION INSTRUCTIONS MAY VOID YOUR WARRANTY! The main power to any existing system must be disconnected prior to the

More information

City of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov

City of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov City of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov PHOTOVOLTAIC PERMITTING GUIDELINES The information provided in this document is general and is intended only as a

More information

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1 City of Cotati Building Division 201 W. Sierra Ave. Cotati, CA 94931 707 665-3637 Fax 792-4604 INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1 Any PV system on a new structures should be included

More information

YINGLI SOLAR PV MODULES Installation and User Manual

YINGLI SOLAR PV MODULES Installation and User Manual YINGLI SOLAR PV MODULES Installation and User Manual Revision Date December 24, 2011 Applicable for IEC certified products This manual applies to photovoltaic modules ( PV modules, also commonly known

More information

County of Riverside Building and Safety Department

County of Riverside Building and Safety Department County of Riverside Building and Safety Department Mike Lara Director Photovoltaic Permitting Guidelines The information provided in this document is general and is intended only as a guide. Each project

More information

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: Chapter 12 of the Burlington Code of ordinances allows owner occupants of single family homes to do their own wiring if they choose. If you choose to

More information

Coaxial Cable Entry Panels, Coax and Grounding Connectors. Technical Note

Coaxial Cable Entry Panels, Coax and Grounding Connectors. Technical Note Coaxial Cable Entry Panels, Coax and Grounding Connectors Technical Note Coaxial Cable Entry Panels, Coax and Grounding Connectors Surge Protection Solutions for PTC 2 Coaxial Cable Entry Panels, Coax

More information

Top Commercial / Residential Electrical Requirements *

Top Commercial / Residential Electrical Requirements * Department of Community Development Building Division 4800 West 92 nd Avenue Westminster, Colorado 80031 For Information call (303) 658-2075 Fax (303) 706-3922 www.westminsterpermits.com Top Commercial

More information

Common Electrical Hazards in the Workplace Including Arc Flash. Presented by Ken Cohen, PhD, PE & CIH (Ret.)

Common Electrical Hazards in the Workplace Including Arc Flash. Presented by Ken Cohen, PhD, PE & CIH (Ret.) Common Electrical Hazards in the Workplace Including Arc Flash Presented by Ken Cohen, PhD, PE & CIH (Ret.) 1 What s New In February 1972, OSHA incorporated the 1971 edition of the National Fire Protection

More information

SECTION 22 LIGHTNING PROTECTION SYSTEM

SECTION 22 LIGHTNING PROTECTION SYSTEM SECTION 22 LIGHTNING PROTECTION SYSTEM 22.01 SCOPE: A. These Specifications shall form a part of the Contract Documents and shall govern construction work for all buildings to be built or modified for

More information

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage: Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial

More information

LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems

LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems A. General This Net Metering Standard for Customer-Owned Grid Connected Electric Generating Systems sets forth the

More information

Solar Water Heating and Photovoltaic Electrical Systems Installed on One or Two Family Dwellings

Solar Water Heating and Photovoltaic Electrical Systems Installed on One or Two Family Dwellings Solar Water Heating and Photovoltaic Electrical Systems Installed on One or Two Family Dwellings I. BACKGROUND As awareness of renewable energy and green building options increases, solar energy systems

More information

Co-location Interconnect Power Panel (CIPP) Installation Guide

Co-location Interconnect Power Panel (CIPP) Installation Guide Co-location Interconnect Power Panel (CIPP) Installation Guide Document INS-97xxxxxxx This guide covers the following part numbers- Trimm 97xxxxxxx Series Table of Contents Section 1 - General Information...

More information

ELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST

ELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST Name of School: OPTIONAL INFORMATION Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: ELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST Guidelines: This checklist

More information

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264 BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

Dielectric Withstand Testing in a Production Environment

Dielectric Withstand Testing in a Production Environment Dielectric Withstand Testing in a Production Environment Performing a routine product safety test should not in itself represent a shock hazard to the operator who is conducting the test, yet anytime you

More information

HP UPS R1500 Generation 3

HP UPS R1500 Generation 3 HP UPS R1500 Generation 3 Installation Instructions Part Number 650952-001 NOTE: The rating label on the device provides the class (A or B) of the equipment. Class B devices have a Federal Communications

More information

SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE

SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE for solar energy management LEATEC Delivering Solutions for Energy Management SOLAR ENERGY DATA CENTER BUILDING 4 to8 String Monitoring with 0.% Accuracy

More information

RAY-MAX Integrated Solar Power Strip

RAY-MAX Integrated Solar Power Strip RAY-MAX Integrated Solar Power Strip 600008, 600009, 600010, 600208, 600209, 600210 Owner s Manual NEXTRONEX, INC. Revision Date: 10/27/14 Contents 1. Safety Instructions... 3 2. General Equipment Warnings...

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS LIGHTING CONTROL PANELS 4 AND 8 RELAYS INSTALLATION INSTRUCTIONS INSTALLATION OVERVIEW The installation instructions contained in this document are provided as a guide for proper and reliable installation.

More information

Engage Coupler. Engage Coupler Chase

Engage Coupler. Engage Coupler Chase TECHNICAL BRIEF Wire Management in an Enphase System The Enphase Microinverter System installs much more quickly than other PV (photovoltaic) system technologies. This is partly due to the plug-and-play

More information

HOUSTON COMMUNITY COLLEGE HCC ALIEF CAMPUS MAIN BUILDING, FIRST, SECOND & FOURTH FLOORS RENOVATION ISSUE DATE: 10.17.12

HOUSTON COMMUNITY COLLEGE HCC ALIEF CAMPUS MAIN BUILDING, FIRST, SECOND & FOURTH FLOORS RENOVATION ISSUE DATE: 10.17.12 SECTION 27 05 26 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes grounding and bonding products, design requirements and installation for communications

More information

Expedited Permit Process for PV Systems AC Module

Expedited Permit Process for PV Systems AC Module Module The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Process provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with

More information

SURGE PROTECTIVE DEVICES (SPDs) LOW VOLTAGE AC EXTERNAL SIDEMOUNT SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION SYSTEMS SECTION 16671B SECTION 16671B

SURGE PROTECTIVE DEVICES (SPDs) LOW VOLTAGE AC EXTERNAL SIDEMOUNT SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION SYSTEMS SECTION 16671B SECTION 16671B SURGE PROTECTIVE DEVICES (SPDs) EXTERNAL SIDEMOUNT UNITS LOW VOLTAGE AC SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION PART 1 GENERAL 01 02 03 SCOPE The Contractor shall furnish and install the Surge Protective

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

National Craft Assessment and Certification Program S P E C I F I C A T I O N S National Craft Assessment and Certification Program S P E C I F I C A T I O N S INDUSTRIAL ELECTRICIAN V4 ELEC26_O4 Released September 2013 Focus Statement An Industrial Electrician must be able to interpret

More information

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations. DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,

More information

Trade of Electrician. Three-phase Distribution Boards And Socket Circuits

Trade of Electrician. Three-phase Distribution Boards And Socket Circuits Trade of Electrician Standards Based Apprenticeship Three-phase Distribution Boards And Socket Circuits Phase 2 Module No. 2.3 Unit No. 2.3.2 COURSE NOTES Created by Charlie Walsh - Athlone TC Revision

More information

Determining the Cause of AFCI Tripping Branch/Feeder and Combination Arc Fault Circuit Interrupters Class 760

Determining the Cause of AFCI Tripping Branch/Feeder and Combination Arc Fault Circuit Interrupters Class 760 Data Bulletin Determining the Cause of AFCI Tripping Branch/Feeder and Combination Arc Fault Circuit Interrupters Class 760 Retain for future use. 0760DB0204 Replaces 0760DB0204 R09/07 Precautions DANGER

More information

LOXONE 12 Channel Amplifier

LOXONE 12 Channel Amplifier LOXONE 12 Channel Amplifier Item no.: 200110 Thank you for purchasing the Loxone Twelve Channel Amplifier. The versatility of the Amplifier makes it the perfect choice for almost every type of custom multi-room

More information

Protect your home and family with Advanced Technology from Cutler-Hammer

Protect your home and family with Advanced Technology from Cutler-Hammer Protect your home and family with Advanced Technology from Cutler-Hammer Residential Home Fire Statistics Annually - over 415,000 Residential Fires Annually - over 40,000 electrical fires over 350 deaths

More information

Prism Solar Installation Manual

Prism Solar Installation Manual This installation manual applies to the following Prism Solar bifacial glass/glass models: B265(L), B260, B255, B250, B245, B200, B150, HB180. IMPORTANT: Read these instructions and the Prism Solar Design

More information

Arc Flash Avoidance and its Application to Overhead Traveling Cranes

Arc Flash Avoidance and its Application to Overhead Traveling Cranes Arc Flash Avoidance and its Application to Overhead Traveling Cranes Whitepaper August 2012 Jason Wellnitz, Controls Product Manager Material Handling Numerous technical papers, bulletins, magazine articles

More information

Checklist Testing and inspection without interconnection

Checklist Testing and inspection without interconnection Shams Dubai Checklist Testing and inspection without interconnection Version.0 AUGUST 205 TABLE OF CONTENTS Scope...5. PV PLANT AND INSPECTION DATA... 6 2 TESTING EQUIPMENT...7 3 DOCUMENTS... 8 3. Reference

More information

Significant Changes in the 2011 NEC Prepared by Bryan Holland City of North Port

Significant Changes in the 2011 NEC Prepared by Bryan Holland City of North Port Significant Changes in the 2011 NEC Prepared by Bryan Holland City of North Port Code-Wide Code Change Section 90.5(C). Fine Print Notes are now referred to as "Informational Notes." The purpose, intent,

More information

Wiser Panel Meter, Model Number WISERCTPM200 Installer s Guide

Wiser Panel Meter, Model Number WISERCTPM200 Installer s Guide Instruction Bulletin EAV85226 08/2014 Wiser Panel Meter, Model Number WISERCTPM200 Installer s Guide Retain for future use. Product Description Kit Contents The Wiser Panel Meter is for use in energy management

More information

Grounding Practice at Data and Communications Centers. David Brender, P.E., CPQ National Program Manager Copper Development Association Inc.

Grounding Practice at Data and Communications Centers. David Brender, P.E., CPQ National Program Manager Copper Development Association Inc. Grounding Practice at Data and Communications Centers David Brender, P.E., CPQ National Program Manager Copper Development Association Inc. Overview of This Presentation Elements of building wiring and

More information

2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1. 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1. 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. 2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. Relays) Part 1 General 1.1 CONDITIONS AND REQUIREMENTS: A. Refer to

More information

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin January 2016 CEC-10 [rev-9] Page 1 of 8 CANADIAN ELECTRICAL CODE SUBJECT: Section 10 Grounding and Bonding Rule 10-204 Grounding Connections for Alternating-Current

More information

2012 Canadian Electrical Code, Part I (CEC) Top Fifteen changes

2012 Canadian Electrical Code, Part I (CEC) Top Fifteen changes 2012 Canadian Electrical Code, Part I (CEC) Top Fifteen changes 1) Tamper resistant receptacles. 2009 CEC Required in dwelling units 2012 CEC Expanded to child care facilities First introduced in the 2009

More information

Solar Kit. Complete solution to optimize your photovoltaic system

Solar Kit. Complete solution to optimize your photovoltaic system Solar Kit Complete solution to optimize your photovoltaic system April 2012 Mounting and selection quick guide On Grid Solar Kit rooftop installation INSTALLATION WITH OVERLAID SUB-STRUCTURE (A.1, A.2)

More information

SnoTrace KSR Surface Snow and Ice Melting INSTALLATION PROCEDURES

SnoTrace KSR Surface Snow and Ice Melting INSTALLATION PROCEDURES SnoTrace Surface Snow and Ice Melting INSTALLATION PROCEDURES SnoTrace INSTALLATION PROCEDURES Refer to the SnoTrace Cable Testing Report for required recording of test data and circuit information. Upon

More information

DIVISION 26 - ELECTRICAL SECTION 26 05 20 CABLES FOR INSTRUMENTATION

DIVISION 26 - ELECTRICAL SECTION 26 05 20 CABLES FOR INSTRUMENTATION DIVISION 26 - ELECTRICAL PART 1 - GENERAL 1.01 SUMMARY A. Section Includes 1. Instrumentation Cables 1.02 SUBMITTALS A. Submit in accordance with requirements of Section 01 33 00. B. Product Data: Submit

More information

Entrances to and from Electrical Equipment Rooms

Entrances to and from Electrical Equipment Rooms Electrical Code Requirements for Commercial and Residential Buildings Presented by Bob Nuzzi State Electrical Inspector Entrances to and from Electrical Equipment Rooms 2005 NEC Section 110.26(C)(2) Large

More information

How Much Voltage Drop Is Acceptable?

How Much Voltage Drop Is Acceptable? How Much Voltage Drop Is Acceptable? Article supplied by Ideal The National Electrical Code (NEC) recommends that the combined voltage drop of the electrical system (branch circuit and feeders) not exceed

More information

Integrating SPDs in Switchgear & Switchboards Causes More Problems than it Solves

Integrating SPDs in Switchgear & Switchboards Causes More Problems than it Solves Integrating SPDs in Switchgear & Switchboards Causes More Problems than it Solves White Paper July 2010 Integrating surge protective devices (SPD) into distribution equipment (i.e. switchgear, switchboards,

More information

SECTION 26 09 26 LOW VOLTAGE LIGHTING CONTROLS

SECTION 26 09 26 LOW VOLTAGE LIGHTING CONTROLS SECTION 26 09 26 LOW VOLTAGE LIGHTING CONTROLS PART 1 - GENERAL 1.01 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

HM-W536 Install Guide

HM-W536 Install Guide HM-W536 Install Guide 9/13/2013 IMPORTANT SAFETY INSTRUCTIONS Warning - When using electrical devices, basic safety precautions should be followed to reduce the risk of fire, electrical shock or injury.

More information

DORMA MODEL PS-406BB POWER SUPPLY INSTALLATION INSTRUCTIONS

DORMA MODEL PS-406BB POWER SUPPLY INSTALLATION INSTRUCTIONS Features: INSTALLATION Install in accordance with NFPA 70. DORMA MODEL PS-406BB POWER SUPPLY INSTALLATION INSTRUCTIONS Up to 1.95 Amps Load Capacity Class 2 Rated Outputs Overload, Over Voltage, and Short

More information

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F TABLE OF CONTENTS Appendix F - Electrical Engineering Design Criteria F.1 Introduction...F-1 F.2 Codes and Standards...F-1 F.3 Switchyard and Transformers...F-1

More information

Enphase M215 Microinverter

Enphase M215 Microinverter INSTALLATION AND OPERATION MANUAL Enphase M215 Microinverter 141-00012, Rev 06 Contact Information Enphase Energy Inc. 1420 N. McDowell Blvd. Petaluma, CA 94954 http://www.enphase.com [email protected]

More information

PROTECTION AGAINST ELECTRIC SHOCK by John Ware

PROTECTION AGAINST ELECTRIC SHOCK by John Ware 16 become live under fault conditions. The potential of the metal enclosure is higher than that of the main earthing terminal of the installation (and that of Earth) because of a potential difference created

More information