THE COPPER SOLUTION: Power Quality
|
|
|
- Sibyl Stokes
- 10 years ago
- Views:
Transcription
1 THE COPPER SOLUTION: Power Quality Copper Ensures Reliability, Power Quality at Boston Data Center Data centers have quietly become a significant portion of the national electrical infrastructure. The Federal Government alone was operating more than 1,100 in Along with commercial facilities, the data centers are huge electric power users. The U.S. Environmental Protection Agency once projected that such centers would account for three percent of all electricity consumed in the country in 2011, but they surpassed that figure a year earlier. At a 10% cumulative annual growth rate (CAGR), consumption could double well before the decade is out. 2 Steve Collins, an Associate with Vanderweil Engineers, a leading engineering firm (see description below), estimates that the gross power consumed by these server farms will increase significantly as centers continue to proliferate and unit electrical loading in them rises to a projected 1,500 W/sq ft. Data centers differ from most other industries in that electrical power reliability and power quality are exceptionally high. A TIA 942 Tier 4-rated facility will have 100% reliability, but, allowing for human error, the standard allows or projects at least % average availability (0.4 h average annual downtime over five years), yet, the percentage is often higher than that. High power quality implies stable, correct voltage with undistorted waveform. Equipment is correctly installed, rigorously maintained, and, not incidentally, dependent on miles of copper for reliability. All of which brings us to One Summer Street, an 800,000-sq ft data center located in Boston s Downtown Crossing (Cover photo). Don t be misled by that Macy s sign; the data center occupies most of the 2½-acre, city-block-size building, including systems infrastructure located in the basement levels and multiple roof areas. As a data center, its advantages include a potentially large nearby customer base; eight utility feeds from
2 two substations for reliable power and service by no less than 40 national and international communication providers. The neutral colocation center is a true carrier hotel. It s the largest and arguably the most significant data center facility in the entire New England region. New Infrastructure The Markley Group built, owns and operates One Summer Street. The company is a leading data center developer with properties in the U.S. and Europe totaling more than three million square feet. Markley Group acquired the 70-year-old Macy s building in 1999 and has invested more than $150 million to create the kind of sophisticated infrastructure a facility of this importance requires. That infrastructure is the subject of this case study. The building itself was exceptionally sound, with features such as secure walls and high ceilings not found in some purpose-built centers (Figure 1). Its large, multitiered roof area was ideal for emergency generators, chillers and related equipment (Figure 2). And, with Macy s continuing to occupy the lower floors, the center itself is hidden in plain view not a trivial security consideration. The building s old electrical infrastructure was another story. Energy-hungry data centers didn t exist 70 years ago, so totally new electrical, grounding, IT and HVAC systems had to be installed. Power density exceeds 400 watts per square foot. The Markley Group assigned the building s makeover to Vanderweil Engineers, a Boston-based firm with more than 50 years experience with commercial, industrial and public facilities, including data centers. Besides design, Vanderweil undertook construction administration and oversight, recommended subcontractors, and even conducted detailed inspections during construction. They were also the systems-commissioning and integrated testing agents. Figure 1. Fifteen-foot ceilings at One Summer Street enable installation of 24 to 36 raised floors while maintaining ample overhead space for cable trays and racks. Fully Redundant Electrical Systems The building s utility vaults are designed for a 20-MW electrical service, which is expandable to 40 MW. The vaults are dedicated to the data center. Two entirely separate 13.8-kV, 10-MW utility feeds enter through the two vaults, each containing four liquid-cooled, 2,500- kva, 13.8 kv-480/277 V transformers, Figure 3. Three double-ended switchboards provide fully redundant Figure 2. More than 30 generators and HVAC equipment nearly blanket the building s 2½-acre, mulitiered roof. A total of 30 MW of emergency power plus more than 10 MW of rotary and battery UPS power ensure seamless transfer. Future build-out to 40 MW of generation will accommodate growing electrical loads. Figure 3. Four of eight 13.8 kv-480 V utility transformers located in a vault at One Summer Street. A similar set of transformers in a separate vault form the other half of the double-ended utility feed. Copper buswork seen at the upper left feeds distribution switchgear located in the basement. Utility ground straps are visible on the floor and rear wall. 2
3 services, referred to as the A and B circuits. The data center has never experienced an outage, although it is fully protected should one occur. The center s 480-V power is distributed from the basement to server floors via ten 4,000-A copper bus risers. Four 5,000-A bypasses connected to the 6000-A rated switchgear enable load-switching among the riser feeds in the event one service should fail (Figure 4). Power bus risers are physically separate from IT/data risers in order to avoid electrical noise on sensitive circuits. Approximately one hundred 480 V-208/120 V distribution transformers of various sizes feed servers and convenience outlets (Figure 5). Additional 480/277 V transformers serve lighting and HVAC requirements. All distribution transformers are copper-wound, dry-type, K-rated (mostly K13 and K20) units meeting NEMA TP-1 efficiency standards. Individually fed power distribution units (PDUs) feed branch circuit panels and remote power panels (RPPs). For redundancy, branch circuits are extended to each server cabinet in an A+B configuration from two unique PDUs. The redundancy at the branch circuit improves reliability and permits either half of the electrical system to be shut down for maintenance without disrupting power (Figure 6). Figure 4. Switchgear (in cabinets, bottom) and three of the ten 480-V, 4,000-A copper bus risers that feed power to upper floors (top of photo). Four 5,000-A bypasses enable switching among primary feeds. Figure 6. Power is fed to equipment cabinets via power distribution units (PDUs), seen here. Each PDU/cabinet is served by a minimum of two branch circuits providing 2N redundancy. Copper grounding conductors are run in ladder racks, above. Figure 5. Two (of more than 100) redundant 480 V-208/120 V distribution transformers feed customers servers and convenience outlets. All sub-distribution transformers are copperwound, dry-type, K-rated, and meet NEMA TP-1 efficiency standards. Going Beyond the Code Every Day The National Fire Protection Association s (NFPA) National Electrical Code (NFPA 70: NEC) is concerned primarily with safety. It doesn t fully address reliability or sensitive electronic equipment, which are dealt with in publications such as the Institute for Electrical and Electronics Engineers (IEEE) Gold 3 and Emerald 4 books, and the Telecommunications Industry Association standards 5, among others. Data centers could not guarantee the levels of reliability and power quality required if they were designed and built to the Code s minimum requirements. Electronic equipment especially IT and telecommunications equipment requires higher reliability and better power quality than the Code s minimum standards provides for. For example, Code-mandated wire sizes and voltage drop limits involve safety issues (overheating) but 3
4 can also affect reliability and power quality. Don Esson is the Markley Group s facilities manager at One Summer Street. The NEC is a minimum standard, he says, and we supersede it every day in every project we work on. Working strictly to Code practice, we would be running AWG #12 wire for a 20-A branch circuit. Our standard is to run #10 instead. It can handle 1.5 times the ampacity; it s more robust and therefore more reliable. Also, with #10, the customer has the built-in flexibility to upsize to 30-A receptacles in the future if he wishes. There s very little increase in materials and labor costs, but reliability improves and you usually don t have to upsize the conduit when upsizing copper, as you would with aluminum. We limit the number of outlets per branch circuit to between four and six, except for IT circuits, which are one-on-one, or actually two-on-one since all IT branch circuits are double-ended: each receptacle contains two #10 phase conductors and a neutral conductor for the A circuit and two more for the B circuit, plus separate full-size grounding conductors. Voltage drop is another important consideration. We always bump up one conductor size, so if you had a 100- A feeder, by Code you would typically run #4. We would probably run that with #2 wire. Voltage drop gets taken out of the equation at that point. The Code permits a two percent drop for feeders and three percent for branches, but we hold that to just two percent. Back-up Power The facility has approximately 20 MW of emergency generator capacity, and more than 10 MW of rotary (flywheel-type) and battery power in multiple UPS systems. Power cables from generators and UPS systems are in multiple sets of kcmil conductors. Backup power is extremely important for a facility such as this, says Mr. Esson, and, while value engineering may give us a choice to save on cost, it is important for us to utilize quality components to maintain system reliability. Equipment testing, commissioning and integrated testing, along with proper scheduled maintenance, are essential for these equipment items and systems. all treated individually, which resulted in each tenant having their own electrical service entrance equipment, a scenario that created multiple ground current loops throughout the building. Grounding is critical in a data center, says Mr. McLean. Computer equipment is very sensitive to harmonics and high currents, so you want to isolate the equipment from transients, high frequencies and ground currents that might be placed on your grounding system at points of voltage and current transformation. We only have two levels of transformation, from 13.8-kV utility service to 480 volts and again from 480 volts to 208/120 volts, but they occur at hundreds of points where you re connecting neutral to ground at transformers, switchboards and other separately-derived systems. Any of those points could feed transients, stray currents or harmonics back to the computer equipment. Our enforcement of a single-point grounding system prevents that. The single point Mr. McLean refers to is the center s main grounding bar, a one-foot-high by three-feet-wide copper plate located in the building s subbasement (Figure 7). To that plate alone are bonded all ground leads from the building. There are actually two risers for the grounding system: one for the power distribution system, which includes generators, transformers and UPS equipment; the other for IT and communications circuits. Separating the two systems isolates IT/comm equipment from noise, harmonics and floating ground currents that may be present at ground-to-neutral bonds. The two systems are bonded together only at the main grounding bar. Single-point Grounding Christopher McLean, PE, LEED AP, is Vanderweil s Electrical Engineer at One Summer Street. From his employer s side, he s been personally responsible for almost all of the power distribution improvements during the several years he s been on the project. That responsibility includes the all-important grounding system. Prior to the inception of the Markley Group s ownership, tenants were Figure 7. The main grounding bar at One Summer Street is a three-foot by one-foot copper plate (right) located in the subbasement. All grounding conductors in the building s two grounding system branches terminate here. The smaller bar at left rear is an extension of the larger bar. 4
5 Extending earthward from the main grounding bar are multiple connections to building steel in walls and the subbasement floor, as well as to the water main on both sides of the meter. The building stands just 23 feet above sea level, making the floor and footings effective earthing points (Ufer grounds). Design ground resistance is five ohms. Connections to building steel (including the basement floor) are made only from the main grounding bar. McLean explains that All of the hundred-plus transformers throughout the building are connected to ground, plus we have many neutral-to-ground currents from unbalanced single-phase sources that ultimately put current to ground someplace. Had we connected to building steel from several points on the grounding system, the entire building steel system could have become one giant ground loop. That could compromise the ground-fault settings in switchgear and cause problems everywhere in the building. By connecting from only one point the main grounding bar in the basement we ve created a very robust grounding system that isolates those problems. Conduits are also bonded to the grounding system only at the main grounding bar to create a complete system. However and despite it being permitted by Code conduit is never used as the only grounding conductor. McLean explains: In almost all instances, conduit would not be an effective grounding path. We always run at least one separate grounding conductor for each feed. Where we run two parallel feeds in the same conduit, each gets its own green wire. One look at Article 250 in the Code would show you that the ampacity of the required copper grounding conductor is much higher than that of either galvanized conduit or electrical metallic tubing, EMT. Also, if we used the conduits as grounds, thousands of fittings and interconnections would then have to be inspected, torqued and tightened periodically, whereas a separate green wire only has to be inspected and torqued at the two end connections (Figure 8). Grounding connections between the main grounding bar and the two grounding system branches are made through separate risers in the building s corners, one for power distribution and one for IT equipment. Plans called for adding two more ground risers in the near future. Conductors from the main bar to the building floors are sized at 750 and 1,000 kcmil. They terminate at one-foot by three-foot copper grounding bars at each floor (Figure 9). Smaller conductors lead from those bars to multiple four-inch by one-foot collector bars located high on walls throughout the floor space Figure 8. Typical conduit runs at One Summer Street illustrate why the center relies on separate internal green wires rather than conduit itself as the grounding path. Copper is a better conductor than conduit steel. And, if conduits were used for grounding, thousands of connections and fittings would have to be inspected, torqued and tightened periodically, a hopeless task. Figure 9. A 1,000 kcmil grounding conductor (lower left) from the main grounding bar terminates at a ground bar serving one floor from one of the building s two ground risers. Smaller conductors bonded to the main floor bar (upper cables) lead to collector bars on the floor. 5
6 (Figure 10). Two sets of large and small grounding bars per floor serve power distribution and IT equipment, respectively. Grounding Overhead and Underfoot Equipment racks are grounded by overhead and underfloor systems. For overhead systems, individual cabinets are grounded with AWG #6 or #4 leading to overhead ladder racks. Grounding conductors from all cabinets in a row are bonded to a collector bus cable run in the racks. It may range from #2 to 4/0 in size depending on need (Figure 11). Collector bus cables are directed to the nearest collector bar. The ladder racks themselves are also grounded via the bars (Figure 12). Cable trays carrying 208-V power to servers are grounded to separate collector bars serving the power distribution branch of the grounding system. The raised-floor grounding system consists of grids of AWG #2 and 4/0 bare copper, (Figure 13). For approximately every 3000 sq ft of raised-floor area, one 4/0 grounding conductor is run from the grid to the wallmounted collector bar. Figure 12. Overhead cable trays and ladder racks are jumpered and grounded with AWG #2 bare copper. These conductors, along with the cable bus that collects ground leads from individual cabinets, are connected to the nearest wall-mounted collector bar. Figure 10. Multiple grounding collector bars are mounted on walls in server rooms. The AWG 2/0 conductor, top, leads to the riser bar, while #2 green cable, bottom, is a collector bus for a row of cabinets. Conductor sizes vary with clients needs. Figure 11. Green grounding conductors bond individual cabinets to an overhead collector bus. In this example, cabinet grounds are AWG #6 and the collector bus is #2, but larger sizes may be used. Figure 13. Bare copper grounding conductors are shown strung under a section of raised floor. Raised-floor grounding conductors from approximately every 3,000 sq ft of floor area are connected to a wall-mounted collector bar. 6
7 Planned Maintenance Important One Summer Street clearly has well thought out and executed electrical and grounding systems, but even these systems can degrade over time: Connections loosen, contact resistances rise and loads change, producing unexpected effects. The electrical and grounding systems at One Summer Street are, therefore, inspected and maintained according to a written program. Grounding connections are checked for tightness on a fixed schedule and re-torqued as needed. Power quality is monitored to ensure clean waveforms and voltage stability. Emergency generators and UPS units are periodically exercised. Systems are also regularly upgraded to meet changing needs. Data centers are indeed mission-critical facilities with unique reliability and power quality requirements. Toptier designers and owners like Vanderweil Engineers and The Markley Group, respectively, clearly provide their clients with both of these elements at One Summer Street. The key components are not surprising: sound design, careful installation, attentive management, regular maintenance... and the correct use of copper for circuitry and grounding. The Principals Donald J. Esson is the chief infrastructure engineer at One Summer Street. He can be reached at and at [email protected]. Stephen R. Collins is an Associate at Vanderweil Engineers and has been the project manager for the One Summer Street projects. He can be reached at and scollins@vanderweil. com. Christopher K. McLean, PE, LEED AP, is an electrical engineer with Vanderweil Engineers assigned to One Summer Street. He can be reached at and [email protected]. Endnotes 1 Office of Management and Budget, Consolidation-Memo Report_Congress_Final1.pdf 3 The IEEE Gold Book: IEEE Standard 493, Recommended Practices for Grounding of Industrial and Commercial Power Systems, Institute of Electrical and Electronics Engineers, February Founded in 1950, Vanderweil Engineers is a full-service engineering firm committed to developing innovative solutions and solid working partnerships. It has earned a 90% repeat business ratio and is consistently ranked among the top U.S. engineering firms. Vanderweil can be reached at com or (617) The IEEE Emerald Book: ANSI/IEEE 1100, Recommended Practice for Powering and Grounding Electronic Equipment. Institute of Electrical and Electronics Engineers, December TIA-942: Telecommunications Infrastructure Standard for Data Centers, Ed. V, March 2010, Telecommunications Industry Association. Over the past two decades, the Markley team has developed thirteen data center and telecom buildings throughout Europe and North America, with Markley's flagship facility located at One Summer Street in Boston. Markley Group can be contacted at or (213) The Boston facility, in particular, can be contacted at (617)
8 This publication has been prepared solely as resource material for the use of individuals involved in the specification, design, selection and installation of electrical systems. It has been compiled from information provided by one or more of the parties mentioned herein and other information sources Copper Development Association Inc. (CDA) and/or the relevant parties believe to be competent. However, recognizing that each system must be designed and installed to meet particular circumstances, CDA and the parties mentioned in this publication assume no responsibility or liability of any kind, including direct or indirect damages in connection with this publication or its use by any person or organization, AND MAKE NO REPRESENTATIONS OR WARRANTIES OF ANY KIND RELATED TO ITS USE, ACCURACY, COMPLETENESS, UTILITY, AVAILABILITY OR DOCUMENTATION. A6134 XX/11
Grounding Practice at Data and Communications Centers. David Brender, P.E., CPQ National Program Manager Copper Development Association Inc.
Grounding Practice at Data and Communications Centers David Brender, P.E., CPQ National Program Manager Copper Development Association Inc. Overview of This Presentation Elements of building wiring and
270526-TC Grounding and Bonding for Telecommunications Systems
270526-TC Grounding and Bonding for Telecommunications Systems Part 1 - General Related Documents The following related sections of the OT standards shall also be applicable to this section. OT Engineer
Element D Services Electrical
Service and PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as
100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G
100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G The Opportunity Jones Lang LaSalle, Inc. (the Broker ) is please to offer the fee simple interest in 100 Locust Avenue (the
Grounding of Electrical Systems NEW CODE: Grounding and Bonding
Grounding of Electrical Systems NEW CODE: Grounding and Bonding Presented By Scott Peele PE Grounding of Electrical Systems Outline Defining the Terms Why should I Ground? Types of Grounding Systems Separately
OPERATOR - FACILITY ADDRESS - DATE
. Facility Criteria (RFP).0 Location Characteristics Criteria Requirements 1 Ownership and Management: Please identify the owner(s) and managers of the property and indicate if there is on-site management.
Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.
AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled
Minimum Standards for Data/Voice Infrastructure in New Building Construction
UNIVERSITY OF WATERLOO Minimum Standards for Data/Voice Infrastructure in New Building Construction 12/17/2012 Offices 1. Two Work Area Outlets (WAO) on opposite walls, each with 2 jacks 2. Each WAO shall
How to Estimate the Cost of a Clean Room and Data Center Equipment Electrical Work. Section 2 Types of Methods of Measurements page 4
How to Estimate the Cost of a Clean Room and Data Center Equipment Electrical Work Table of Contents Section 1 Introduction page 3 Section 2 Types of Methods of Measurements page 4 Section 3 Project Specific
Engineers Edge, LLC PDH & Professional Training
510 N. Crosslane Rd. Monroe, Georgia 30656 (770) 266-6915 fax (678) 643-1758 Engineers Edge, LLC PDH & Professional Training Copyright, All Rights Reserved Engineers Edge, LLC An Introduction to Interior
Electrical. This section applies to the design and installation of building power distribution systems.
Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions
NORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW
VAZATA 9651 Hornbaker Road Manassas, VA 20109 VAZATA.COM VAZATA's NoVa One data center located at 9651 Hornbaker Road in Manassas, Virginia is engineered from the ground up to deliver highly reliable and
Electrical Code Regulation
Electrical Code Regulation St. Clair County has adopted the 2005 National Electrical Code in its entirety for the unincorporated areas of the county and all communities that have contracted with the county
MONTGOMERY COUNTY EXECUTIVE REGULATION Offices of the County Executive. 101 Monroe Street. Rockville, Maryland 20850
Montgomery County Regulation on: ADOPTION OF THE 2008 NATIONAL ELECTRICAL CODE DEPARTMENT OF PERMITTING SERVICES Issued by County Executive Regulation # 15-09 Authority: Code Section 17-2 and 17-3 Supersedes:
David Brender Copper Development Association Inc. [email protected]. Miramar, March 8, 2013
Grounding and Bonding in Communications Systems David Brender Copper Development Association Inc. [email protected] Ennes Workshop Miramar, March 8, 2013 MMXIII This talk concentrates on:
Power to the adaptable data center
Business Unit Manager, Data Center Solutions, Eaton s electrical group IT managers have more options than ever to tailor the power infrastructure to their unique data center and business requirements.
Voltage Drop (Single-Phase)
Voltage Drop (Single-Phase) To Find: To Find Voltage Drop Formula: 2 x K x L x I V.D. = ------------------- C.M. Variables: C.M. = Circular Mill Area (Chapter 9, Table 8) To Find Voltage Drop Percentage
Subject: County of Los Angeles Data Center Space Requirement
Subject: County of Los Angeles Data Center Space Requirement The County of Los Angeles, Chief Executive Office, Real Estate Division (CEO-RED) is issuing this Property Search for the purchase of a vacant,
Re-examining the Suitability of the Raised Floor for Data Center Applications
Re-examining the Suitability of the Raised Floor for Data Center Applications By Neil Rasmussen White Paper #19 Revision 1 Executive Summary The circumstances that gave rise to the development and use
BASIC NEC CODE RULES AND DESIGN PRACTICE
BASIC NEC CODE RULES AND DESIGN PRACTICE Wire Ampacity and Size Circuit Breaker Size 1. Maximum loading for any branch circuit is 80% of rating of circuit for ampacity of wire for any load. NEC 220-2,
GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264
BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used
19 Site Location, Design and Attributes. Site Location, Design and Attributes
1 Site Location, Design and Attributes The Primary Data Center shall be physically located on Oahu, Hawaii. 2 Site Location, Design and Attributes The Primary Data Center shall be located at least 1 mile
Top Commercial / Residential Electrical Requirements *
Department of Community Development Building Division 4800 West 92 nd Avenue Westminster, Colorado 80031 For Information call (303) 658-2075 Fax (303) 706-3922 www.westminsterpermits.com Top Commercial
0095.05 June 30. 2011 July 18, 2014 1 of 7
Standard Number: Superseding: Effective Date: Page: 0095.05 June 30. 2011 July 18, 2014 1 of 7 Pole Attachments, Automated Meter Reading and Cellular Phone Antennas 1. Scope 2. Application This standard
Power Distribution in Data Centers: STARLINE Track Busway, PX ipdus and Power IQ
Power Distribution in Data Centers: STARLINE Track Busway, PX ipdus and Power IQ 2011 Raritan Inc. Overview Data center managers are faced with increasingly challenging demands: supplying additional computing
LTR Series Uninterruptible Power Systems 700 VA - 2.1 KVA. General Specification
08/17/12 Rev2 LTR Series General Specification 700 VA to 2.1 KVA 1.0 General LTR Series Uninterruptible Power Systems 700 VA - 2.1 KVA General Specification This specification describes the features and
The National Armored Cable Manufacturers Association Presents. Installation Standard for Types AC and MC Cables
The National Armored Cable Manufacturers Association Presents Installation Standard for Types AC and MC Cables An ANSI Standard Original document jointly produced by NECA and NACMA as Standard for Installing
Increasing Data Center Efficiency by Using Improved High Density Power Distribution
Increasing Data Center Efficiency by Using Improved High Density Power Distribution By Neil Rasmussen White Paper #128 Executive Summary A new approach to power distribution for high density server installations
Voltage Drop. Voltage Drop 1
Voltage Drop The technical information provided herein is to assist qualifi ed persons in planning and installing electric service to farms and residences. Qualified person is defi ned in Article 100 of
Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.
AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled
Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.
AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled
Parallel Redundant Uninterruptible Power Supply
9 315 Parallel Redundant Uninterruptible Power Supply Installation/Operation Manual 164202013 Rev. D ------------------------------------------------------------------------ ------------------------------------------------------------------------
ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01)
ELECTRICAL INSPECTION BULLETIN (Effective 2000-03-01) Rule 28-900 Standby Generator Installations Due to the increasing number of standby generator installations being established to maintain continuity
Qualitative Analysis of Power Distribution Configurations for Data Centers
Qualitative Analysis of Power Distribution Configurations for Data Centers White Paper #4 2007 The Green Grid. All rights reserved. No part of this publication may be used, reproduced, photocopied, transmitted,
ANSI/TIA-942 Telecommunications Infrastructure Standards for Data Centers
ANSI/TIA-942 Telecommunications Infrastructure Standards for Data Centers Jonathan Jew jew@j-and and-m.com J&M Consultants, Inc Co-chair TIA TR-42.1.1 data center committee Co-chair BICSI data centers
415V DISTRIBUTION FOR GREEN DATA CENTERS
White Paper: HMRP-WP001-A5 June 5, 2012 415V DISTRIBUTION FOR GREEN DATA CENTERS Prepared by: Anthony (Tony) Hoevenaars, P. Eng President and CEO Mirus International Inc. Copyright 2012 Mirus International
CUSTOMER REQUIREMENTS AT POWER SUBSTATIONS
CUSTOMER REQUIREMENTS AT POWER SUBSTATIONS Customer Handout Date Aug 2, 2010 Version 1.0 File Name Customer Requirements At Power Substations Document Id Outside Plant Engineering 1 Table Of Contents 1.0
IRRIGATION PUMPING Table of Contents - Section 900
IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS
BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET
BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET Berthold Electric Company s Generator Connection Cabinet provides a quick and convenient station to connect a portable generator to a facility s main service
SYSTEM 1850-SE SERVICE ENTRANCE CABLE SYSTEM
Pyrotenax SYSTEM 1850-SE SERVICE ENTRANCE CABLE SYSTEM Contents Introduction This section provides an overview of general circuit design considerations and installation guidelines for a Pyrotenax System
How To Get A Power Line Extension
GUIDELINES FOR COMMERCIAL ELECTRIC SERVICE HOOKUP 1 Steps to Commercial Service Pay the Design Deposit Commercial Buildings: Up to 1, sq ft = $1,. 1, 5, sq ft = $2,. Over 5, sq ft = $3,. Commercial jobs
CHAPTER 2 EXAMPLES AND TABLES
CHAPTER 2 EXAMPLES AND TABLES COMMENTARY AT 210.20(A) EXCEPTION An overcurrent device that supplies continuous and noncontinuous loads must have a rating that is not less than the sum of 100 percent of
INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION
INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION February 2013 NOTE: If conflict exists between St. Thomas Energy s Conditions of Service and this document, the Conditions
APC 3Phase Power Distribution
APC 3Phase Power Distribution North American 3 Phase Business Development Team All content in this presentation is protected 2008 American Power Conversion Corporation Objectives Understand the entire
SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS. Presented by SAI Advanced Power Solutions
SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS POWER DISTRIBUTION RACKS IN A MISSION CRITICAL SYSTEM MODULES IN A MISSION CRITICAL SYSTEM UPS Convertor Main Inverter Load Battery BPC UPS & BATTERY
GUIDELINES FOR WIRING SINGLE FAMILY DWELLING UNITS
GUIDELINES FOR WIRING SINGLE FAMILY DWELLING UNITS This guideline has been prepared to assist the owner/occupant of a single family dwelling with compliance to the requirements of the National Electrical
2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE
2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE PAGE 1 OF 5 This Reference provides a very comprehensive list of aspects of a solar PV installation that could be reviewed, clarifying
COMMODITIZING THE DATA CENTER MARKET
COMMODITIZING THE DATA CENTER MARKET Site Summary The building at 1360 Kifer Road has approximately 94,500 SF of server and support space and is currently divided into two independent data center areas.
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum
The following are general terms that we have found being used by tenants, landlords, IT Staff and consultants when discussing facility space.
The following are general terms that we have found being used by tenants, landlords, IT Staff and consultants when discussing facility space. Terminology: Telco: Dmarc: NOC: SAN: GENSET: Switch: Blade
Presenters Brett Weiss, Gabe Martinez, Brian Kroeger.
1 Presenters Brett Weiss, Gabe Martinez, Brian Kroeger. Topics to be covered: Cable identification Purpose of the various cable types Installation techniques Building Infrastructure Overview of networking
AMFA-27 AMFA-29. Operator s Manual & Installation Instructions. Rev. 2.5
AMFA-27 AMFA-29 Operator s Manual & Installation Instructions Rev. 2.5 Date: 17 July, 2010 Permanently-connected, utility Interactive, single-phase, inverters Model AMFA-27 WIND TURBINE INVERTER (240 VAC
AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL)
AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL) Site Biography Market Area: Chicago, IL Location: Lisle, IL 60532 Address: 4513 Western Avenue CLLI,POP, NPA/NXX Code: LSLEILAA, EQLAILAA
2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property
2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical
Doc Ref: 2015.06.01.002. 602.783.1112 baselayer.com 2015 BASELAYER TECHNOLOGY, LLC
TM 602.783.1112 baselayer.com 2015 BASELAYER TECHNOLOGY, LLC TM D400E Data Module (60Hz) The EDGE D400E is designed to meet high power density requirements for both the HPC and Web Scale environments while
Power Management Strategies for High-Density IT Facilities and Systems. A White Paper from the Experts in Business-Critical Continuity TM
Power Management Strategies for High-Density IT Facilities and Systems A White Paper from the Experts in Business-Critical Continuity TM Executive Summary Increases in data center density and diversity
Fundamentals of Power
Fundamentals of Power Fundamentals of Power 2008 American Power Conversion Corporation. All rights reserved. All trademarks provided are the property of their respective owners. Learning Objectives At
Fortune Oregon Data Center Increases Reliability with a High Resistance Grounding System
Fortune Oregon Data Center Increases Reliability with a High Resistance Grounding System Cory David Smith, Project Manager, ECOM Engineering Inc., and David Lawrence Smith, Principal, ECOM Engineering
All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.
DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,
Addendum #2 Contract UK-11-13
Addendum #2 Contract UK-11-13 Utilities Kingston Purchase and Replacement of Switchgear at Kingston Hydro Substation MS11 March 25, 2011 Delivered to: All RFP recipients Total number of pages: Nine (9)
Circuit Breakers and Switchgear. Thomas Greer Director of Engineering TLG Services
Circuit Breakers and Switchgear Thomas Greer Director of Engineering TLG Services Presentation Outline Switchgear Definition Overcurrent Protection Devices Circuit Breaker Trip Curves and Coordination
Multiple Meter Installation - 200 Amperes Per Position -Single Phase, Self-contained
Overhead Meters TABLE OF CONTENTS D D Consumer Service Pole for Mobile Home Park Temporary Service -wire Single Phase D. Overhead Meter Installation - Single Phase D. Connection Diagram - Single Phase
HOUSTON COMMUNITY COLLEGE HCC ALIEF CAMPUS MAIN BUILDING, FIRST, SECOND & FOURTH FLOORS RENOVATION ISSUE DATE: 10.17.12
SECTION 27 05 26 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes grounding and bonding products, design requirements and installation for communications
High-Efficiency AC Power Distribution for Data Centers
High-Efficiency AC Power Distribution for Data Centers White Paper 128 Revision 2 by Neil Rasmussen > Executive summary The use of 240 volt power distribution for data centers saves floor space, simplifies
Introduction to Data Centre Design
Introduction to Data Centre Design Barry Elliott BSc RCDD MBA CEng Earthing, grounding and bonding November 09 Earthing what s the point Safety from electrical hazards Reliable signal reference within
Data Centers and Mission Critical Facilities Operations Procedures
Planning & Facilities Data Centers and Mission Critical Facilities Operations Procedures Attachment A (Referenced in UW Information Technology Data Centers and Mission Critical Facilities Operations Policy)
Proper Application of 415V Systems in North American Data Centers. A White Paper from the Experts in Business-Critical Continuity
Proper Application of 415V Systems in North American Data Centers A White Paper from the Experts in Business-Critical Continuity Introduction Increasing pressure to reduce operating expenses and be more
TIA 569 Standards Update Pathways & Spaces. Ignacio Diaz, RCDD April 25, 2012
TIA 569 Standards Update Pathways & Spaces Ignacio Diaz, RCDD April 25, 2012 The purpose of this Standard is to standardize specific pathway and space design and construction practices in support of telecommunications
This presentation to be used in conjunction with:
1 This presentation to be used in conjunction with: Spec Sheets: SA-GRSP10, SA-GRSP09, SA-GRSP11 Samples in DC-GROUND-KIT 8/16/2012 2 Network Bonding and Grounding: TIA-607-B Generic Telecommunications
TIA-942 Data Centre Standards Overview WHITE PAPER
TIA-942 Data Centre Standards Overview WHITE PAPER TIA-942 Data Centre Standards Overview For the past 20 years, cabling standards have been the cornerstone of ensuring proper design, installation, and
800 Communications Circuits
ARTICLE 800 Communications Circuits INTRODUCTION TO ARTICLE 800 COMMUNICATIONS CIRCUITS This article has its roots in telephone technology. Consequently, it addresses telephone and related systems that
FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid
Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars Presented By: Greg Pelster & Robert Schmid FFI Ferrie, Franzmann Industries LOW VOLTAGE SWITCHGEAR & LOW VOLTAGE
Power Quality for Information Technology System
Power Quality for Information Technology System ITS OBVIOUS THE TOLERANCE IS DIFFRENT But What isn t Tobvious? HOW MANY OF YOU HAVE : A COMPUTER AT HOME? = Computers are not screens and Keyboards COMPUTERS
Midwest s Premier Carrier Neutral Colocation Data Center Greater Minneapolis St. Paul, Minnesota
Midwest s Premier Carrier Neutral Colocation Data Center Greater Minneapolis St. Paul, Minnesota A Premier Mission Critical Development and Leasing Opportunity The Connexion A carrier-neutral data center
Cable Tray Selection-
Cable Selection- For allowable cable types see the Appendix page A-9. The following guidelines are based on the 2002 National Electrical Code, Article 392. I) Number of Multiconductor Cables rated 2000
Data Centre Barrie, Ontario
COGECO DATA SERVICES DATA CENTRE Data Centre Barrie, Ontario Cogeco Data Services offers flexible, secure, connected and fully managed ICT solutions at its Flagship Data Centre in Barrie, Ontario Data
Power and Cooling for Ultra-High Density Racks and Blade Servers
Power and Cooling for Ultra-High Density Racks and Blade Servers White Paper #46 Introduction The Problem Average rack in a typical data center is under 2 kw Dense deployment of blade servers (10-20 kw
LEVEL 3 DATA CENTER ASSESSMENT
Nationwide Services Corporate Headquarters 410 Forest Street Marlborough, MA 01752 USA Tel: 800-342-5332 Fax: 508-303-0579 www.eecnet.com LEVEL 3 DATA CENTER ASSESSMENT Submitted by: Electronic Environments
Chapter 9. Bonding and Grounding
Chapter 9 Bonding and Grounding Objectives Describe why the cable should be bonded Describe bonding and grounding procedures Define Bonding and Grounding Explain Safety Benefits and intent of bonding and
Coaxial Cable Entry Panels, Coax and Grounding Connectors. Technical Note
Coaxial Cable Entry Panels, Coax and Grounding Connectors Technical Note Coaxial Cable Entry Panels, Coax and Grounding Connectors Surge Protection Solutions for PTC 2 Coaxial Cable Entry Panels, Coax
Wiser Panel Meter, Model Number WISERCTPM200 Installer s Guide
Instruction Bulletin EAV85226 08/2014 Wiser Panel Meter, Model Number WISERCTPM200 Installer s Guide Retain for future use. Product Description Kit Contents The Wiser Panel Meter is for use in energy management
AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)
AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) Site Biography Market Area: Washington, DC Area Location: Ashburn, VA 20147-6011 Address: All deliveries should be sent to
Safeguard your critical IT assets in a highly secure, fully redundant, environmentally-conditioned and constantly monitored hosting space to receive
Co-Location Services Safeguard your critical IT assets in a highly secure, fully redundant, environmentally-conditioned and constantly monitored hosting space to receive optimum performance 24x7. SERVICE
Errata NFPA 70. Proposed 2014 Edition
Errata NFPA 70 National Electrical Code (Report on Proposals) Reference: 12-109 (Log #1618) Panel Meeting Action Proposed 2014 Edition The National Electrical Code Technical Correlating Committee notes
White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5
White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code June 2015 Revision 1.5 Shalhevet Bar-Asher; SolarEdge Technologies, Inc. Bill Brooks, PE; Brooks Engineering LLC
STREETLIGHT SYSTEM GROUNDING AND BONDING
Page: 1 of 8 STREETLIGHT SYSTEM GROUNDING AND BONDING 1. Scope This Construction Standard covers the grounding and bonding requirements for single phase streetlight systems served by the Looped Radial
A Scalable, Reconfigurable, and Efficient Data Center Power Distribution Architecture
A Scalable, Reconfigurable, and Efficient Data Center Power Distribution Architecture By Neil Rasmussen White Paper #129 Executive Summary Significant improvements in efficiency, power density, power monitoring,
Alternative data center power
Alternative data center power A quantitative TCO comparison of 400V AC and 600V AC power systems Abstract Power efficiency has become a critical focus for IT and facilities managers as they struggle to
2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1. 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.
2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. Relays) Part 1 General 1.1 CONDITIONS AND REQUIREMENTS: A. Refer to
Digital Chicago. 600 south FeDeraL - chicago 9333 9377 grand ave - FranKLin ParK 350 east cermak - chicago
Digital Chicago 600 south FeDeraL - chicago 9333 9377 grand ave - FranKLin ParK 350 east cermak - chicago The Digital Chicago portfolio consists of three state-of-the-art data center facilities: 600 South
Grounding & Bonding Why it is done And How to Install Properly
Grounding & Bonding Why it is done And How to Install Properly The technical information provided herein is to assist qualifi ed persons in planning and installing electric service to farms and residences.
3. TYPES OF SERVICE AVAILABLE. 3.1 Scope
3. TYPES OF SERVICE AVAILABLE 3.1 Scope UI supplies 60 hertz, alternating current with different voltage and ampere ratings. Not all voltage and ampere ratings are available throughout the entire service
Session 14 Cable Support Systems
Session 14 Cable Support Systems Cable Support Systems in the IEC World A new IEC Standard, IEC61537 2001 has been developed If full details of the cabling layout are available then the likely cable load
LEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT.
LEVEL 3 DATA CENTER SERVICES IN OMAHA, NEBRASKA HIGH AVAILABILITY ENTERPRISE COMPUTING BUSINESS DEMANDS IT. LEVEL 3 DELIVERS IT. THE SCALE TO SUPPORT GLOBAL ENTERPRISE IT Designed and equipped to meet
Is an energy-wasting data center draining your bottom line?
Abstract Is an energy-wasting data center draining your bottom line? New technology options and power distribution strategies can dramatically reduce the cost and carbon footprint of your data center.
SYSTRUST CERTIFICATION REPORT FOR COLLOCATION AND DATA CENTER HOSTING SERVICES FOR THE PERIOD FROM JANUARY 1, 2013 TO DECEMBER 31, 2013
SYSTRUST CERTIFICATION REPORT FOR COLLOCATION AND DATA CENTER HOSTING SERVICES FOR THE PERIOD FROM JANUARY 1, 2013 TO DECEMBER 31, 2013 TABLE OF CONTENTS SECTION I: INDEPENDENT PRACTITIONERS TRUST SERVICES