Minimizing Impact of Electric Utility Outages with Backup Generation
|
|
|
- Lorin Mills
- 10 years ago
- Views:
Transcription
1 Minimizing Impact of Electric Utility Outages with Backup Generation
2 Introduction of the Speaker Michael Dempsey, PE Senior Electrical Engineer Carter & Burgess, Inc. Energy & Power Solutions
3 Facility Background Large Financial Institution: Southwestern US Over 5 million square feet 24 x 7 Operations Banking Customer Service Multiple Data Centers Billing Records Claims
4 Facility Background Two Central Plants North Plant 7500 Tons of Cooling South Plant 6600 Tons of Cooling Multiple Life-Safety Emergency Generator Installations
5 Facility Background Existing Standby Generator Plant kW Diesel Generators 13,800V Distribution Fully Automated Only Serves Portion of Facility South Central Plant Main Data Center Less Than 1/3 Available Office Space
6 Facility Background Electric Utility Service Primary Distribution 13,800V Two Dedicated Substations Utility Owned Transformers Campus Load Normally Divided Between Substations Normally Open Cross Tie Circuits Available
7 Mission - Facilitate Continued Business Operations Following Electric Utility Outage Serve Over 4 Million Square Feet of Office Space Serve North Central Plant Serve Banking Operations Existing Standby Generator Plant Unchanged
8 Electric Load Served by New Generator Plant Approximately 2/3 of Campus Square Footage 2003 Peak Demand 14.5 MW Based on Utility Billing Data 19.4MW Projected Future Peak Demand Based on Full Facility Occupancy
9 Generator Plant Mode of Operation - Options Standby Only Operate for Utility Outage Simplified Permitting Process Permit by Rule 3 Month Process Standby and Economic Dispatch Operate for Utility Outage Operate to Reduce Energy Cost Significantly More Complicated and Longer Permitting Process New Source Review 18 Month Process Initial Design - Standby
10 Generator Sizing Packaged Diesel Generators 2MW Standby Rating Max Field Erected Diesel Generators Above 2MW Threshold Redundancy Requirement N+1 Minimum
11 Generator Ratings Load Factor Average Load/Peak Load Over a Specified Period of Time Accounts for Load Fluctuations Over a Given Period Example Average Load Per Day = 8MW Peak Load Per Day = 10MW Load Factor = 80%
12 Generator Ratings Standby Power Only Supplied When Utility Source is Unavailable Variable Load Operation Follow Facility Load Fluctuations Not Parallel Operation 80% Load Factor Max 200 Hours Operation Per Year 25 Hours Operation Per Year at 100% Standby Rating
13 Generator Ratings Prime Variable or Continuous Load Applications Variable Load Operation 70% Load Factor Max Unlimited Hours Operation Per Year 10% Overload for 1 Hour in 12 Hours Not Exceeding 25 Hours Per Year Constant Load Operation Generally Parallel Operation - Peakshave 500 Hours Per Year at 100% Prime Rating
14 Generator Ratings Cont d Continuous Continuous Load Application 100% Load Factor No Sustained Overload Capability Parallel Operation Base Loaded Unlimited Hours Operation Per Year (Variable Load)
15 Generator Rating Selected 11 Generators in Parallel 2000kW Standby 1825kW Prime 13,800V 3PH 3W Low Impedance Grounded Minimize Line-to-Ground Short Circuit Current
16 Fuel System 5 Day Runtime Required Facilitate Extended Utility Outage Operation Redundancy N+1 Fuel tanks Required Automated Fuel Delivery System
17 Fuel System cont d Options Evaluated Underground Storage Tanks Maintenance Issue Leak Risk Above Ground Storage Tanks Easy Visual Inspection and Maintenance Leaks can be Contained Susceptible to Damage/Fire
18 Fuel System cont d Above Ground Tanks Selected UL2085 Rated Housed in Enclosed Warehouse Minimize Exposure to Physical Damage 6 30,000 Gallon Tanks 5 Day runtime N+1 Redundancy Supports Future Peak Load» 75% Load Factor Assumed
19 Electrical Distribution 13,800V Distribution Feeders New Ductbanks Required Connect to Existing Switchgear Main Campus 3 Feeder Circuits Any 2 can Serve Load Banking Facility 2 Feeder Circuits Either 1 can Serve Load
20 Electrical Distribution cont d Main Campus Cable in Ductbank Installation Cable in Conduit in Utility Tunnel Cable Downsized in Exposed Conduit - $250,000 Savings 500kcmil to 350kcmil 5 Rigid to 4 IMC Banking Facility Cable in Ductbank
21 Generator Switchgear 13,800V Metalclad 500MVA Interrupting rating Fault Duty Calculated for Parallel Operation Worst Case Breakers Interchangeable with Existing Breakers/Switchgear Sets of 3 Generators Segregated with Tie Breakers Feeder Breakers Segregated with Tie Breakers Ring Bus Configuration
22 Generator Switchgear cont d Controls Redundant PLCs Redundant Main Touch Screens Bus Differential Low Impedance to Minimize Added CTs Fully Automated Sequence of Operations Generator Load Control Automated Testing with Breaker Operation Remote Workstations Added at Existing Central Plants
23 Existing Switchgear Modifications Added Circuit Breakers Generator Interconnections Upgraded Voltage Sensing to Three Phase PTs Facility History of PT Problems Added Undervoltage Relays (27) Controlled via Generator Switchgear Added 5 Local Remote terminal Units (RTU) Redundant Fiber Optic Communications
24
25
26
27
28
29 Summary Backup Generator Plant Supports Over 4,000,000 sq ft of Facility Operations Over 10,000 Employees Designed to Serve Future Peak Load 19.4 MW Initially designed for Standby Operation Only Potential Conversion to Parallel Operation for Economic Deployment in Future
30 Summary 11 Packaged Diesel Generators for N kW (Standby Rating) 1825kW (Prime Rating) Be Careful When Specifying Load Rating Fuel System Sized for 5 Days Continuous Operation Distribution Feeder Redundancy N+1 Fully Automated Generator Switchgear Touch Screen Control Redundant PLCs
31 Questions
CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.
Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M
4160: THE GREEN 480 MEDIUM VOLTAGE ELECTRICAL SYSTEMS
4160: THE GREEN 480 MEDIUM VOLTAGE ELECTRICAL SYSTEMS for DATA CENTERS Michael Mosman, PE Chief Technical Officer CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED MEDIUM VOLTAGE
MEDIUM VOLTAGE. Michael Mosman, PE. CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED
MEDIUM VOLTAGE ELECTRICAL SYSTEMS for DATA CENTERS Michael Mosman, PE Chief Technical Officer CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED CCG Facilities Integration Incorporated
Comprehensive Electrical Distribution Master Planning at North Carolina State University. Alan Daeke Michael Dempsey
Comprehensive Electrical Distribution Master Planning at North Carolina State University Alan Daeke Michael Dempsey CAMPUSENERGY2015 Agenda Campus Overview Overview of Existing System Project Goals Project
Paralleling Switchgear
Paralleling Switchgear By Maurice D Mello, P.Eng. Systems Engineer, GE Consumer & Industrial, Canada What is Paralleling? Paralleling is the operation in which multiple power sources, usually two or more
NEW JERSEY CENTER OF EXCELLENCE
Overview NEW JERSEY Page 1 The Plant (CUP) provides electricity via a cogeneration system, chilled water for environmental cooling, steam for heating, and compressed air primarily for HVAC control Serves
Wholesale Data Center Suites Available Now
Wholesale Data Center Suites Available Now FROM 2,500 to 100,000 Sq Ft A secure, fortified Mission Critical data center facility located in Innovation Park, Charlotte, NC Scalable data center suites available
Monitoring Underground Power Networks
Monitoring Underground Power Networks By Mark Stiles Merve Cankaya ABSTRACT Underground electric distribution systems are common in large cities throughout the United States. Power usage for the entire
UTILITIES AND ENERGY MANAGEMENT
UTILITIES AND ENERGY MANAGEMENT University of Texas at Austin increases investment in co-generation to achieve greater utility reliability and economy. ENVIRONMENTAL BENEFITS AND ENERGY SAVINGS Power plant
A Comparison of Contemporary Electrical Distribution Equipment Standards. San Francisco IEEE Industry Applications Society May 26, 2009
A Comparison of Contemporary Electrical Distribution Equipment Standards San Francisco IEEE Industry Applications Society May 26, 2009 What are Standards? Clearly defined performance characteristics Based
OPERATOR - FACILITY ADDRESS - DATE
. Facility Criteria (RFP).0 Location Characteristics Criteria Requirements 1 Ownership and Management: Please identify the owner(s) and managers of the property and indicate if there is on-site management.
SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS. Presented by SAI Advanced Power Solutions
SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS POWER DISTRIBUTION RACKS IN A MISSION CRITICAL SYSTEM MODULES IN A MISSION CRITICAL SYSTEM UPS Convertor Main Inverter Load Battery BPC UPS & BATTERY
Cahier technique no. 196
Collection Technique... Cahier technique no. 196 Integration of local power generation in industrial sites and commercial buildings T. Hazel "Cahiers Techniques" is a collection of documents intended for
QUESTIONS and ANSWERS RFB 745-15-9894, Metal Clad Switchgear and Power Control Room
QUESTIONS and ANSWERS RFB 745-15-9894, Metal Clad Switchgear and Power Control Room 1) When you click on the UTHSCSA Drawing the site takes you to the E-1 drawing no other. Will there be other drawings
Primary and Secondary Electrical Distribution Systems
Primary and Secondary Electrical Distribution Systems Critical Facilities Round Table 12th Quarterly Membership Meeting June 2, 2006 David D. Roybal. P.E. Eaton Electrical Cutler-Hammer Products Utility
Commissioning of Mission Critical Facilities
Commissioning of Mission Critical Facilities Terry L. Rodgers, CPE, CPMP VP of Sustainable Operations Primary Integration Solutions Paul Liesman SVP of FM & Commissioning Syska Hennessy Group AIA Quality
Data Center:Build-to-Suit
Data Center:Build-to-Suit A fortified 100,000 SqFt mission critical build-to-suit constructed on a secured 5 acre parcel at Innovation Park Charlotte, NC On-Site 120MW Substation Sourced from Two Independent
Switchgear and Metal-Enclosed Bus
Section 18 Switchgear and Metal-Enclosed Bus 180. SWITCHGEAR ASSEMBLIES 180A. General Requirements for All Switchgear. This rule covers general requirements for all switchgear. Examples of switchgear found
INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION
INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION February 2013 NOTE: If conflict exists between St. Thomas Energy s Conditions of Service and this document, the Conditions
Power Generator Switching for Power Engineers Inc. with. Distrix Software Defined Infrastructure. A Distrix Networks Case Study.
Power Generator Switching for Power Engineers Inc. with Distrix Software Defined Infrastructure A Distrix Networks Case Study November, 2015 2015 Distrix Networks Ltd. All Right Reserved 1 The project
OPTIMIZING POWER SYSTEM PROTECTION FOR MODERN DATA CENTERS
OPTIMIZING POWER SYSTEM PROTECTION FOR MODERN DATA CENTERS Data center power systems are constructed with a premium on reliability at a significant cost. The return on this investment is realized if it
Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process
Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process Presented by: Marianne Mannschreck Date: Welcome A Look at the Net Energy Metering
AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA)
AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA) Site Biography Market Area: San Diego, CA Location: San Diego, CA 92121 Address: 5732 Pacific Center Blvd CLLI,POP, NPA/NXX Code:
OPERATIONS CAPITAL. The Operations Capital program for the test years is divided into two categories:
Filed: September 0, 00 EB-00-0 Tab Schedule Page of OPERATIONS CAPITAL.0 INTRODUCTION Operations Capital funds enhancements and replacements to the facilities required to operate the Hydro One Transmission
SECTION 26 09 13 - POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL
SECTION 26 09 13 - POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL 1.1 SUMMARY A. This section describes the requirements for the installation of Power Monitors and associated
Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering
Title 20 PUBLIC SERVICE COMMISSION Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES Chapter 02 Engineering Authority: Public Utility Companies Article, 2-121, 5-101 and 5-303, Annotated Code of Maryland.
Designed for uptime. Defining data center availability via a tier classification system
Defining data center availability via a tier classification system MIETEK GLIKOWSKI All systems can fail this is a simple fact that every industry must deal with. The paramount concern for the data center
LOGAN TERMINAL B SUBSTATION UPGRADE
AIRPORTS LOGAN TERMINAL E AND HEATING PLANT 5 KV AND 15 KV UPGRADES D 2015 Design replacement of two double-ended substations, HVAC upgrades for six substations, upgrades to 400 hertz gate power central
COMMODITIZING THE DATA CENTER MARKET
COMMODITIZING THE DATA CENTER MARKET Site Summary The building at 1360 Kifer Road has approximately 94,500 SF of server and support space and is currently divided into two independent data center areas.
Digital Chicago. 600 south FeDeraL - chicago 9333 9377 grand ave - FranKLin ParK 350 east cermak - chicago
Digital Chicago 600 south FeDeraL - chicago 9333 9377 grand ave - FranKLin ParK 350 east cermak - chicago The Digital Chicago portfolio consists of three state-of-the-art data center facilities: 600 South
Rule 5.500 Fast Track Analysis for National Life Insurance Co.
Rule 5.500 Fast Track Analysis for National Life Insurance Co. For a 500 kw Solar array to be located at 155 Northfield Street in Montpelier, Vermont Green Mountain Power Pam Allen Date: 5/31/13 SECTION
IRRIGATION PUMPING Table of Contents - Section 900
IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS
Isolated-Parallel UPS Configuration
Isolated-Parallel UPS Configuration 1 Inhalt 1 Introduction... 4 2 IP systems configuration... 6 3 Projects... 17 4 Conclusions... 17 2 Abstract The isolated-parallel UPS configuration has become well
Federal Wage System Job Grading Standards for Electric Power Controlling, 5407. Table of Contents
Federal Wage System Job Grading Standards for Electric Power Controlling, 5407 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 SPECIAL ADDITIONAL RESPONSIBILITIES...
FIXED CHARGE: This is a cost that goes towards making the service available, including
ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer
How To Visit An Internet Data Center
AT&T Internet Data Center Site Specification Atlanta Area (Lithia Springs, GA) Site Biography Market Area: Atlanta and surrounding areas (Georgia, Alabama, Tennessee, Florida, North and South Carolina
The Application of Circuit Breakers to Reduce Downtime in Datacentres
The Application of Circuit Breakers to Reduce Downtime in Datacentres Tim Campbell BEng MIET. Marketing Manager, Terasaki Electric (Europe) Ltd. Abstract Circuit breakers fulfil several functions in the
AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)
AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA) Site Biography Market Area: Washington, DC Area Location: Ashburn, VA 20147-6011 Address: All deliveries should be sent to
AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL)
AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL) Site Biography Market Area: Chicago, IL Location: Lisle, IL 60532 Address: 4513 Western Avenue CLLI,POP, NPA/NXX Code: LSLEILAA, EQLAILAA
Data Bulletin. Communications Wiring for POWERLINK G3 Systems Class 1210 ABOUT THIS BULLETIN APPLICATION INTRODUCTION.
Data Bulletin 1210DB0002R3/05 03/2005 LaVergne, TN, USA Communications Wiring for POWERLINK G3 Systems Class 1210 Retain for future use. ABOUT THIS BULLETIN This data bulletin describes the proper wiring
T-016: Paralleling Application Manual
Application Engineering T-016: Paralleling Application Manual English Original Instructions 6-2014 A040W370 (Issue 4) Table of Contents 1. INTRODUCTION... 1 1.1 Overview... 1 1.2 About This Manual...
Arc Terminator Active Arc-Resistant Switchgear
Arc Terminator Active Arc-Resistant Switchgear Increasing safety and productivity by extinguishing internal arcing faults within the switchgear. The Square D Arc Terminator from Schneider Electric offers
Industrial Ethernet How to Keep Your Network Up and Running A Beginner s Guide to Redundancy Standards
Redundancy = Protection from Network Failure. Redundancy Standards WP-31-REV0-4708-1/5 Industrial Ethernet How to Keep Your Network Up and Running A Beginner s Guide to Redundancy Standards For a very
Emirates Aluminium starts up World s first fully integrated power distribution system from ABB
Reprint from Aluminium World 2009, Volume 2 Emirates Aluminium starts up World s first fully integrated power distribution system from ABB Emirates Aluminium (EMAL), a joint venture between Abu Dhabi s
ELECTRICAL DISTRIBUTION STUDY
ELECTRICAL DISTRIBUTION STUDY FOR UNIVERSITY OF NORTH TEXAS DENTON, TEXAS JUNE 17, 2011 THE SEAL APPEARING ON THIS DOCUMENT WAS AUTHORIZED BY R. TIM YAGGI, P.E. 57030 ON JUNE 17, 2011. YAGGI ENGINEERING,
Experience Matters...
Experience Matters... Travelport Data Center offers confidence and space to meet your demanding IT needs Transwestern presents the Travelport Data Center in Denver, Colorado totaling 267,000 SF with 121,600
UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN
Page 1 of 27 UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN Page 2 of 27 Table of Contents 1. OBJECTIVE... 4 2. SCOPE... 4 3. COMMUNICATION... 4 4. LOSS OF NATURAL GAS SUPPLY... 5 5. LOSS OF
PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions
PMCS Integrated Energy Management Solution Unlock the Full Potential of Power Networks Through Integration Power Management Control System (PMCS) is a highly customizable, fully integrated end-to-end Energy
AT&T Internet Data Center Site Specification New York III (Secaucus, NJ)
AT&T Internet Data Center Site Specification New York III (Secaucus, NJ) Site Biography Market Area: New York City, New Jersey, Upstate NY and Lower Connecticut Location: Secaucus, NJ 07094 Address: 15
Building a Tier 4 Data Center on a Tier 1 Budget
Building a Tier 4 Data Center on a Tier 1 Budget A Walk Through of TIA-942 Peter P. Charland III, RCDD/NTS/WD, CET RTKL Associates Inc. March 27, 2008 BICSI South Central Region Meeting Denver, CO TIA-942
Increased power protection with parallel UPS configurations
Increased power protection with parallel UPS configurations Making the selection between Centralized Bypass and Distributed Bypass systems Janne Paananen Application Engineer, Large Systems Group Eaton
16 West Coast Regional Plan
16 West Coast Regional Plan 16.1 Regional overview 16.2 West Coast transmission system 16.3 West Coast demand 16.4 West Coast generation 16.5 West Coast significant maintenance work 16.6 Future West Coast
NORTHERN VIRGINIA ONE (NoVa) DATA CENTER OVERVIEW
VAZATA 9651 Hornbaker Road Manassas, VA 20109 VAZATA.COM VAZATA's NoVa One data center located at 9651 Hornbaker Road in Manassas, Virginia is engineered from the ground up to deliver highly reliable and
NY-1 DATACENTER AT A GLANCE. NY-1 is a Tier III-rated, SAS SSAE16 and HIPAA-certified data center
NY-1 1.866.WEBAIR.1 WWW.NY1.WEBAIR.COM NY-1 LONG ISLAND S MOST SECURE, FULLY-REDUNDANT DATA CENTER ENTERPRISE COLOCATION, PRIVATE AND HYBRID CLOUD SOLUTIONS, AND MANAGED SERVICES. DATACENTER Enjoy the
ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F
ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F TABLE OF CONTENTS Appendix F - Electrical Engineering Design Criteria F.1 Introduction...F-1 F.2 Codes and Standards...F-1 F.3 Switchyard and Transformers...F-1
Fundamentals of Power
Fundamentals of Power Fundamentals of Power 2008 American Power Conversion Corporation. All rights reserved. All trademarks provided are the property of their respective owners. Learning Objectives At
Simulation of Cable Overloading Problem on a University Distribution System
Advance in Electronic and Electric Engineering. ISSN 2231-1297, Volume 3, Number 6 (2013), pp. 765-770 Research India Publications http://www.ripublication.com/aeee.htm Simulation of Cable Overloading
The following are general terms that we have found being used by tenants, landlords, IT Staff and consultants when discussing facility space.
The following are general terms that we have found being used by tenants, landlords, IT Staff and consultants when discussing facility space. Terminology: Telco: Dmarc: NOC: SAN: GENSET: Switch: Blade
Electrical Distribution System Study
Electrical Distribution System Study Final Study Report Revised December 16, 2011 Primary Electrical Distribution System Study Kennesaw State University REVISED December 16, 2011 INDEX TITLE PAGES Executive
Step Voltage Regulators
Step Voltage Regulators Don Wareham Field Application Engineer Today s Agenda Introduction Voltage Regulator theory Voltage Regulator application considerations Installation and proper bypassing Wrap-up/questions
Energy Systems Integration
Energy Systems Integration Dr. Martha Symko-Davies Director of Partnerships, ESI March 2015 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy,
Electrical Systems Commissioning
Electrical Systems Commissioning Catherine Melander, Questions & Solutions Engineering 21 st National Conference on Building Commissioning AIA Quality Assurance The Building Commissioning Association is
Data Center Commissioning: What you need to know
Data Center Commissioning: What you need to know Course # CXENERGY1511 AIA Provider # 50111116 AABC Commissioning Group CxEnergy Conference Henderson, NV April 30, 2015 Presented by: Judson H. Adams, P.E.,
Vision 2050 An Asset Management Strategy. Jaclyn Cantler Manager, Transmission Planning, PHI
1 Vision 2050 An Asset Management Strategy Jaclyn Cantler Manager, Transmission Planning, PHI 2 Agenda Case for Change About Vision 2050 Status Closing System Design Cybersecurity Interface with distributed/dispersed
Chapter 1. Network Structures
Chapter 1 Network Structures Definition Standard IEC 60038 defines voltage ratings as follows: Low voltage (): for a phase-to-phase voltage of between 100 V and 1,000 V, the standard ratings are: 400 V
Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.
Generation Interconnection System Impact Study Report For PJM Generation Interconnection Request Queue Position X1-114 Sandyston January 2012 Preface The intent of the System Impact Study is to determine
Eaton s E-Series protective relay family
E-Series protective relays Feeder distribution relays Motor relays Transformer relays Generator relays Eaton s E-Series protective relay family Microprocessor-based design Eaton s E-Series relay family
NRG Energy Center Minneapolis
NRG Energy Center Minneapolis Beyond the Strip Chart: Drivers, Goals and Lessons Learned in Customer Metering Modernization Presented by: Tim Johnston, P.E., NRG Energy Center Minneapolis at the IDEA 99
Part 1 System Modeling & Studies for Existing Systems
Part 1 System Modeling & Studies for Existing Systems Operation Technology, Inc. Copyright 2009 Result of rapid release of energy due to an arcing fault between two conductors. Bus voltages > 208V Temperatures
CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT NETWORK SYSTEMS SECTION
CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT NETWORK SYSTEMS SECTION SPECIFICATION EO-2022 REVISION 15 DECEMBER 2009 EFFECTIVE DATE DECEMBER
Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures
Data Realty Colocation Data Center Ignition Park, South Bend, IN Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures Project Overview Data Realty is a data center service provider for middle
Suitable for Emergency, Peak and Prime Power System Applications. Low Voltage Automatic Transfer Switch Systems
Suitable for Emergency, Peak and Prime Power System Applications Low Voltage Automatic Transfer Switch Systems THE POWER AUTHORITY THE POWER AUTHORITY ASCO s experience and commitment to excellence in
For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz)
24 1. NETWORK CONFIGURATIONS definition Standard IEC 38 defines voltage ratings as follows: - Low voltage () For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690
A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES
A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES A Roberts, T Berry, W D Wilson Schneider Electric Ltd, UK SYNOPSIS This paper describes the features of a modern Distribution
PowerCommand Paralleling System Digital MasterControl
PowerCommand Paralleling System Digital MasterControl Description The PowerCommand Digital MasterControl is a systemlevel controller designed to interface directly with Cummins Power Generation PowerCommand
in other campus buildings and at remote campus locations. This outage would include Internet access at the main campus.
DATA CENTER The current Campus Data Center is located within historic Founders Hall which is in a less-than ideal location for a variety of reasons, but is typical of an existing campus IT infrastructure
HIGH-RELIABILITY DESIGNS FOR ECONOMICAL DATA CENTERS
HIH-RLIABILITY DSINS FOR CONOMICAL DATA CNTRS Design Features that Add Reliability to Data Centers while Reducing Costs per kw Michael Mosman, P Vice President, Chief Technology Officer Baltimore, MD Discussion
415V DISTRIBUTION FOR GREEN DATA CENTERS
White Paper: HMRP-WP001-A5 June 5, 2012 415V DISTRIBUTION FOR GREEN DATA CENTERS Prepared by: Anthony (Tony) Hoevenaars, P. Eng President and CEO Mirus International Inc. Copyright 2012 Mirus International
Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.
AIMS is Malaysia and South East Asia s leading carrier neutral data centre operator and managed services provider. We provide international class data storage and ancillary services, augmented by an unrivaled
Contents. Description. Product Selection Guide
.1 Medium Voltage Switchgear Introduction Indoor Type VCP-W Metal-Clad Switchgear Assembly (5/15 kv shown) Product Selection Guide Product Offering Chart Metal-Enclosed Contents Description Notes Additional
Santa Clara, CA 95054
Leading-Edge Datacenter Facility Silicon Valley GENERAL In excess of 41,000 sq. ft. of raised floor 9 MVA of utility power into facility Purpose built Green Datacenter Sutton Roley Lic. 00793235 (408)
DATA CENTERS. VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM
DATA CENTERS VAZATA Headquarters: 6900 Dallas Parkway, Suite 800 Plano, TX 75024 VAZATA.COM DAL I MIDWAY ROAD CARROLLTON TX OVERVIEW 4025 Midway Road is a full service, enterprise-class data center colocation
Guideline for Energy Efficient Electrical systems for building. Presentation by TERI
Guideline for Energy Efficient Electrical systems for building Presentation by TERI Objective of study The study highlights how BBMP can implement energy efficiency measures in building in co-ordination
Chicago 1 (CHI-1) Data Center
215 W. Ohio St. 5th Floor Chicago, IL 60564 Call Us Toll-Free 1 (866) 817-2811 Follow Us @SingleHop Like Us facebook.com/singlehop Chicago 1 (CHI-1) Data Center Enterprise-Class, Downtown Chicago Facility
Energy-efficient data center achieves 2N reliability; MTU Onsite Energy generator sets provide critical backup
Press Release Contact: Gary Mason Tognum America Inc. Phone: +1 248 560 8480 E-mail: [email protected] Agency contact: Robert E. Sheldon, APR Creative Communications Consultants, Inc. Phone: +1 210
AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)
AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ) Site Biography Market Area: Phoenix, Mesa, Tempe, Chandler, Scottsdale, AZ Location: Mesa, AZ 85201 Address: 1301 University Blvd.
TERMS AND CONDITIONS
Virginia Electric and Power Company TERMS AND CONDITIONS XXIV. GENERATOR INTERCONNECTION STANDARD Electric generator interconnection service includes only the ability to interconnect an electric generator
UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation
Basis of Design This section applies to the design relating to low voltage switchboards. Design Criteria UW Class N1 facilities main switchboards shall be rear accessible. The main, tie and feeder breakers
Hyperlinks are Inactive
Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)
ADMS(Advanced Distribution Management System ) in Smart Grid
ADMS(Advanced Distribution Management System ) in Smart Grid 柯 佾 寬 博 士 Yi-Kuan Ke, Ph.D. 2014/03/28 Smart Grid Solution Smart Grid Solution Overview Smart Grid Solutions Smart Network Operation - Distribution
How To Test A Power Switch On A Power Supply
transfer switches Soft load Innovative, reliable, integrated solution Built with years of experience Powered with innovation Delivered with reliability A history of experience, innovation and reliability
How To Build A Data Center For Ragingwire
TURN-KEY AND BUILD-TO-SUIT WHOLESALE DATA CENTER SOLUTIONS RAGINGWIRE CA3 SACRAMENTO, CA NOW LEASING LARGEST DATA CENTER IN CALIFORNIA WITH LOWEST COST POWER RagingWire s new CA3 data center facility brings
Sovereign. The made to measure data centre
Sovereign D ATA C O N N E C T The made to measure data centre Prime Location Within touching distance of everything that s important. 2 Your Customer-Centric Data Centre For the vast majority of organisations