Simulation of Cable Overloading Problem on a University Distribution System
|
|
|
- Bernard Kelley
- 10 years ago
- Views:
Transcription
1 Advance in Electronic and Electric Engineering. ISSN , Volume 3, Number 6 (2013), pp Research India Publications Simulation of Cable Overloading Problem on a University Distribution System (Power System), Electrical & Electronics Engineering Department, Amity University, Noida, Utter Pradesh, INDIA. Abstract This paper presents the cable overloading analysis on the distribution system of the Amity University, Noida campus. The MiPower software was used in modelling the distribution components and simulating the process of load flow analysis. The simulation results were analysed and compared with relevant standards for evaluating the problem of cable overloading in distribution system. Keywords: Distribution system; cable overloading; system modelling and simulation. 1. Introduction The evaluation of the suitability of electric power cables and the overload protection are very important. In reference to the prospective actual load profile of each circuit, this feeling is very useful for the designer to presuppose how much the power cable size will be allowable and for the maintenance operator to presume during the life of the circuits.the objective of this paper is to formulate the model of University distribution system components and simulate several processes related to cable overloading problems with the help of MiPower software. The power distribution system of the Amity University consists of one 33kv and two 11 kv substations, approximately 8 km of underground power cable with a maximum load level of 4MW with total backup capacity 8200 KVA. The distribution system is supplied by the local utility UPPCL through a 33KV substation, which is located on the University campus.
2 Component Models One of the typical feeders in the distribution system was chosen for this study, which involve Substations 1 and 2.The load pattern of the distribution system mainly includes- air conditioners, fluorescent lighting, PC S, heaters, motors, etc. Some power cable overloading disturbances were reported in the University distribution system over the past few years mainly due to tripping of motors in the central chillers plant. To find the location of cable overloading this simulation is performed. 2.1 Transformer Model The transformer is modelled with series impedance for the windings together with a shunt magnetising branch of the core. For a overloading study, the resistance and leakage inductance of the transformer windings are frequency-dependent, modelling them as constant R and L is generally acceptable for typical overloading studies. Basic transformer parameters (as supplied by a local manufacturer) used to generate input data for transformer models are shown in Table 1. Table 1: Transformer basic parameters. Sr No Trans Rating (kv) Capacity (kva) I o (%) ΔP nl (kw) ΔP sh (kw) Z (%) 1 33/11 3, / , / , / , Underground power cable model A cable equivalent circuit with PI circuit was used to construct the three-phase underground cable models. First, the unit-length series impedance and shunt admittance parameters are computed according to the geometrical and physical arrangement of the cable with the earth return effect is taken into account. Underground line parameters are on the basis of single line diagrams provided by Quality department of campus which are shown in Table 2. Name of A Lengt Cable h of size Cable (in sq (in mm) meter s) 1 3.5x1 Table 2: Underground Cable Line parameters. Current Electrici Name of Lengt Cable Rating ty h of size (in consum Cable (in sq ampere ed (in (in mm) s) KW) meter s AC Chillers x3 00 Current Rating (in ampere s) Electrici ty consum ed (in KW)
3 Simulation of Cable Overloading Problem on a University Distribution System767 B C AC C Power G D AC D + Cante en D Power E1 E2 F1 F x x x x x x x x x x x F x Hostel x I x Feeder x1 Pillars Chillers x Agricultu ral Farm x Sports x Swimmin x1 g Pool STP ( x1 2 ) RO Water x9 System Hostel x Generalised linear load model Linear loads are represented by parallel R and L elements. The value of R and L can be computed by the active power P and reactive power Q of the load according to the following formula and monthly consumption block wise shown in Table 2. R=V 2 /P; L=V 2 /(2πf 0 Q) 2.4 System source and capacitor bank model The 33kV system source is modelled as a standard voltage source with the equivalent system impedance, which is converted from the three-phase short circuit strength at the 33kV bus. The capacitor bank is represented by a standard EMTP capacitor component with the three phase kvar rating converted to mf value.
4 Simulation Results Based on the collected data model which is shown below was drawn using the software we had conducted a general load flow analysis on the system to check the voltage drops, current flows through the line/cable feeders and have found that some of the cable were carrying the more Amps based on the existing capacity. This showed that the cables were not having sufficient amount of power to carry for the load. An improvement in the system was suggested to overcome the problem. The issues on the cables such as overloading had to be cleared by proposing a change in such a way that once their is a load increase it should be able to carry sufficient amount of power so that the insulation remains intact and also for future growth of loads.the simulation results show that at substation 1 bus no 6 and at substation 2 bus 28, bus 33 and bus 35 are facing cable overloading problem. 4. Lt Power Cable Sizing Criteria Comparing the simulation result of cable overloading with IEC standard, the cable sizing reqirements were not meeting and line loading limit was found to exceed the IEC requirements at bus 6, 28, 33 and bus 35. One commonly used method for limiting
5 Simulation of Cable Overloading Problem on a University Distribution System769 the cable overloading is to use LT power cable sizing criteria. Some calculations are performed for the buses facing overloading problem as per method of cable sizing given below and improvements were suggested to quality department. Step - 1 : Inputs ( Load Data ) Connected Load Power = 90 KW System Voltage = 415 Volts Length of the load from panel = 250 Mtrs. Step - 2 : Caculation for Full load current (IFL) Full Load current ( Amps ) =. Step - 3 : Inputs from Cable catalogue Current carrying capacity of the cable = 257Amps Resistance of the cable = Ω / km Reactance of the cable = Ω / km = Amps Step - 4 : Calculation of Derated Current of the cable De-rated current of the cable = Current carrying capacity of the cable x de-rating factor De-rated current of the cable = Amps Step - 5 : Calculation of Number of cable runs required Number of runs = = Actual Number of cable runs required = 2 Step - 6 : Calculation of %Voltage drop % Voltage drop at Starting = =. % Voltage drop at Running = 100 = Result: Number of cables runs required is 2 or 3. The suggestions for increasing number of cable runs at bus 2, 28, 33 and bus 35 were given to the existing maintenance engineers who will later on test it according to the loadings. 5. Conclusion The failure of underground cables due to heating caused by long term overload conditions is easily prevented by proper cable sizing. This is based on information
6 770 provided by cable manufacturers, circuit configuration, and operating conditions. When combined with a SCADA system, can be used to track the amount of time the cable is exposed to overload, allowing for estimates of the remaining life of the cable. Load shedding, operation, rated capacity operation of transformer is must needed for efficient operation of lines. In this paper, the capacity of overloaded cable is increased by using double circuit line. Double circuits can carry more power. Also, double circuits introduce a level of redundancy, so that if a single circuit (half of the double circuit) fails, the other half is still intact. References [1] Technical Document on Power System Studies, MiPowe Software, PRDC Bangalore [2] Present worth analysis by MiPower Software, PRDC Bangalore [3] Electrical Safety Hazards of Overloading Cable from [4] A Primer on Cable Damage and Related Failure of Cables from [5] XLPE Land Cable Systems User s Guide from
GPS Interfacing of Banediya Feeder (M.P) Using MI Power Software
GPS Interfacing of Banediya Feeder (M.P) Using MI Power Software Swati Paliwal 1, V.K Tayal 2, H.P Singh 3 Assistant professor, Department of Electrical & Electronics Engineering, Northern India Engineering
Simple Methods for Calculating Short Circuit Current Without a Computer By Dennis McKeown, PE GE Senior System Application Engineer
Simple Methods for Calculating Short Circuit Current Without a Computer By Dennis McKeown, PE GE Senior System Application Engineer A Short Circuit analysis is used to determine the magnitude of short
Understanding Power Factor and How it Affects Your Electric Bill. Presented by Scott Peele PE
Understanding Power Factor and How it Affects Your Electric Bill Presented by Scott Peele PE Understanding Power Factor Definitions kva, kvar, kw, Apparent Power vs. True Power Calculations Measurements
Module Title: Electrotechnology for Mech L7
CORK INSTITUTE OF TECHNOLOGY INSTITIÚID TEICNEOLAÍOCHTA CHORCAÍ Autumn Examinations 2012 Module Title: Electrotechnology for Mech L7 Module Code: ELEC7007 School: School of Mechanical, Electrical and Process
Conservation Voltage Reduction (CVR)
Conservation Voltage Reduction (CVR) Nicholas Abi-Samra Senior Vice President October 15, 2013 DNV GL Energy Table of Contents What does CVR do? Why Does CVR Work? DNV GL s CVR Project Experience Needs
Three phase circuits
Three phase circuits THREE PHASE CIRCUITS THREE-PHASE ADVANTAGES 1. The horsepower rating of three-phase motors and the kva rating of three-phase transformers are 150% greater than single-phase motors
GENERATOR SELECTION. a. Three phase - 120/208V, 3 phase, 4W wye; 277/408, 3 phase, 4W wye; * 120/240V 3 phase, 4W Delta
GENERATOR SELECTION Generators must be sized to handle their load based on the continuous KW, kilowatt load, and KVA, kilovoltamp load, and the worst case starting load KW + KVA. They must be derated for
For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz)
24 1. NETWORK CONFIGURATIONS definition Standard IEC 38 defines voltage ratings as follows: - Low voltage () For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690
ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1
ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1 Design and Planning Specification for New Low Voltage Installations for Housing Developments 1. SCOPE This appendix to ENA
Radial Distribution Test Feeders
Radial Distribution Test Feeders Distribution System Analysis Subcommittee Report Abstract: Many computer programs are available for the analysis of radial distribution feeders. In 1992 a paper was published
The following table shows approximate percentage wise the
SHORT-CIRCUIT CALCULATION INTRODUCTION Designing an electrical system is easy and simple, if only the normal operation of the network is taken into consideration. However, abnormal conditions which are
11. Assessment of service 12. S-phase supply 13. Water heaters NORTHERN TERRITORY OF AUSTRALIA ELECTRICITY BY-LAWS T ABLE OF PROVISIONS
NORTHERN TERRITORY OF AUSTRALIA ELECTRICITY BY-LAWS T ABLE OF PROVISIONS By-law PART I - PRELIMINARY 1. Citation 2. Repeal 3. Interpretation 4. Qualifications of inspector PART II - INSPECTORS PART III
Guideline for Energy Efficient Electrical systems for building. Presentation by TERI
Guideline for Energy Efficient Electrical systems for building Presentation by TERI Objective of study The study highlights how BBMP can implement energy efficiency measures in building in co-ordination
ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H.
POWER SUPPLY SYSTEMS AND ELECTRICAL EQUIPMENT FOR DESALINATION PLANTS Y.M. Hamud and A.H. Anwar Abu Dhabi Water and Electricity Authority, Abu Dhabi, UAE Keywords : Electrical System, Network for Desalination,
Product brochure Multi Functional Switchgear PASS M00 72.5 kv Flexible and compact switchgear solutions for windfarms
Product brochure Multi Functional Switchgear PASS M00 72.5 kv Flexible and compact switchgear solutions for windfarms The future of Wind Farms As offshore wind farms move towards deploying higher capacity
7. Reactive energy compensation
593 7. Reactive energy compensation 594 7. REACTIVE ENERGY COMPENSATION Reactive energy compensation is an important element for reducing the electricity bill and improving the quality of the electrical
CHAPTER 2 EXAMPLES AND TABLES
CHAPTER 2 EXAMPLES AND TABLES COMMENTARY AT 210.20(A) EXCEPTION An overcurrent device that supplies continuous and noncontinuous loads must have a rating that is not less than the sum of 100 percent of
Engineering Recommendation G81 - Part 1: Design and Planning
PRODUCED BY THE ENGINEERING DIRECTORATE OF THE ENERGY NETWORKS ASSOCIATION Engineering Recommendation G81 - Part 1: Design and Planning Issue 2 Ammendment 1 January 2008 Framework for design and planning,
Power Quality Standards for Electric Service
Power Quality Standards for Electric Service Effective June 1, 2008 A transition period will exist from June 1 through December 31, 2008 in which installations may be approved and connected as long as
Size template. Grid Connection Masterclass Energex John Lansley Senior Network Solutions Engineer
Size template Grid Connection Masterclass Energex John Lansley Senior Network Solutions Engineer The average system size has doubled since 2010 Key Network Issues Reverse power on up to 12 off 11 kv feeders
How To Understand The Electrical Power Supply Of A Power Supply System
17 Circuit diagram symbols E 18 CIRCUIT DIAGRAM SYMBOLS electrical network elements three-phase line or cable single-phase line or cable short circuit earth electrode outgoing feeder supply incoming feeder
AC Power. by Prof. Dr. Osman SEVAİOĞLU Electrical and Electronics Engineering Department
by Prof. Dr. Osman SEVAİOĞLU Electrical and Electronics Engineering Department EE 209 Fundamentals of Electrical and Electronics Engineering, Prof. Dr. O. SEVAİOĞLU, Page 1 Voltage Waveform Consider the
Power factor correction. An introduction to technology and techniques
Power factor correction An introduction to technology and techniques 2 Contents Understanding power factor 03 Power factor correction 05 Implementing power factor correction techniques 06 Glossary 07 Further
Reduction of Power Losses Using Phase Load Balancing Method in Power Networks
Proceedings of the World Congress on Engineering and Computer Science 009 Vol I WCECS 009, October 0-, 009, San Francisco, USA eduction of Power Losses Using Phase Load Balancing Method in Power Networks
Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3
Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3 Basics of Power systems Network topology Transmission and Distribution Load and Resource Balance Economic Dispatch Steady State System
Short Circuit Current Calculations
Introduction Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective devices based on these sections mandate that
Estimating Line-Flow Limits
Estimating Line-Flow Limits University of Wisconsin-Madison May 1, 2013 Specifying reasonable line-flow limits requires two quantities: the surge impedance loading for the line and an estimate of the line
DESCRIPTION DWG DESCRIPTION DWG
DESCRIPTION DWG DESCRIPTION DWG Ferroresonance 3451/1 3451/2 3451/3 Electro-magnetic Fields (EMF) 3462/1 HV & LV Insulators (Links) 3463/1 A ORIGINAL ISSUE B 14.07.09 APPROVED DATE J. Brooks 25.02.03 INDEX
Step Voltage Regulators
Step Voltage Regulators Don Wareham Field Application Engineer Today s Agenda Introduction Voltage Regulator theory Voltage Regulator application considerations Installation and proper bypassing Wrap-up/questions
LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS
LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS Terence Hazel Senior Member IEEE Schneider Electric 38050 Grenoble France Abstract The power requirements for large industrial sites is increasing.
Three-phase AC circuits
Three-phase AC circuits This worksheet and all related files are licensed under the Creative Commons Attribution License, version 1.0. To view a copy of this license, visit http://creativecommons.org/licenses/by/1.0/,
Improvement of Power Factor for Industrial Plant with Automatic Capacitor Bank
Improvement of Power Factor for Industrial Plant with Automatic Capacitor Bank Marlar Thein Oo, Ei Ei Cho Abstract-This paper is intended to uplift the technological standard of industrial plants. The
Electrical Fault Level Calculations Using the MVA Method
J.M. PNG & SH PT LTD Chapter lectrical ault Level Calculations Using the Method 5 With modern day personal computers, hand calculations for electrical fault level are becoming a thing of the past. The
Voltage regulation in distribution systems - Tap changer and Wind Power
CODEN:LUTEDX/(TEIE-5270)/1-59/(2010) Industrial Electrical Engineering and Automation Voltage regulation in distribution systems - Tap changer and Wind Power David Sáez Romero D of Industrial Electrical
6 ELECTRICAL PARAMETERS
6 ELECTRICAL PARAMETERS For power, low voltage and medium voltage cables, cross section nominal areas are calculated in taking into account several parameters as: permissible current carrying capacities
Calculating Total Power Requirements for Data Centers
Calculating Total Power Requirements for Data Centers By Richard Sawyer White Paper #3 Executive Summary Part of data center planning and design is to align the power and cooling requirements of the IT
Introduction. Harmonics and IEEE 519 Page 1 of 19
Introduction In an ideal power system, the voltage supplied to customer equipment, and the resulting load current are perfect sine waves. In practice, however, conditions are never ideal, so these waveforms
Current transformer selection guide
The selection of a current transformer is a simple task. There are four phases in the selection procedure. Current transformer selection guide KEEP IN MIND efine customer requirements based on the primary
Power transformers. Special transformers Railway
Power transformers Special transformers Railway A leader in railway systems Our compact and low-weight transformers fully comply with the customer s specifications. The products are developed together
The Importance of the X/R Ratio in Low-Voltage Short Circuit Studies
The Importance of the X/R Ratio in Low-Voltage Short Circuit Studies DATE: November 17, 1999 REVISION: AUTHOR: John Merrell Introduction In some short circuit studies, the X/R ratio is ignored when comparing
ATTACHMENT F. Electric Utility Contact Information Utility Name. For Office Use Only
ATTACHMENT F CATEGORY 2 GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 20 KW BUT LESS THAN OR EQUAL TO 150 KW Also Serves as Application for Category
Minimizing Impact of Electric Utility Outages with Backup Generation
Minimizing Impact of Electric Utility Outages with Backup Generation Introduction of the Speaker Michael Dempsey, PE Senior Electrical Engineer Carter & Burgess, Inc. Energy & Power Solutions Facility
EEL303: Power Engineering I - Tutorial 4
1. Determine the voltage at the generating station and the efficiency of the following system (Figure 1): Both transformers have ratio of 2kV/11kV. The resistance on LV side of both Figure 1: transformers
Power Factor Correction for Power Systems First Semester Report Spring Semester 2007
Power Factor Correction for Power Systems First Semester Report Spring Semester 2007 by Pamela Ackerman Prepared to partially fulfill the requirements for EE401 Department of Electrical and Computer Engineering
FIXED CHARGE: This is a cost that goes towards making the service available, including
ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer
Static Analysis of Power Systems. Lennart Söder and Mehrdad Ghandhari
Static Analysis of Power Systems Lennart Söder and Mehrdad Ghandhari Electric Power Systems Royal Institute of Technology August 200 ii Contents Introduction 2 Power system design 3 2. The development
Power System Analysis
PDHonline Course E194 (15 PDH) Power System Analysis Instructor: Timothy L. O'Hearn, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org
Motor Protection Voltage Unbalance and Single-Phasing
Motor Protection Voltage Unbalance and Single-Phasing Cooper Bussmann contributes the following information, which is an excerpt from their 190-page handbook SPD Selecting Protective Devices Based on the
Specification guide no. 9 Active harmonic conditioner from 20 to 480 A
Active harmonic conditioner from 20 to 480 A Contents 1 - Installations concerned... 2 1.1 - New installations... 2 1.2 - Existing installations... 2 2 - General... 2 2.1 - Scope... 2 2.2 - Applicable
Inverter technology. bulletin
Inverter technology application bulletin What is the inverter component? The inverter is an electronic power component that continuously varies the electricity supply frequency of an electric motor. The
Phase Balancing of Distribution Systems Using a Heuristic Search Approach
Phase Balancing of Distribution Systems Using a Heuristic Search Approach Lin, Chia-Hung*, Kang, Meei-Song**, Chuang, Hui-Jen**, and Ho, Chin-Ying** *National Kaohsiung University of Applied Sciences **Kao
EMTP STUDIES PERFORMED TO INSERT LONG AC CABLES IN THE FRENCH GRID
Tension (kv) Impedance (Ohms) EMTP STUDIES PERFORMED TO INSERT LONG AC CABLES IN THE FRENCH GRID frequency (Hz) Simon DESCHANVRES Yannick VERNAY RTE, CNER, Substations Department t (ms) EMTP-RV Users Group
Voltage Drop (Single-Phase)
Voltage Drop (Single-Phase) To Find: To Find Voltage Drop Formula: 2 x K x L x I V.D. = ------------------- C.M. Variables: C.M. = Circular Mill Area (Chapter 9, Table 8) To Find Voltage Drop Percentage
Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP
Grid Interconnection & Contract Development Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP Submittal Instructions Prior to submitting your application and
Engineering Recommendation G81 Issue: October 2004
Engineering Recommendation G81 Issue: Part 4 - Framework for design and planning of industrial and commercial underground connected loads up to and including 11kV 2004 Energy Networks Association All rights
Effective: September 10, 2006 Vermont Attachment 1 to Rule 5.500 Public Service Board Page 1 of 6
Public Service Board Page 1 of 6 STANDARD APPLICATION FOR INTERCONNECTION OF GENERATION RESOURCES IN PARALLEL TO THE ELECTRIC SYSTEM OF: (Interconnecting Utility) Preamble and Instructions: An owner of
A Fuzzy Based Solution for Improving Power Quality in Electric Railway Networks
A Fuzzy Based Solution for Improving Power Quality in Electric Railway Networks Mohammad Ali Sandidzadeh School of Railway Engineering, Iran University of Science & Technology, Tehran, Iran Tel: 98-21-7749-1030
Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER.
Power Voltage Transformers for Air Insulated Substations THE PROVEN POWER. Introduction Trench Power Voltage Transformers (Power VTs) combine the attributes of an inductive voltage transformer with the
HARMONIC DISTORTION IN THE ELECTRIC SUPPLY SYSTEM
Technical Note No.3 March 2000 HARMONIC DISTORTION IN THE ELECTRIC SUPPLY SYSTEM This Technical Note discusses harmonic distortion, its causes and adverse effects, what levels are unacceptable and how
MOBILE SYSTEM FOR DIAGNOSIS OF HIGH VOLTAGE CABLES (132KV/220KV) VLF-200 HVCD
MOBILE SYSTEM FOR DIAGNOSIS OF HIGH VOLTAGE CABLES (132KV/220KV) VLF-200 HVCD VERY LOW FREQUENCY (VLF) - PARTIAL DISCHARGES AND TANGENT DELTA HV/EHV POWER CABLES DIAGNOSTIC AND ON-SITE FIELD TESTING WITH
13. Electrical network design methodology and application example
873 13. Electrical network design methodology and application example 874 13. ELECTRICAL NETWORK DESIGN METHODOLOGY AND APPLICATION EXAMPLE The profitability of an industrial installation is directly linked
..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark...
..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark... TIME MARK CORPORATION 11440 EAST PINE STREET TULSA, OK 74116 USA tel 918 438-1220 fax 918 437-7584 www.time-mark.com
Tutorial One: Calculation of leakage inductance of transformer using FEM. 31.5 MVA, 132 kv/33kv, Y/, Ampere-turns: 135024, No.
Tutorial One: Calculation of leakage inductance of transformer using FEM Consider a transformer with the following rating: 31.5 MVA, 132 kv/33kv, Y/, Ampere-turns: 135024, No. of HV turns = 980 Although
Monitoring Underground Power Networks
Monitoring Underground Power Networks By Mark Stiles Merve Cankaya ABSTRACT Underground electric distribution systems are common in large cities throughout the United States. Power usage for the entire
VOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES
VOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES C. Schwaegerl*, M.H.J. Bollen, K. Karoui #, A. Yagmur + *Siemens AG, # Tractebel STRI AB
Standards of Power Quality with reference to the Code of Practice for Energy Efficiency of Electrical Installations
Standards of Power Quality with reference to the Code of Practice for Energy Efficiency of Electrical Installations Ir. Martin WU Kwok-tin, Energy Efficiency Office, Electrical & Mechanical Services Department
BASIC NEC CODE RULES AND DESIGN PRACTICE
BASIC NEC CODE RULES AND DESIGN PRACTICE Wire Ampacity and Size Circuit Breaker Size 1. Maximum loading for any branch circuit is 80% of rating of circuit for ampacity of wire for any load. NEC 220-2,
PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions
PMCS Integrated Energy Management Solution Unlock the Full Potential of Power Networks Through Integration Power Management Control System (PMCS) is a highly customizable, fully integrated end-to-end Energy
SYNCHRONOUS MACHINES
SYNCHRONOUS MACHINES The geometry of a synchronous machine is quite similar to that of the induction machine. The stator core and windings of a three-phase synchronous machine are practically identical
Occupational Profile: Electrical & Electronics Engineering Technician
Occupational Profile: Electrical & Electronics Engineering Technician A competent Electrical & Electronics Engineering Technician should be able to demonstrate the following skills and competences: 1.
Chapter 1. Network Structures
Chapter 1 Network Structures Definition Standard IEC 60038 defines voltage ratings as follows: Low voltage (): for a phase-to-phase voltage of between 100 V and 1,000 V, the standard ratings are: 400 V
Design of Electrical Power Supply System in an Oil and Gas refinery. Master of Science Thesis in Electric Power Engineering
Design of Electrical Power Supply System in an Oil and Gas refinery Master of Science Thesis in Electric Power Engineering Reza Vafamehr Department of Energy and Environment Division of Electric Power
CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE
CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE Ana Diez Castro & Rickard Ellström Ying Jiang Häfner Christer Liljegren Vattenfall Utveckling AB ABB Power Systems Gotlands Energiverk AB
A Guide to Performing An Arc Flash Hazard Assessment Using Power Analysis Software
A Guide to Performing An Arc Flash Hazard Assessment Using Power Analysis Software Abstract: The nature of explosive equipment failures, and the rate of serious burn injuries in the electrical industry
SURVEY OF HARMONIC DISTORTION IN LV AND MV NETWORKS: RESULTS AND CORRECTIVE STRATEGIES
SURVEY OF HARMONIC DISTORTION IN LV AND MV NETWORKS: RESULTS AND CORRECTIVE STRATEGIES E Bompard*, E Carpaneto*, R Napoli*, P Ribaldone**, C Vercellino** * Dipartimento di Ingegneria Elettrica Industriale,
Power factor correction and harmonic filtering. Rectimat 2 Automatic capacitor banks. Catalogue. Building a New Electric World
Catalogue 2002 Automatic capacitor banks Building a New Electric World 0Contents Power factor correction 2 Power factor equipment selection guide 3 General technical data 4 Capacitors and banks 50 z 6
2012 San Francisco Colloquium
2012 San Francisco Colloquium http : //www.cigre.org HVDC and Power Electronic Systems for Overhead Line and Insulated Cable Applications B4-8 Trans Bay Cable A Breakthrough of VSC Multilevel Converters
AUTOMATIC TRANSFER SWITCH. Changeover Type from 250A to 2500A
AUTOMATIC TRANSFER SWITCH Changeover Type from 250A to 2500A Table of Contents Preamble 1.1 Theoretical base 1.2 Selection the size of automatic transfer switch 1.3 Automatic transfer switch components
Guidelines on the Short Circuit Current Rating for Industrial Control Panels
usa.siemens.com/sccr Guidelines on the Short Circuit Current Rating for Industrial Control Panels Technical Paper for Practical Applications White Paper I October 2014 As per NEC Edition 2014, and UL508A
Agilent Technologies. Troubleshooting Three-Phase AC Motors with U1210 Series Handheld Clamp Meters. Application Note
Agilent Technologies Troubleshooting Three-Phase AC Motors with U1210 Series Handheld Clamp Meters Application Note INTRODUCTION In today s world, the three-phase AC induction motors are widely used in
Screened cable and data cable segregation
December 2007 Screened cable and data cable segregation Can an armoured power cable be considered a screened cable and how does this relate to power and data cable segregation? The short answer is yes;
Electron S.R.L. A29 ELECTRICAL POWER SYSTEM TRAINERS. Production Transmission Distribution
lectron S..L. Design Production & Trading of ducational quipment A29 LCTICAL POW SYSTM TAINS Production Transmission Distribution FAX 9065 980 - -mail: [email protected] Web: www.electron.it ev 02 Specifications
Lecture Notes ELE A6
ecture Notes EE A6 Ramadan El-Shatshat Three Phase circuits 9/12/2006 EE A6 Three-phase Circuits 1 Three-phase Circuits 9/12/2006 EE A6 Three-phase Circuits 2 Advantages of Three-phase Circuits Smooth
Application for Small Generator Facility Interconnection Tier 2, Tier 3 or Tier 4 Interconnection
Application for Small Generator Facility Interconnection Tier 2, Tier 3 or Tier 4 Interconnection (See ARSD chapter 20:10:36 for the requirements for a Tier 2, Tier 3, or Tier 4 Interconnection.) Applicant/Interconnection
Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process
Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process Presented by: Marianne Mannschreck Date: Welcome A Look at the Net Energy Metering
How To Get A Power Line Extension
GUIDELINES FOR COMMERCIAL ELECTRIC SERVICE HOOKUP 1 Steps to Commercial Service Pay the Design Deposit Commercial Buildings: Up to 1, sq ft = $1,. 1, 5, sq ft = $2,. Over 5, sq ft = $3,. Commercial jobs
POWER FACTOR CORRECTION
[CATALOGUE PFC-SFC] POWER FACTOR CORRECTION INDUSTRIAL SWITCHGEAR & AUTOMATION SPECIALISTS A component of nhp s green star solution... www.nhp.com.au Power Factor - What does it mean? Where open electricity
Variable Frequency Drives - a Comparison of VSI versus LCI Systems
Variable Frequency Drives - a Comparison of VSI versus LCI Systems Introduction TMEIC is a leader in the innovative design and manufacture of large ac variable f requency drive systems. TMEIC has been
MINISTERIE VAN ECONOMISCHE ZAKEN GENERAL COST COMPARISON BETWEEN UNDERGROUND CABLES AND O.H. LINE SYSTEMS FOR H.V. TRANSMISSION
MINISTERIE VAN ECONOMISCHE ZAKEN GENERAL COST COMPARISON BETWEEN UNDERGROUND CABLES AND O.H. LINE SYSTEMS FOR H.V. TRANSMISSION REPORT ON NETWORK RELIABILITY ASPECTS OF THE CHOICE LINE VERSUS CABLE FOR
Understanding Power Factor, Crest Factor, and Surge Factor. White Paper #17
Understanding Power Factor, Crest Factor, and Surge Factor White Paper #17 Executive Summary This paper explains the technical terms of Power Factor, Crest Factor, and Surge Factor. The use of these terms
Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas
Electric Power Systems An Overview Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Overview Power Generation Conventional power generation Power generation from renewables
TRANSMISSION SERVICE RATE SCHEDULE Effective from 1 April 2015
TRANSMISSION SERVICE RATE SCHEDULE Effective from 1 April 2015 A SERVICE CONNECTION CHARGES Note : All charges in this Schedule are exclusive of GST. 1 Service Connection This includes cables, associated
Energy Management Energy Meter Type EM23 DIN
Energy Management Energy Meter Type EM23 DIN Class 1 (kwh) according to EN62053-21 Class B (kwh) according to EN50470-3 Class 2 (kvarh) according to EN62053-23 Accuracy ±0.5 RDG (current/voltage) Energy
Typical Data Requirements Data Required for Power System Evaluation
Summary 66 Carey Road Queensbury, NY 12804 Ph: (518) 792-4776 Fax: (518) 792-5767 www.nepsi.com [email protected] Harmonic Filter & Power Capacitor Bank Application Studies This document describes NEPSI
Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw
4 937 DESIO Current valve for AC 24 V pulse/pause control of electrical loads up to 30 kw SEA45.1 Use The current valve is used for the control of electric heating elements in heating, ventilation and
ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe
NETWORKS ESB Networks Response to ERGEG Consultation on Voltage Quality Regulation in Europe Date: 22 February 2007 Distribution System Operator ESB Networks Page 1 of 12 Contents 1.0 INTRODUCTION...3
Federal Wage System Job Grading Standards for Electric Power Controlling, 5407. Table of Contents
Federal Wage System Job Grading Standards for Electric Power Controlling, 5407 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 SPECIAL ADDITIONAL RESPONSIBILITIES...
BETA Switching. Switching Devices. 5TT5 8 Insta contactors, AC technology. Overview
BETA Switching Siemens AG 200 5TT5 Insta contactors, AC technology Overview The 5TT5 Insta contactors are equipped with an AC magnetic system and are ideal for use under harsh conditions. The auxiliary
LAB1 INTRODUCTION TO PSS/E EE 461 Power Systems Colorado State University
LAB1 INTRODUCTION TO PSS/E EE 461 Power Systems Colorado State University PURPOSE: The purpose of this lab is to introduce PSS/E. This lab will introduce the following aspects of PSS/E: Introduction to
Power Quality Analysis and Evaluation at Water Pumping Station Supplied by Medium Voltage
Power Quality Analysis and Evaluation at Water Pumping Station Supplied by Medium Voltage Mustafa SEKKELI 1,*, Süleyman EROL 2 1 Sutcu Imam University, Faculty of Engineering, Electrical and Electronics