Vision 2050 An Asset Management Strategy. Jaclyn Cantler Manager, Transmission Planning, PHI
|
|
|
- Jonas Parrish
- 10 years ago
- Views:
Transcription
1 1 Vision 2050 An Asset Management Strategy Jaclyn Cantler Manager, Transmission Planning, PHI
2 2 Agenda Case for Change About Vision 2050 Status Closing
3 System Design Cybersecurity Interface with distributed/dispersed generation (micro and macro) Substation siting issues, etc. High Side Bus configurations Requirements Infrastructure Design Aging transformer replacement Conversion of 4kV to 13kV General aging infrastructure replacement criteria Switchgear & breaker replacement Network protector & transformer Requirements System Design Case for Change Aging infrastructure, emergence of new technologies, change in customer expectations and traditional regulatory compact drive the need to implement a comprehensive asset management strategy for PHI LVAC network renewal Criteria for adding new substations Selective / system Undergrounding replacement PILC replacement Transmission line upgrades 69 kv MCM MPOF cable replacement Reliability Appropriate Business Models Infrastructure Design Appropriate Business Models PHI must select the business models that best address widespread future requirements New Technology Reliability Reliability centered maintenance (RCM) Distribution feeder, subtransmission, transmission hardening Pole and padmounted transformer replacement SCADA control for substations in ACE & DPL Inspection programs New Technology Smart grid and distribution generation requirements EV growth Recloser application Distribution & sub-transmission automation Integrated volt-var control Distributed energy resources CVR Energy storage Innovation in design and dist equipment Requirements Requirements
4 Vision 2050 Initiative Objectives Develop sound strategies that are practically based, can drive execution and the ability to make decisions based on solid research and background. Objective: Determine what PHI s electric system of the future will look like and what PHI needs to do through the development of a long-term asset management roadmap that aligns our regulatory and financial strategies with our asset management strategies to get us there Define and institute a governance process for asset management across PHI Create an asset strategy roadmap for the next 5, 10 and 40 years Develop a going forward process that facilitates meeting asset strategy goals and improves the transparency of PHI s capital and O&M investments Implement a consistent framework/methodology for evaluating asset management based initiatives across PHI Adopt a set of models and tools that can be used to evaluate different initiative options Develop standards and system design for implementation across PHI Reliability Enhancement Plan Pepco, ACE, DPL Power Delivery Vision 2050 Comprehensive Asset Management Strategy Ongoing REP work
5 Vision 2050 Initiative Benefits Incorporation of long-term infrastructure renewal strategies with ongoing REP work Increased alignment of the asset management needs with customer and regulator expectations Identification of critical assets and programmatic approaches that focus on the renewal of transmission, substation and distribution infrastructure Standardization of asset management strategies across all jurisdictions Justification to pursue new technologies supported by thorough benefit to cost analysis Development of recognized thought and execution leadership in the area of system modernization and data analytics Achievement of optimized system performance objectives coupled with an understanding of asset utilization, losses and capacity constraints Understanding of future workforce requirements Enhanced decision making balancing cost, risk and performance Establishment of a clear and defensible path forward that can meet customer and shareholder expectations Reliability Enhancement Plan Pepco, ACE, DPL Power Delivery Vision 2050 Comprehensive Asset Management Strategy Ongoing REP work
6 What s in scope? Project Scope All assets of the transmission and distribution system used in the delivery of electric power Transmission Distribution Substations Distribution and transmission planning guidelines and criteria Assets involved with dispersed generation, EV s and storage Related initiatives Maintenance and operations practices and standards Assumption for development of asset replacement standards is that the current maintenance and operations will remain as defined albeit there is a capability of updating as necessary Any changes that may be identified as part of this work will be referred to the appropriate standards group for review and action
7 Vision 2050 Structure / Project Governance Executive Leadership Sponsor Vision 2050 Steering Committee Lead Vision 2050 Stakeholders Vision 2050 Steering Committee Working Committee Vision 2050 Project Manager Work streams Design Authority Review / Escalate to Steering Committee when needed System Planning/Reliability Transmission Substation Operations Maintenance Construction Distribution Asset Strategies Budget
8 Transmission System Managing asset replacement based on multiple risk criteria was determined to be the most practical approach for the transmission system A novel approach has been developed for identifying, scoring and ranking transmission circuit risk Plan is proactive and transparent Addresses transmission assets as an integrated system through defined risk assessment models The models are dynamic, do not rely on age only, and were designed to use relative comparisons Model output (risk scores) allows for situational awareness An asset replacement program can be derived from the models The results are a decision support tool that can be integrated with PHI capital investment prioritization software
9 Underground Risk Model Underground risk model development began with physical asset data collection. A previous assessment of the UG oil filled transmission system in 2013 provided an excellent starting point for identifying multiple risk criteria and comprehensive risk models. The initial risk criteria included: Age Type Installation Water crossing Trenchless installation DB reservoirs Age of primary pumping plant Loading System impact Circuit availability Response time Availability of resources Accessibility Location Cable type Splices Terminations Accessories Alarms Leaks Repeat problem locations Sub 1 reservoirs Sub 1 terminations Sub 2 reservoirs Sub 2 terminations Duct line
10 Underground Risk Model (cont.) Additional risk factors were added to account for: Hybrid construction Direct buried splices Redundancy SCFF cable systems due to obsolescence Failures Buried Feeder Number Risk Value Hybrid Construction Splices per Mile Redundancy SCFF Failures Score 69xxx xxx xxx xxx xxx xxx
11 Overhead Risk Model The starting point for the OH risk model was the UG model. All UG risk model criteria that could also be applied to the OH model were used in addition to criteria specific to OH facilities Age Type Water crossing Permitting Loading Future plans Customer criticality Circuit criticality Response rate Accessibility Redundancy Underbuild Materials Steel Wood Insulators Conductor OHGW Foundation and footings Grounding Arms Hardware Condition criteria For the condition criteria (in blue) comprehensive inspection reports over the past 5 years were used to complete the condition scores. If no inspection was available, PHI personnel manually entered the scores.
12 Overhead Risk Model Sample Criteria
13 Overhead Risk Model Sample Output The overhead risk model includes a forced pair ranking process to set the weighting factors for each individual risk criteria. The individual risk criteria scores are multiplied by their weighting and summed to obtain the overall risk score. A sample output is shown below. Asset Information Overall Score Circuit Number Circuit No. Line Characteristics Operational Condition Weighted Risk Score Pepco 11xxx Pepco 11xxx Pepco 23xxx Pepco 11xxx Pepco 11xxx Pepco 23xxx Pepco 5xxx
14 Substations and Equipment Initial efforts used available data, industry knowledge, equipment condition assessment (ECA), age, and the Asset Health Index to understand the potential replacement and required capital spend Substation assets were broken down by high level equipment including: Batteries, breakers, switchgear, and transformers General findings Approach and methodology vary for each equipment type Identified potential data gaps Application of the novel risk model approach can be applied to substation assets to rank by risk and inform the capital budget Factors such as equipment obsolescence, spare equipment programs, existing condition and assessment, and maintenance programs are several of the key criteria to be factored into assessing substation equipment risk
15 Batteries Initial Risk Factors and Data Lifecycle is dependent on operating atmosphere Replacement programs primarily use age as trigger Free standing T & D breakers Lifecycle is dependent on age, insulating medium, stored energy system, BIL, clearing capabilities, events, limited supplier support of assets, etc. Oil circuit breaker replacement project underway Switchgear Lifecycle dependent on condition of the breakers including: number of operations and severity, moisture, building conditions, spare parts, deterioration of cubicles, etc. Two recent studies were completed on all PHI switchgear
16 Substation transformers Initial Risk Factors and Data (Cont.) Lifecycle is dependent on many factors including load, temperature, design, moisture, quality of the build, etc. Transformer asset health index has been completed for nearly all existing fleet failures occurred predominantly in units years old Failures of late focus on the >50 year old units.
17 Asset Health Index Weighting Weighting Summary Higher score value = worse condition Factor Total Weight Score Range 1. LTC 10% Age 10% 1-10 Reasoning Issues with the LTC can cause the entire transformer to fail. Calculated based on in-service date. Data Source SAP, Field reports SAP 1. Bushings 10% 1-10 Bushing tests reveal equipment trending towards failure. Doble DTA Web, SAP 1. Main Tank Leaks 10% LTC Leaks 5% Manufacture r 5% Doble Tests 15% Dissolved Gas Analysis 1. Oil Quality and Estimated Paper Life 15% % 1-10 Leaking tanks should be repaired as soon as possible, preferably without an outage. Leaking tanks should be repaired as soon as possible, preferably without an outage. Flawed designs can be prone to failure. Trending the power factor can identify units that may fail. Testing the oil provides vital knowledge regarding the state of the transformer windings and insulation. Measuring characteristics of the oil in the transformer provides insight and can also be used to estimate paper life. Field reports Field reports SAP, Industry Knowledge Doble DTA Web PHI Chemistry Lab (TOA), SAP, TM View PHI Chemistry Lab (TOA) 1. Surface Rust 5% 1-10 Surface rust can be treated and sealed if caught early before it causes larger problems. Field reports 1. History 5% System Criticality 5% 1-10 If a certain vintage model is known to fail, then our similar unit has a higher chance of failure. N-1 and N-2 contingency analysis will determine how critical a transformer is. elogger, SAP System Planning 1. Loading 0% - Track this in the database to ensure that if a transformer is overloaded, planning knows to analyze it for a potential upgrade. PI 1. Through faults 0% - Track this in the database for informational purposes.
18 Documentation Final Work Product Table of Contents 1. INTRODUCTION EXECUTIVE SUMMARY SUMMARY OF THE PLANS SUBSTATION DC SYSTEMS BATTERIES AND CHARGERS PRESENT POPULATION REPLACEMENT PLANS COST AND REPLACEMENT PLANS Cost BREAKERS - OVERVIEW DEMOGRAPHICS OF THE EXISTING EQUIPMENT ALTERNATIVES/OPTIONS PRESENT POPULATION V. AGE OF THE ASSETS REPLACEMENT BREAKER COSTS ESTIMATED REPLACEMENT COSTS SWITCHGEAR PRESENT POPULATION EQUIPMENT EVALUATION - SWITCHGEAR Equipment Assessments PHI SWITCHGEAR REPLACEMENT PLANS ACE DPL PEPCO TRANSFORMERS PRESENT POPULATION DEVELOPMENT OF A RISK BASED STRATEGY PHI transformer failures 1963 to Predicting Future Failure Probability Prioritizing the Replacements REPLACEMENT STRATEGY Spare Transformer Strategy LONG TERM STRATEGY AND PLAN UPDATES Table of Contents 1. EXECUTIVE SUMMARY PROBLEM DESCRIPTION INDUSTRY BACKGROUND DATA REQUIREMENTS UNDERGROUND RISK MODEL OVERHEAD RISK MODEL APPROACH AND METHODOLOGY UNDERGROUND RISK MODEL OVERHEAD RISK MODEL BENEFITS MODEL IMPLEMENTATION AND USE APPENDIX A UNDERGROUND TRANSMISSION LINE ASSET DATA APPENDIX B SCORING RESULTS FROM POWER ENGINEER RISK ASSESSMENT APPENDIX C UNDERGROUND TRANSMISSION LINE PRIORITIZED CIRCUIT LIST APPENDIX D OVERHEAD TRANSMISSION LINE PRIORITIZED CIRCUIT LIST The output of this process is a comprehensive framework and documented, proactive, risk-based replacement standards
19 Summary Vision 2050 is an overall asset management strategy that incorporates: Programmatic, documented replacement of assets Management of risk Incorporation of industry as well as historical operating and maintenance asset data Balancing of capital funds to meet regulatory requirements Uses dynamic models to easily facilitate changes in a non-static environment
Assessing, Maintaining & Replacing Fluid Filled Cable Systems at PEPCO
April 2, 2014 Assessing, Maintaining & Replacing Fluid Filled Cable Systems at PEPCO Todd Goyette, P.E., POWER Engineers Mousa Hejazi, P.E., Pepco Holdings Inc. 1 Pepco Quick Facts First incorporated in
RCP2 Portfolio Overview Document
RCP2 Portfolio Overview Document Portfolio: Expenditure Class: Base Capex Expenditure Category: Grid Replacement & Refurbishment As at date: 15 November 2013 Expenditure Forecast Real 2012/13 NZ$ (m) 2015-2016
Achieving Operational Efficiencies through On-Line Substation Monitoring. Vince Polsoni Powerstream Inc. Manager Station Sustainment EDIST 2016
Achieving Operational Efficiencies through On-Line Substation Monitoring Vince Polsoni Powerstream Inc. Manager Station Sustainment EDIST 2016 1 Agenda Maintenance Monitoring Equipment CMMS Data Historian
Western Power transmission and distribution annual asset management report. prepared by Asset Management Division
2006 Western Power transmission and distribution annual asset management report prepared by Asset Management Division Disclaimer The Asset Management Division of Western Power has published this document
COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited
PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date
ICM Project Station Infrastructure and Equipment
EB 0 00 Schedule B. ( pages) ICM Project Station Infrastructure and Equipment (THESL) EB 0 00 Schedule B. I EXECUTIVE SUMMARY 0. Project Description Many Municipal Substations (MS) located outside of downtown
Monitoring Underground Power Networks
Monitoring Underground Power Networks By Mark Stiles Merve Cankaya ABSTRACT Underground electric distribution systems are common in large cities throughout the United States. Power usage for the entire
Electric Field Operations Organization
NSTAR Electric Transmission Function Job Summaries Electric Field Operations Organization Vice President, Electric Field Operations (Transmission) This position has primary responsibility for the planning,
Certificate of Registration
Certificate of Registration This is to certify that Clancy Docwra Limited Supplier Number: 061973 are now fully registered as a supplier on UVDB for the following products/services 1.4.25 Communication
NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited
NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited TABLE OF CONTENTS 1.0 Purpose and Scope...2 1.1 Methodology Purpose...2
SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD
SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC. HUGHESVILLE, MD HOLLAND CLIFF HEWITT ROAD 230 KV TRANSMISSION LINE PROJECT ELECTRIC ALTERNATIVE EVALUATION STUDY BLACK & VEATCH CORPORATION B&V Project 146026(G)
Energy Transmission and Distribution Services
Energy Transmission and Distribution Services Business segment presentation Asset Services Energy is an essential part of our daily lives Industry Education Mobility Workplace Entertainment Homes Healthcare
ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F
ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F TABLE OF CONTENTS Appendix F - Electrical Engineering Design Criteria F.1 Introduction...F-1 F.2 Codes and Standards...F-1 F.3 Switchyard and Transformers...F-1
Toronto Hydro-Electric System Limited ( THESL ) 2011-2020 Electrical Distribution Capital Plan
Toronto Hydro-Electric System Limited EB-2010-0142 Exhibit D1 Tab 8 Schedule 10 ORIGINAL (33 pages) Toronto Hydro-Electric System Limited ( THESL ) 2011-2020 Electrical Distribution Capital Plan June 2010
Product overview brochure. ABB Medium Voltage Products Our one-stop approach for every medium voltage application
Product overview brochure ABB Medium Voltage Products Our one-stop approach for every medium voltage application Overview ABB meets every need for reliable, safe and energy-efficient medium voltage switchgear,
REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING
REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING Revised October, 2013 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 REQUIRED DRAWINGS... 3 2.1 Site Plan... 3
Lifecycle Strategy DISPOSAL AND DIVESTMENT
Lifecycle Strategy DISPOSAL AND DIVESTMENT Document 07/10/2013 Page 1 of 19 C O P Y R I G H T 2013 T R A N S P O W E R N E W Z E A L A N D L I M I T E D. A L L R I G H T S R E S E R V E D This document
2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology
2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology Version Number 1 26 June 2015 Tasmanian Networks Pty Ltd (ACN 167 357 299) Table of contents 1 Introduction... 1 2 Meeting our
PA PUC AERS & Metropolitan Edison Company Site Visit
PA PUC AERS & Metropolitan Edison Company Site Visit October 26, 2010 Scott Lowry Director-Operation Services, Met-Ed Andrew Zulkosky Manager-Engineering, Met-Ed Curt Christenson Manager-York Customer
Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman. [email protected]. [email protected]
Agenda do Mini-Curso Sérgio Yoshio Fujii [email protected] Ethan Boardman [email protected] Agenda do Mini-Curso Sistemas de Distribuição (DMS) Characteristics of Distribution Network
Litigation Services & Information
Litigation Services & Information Laurence "Lo" Lehman, P.E. Lehman Engineering Company Lehman Engineering has been providing engineering, design, and consulting services for electrical power systems to
ADMS(Advanced Distribution Management System ) in Smart Grid
ADMS(Advanced Distribution Management System ) in Smart Grid 柯 佾 寬 博 士 Yi-Kuan Ke, Ph.D. 2014/03/28 Smart Grid Solution Smart Grid Solution Overview Smart Grid Solutions Smart Network Operation - Distribution
Transformer Fleet Management with e-terraassetcare
Transformer Fleet Management with e-terraassetcare Jean-Michel AGNIER [email protected] Alstom-Grid - http://www.alstom.com/ Asset Management Development Director Alstom Group Thermal Power
Project Justification for an Enterprise Online Monitoring Program
Project Justification for an Enterprise Online Monitoring Program Amir Memic, P.E. Lower Colorado River Authority COMET 2015 Austin, TX November 12, 2015 1 Presentation Agenda 1. About LCRA 2. Building
ComEd Grid Renewal Terence R. Donnelly
ComEd Grid Renewal Terence R. Donnelly Executive Vice President and Chief Operating Officer September 23, 2013 COMED S GRID MODERNIZATION VISION ComEd will fulfill the promise of grid modernization for
Investor day. November 17, 2010. Energy business Michel Crochon Executive Vice President
Investor day November 17, 2010 Energy business Michel Crochon Executive Vice President We built a global leadership in medium voltage and grid automation with Areva Distribution MV switchgears & systems
Power products and systems. Intelligent solutions for power distribution Zone concept
Power products and systems Intelligent solutions for power distribution Zone concept Securing continuous power supply ABB is one of the world's leading power and automation technology companies whose products,
CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services
CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services SpecialistS IN ELECTRICAL SUPPORT SERVICES TO MINING, UTILITIES & industry Ampcontrol is committed to supporting our customers to maintain efficient
SP Energy Networks 2015 2023 Business Plan
Environmental Discretionary Reward Scheme 1 SP Energy Networks 2015 2023 Business Plan Executive summary SP Distribution Ltd SP Manweb plc July 2013 RIIO ED1 Business Plan 2015 to 2023 2 A Message from
The Future of Grid Control: Smart Grid and Beyond John D. McDonald, P.E. Director Technical Strategy & Policy Development
GE Digital Energy The Future of Grid Control: Smart Grid and Beyond John D. McDonald, P.E. Director Technical Strategy & Policy Development IEEE Fellow IEEE PES President (2006-2007) IEEE Division VII
2014 ELECTRIC SYSTEM RELIABILITY REPORT CITY OF ANAHEIM PUBLIC UTILITIES DEPARTMENT
2014 ELECTRIC SYSTEM RELIABILITY REPORT CITY OF ANAHEIM PUBLIC UTILITIES DEPARTMENT Contents Overview... 3 1.0 Electric System Reliability... 4 1.1 Annual Reliability Data with Utility Comparisons... 4
Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components
Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components Course No: E02-010 Credit: 2 PDH Boris Shvartsberg, Ph.D., P.E., P.M.P. Continuing Education
Smart Grid Overview How the smart grid will give customers the tools to create the new future for electricity use.
Smart Grid Overview How the smart grid will give customers the tools to create the new future for electricity use. Presentation to California Municipal Utilities Association Paul Lau Assistant General
When power interruptions happen.
When power interruptions happen. We know it s never a good time to have your power go out, so we work all year pruning trees and investing in our system to cut down on problems before they start. Outage
Distribution Systems - Program 180
Program Program Overview The traditional distribution system philosophy has been to maintain acceptable electrical conditions at the lowest possible cost for all customers. Today, system operators also
Asset Management Strategy
Asset Management Strategy ElectraNet Corporate Headquarters 52-55 East Terrace, Adelaide, South Australia 5000 PO Box, 7096, Hutt Street Post Office, Adelaide, South Australia 5000 Tel: (08) 8404 7966
DISTRIBUTION OPERATIONS AND MAINTENANCE
EB-00-00 Filed: 00 Aug Page of DISTRIBUTION OPERATIONS AND MAINTENANCE PREVENTIVE MAINTENANCE Preventive Maintenance is intended to maintain or improve customer service reliability, extend equipment life
Substation Automation and Smart Grid
GE Energy Substation Automation and Smart Grid John D. McDonald, P.E. GM, T&D Marketing IEEE PES Past President IEEE Division VII Director IEEE Fellow The Smart Grid POWERING POTENTIA L Current Situation
For Utility Operations
For Utility Operations Provided For: SCAMPS 2014 Annual Meeting Presented By: Michael E. Jenkins, PE What Are We Talking About? Simply, Preparing A Clear Picture Of Where And How The Utility Is Headed
FIXED CHARGE: This is a cost that goes towards making the service available, including
ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer
Minimizing Impact of Electric Utility Outages with Backup Generation
Minimizing Impact of Electric Utility Outages with Backup Generation Introduction of the Speaker Michael Dempsey, PE Senior Electrical Engineer Carter & Burgess, Inc. Energy & Power Solutions Facility
White Paper. www.geodecisions.com
White Paper www.geodecisions.com A Geo Spatial Total Asset Management System (TAMS) To Improve Asset Management Decision Making Fall 2013 Abstract This paper describes a Geospatial Total Asset Management
Intelligent maintenance decisions with ABB TrafoAssetManagement TM proactive services
Intelligent maintenance decisions with ABB TrafoAssetManagement TM proactive services Paul Ammann, Pierre Lorin, Anders Grano ABB Power Products - Transformer Service ABSTRACT Transformers are indispensable
OPERATIONS CAPITAL. The Operations Capital program for the test years is divided into two categories:
Filed: September 0, 00 EB-00-0 Tab Schedule Page of OPERATIONS CAPITAL.0 INTRODUCTION Operations Capital funds enhancements and replacements to the facilities required to operate the Hydro One Transmission
A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES
A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES A Roberts, T Berry, W D Wilson Schneider Electric Ltd, UK SYNOPSIS This paper describes the features of a modern Distribution
ARRA Grant Case Studies SMUD s Smart Grid Program
. ARRA Grant Case Studies SMUD s Smart Grid Program Jim Parks December 2012 Powering forward. Together. About SMUD 600,000 customers 1.4 million population $1.4 billion in revenues 900 mi 2, 2331 km 2
Underground vs. Overhead Transmission and Distribution
electric power engineering Underground vs. Overhead Transmission and Distribution Your Power System Specialists June 9, 2009 1 NATIONAL TRENDS Municipalities have passed laws requiring new distribution
Governor s Two-Storm Panel: Distribution Infrastructure Hardening Options and Recommendations
Governor s Two-Storm Panel: Distribution Infrastructure Hardening Options and Recommendations Dana Louth, CL&P VP - Infrastructure Hardening December 14, 2011 0 Topics for today s presentation Review of
Hyperlinks are Inactive
Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)
EDB Information Disclosure Requirements Information Templates for Schedules 11a 13
EDB Information Disclosure Requirements Information Templates for Schedules 11a 13 Disclosure Date 31 March 2015 Start Date (first day) 1 April 2015 Templates for Schedules 11a 13 (Asset Management Plan)
Advanced Distribution Grid Management for Smart Cities
Smart Grid Solutions Advanced Distribution Grid Management for Smart Cities Kevin Corcoran, Director Product Line Management IEEE SmartGridComm 2015 Miami, FL Bridging Smart Cities & Smart Grids Common
NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission PLC, Scottish Hydro Electric Transmission Limited
NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission PLC, Scottish Hydro Electric Transmission Limited TABLE OF CONTENTS 1.0 Purpose and Scope...2 1.1 Methodology Purpose...2 2.0
Lessons from the Real World Webinar Series
Lessons from the Real World Webinar Series End-to-End Asset Health September 11, 2013 End-to-End Asset Health 1. The challenge and the opportunity 2. The end-to-end process 3. Asset health center concept
Extend the Life of Existing Switchgear
Extend the Life of Existing Switchgear January 2011/1910DB1002 by Hal Theobald, Product Manager Schneider Electric USA, Inc. Make the most of your energy SM Summary Introduction... p 3 Maintenance Requirements...
Pennsylvania Summer Reliability
A. Reliability Enhancement Programs In 2015, Pennsylvania Power Company s ( Penn Power or Company ) reliability plan incorporates projects and programs to enhance overall reliability. The plan is structured
Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches
Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches Downtime Is Not An Option The industrial uninterruptible power supply (UPS) is the foundation of your
Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process
Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process Presented by: Marianne Mannschreck Date: Welcome A Look at the Net Energy Metering
Washington DC Power Sector Overview
Washington DC Power Sector Overview Kenneth (Ken) Glick Public Service Commission Of the District of Columbia December 8, 2014 DC Power Market Area - Summary Single electric utility that has divested itself
Power Plant Electrical Distribution Systems
PDH Course E184 Power Plant Electrical Distribution Systems Gary W Castleberry, PE 2008 PDH Center 2410 Dakota Lakes Drive Herndon, VA 20171-2995 Phone: 703-478-6833 Fax: 703-481-9535 www.pdhcenter.com
Data Analytics for Future Energy Systems
Data Analytics for Future Energy Systems Dr Stuart Galloway & Dr Bruce Stephen Advanced Electrical Systems Group Institute for Energy and Environment Department of Electronic and Electrical Engineering
261000 Medium Voltage Electrical Distribution
Sections Included In This Standard: 1.1 General 1.2 Underground Cable 1.3 Medium Voltage Switches 1.4 Transformers 1.5 Electrical Manholes 1.6 Switch Vaults 1.7 Distribution Switchgear/Switchboards This
Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS
Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS EVP, Chief Operations Officer, has primary responsibility for the overall planning, operations and control of the transmission
ASSET MANAGEMENT PLANNING PROCESS
Filed: -0- EB--0 Tab Page of ASSET MANAGEMENT PLANNING PROCESS.0 INTRODUCTION Hydro One s Asset Management Plan is a systematic approach to determine and optimize on-going operating and maintenance expenditures
Asset Management Plans
November 213 Introduction Table of Contents Page # ACS Buildings & Grounds 2 Purpose and Scope ACS Buildings & Seismic 3 The purpose of these ( Plans ) is to demonstrate how we intend to deliver on the
April 2016. ABB in Norway. Power and productivity for a better world ABB. Slide 1
April 2016 ABB in Norway Power and productivity for a better world Slide 1 ABB today A global leader in power and automation technologies What (Offering) Power ~ 40 % of revenue Power & Automation Automation
How the National Grid System Operates. Chris Gorman Lead Account Executive Syracuse
How the National Grid System Operates Chris Gorman Lead Account Executive Syracuse 2 Parts of the Electric System Parts of the Electric System 1. Generating Station: Produces Electricity. 2. Transmission
Primary and Secondary Electrical Distribution Systems
Primary and Secondary Electrical Distribution Systems Critical Facilities Round Table 12th Quarterly Membership Meeting June 2, 2006 David D. Roybal. P.E. Eaton Electrical Cutler-Hammer Products Utility
Improving Distribution Reliability with Smart Fault Indicators and the PI System
Improving Distribution Reliability with Smart Fault Indicators and the PI System Presented by Cameron D. Sherding, Sr. Software Engineer Mark R. Blaszkiewicz, Manager IT DTE Energy is an Integrated Energy
Dead Tank Circuit Breaker 72PM40-C Proven reliability through common platforms
Dead Tank Circuit Breaker 72PM40-C Proven reliability through common platforms ABB innovations for changing demands ABB (www.abb.com) is a leader in power and automation technologies that enables utility
ABB PSPS Erich Steinmann; Generator control-2013
ABB PSPS Erich Steinmann; Generator control-2013 GENERATOR CONTROL THE MODULAR SOLUTION FOR GENERATORS To make sure that power is efficiently converted into electric energy, it is necessary to supervise
Emirates Aluminium starts up World s first fully integrated power distribution system from ABB
Reprint from Aluminium World 2009, Volume 2 Emirates Aluminium starts up World s first fully integrated power distribution system from ABB Emirates Aluminium (EMAL), a joint venture between Abu Dhabi s
Integrated Distribution Management System in Alabama
Integrated Distribution Management System in Alabama Research & Technology Management Joe Schatz Integrated Distribution Management System Develop and demonstrate the principle concepts required for operating
Future of Electric Distribution Dialogue
Future of Electric Distribution Dialogue Webinar Series Session I: State of U.S. Electric Distribution July 11, 2012 2:00 3:30 p.m. EDT Session I: State of U.S. Electric Distribution 2:00 p.m. Opening
National Science Foundation Funds Request
University Corporation for Atmospheric Research National Science Foundation Funds Request 1. (NSF USE ONLY) 2. FACILITY NAME & LOCATION 3. PROJECT NAME 4. UCAR TRACKING NUM. NCAR Mesa Lab 15KV FEEDER REPLACEMENT
ESCOM BY G.KALINDE SUBSTATIONS ENGINEER
ESCOM BY G.KALINDE SUBSTATIONS ENGINEER Balance Shareholder and Customer Interests Balance Short and Long Term Serviceability Understand trade-offs between Value and Risk Apply Asset Management Tools Build
MEDIUM AND HIGH VOLTAGE CAPACITORS, CAPACITOR BANKS AND SYSTEMS
MEDIUM AND HIGH VOLTAGE CAPACITORS, CAPACITOR BANKS AND SYSTEMS Meher Capacitors offers reliable and innovative products and solutions in the fields of Reactive Power Compensation, Power Quality and Energy
SP Energy Networks 2015 2023 Business Plan
SP Energy Networks 2015 2023 Business Plan Updated March 2014 Annex 132kV Cable Strategy SP Energy Networks 27 March 2014 132kV Cable Strategy March 2014 Issue Date Issue No. Document Owner Amendment Details
Monitoring and diagnostics
Monitoring and Diagnostics Monitoring and diagnostics Analyze the past, monitor the present, and predict the future! Asset Services/Monitoring and Diagnostics Switchgear Services Transformer Services Cable
Data Analytics. How Operational Analytics can transform the grid. Sameer Tiku. Product Architect. Bentley Systems
Data Analytics Sameer Tiku Product Architect Bentley Systems How Operational Analytics can transform the grid Data heart of the digital transformation Remote sensing of objects and machines The Environment
Electric Power Distribution
Electric Power Distribution A S Pabla Consulting Engineer and Former Chief Engineer Punjab State Electricity Board McGraw-Hill New York Chicago San Francisco Lisbon London Madrid Mexico City Milan New
Superconducting and Solid-State Electronic Fault Current Limiter Technologies The shift from demonstration projects to Business-as-Usual solutions
Superconducting and Solid-State Electronic Fault Current Limiter Technologies The shift from demonstration projects to Business-as-Usual solutions Dr. Detlev Kirsten & Herbert Piereder Solid State SSFCL
Best Practices for Creating Your Smart Grid Network Model. By John Dirkman, P.E.
Best Practices for Creating Your Smart Grid Network Model By John Dirkman, P.E. Best Practices for Creating Your Smart Grid Network Model By John Dirkman, P.E. Executive summary A real-time model of their
March 2015. ComEd Grid Modernization
March 2015 ComEd Grid Modernization COMED S GRID MODERNIZATION VISION ComEd will fulfill the promise of grid modernization for northern Illinois consumers by: Improving system reliability and deploying
Attachment 20.64 SA Power Networks: Asset Management Plan 3.2.01 Substation Transformers 2014 to 2025
Attachment 20.64 SA Power Networks: Asset Management Plan 3.2.01 Substation Transformers 2014 to 2025 ASSET MANAGEMENT PLAN 3.2.01 SUBSTATION TRANSFORMERS 2014 TO 2025 Published: October 2014 SA Power
SMART ASSET MANAGEMENT MAXIMISE VALUE AND RELIABILITY
SMART ASSET MANAGEMENT MAXIMISE VALUE AND RELIABILITY Electrical equipment is a critical component of your asset portfolio. Beyond its financial value, it plays an even greater role in your business performance.
Relion. Power system protection and automation reference Fast substation busbar protection with IEC 61850 and GOOSE
Relion Power system protection and automation reference Fast substation busbar protection with IEC 61850 and GOOSE Fast substation busbar protection with IEC 61850 and GOOSE Falu Elnät AB applies new power
Cable Consulting International
Cable Consulting International Brian Gregory BSc, CEng, MIEEE, FIEE Technical Director www.cableconsulting.net Alan Williams BSc, CEng, MIEE Senior Consultant 1 FEASIBILITY STUDY for 500 kv AC UNDERGROUND
AMSC s Superconductor Cable Technologies for Electric Utilities
International Workshop 2014 AMSC s Superconductor Cable Technologies for Electric Utilities Michael Ross, P.E. Managing Director of Superconductor Power Systems AMSC Corporate Facts Headquartered in MA,
Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER.
Power Voltage Transformers for Air Insulated Substations THE PROVEN POWER. Introduction Trench Power Voltage Transformers (Power VTs) combine the attributes of an inductive voltage transformer with the
ENA Submission to the Parliamentary Renewable and Sustainable Energy Group Inquiry into the access and management of renewables and the Grid
1 ENA Submission to the Parliamentary Renewable and Sustainable Energy Group Inquiry into the access and management of renewables and the Grid 1.0 Introduction 1.1 Energy Networks Association (ENA) is
Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems
Centre for Sustainable Electricity and Distributed Generation Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems Predrag Djapic and Goran Strbac July 2008 FUNDED BY BERR URN 08/1144
Utilization of Automatic Meter Management in Smart Grid Development
Utilization of Automatic Meter Management in Smart Grid Development Elenia Verkko Oy Ville Sihvola Head of Marketing and Sales [email protected] Content of the presentation 1. What is Elenia Verkko
Smart solutions for fleets of all types & sizes of power generation. Marcus König, E F IE SGS / September 2013
Smart solutions for fleets of all types & sizes of power generation Marcus König, E F IE SGS / September 2013 Instrumentation, Controls & Electrical The Siemens structure: Four Sectors close to the customer
PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions
PMCS Integrated Energy Management Solution Unlock the Full Potential of Power Networks Through Integration Power Management Control System (PMCS) is a highly customizable, fully integrated end-to-end Energy
Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach
Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach READ AND DELETE For best results with this template, use PowerPoint 2003 10 November 2015 Background and Importance of ICA Definition: