ENVIRONMENT MANAGEMENT PLAN



Similar documents
ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN

Environment Management Plan

Environment Management Plan

Environment Management Plan

Environment Management Plan

CHANDAM7AIL,P SAND DEPOSIT

Project Details- Minor Minerals (Other Than Sand)

Environmental Management Plan

Project Details-Minor Minerals (Other Than Sand)

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENT MANAGEMENT PLAN

Project Details- Minor Minerals (Other Than Sand)

ENVIRONMENT MANAGEMENT PLAN

2. PRE-FEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

2. PRE-FEASIBILITY REPORT

ENVIRONMENT MANAGEMENT PLAN

PRE FEASIBILITY REPORT

PROPOSED TERMS OF REFERENCE

ENVIRONMENT MANAGEMENT PLAN

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

ENVIRONMENT MANAGEMENT PLAN

EnVirOnMEnT ManaGEMEnT PLan. FOr. M/S. LiME STOnE MinE OF. Dhirajlal Panchanbhai Vachhani. area. PrOPOSEd PrOdUCTiOn: TPa

PRE- FEASIBILITY STUDY REPORT

Final Environmental Impact Assessment of Smt. Singam Bhavani Laterite Mining ADDITIONAL STUDIES

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

PRE FEASIBILITY REPORT

Proposed Terms of Reference for EIA studies

PRE-FEASIBILITY REPORT

PRE - FEASIBILITY REPORT

ENVIRONMENTAL MANAGEMENT PLAN

Fauna- No particular type of fauna finds except snakes, hynus & Jackals, wild cat, wildhen etc. are found in and around the area.

How To Conduct An Environmental Impact Assessment

S/o Vishnudas Chakraborty, residence at R/o Narsinghgarh, District Rajgarh (M.P.).

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

ENVIRONMENTAL MANAGEMENT PLAN

PRE-FEASIBILITY CUM EMP REPORT FOR SAND EXTRACTION PROJECT (FROM RIVER PURNA PAT) FOR. KESHAVBHAI RATANJIBHAI PATEL 150 MT/day

PRE FEASIBILITY REPORT

PROJECT DETAILS. Smt. Rajeshwari M.Viraktamath of Lokapur, Mudhol Taluk, Bagalkot Dist has a

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT. FOR QUARRYING OF ROUGH STONE (Extent: Ha)-B2 Project

PRE FEASIBILITY REPORT

Form -1 Mining Plan & Pre-feasibility Report

Pre- FEASIBILITY REPORT

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION PROJECT: 300 MT/DAY (FROM RIVER TAPI PAT)

Pre- FEASIBILITY REPORT

Ratdi Limestone (Building) Mine Location Near Village- Ratdi, Taluka & district Porbandar, (Gujarat) Latitude. 9.0m RL.

Pre- FEASIBILITY REPORT

Environmental Management Plan

Pre- FEASIBILITY REPORT

NIMAPALLI STONE QUARRY

Project Details-Minor Minerals ( Rajula Building Stone)

PRE- FEASIBILITY REPORT

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd & & Ammendments

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT

ENVIRONMENTAL MANAGEMENT PLAN

Arya Geo-Tech Services Amit Mishra (Geologist) Regd. No. RQP/DGMMP/66/2013,Valid upto 29/07/2018 Kabara Colony, Nagpur Road Distt.-Chhindwara (M.P.

ENVIROMENT MANAGEMENT PLAN FOR DEVGAON SAND STONE DEPOSIT AREA 2.00 HECTARE TEHSIL RITHI DISTT- KATNI (M.P)

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS / ACTIVITIES. 2 Name of the organization/owner. M/s.N.R.Global Granite

NUAGADA STONE QUARRY Village: Nuagada,Tahasil: Hinjilicut,District: Ganjam, State: Odisha

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

ENVIRONMENTAL MANAGEMENT PLAN

M/s. Karshanbhai Bhagvanbhai Rabari


2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

Form -1 Mining Plan & Pre-feasibility Report

Building Stone Quarry

PRE FEASIBILITY REPORT

RISK ASSESSMENT. STONE QUARRY (2.40 Ha)

PRE FEASIBILITY REPORT

PROPOSED TERMS OF REFERENCE

FORM - 1. Location/ Site alternatives under consideration : Block No. O : Contact Information :

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

PRE-FEASIBILITY REPORT

For Building Stone Quarry

APPENDIX I (See Paragraph -6) FORM I

PRE-FEASIBILITY REPORT

PRE FEASIBILITY REPORT & ENVIRONMENT MANAGEMENT PLAN

APPENDIX I. (See Paragraph-6) FORM 1

APPENDIX I (See Paragraph-6) FORM 1. S. No. Item Details

ENVIRONMENTAL MANAGEMENT PLAN

TOR for Synthetic Organic Chemicals ToR for EIA studies in respect of the synthetic organic chemicals industry may include, but not limited to the

G. M. Nagaraju Environment Management Plan

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

Project Name: Nangal (M.L. No. 134/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

APPLICATION (FORM-1, PRE-FEASIBILITY REPORT)

Pre-feasibility Report

PRE FEASIBILITY REPORT

PRE-FEASIBILITY CUM DETAIL PROJECT REPORT FOR SAND EXTRACTION. PROJECT- 50 MT/Day (FROM RIVER VALMIKI) VILL:VEDCHHI,TAL:VALOD,DIST:TAPI

Village Panchayat Halkarni, Tal- Gadhinglaj, Dist- Kolhapur nos. to be given)

Development proposals will require to demonstrate, according to scale, type and location, that they:-

GPS BASED TRUCK DISPATCH SYSTEM (TDS) IN HIGHLY MECHANIZED BAUXITE MINES A CASE STUDY.

Extent : Ha S.F. No. : 9/4A, 9/4B, 9/5, 10/3, 10/4 and 10/5 Village : Uthupatti Taluk : Kulithalai District : Karur State : Tamilnadu

RISK ASSESSMENT REPORT

Form 1 as per EIA Notification 2006 for Meyyur Rough Stone Quarry of Thiru.N.Suresh Meyyur Village, Tiruvannamalai Taluk and District and Tamilnadu

Project Name: Chinawda (M.L. No. 276/03) Masonary Stone Mine PRE- FEASIBILITY REPORT

Transcription:

ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone APPLICANT Shri Krishna Pratap Singh S/o Shri Pyare Ju, Resi. Village- Ludhani, Teh. Pawai, Dist. Panna Prepared by Rajeev Ranjan Sinha RQP/DGMMP/006/2013 A-1, 302 Shubhlabh Residency Khajrana Square Indore

CONTENTS Sr No PARTICULARS Page No 1 2 3 4 5 6 7 8 9 10 11 INTRODUCTION NAME OF THE LESSEE DETAILS OF THE AREA DETAILS OF THE MACHINES TO BE USED IN MINING OPERATION DETAILS OF MEASUREMENT OF QUARRY PIT EARLIER EXCAVATED IN THE AREA TO BE SANCTIONED AND DETAILS OF MINERAL CONCESSIONS SITUATED WITHIN 100 METERS PERIPHERY OF THIS AREA SCHEME OF THE PLANTATION DETAILS AND APPROXIMATE DISTANCE OF NATIONAL PARK, SANCTUARY, BIODIVERSITY AREA, INTERSTATE BOUNDARY SITUATED WITHIN PERIPHERY OF 10 KM FROM THE AREA TO BE SANCTIONED PROPOSED ANNUAL PRODUCTION OF MINERAL EFFECT ON GROUND WATER LEVEL DUE TO MINING OPERATION AND ITS PREVENTIVE MEASURES: DETAILS OF SCHEME OF CONTINUOUS RECLAMATION AND REHABILITATION OF THE LAND DEGRADATION DUE TO MINING OPERATION: DETAILS OF PREVENTIVE AND CONTROL SCHEME OF AIR AND WATER POLLUTION: PROVISIONS FOR SEPARATE STACKING OF SURFACE SOIL EXCAVATED FROM MINING OPERATION AND IT S UTILITY: 3 4 5-6 - 7 8 8 8-9 10 10 11 11-12 12-13 - 14 12 13 14 DETAILS OF SOCIAL AND ECONOMIC UP GRADATION OF MINING EFFECTED AREA DUE TO PROPOSED PROJECT DETAILS OF BUDGETARY ARRANGEMENT FOR ENVIRONMENTAL MANAGEMENT ANY OTHER DETAILS DESIRED TO BE SUBMITTED BY MINERAL CONCESSION HOLDER 15 15 16 Page 2 of 14

SCHEME FOR ENVIRONMENTAL MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Kothi : Pawai : Panna (M.P.) : 1.370 Hectare : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone INTRODUCTION Nature is very kind on the human to provide all kind of materials on earth. All kinds of minerals are available in their raw form in the earth. Mining operations disturb the terrestrial configuration and natural beauty of the area. The magnitude of disturbance depends upon how the minerals are extracted from the mining area and the environmental impact depends upon the location and size of deposits and the methods adopted for its exploration. By adopting good mining practices it is moving towards harmonious development where both the operational and environmental aspects are accorded due weightage. Every quarry lease holder shall take all possible precautions for the protection of environment and control of pollution while conducting quarry operation. Under the mining operation the this management plan is required. The mining plan has been approved by Regional Office of Geology & Mining, Jabalpur Madhya Pradesh vide letter no. 1101 on dtd. 23/04/2014. The Collector office (Khanij Shakha) Panna vide letter No. 700/11/M/3/6/06, dated-29/06/2006. Page 3 of 14

NAME & ADDRESS OF LESSEE: SHRI KRISHNA PRATAP SINGH S/o Shri Pyare Ju, Resi. Village- Ludhani, Teh. Pawai, Dist. Panna Madhya Pradesh, SALIENT FEATURES OF THE PROJECT: Particulars Name of the project Land use pattern Mineral Mining Lease area Details Individual Owner Flagstone 1.370 Hect. Khasra No. 31 Land Use Private Land Lease Validity Production Capacity Village Tehsil District Latitude& Longitude 10 Years Flagstone Production: Max 875 Cu.mt/year Kothi Pawai Panna A. 80 1'15.81"E 24 8'52.08"N B. 80 1'15.86"E 24 8'54.39"N C. 80 1'19.52"E 24 8'54.43"N D. 80 1'19.59"E 24 8'53.56"N E. 80 1'18.67"E 24 8'53.41"N F. 80 1'18.52"E 24 8'52.12"N Topo sheet no Estimated project cost 20 Lacs EMP Cost 1.2 lacs Man Power 5 Water demand and supply 2 KLD Nearest habitation/town The nearest village is Kothi which is about 400 m from mine site. Nearest Airport The nearest Airport is Khajuraho which is about 135 KMS from mine site. Nearest Connectivity Village Raod, about 120 km in W direction, from mining Nearest Railway Station The area. nearest Railway Station is Katni which is about 88 KMS from mine site. Power Supply No electricity is required. Page 4 of 14

1. DETAILS OF THE AREA VILLAGE : Kothi TEHSIL : Pawai DISTRICT : Panna (M.P.) AREA : 1.370 Hectare MINERAL : Flagstone KHASRA No : 31 PRODUCTION CAP : Max 875 Cu.mt/year Flagstone Period : 10 Years The details of the lease area to be grant, ownership etc. is as below: District & State Tehsil Village Area in hect. Panna, Madhya Pawai Kothi 1.370 Pradesh Hact Khasra Mineral Lease No. Name Period 31 Flagstone 10 Years Whether area is recorded in forests : No Existance of Public road : No public road passes TOPO SHEET : Area falls in survey of India : Page 5 of 14

Khasra Map: Page 6 of 14

Satellite Imageof the mining area: 3. DETAILS OF MACHINE TO BE USED IN MINING OPERATION: No machinery will be used in the mining and only manual mining will be done. Equipments used will be Hammer, Chisel, Spade, Bucket, Tasla in sufficient quantity. 4. DETAILS OF MEASUREMENT OF QUARRY PIT EARLIER EXCAVATION IN THE AREA TO BE SANCTIONED AND DETAILS OF MINERAL CONCESSIONS SITUATED WITHIN 100 METER PERIPHERY OF THIS AREA No seasonal perennial drainage exists within the lease area. No pit was excavated in the past since this is new lease quarry. The area in surroundings up to 100 meters forms a plain topography with miner undulations of waste land form. Page 7 of 14

5. SCHEME OF TREE PLANTATION: Main objective of green belt is to provide a barrier between the source of pollution and the surrounding areas. Green belt helps to capture the fugitive emission and to attenuate the noise generated apart from improving the aesthetics. While making choice of plant species for cultivation in green belts priority is to be given to create bio climate. The authorities responsible for making green belt must ensure proper selection of plant species and adequate provision of watering and protection of saplings exist at site. Healthy tree species will be recommends for plantation. Each plant must cover 2.5 x 2.5 meter and its 100 % survival should be achieved Suitable Mali will take care of survival conditions. During the plan period about 0.2Ha area will be used for plantation purposes with in 7.5m barrier zone & plantation will be undertaken towards the southwest slope. The lease area is marked by large exposure of barren land. The lease area is rocky terrain so it is only feasible to undertake the plantation with in lease hold area under 7.5 m barrier after spreading top soil over the strip plantation shall also be undertaken over complete benches. 20 no. trees will be planted per year. The tree species recommended are Tactonagrandis (Teak), Azadirachtaindica (Neem),Mangiferaindica (Aam), Acacia Catechu (Khair), Emblicaofficinalis (Amla),MahuncaLatitolia (Mahua), Planting should be done in large sized 90 cm x 90 cm.pits dug in advance and filled with manure about 50 days before planting. The plantation raised earlier should be carefully maintained. Mortalities should be replaced by fresh saplings. Post Plantation Care: Green belt area must be guarded by suitable fencing to avoid damage by cattle grazing. Page 8 of 14

PROPOSED PLANTATION DURING FIRST FIVE YEARS YEAR NO OF TREES AREA COVERED SURVIVAL RATE 1ST 2ND 3RD 4TH 5TH 20 20 20 20 20 PER HECTARE PER HECTARE PER HECTARE PER HECTARE PER HECTARE (ANTICIPATED) 100 % 100 % 100 % 100 % 100 % SPECIES OF PLANTS MANGO, SUBABOOL KARANJ, TEAK, NEEM, KHAIR OR AS SUGGESTED BY FOREST DEPARTMENT 6. DETAILS AND APPROXIMATE DISTANCE OF NATIONAL PARK, SANCTUARY, BIODIVERSITY AREA, INTERSTATE BOUNDARY SITUATED WITHIN PERIPHERY OF 10 KM FROM THE AREA TO BE SANCTIONED Sr No Proposed project is located in whole or in part within 10 km. from the boundary of YES/NO 1 Protected areas notified under the Wild Life (Protection) - Act, 1972 NO 2 National Park NO 3 Critically polluted areas as notified by the Central Pollution Control NO Board from time to time 4 Notified Eco-sensitive areas NO 5 Inter-state boundaries and international boundaries NO 7. PROPOSED ANNUAL PRODUCTION OF MINERAL The yearly production from the quarry is proposed Flagstone is Max 875 Cu.mt/year with Manual opencast mining system. Entire details are given in the mining plan. Page 9 of 14

8. EFFECT ON GROUND WATER LEVEL DUE TO MINING OPERATION AND ITS PREVENTIVE MEASURES: Mining will not be done below the water table. Mining will be done in non- monsoon period. There is no perennial water body in the area. Therefore mining activities will not cause adverse impacts as the mineral is non toxic in nature. Lease area is fairly flat reducing the possibility of soil erosion. Garland drains and check dams shall be constructed with appropriate settling tanks to prevent any run-offs from mine. As the manpower likely to be deployed from nearby village, therefore discharge of domestic waste water is not much and will be easily controlled with the provision of septic tank and soak pit. The stored water will be used for dust suppression and greenbelt development, etc. The pit exposed due to mining will become a source for catchment of rain water and in future it will be helpful to improve the water table of the area. 9. DETAILS OF SCHEME OF CONTINUOUS RECLAMATION AND REHABILITATION OF THE LAND DEGRADATION DUE TO MINING OPERATION: Land degradation is one of the major adverse impacts of open cast mining activities and any effort to control adverse impacts would be incomplete without appropriate land reclamation strategy. It is a mining below five hectares lease area, which is very small in nature therefore no damage of the land is anticipated. The area is likely to be degraded due to quarrying, pitting & roads. The impact on the land form or Physiography will be limited to the modification of the slope. The landscape and land use will undergo a radical change due to open cast mining. The impact during plan period is limited as benches will be formed on the already degraded land. Besides these benches, roads will also modify the Physiography. By the completion of project period plantation will grow up and will form green belt around the Quarry Land area. During the plan period, benches will reach the ultimate pit limit. The total exploited Flagstone shall be transported to crusher plant of making aggregates therefore no waste shall be generated. 14 Page 10 of

Reclamation and rehabilitation will be started at the end of mine life which required sufficient quantity of waste etc. for back filling. Availability of waste at the closing time of mine will be very less to meet requirement; hence the mined out pit will be developed as water reservoir in future. Experience of scientific mining work will be achieved by the applicant and workers which can be utilized for further achievements related to mining. 10. DETAILS OF PREVENTIVE AND CONTROL SCHEME OF AIR AND WATER POLLUTION: Air Pollution Control: The proposed site is located in the remote area having a clean atmosphere. Therefore the quality of ambient air will be as good as heaven. As the mining is of small scale, the potential sources of air pollution arising from mining operations would be Drilling, haul roads, exhaust fumes of internal combustion machines, combusting of fuel oil and transportation of Flagstone. Due to this mining activities air quality will undergo certain significant change. The present level of mining is not anticipated to raise the concentration of the pollutants beyond the prescribed limits. However, the following measures are being adopted in the proposed mining activity to mitigate the PM levels in ambient air. Mitigation Measure: Mining activities will generate certain quantities of dust during excavation of, loading and transportation operations. The following measures will be taken to mitigate the fugitive dust from different operations: To avoid the dust generation from the drilling operations, wet drilling method will be adopted. Proper mitigation measures like water sprinkling will be adopted to control dust emissions. Drill machines will be equipped with dust collectors. Dust mask will be provided to all workers. Provision of dust filters/ mask to workers working at highly dust prone and affected areas. 14 Page 11 of

Provision of green belt all along the periphery of the lease area. Periodical monitoring of ambient air quality in and around the lease area. Lying of haul road as per the standards Regular maintenance of haul road and service road to reduce air borne dust. Watering of haul road and other road at regular intervals. Dense plantation being carried in and around the proposed mines will help in combating air pollution. In case of long transportation the trucks after loading will be covered with tarpaulin sheets. Speed of the vehicles will be maintained within the prescribed limits. Trucks will not be over loaded and will be maintained to the optimum body level. Water Management and Water Pollution Control: Mining activities will not cause adverse impacts as the mineral is non toxic in nature. Lease area is fairly flat reducing the possibility of soil erosion. Garland drains and check dams shall be constructed with appropriate settling tanks to prevent any run-offs from mine. As the manpower is likely to be deployed from nearby village, therefore the discharge of domestic waste water will not be much and will be easily controlled with the provision of septic tank and soak pit. The stored water will be used for reduction of Particular Matter of Ambient Air, and for the development of greenbelt etc. Following control measures will be taken to minimize water Pollution due to mining activity; The stored water will be used for reduction of Particular Matter of Ambient Air, and for the development of greenbelt etc. A drain should be created around the quarry land and connected to the proposed water body. Water Consumption (Avg.) Waste Water Generation Source of water 2.0 KLD Only from domestic section, taken care by Soak pit/ Septic tank arrangement Nearby Village Noise Environment: 14 Page 12 of

Movement of truck/ dumper will create the transitional noise level. However noise generated by these will be of low level and will be within the prescribed desired limit. Following control measures will be taken to minimize negative impact due to mining activity. Machinery and equipments of improved designs Proper maintenance of all machines will be carried out which will reduce noise generation during operations. Use of PPE,s personal protective devices i.e. earmuffs and earplugs by workers, working in high noise areas. Provision of green belt all along the periphery of the lease area. Conducting periodical medical checkup of all workers for any noise related health problems Proper training to personnel to create awareness about adverse noise level effects. Noise barriers, silencers and enclosures shall be incorporated in the equipments, which emit noise levels. Unnecessary use of horns by the drivers of the vehicles shall be avoided. 11. PROVISIONS FOR SEPARATE STACKING OF SURFACE SOIL EXCAVATED FROM MINING OPERATION AND IT S UTILITY: Top soil in the lease area is very scanty. Available soil will be removed and kept stacked for utilizing for plantation in the backfilled area, when the mine reaches the ultimate limits. Grasses will be planted on the soil along the slopes to prevent wash offs during monsoon and prevent landslides. 12. DETAILS OF SOCIAL AND ECONOMIC UP GRADATION OF MINING EFFECTED AREA DUE TO PROPOSED PROJECT: 1.370 Hectares Kothi Flagstone Stone Quarry of Shri Krishna Pratap Singh Mine has undertaken community development works in order to improve the amenities in nearby villages as a part of commitment towards social and economic up liftment of the area. Mining is expected to have positive impact on socioeconomic life of people living in nearby villages. No impact on agricultural lands has been reported due to mining, nor has mining affected the climate of the area. 14 Page 13 of

There has been rather an improvement in the status of the people because of increase in income due to direct or indirect employment Mining has created awareness amongst the people for education and general upliftment particularly in the womenfolk. 13. ENVIRONMENTAL MANAGEMENT IMPLEMENTATION BUDGET PER PLAN: Pollution control and monitoring Rs. 30000/- Occupational health Rs. 20000/- Green belt Rs. 40000/- Other: CSR Activity like separate toilets for girls in school, potable water tank in school, medical/first aid facility in the school Rs. 20000/- Miscellaneous (Fencing etc.) Rs. 10000 Total Rs 1,20,000/- 14. ANY OTHER DETAILS DESIRED TO BE SUBMITTED BY MINERAL CONCESSION HOLDER: All information regarding EMP has been mentioned above point. Other information is given in Form-1, PFR & Mining plan. 14 Page 14 of