PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville, MD 20850 0
DESIGN TEAM ARCHITECT Smolen 3 Emr + Associates Architects 1355 Piccard Drive Rockville, Maryland 20850 STRUCTURAL ENGINEER Columbia Engineering Inc. 6470 Dobbin Road Columbia, MD 21045 CIVIL ENGINEER KCI Technologies, Inc. 936 Ridgebrook Road Sparks, MD 21152 KITCHEN CONSULTANT Nyikos Associates 18205-A Flower Hill Way Gaithersburg, MD 20879 MECHANICAL, ELECTRICAL, PLUMBING ENGINEER James Posey Associates 3112 Lord Baltimore Drive Baltimore, MD 21244 COST ESTIMATOR KCI Technologies, Inc. 936 Ridgebrook Road Sparks, MD 21152 1
PROJECT DESCRIPTION PROJECT SCOPE Scope includes the original building (not the 1998 addition) Site Improvements: Systemic Improvements: Architectural Improvements: Physical repairs HVAC Building Facility Drainage Plumbing Life Safety Accessibility Electrical Accessibility Programmatic 2
PROJECT DESCRIPTION PSCP/IAC Limited Renovation This project is a Limited Renovation project in accordance with the PSCP/IAC guidelines The scope of work has therefore been categorized into the Limited Renovation Categories Categories Structural Systems Mechanical Systems Electrical Systems Fire Safety Conveying Systems Educational Enhancements Original Building Constructed in 1957 The facility is structurally sound (with limited exceptions) This project includes upgrades to make this school serviceable for another 30 to 50 years 3
EXISTING SITE PLAN EXISTING SITE PLAN The work associated with this project includes only the original building and does not include work associated with the 1998 Area "B" addition. 4
PROJECT DESCRIPTION This project is a Limited Renovation project in accordance with the PSCP/IAC guidelines The scope of work has therefore been categorized into the Limited Renovation Categories Structural Systems Site Related Replacement of damaged site paving and curbing Cleanout and repair storm water management systems Replacement of a failing retaining wall adjacent to the auditorium Building Exterior (Skin) Replacement of window curtain wall system and windows throughout the entire facility Replacement of all exterior doors Repointing of deteriorated areas of exterior brick Building Structural Demolish and rebuild auditorium dressing rooms due to structural failure Repair several bus loop canopy columns that are damaged Repair interior masonry walls 5
EXISTING SITE PHOTOS DETERIORATION OF PAVEMENT FAILING RETAINING WALL WASHOUT CLOGGED STORM DRAIN BROKEN CONCRETE WALKS TRASH BINS SCATTERED 6
CURTAIN WALL SYSTEM MORTAR JOINT FAILURE EXTERIOR DOORS NON-OPERABLE WINDOWS 7
PROPOSED ELEVATION Proposed Front Elevation (South Elevation) Concept (Not to scale) New Building connection between A' Building and Main. Mechanical Room Addition 2nd floor Existing Auditorium repointing of brick as required. New Curtain Wall System High Performance Glazing, Thermally Broken Aluminum Support System A Building Completely Renovated Defined Main Entrance Replacement of All Exterior Doors Auditorium Support Space Addition Construction Concept Aluminum Curtain Wall Concept Detail (2 story Mec. Above) 8
FIRST FLOOR MAIN BUILDING AUDITORIUM STAGE SUPPORT (Not to scale) WALL FAILURE INTERIOR MORTAR DETERIORATION BENT CANOPY COLUMN 9
PROPOSED SITE PLAN PROPOSED SITE PLAN 1. Replacement of damaged site paving and curbing 2. Cleanout storm water management systems 3. Replacement of failing retaining wall adjacent to the auditorium 4. Provide ADA compliant handicap accessibility to recreational fields across Putty Hill Avenue and to lower play fields. 5. Repave parking lot adjacent to A building and across the street parking at fields. 10
PROJECT DESCRIPTION This project is a Limited Renovation project in accordance with the PSCP/IAC guidelines The scope of work has therefore been categorized into the Limited Renovation Categories Mechanical and Plumbing Systems Upgrade mechanical system to all year round climate control thru central heating and central cooling. Replacement of building exhaust system. Replacement of above grade plumbing piping, including sanitary sewer, storm water, natural gas, and domestic hot/cold water systems. Replacement of all plumbing fixtures located throughout the original building due to age. Electrical Systems Fire Safety Replacement of switchboard Replacement of panelboards and branch circuits Replacement of all interior lights Replacement of all exterior building lights Replacement of light controls Install sprinkler system throughout the entire building. Replacement of all doors and hardware All stairwell doors to be placed on magnetic hold opens 11
Mechanical Systems Upgrade mechanical system to all year round climate control thru central heating and central cooling. Replacement of building exhaust system. EXISTING COOLING TOWER WINDOW AC UNIT WINDOW AC UNITS 12
Plumbing Systems ANTIQUATED FIXTURES Replacement of above grade plumbing piping, including sanitary sewer, storm water, natural gas, and domestic hot/cold water systems. Replacement of all plumbing fixtures located throughout the original building due to age. Install sprinkler system throughout the entire building. 13
Electrical Systems EXPOSED ELECTRICAL JUNCTION BOX COMPUTER DEMAND ON ELECTRICAL SYSTEM Replacement of switchboard Replacement of panelboards and branch circuits Replacement of all interior lights Replacement of all exterior building lights Replacement of light controls 14
PROJECT DESCRIPTION This project is a Limited Renovation project in accordance with the PSCP/IAC guidelines The scope of work has therefore been categorized into the Limited Renovation Categories Conveying Systems Elevator addition in the original building Miscellaneous Systems and ADA Provide ADA compliant handicap accessibility to recreational fields across Putty Hill Avenue Reconfiguration of at least one door alcove into each classroom to be ADA compliant. Renovation of gang restrooms to be in compliance with ADA guidelines Renovation of one staff restroom on each floor to be in compliance with ADA guidelines Limited renovation of both the boys and girls locker rooms to provide a minimum of one ADA compliant shower area, locker and bench area, toilet stall and sink. Limited renovation of team rooms to provide a minimum of one ADA compliant shower area, locker and bench area, toilet stall and sink. Provide ADA compliant room signs Install ADA compliant lift to music suite Replacement of all corridor lockers 15
PROJECT DESCRIPTION This project is a Limited Renovation project in accordance with the PSCP/IAC guidelines The scope of work has therefore been categorized into the Limited Renovation Categories Educational Enhancements Renovation of CTE labs in A Building Relocation of Nutrition & Food Science and Childcare Services programs into A Building Renovation of several computer labs in main building Reconfigure of three standard classrooms into two computer labs on the third floor Renovation and grouping of all Art room curriculum Renovation of health suite to MSDE guidelines Renovation of five existing science labs on the first floor Renovation of two large classrooms on the second floor into a new science lab Addition for the missing program spaces to support the auditorium program Renovation of cafeteria serving lines and addition of a serving line Renovation of kitchen layout, and equipment 16
Educational Enhancements PROGRAM DISTRIBUTION PLAN Renovation of A Building CTE Program Relocation of Nutrition & Food Science and Childcare Services Art room curriculum clustered together Renovation of health suite Renovation of five existing science labs on the first floor Renovation of kitchen, serving lines and addition of a serving line Addition for the missing program spaces to support the Theatrical Arts 17
Educational Enhancements PROGRAM DISTRIBUTION PLAN Renovation of several computer labs in main building Reconfigure of three standard classrooms into two computer labs on the third floor. Renovation of administration support areas on both floors Renovation of two large classrooms on the second floor into a new science lab and classroom 18
PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville, MD 20850 19