1 School Facilities Evaluation Project Page 1 Executive Summary In November 1999, Alberta Infrastructure, School Facilities Branch engaged Stephens Kozak Carr and Brown Architects to conduct evaluations on several schools, located in Central and Northern Alberta. The Consultant Team included Jo-Tech Engineering Ltd. to review mechanical items and Wiebe Forest Engineering Ltd. to review electrical components. The reporting format and evaluation criteria were developed by Alberta Infrastructure and coordinated by Group 2 Architecture, the Central Region Coordinator. The estimated construction costs for the remedial work recommended in the attached Facility Evaluation form were based, wherever possible, on the Costing Unit Rate Chart figures provided by Alberta Infrastructure. Items not rated in the Rate Chart were estimated with the assistance of local Contractors and Quantity Surveyors and represent current ( January 2000 ) estimated costs. The school was constructed in 1952 with additions occurring in 1962, 1964, 1965, 1966, 1969 and Minor modernizations occurred in 1985 and The facility has a capacity rating of 2,340 students. The 1962 and 1966 additions, comprising the east wing of the school, were built using non-combustible concrete and masonry construction while the remainder of the facility was constructed in combustible wood framing with masonry or stucco veneer. The evaluation of the facility took place during the last week of November Architectural The west academic wings comprising the original 1952 building and the 1962, 1964 and 1965 additions, referred to as the 600, 700, 800 and 900 wings were found to be in extremely poor physical condition with major structural flooring deficiencies, roofing problems and general deterioration of all finishes and fittings. The central administration area has fared somewhat better, having undergone a modernization in Generally, replacement of floor finishes, a minor structural adjustment and refinishing of library millwork are the main areas of concern. The east wing, being of non combustible masonry and concrete construction, is in reasonable conditions with replacement of roofing, floor finishes, millwork and accessories as the main areas of concern. In order to accommodate mechanical revisions, ceilings will also require replacement.

2 School Facilities Evaluation Project Page 2 Mechanical The primary concern is the lack of ventilation and deteriorated condition of the heating and plumbing systems for the 600, 700, 800 and 900 wings. Other concerns which should be addressed are exfiltration of water from the storm trunk line in the crawl space and operation of the ventilation units in the vocational (east) wing. Electrical There are four electrical services to the school and the distribution system is very complex and hard to maintain due to lack of parts. Life safety systems are generally inadequate and the existing security system is obsolete. Lighting which is mostly original to the year of construction, is below recommended levels and is energy inefficient. Computer network cabling has been run in a temporary manner and the existing backbone cabling is operating at its limit. The telephone and public address system was replaced recently. The existing elevator has some code violations and the technology is obsolete. Summary Recommendations and Estimated Cost for Renovation Ratings 3 or Lower Part 1 West Wing (600, 700, 800, 900 areas).1 Site Work (Complete Site ) 145,000.2 Building Exterior 1,617,000.3 Building Interior 1,338,900.4 Mechanical Systems 1.165,000.5 Electrical Systems 940,000 Subtotal $ 5, Part 2 Central Administration Section.1 Site Work See Part 1.2 Building Exterior 4,000

3 School Facilities Evaluation Project Page 3.3 Building Interior 64,700.4 Mechanical Systems 18,500.5 Electrical Systems 312,800 Part 3 East Wing (Vocational & 3 Storey Academic ) Subtotal $ 400,000.1 Site Work See Part 1.2 Building Exterior 444,500.3 Building Interior 914,800.4 Mechanical Systems 468,000.5 Electrical Systems 1,093,000 Subtotal 2,920,300 Recommendations Total Estimated Cost $8,526,200 Architectural West wings (600,700,800,900) In view of the high cost, age, combustible construction and general disruption to the facility associated with upgrading this portion of the high school, serious consideration should be given to replacement rather than renovation of the west wings of the building. Central Administration Area A renovation to upgrade the flooring and millwork and to repair the exterior stucco finish is recommended. East Vocational Wing Renovation to this component of the facility is recommended. Exterior upgrades are required to roofing, and exterior overhead and man doors. Interior recommended upgrades include floor finishes, ceiling replacement as

4 School Facilities Evaluation Project Page 4 required, millwork, chalk and tack board replacement. Upgrading of doors and hardware is recommended and washrooms require modernizing. Site Repairs are recommended to the roads, parking areas and sidewalks. Additional fencing and bicycle racks are needed. Mechanical Provide new ventilation system and upgrade heating and plumbing systems for the 600,700,800 and 900 wings. Installation of a glycol solution heating system for existing heat and vent coils and heat and vent control upgrades are recommended for the east vocational wing. Replace water tube boilers in the vocational wing and upgrade all miscellaneous items noted. Electrical A single new underground service should be brought into the school and the electrical distribution system brought up to currents standards. Fire alarm, and emergency and exit lighting require replacement. Lighting should be upgraded to suit current illumination and energy efficiency levels. New backbone network cabling is required, with selective new horizontal cabling. Due to the large size of the facility, installation of a closed circuit TV system is recommended. Space Adequacy Current School Area is 22,030 square metres. The School is deficient by 1757 square metres. The gymnasium spaces are well below area standards. There is an excess of standard classrooms and inadequate number of Science Classrooms. Further Investigations Possible rot in walls and roof structure, fascia and soffit framing in West Wing Cost associated with hazardous materials abatement throughout.

5 School Facilities Evaluation Project Page 5 Full Building Code review of complete facility emphasizing combustible portions. Floor settlement in Administration Area Water exfiltration from City storm sewer trunk line under Administration area Wall settlement cause at rooms 176/254 Sanitary drain below Main Corridor East Wing Air handling unit controls for East Wing Confirmation of existence of PCBs in fluorescent ballasts and some transformers (owned by School Board) Acknowledgements The Consultant Team is very appreciative of the input and assistance provided by the Red Deer School Division No. 104 Personnel and in particular Mr. Ray Congdon and Mr. Terry Mitchell. In addition, the team acknowledges the guidance and reviews of Alberta Infrastructure and Group 2 Architecture.

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional

More information

17,280 square feet Overview:

17,280 square feet Overview: CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The

More information

Schedule B to By-law 33-2009

Schedule B to By-law 33-2009 Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service

More information

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are: When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory

More information

BUNKER HILL ELEMENTARY SCHOOL

BUNKER HILL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Print Shop/Mail Room

Print Shop/Mail Room Chapter XVIII Print Shop/Mail Room Page 110 CHAPTER XVIII Print Shop/Mail Room ARCHITECTURAL/STRUCTURAL A. BUILDING EXTERIOR 1.0 EXTERIOR WALLS The exterior walls are comprised of stone veneer. There were

More information

Commercial Building Valuation Report

Commercial Building Valuation Report INSURED University of Houston - Victoria Effective Date: Expiration Date: Cost as of: 09/2010 BUILDING 1 217 - University Center 77901 Location Adjustments Climatic Region: High Wind Region: Seismic Zone:

More information

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519 845-0801 Toll-free: 1-866-324-6912 Fax: 519

More information

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables

More information

APPENDIX E: CAPITAL NEEDS SUMMARY

APPENDIX E: CAPITAL NEEDS SUMMARY APPENDIX E: CAPITAL NEEDS SUMMARY Building A Foundation Hall Building to be replaced ARCHITECTURAL Roof Repair North Structural Wall Repair Flooring Repairs Ceiling Repairs Lighting Repairs Lighting Repairs

More information

Chignecto-Central Regional School Board. Highland Consolidated Middle School. Indoor Air Quality Issues Mechanical Systems

Chignecto-Central Regional School Board. Highland Consolidated Middle School. Indoor Air Quality Issues Mechanical Systems Chignecto-Central Regional School Board Highland Consolidated Middle School Mechanical Systems Prepared by: Neil Van Rossum, P.Eng. CJ MacLellan & Associates Antigonish, Nova Scotia November 2012 CJM File:

More information

ELIGIBLE REPAIR PROJECT PARAMETERS

ELIGIBLE REPAIR PROJECT PARAMETERS THE DISTRICT MUNICIPALITY OF MUSKOKA ONTARIO RENOVATES PROGRAM FOR HOMEOWNERS ELIGIBLE REPAIR PROJECT PARAMETERS 1. To have your project considered and payment processed, all projects requiring a Building

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

Schedule B to By-law 33-2009 Part A Fees Payable for Permits

Schedule B to By-law 33-2009 Part A Fees Payable for Permits Floor Area Calculation Floor area shall: Part A Fees Payable for Permits (Effective January 1, 2015) a) be calculated by measuring to the outer face of exterior walls and to the centre of party walls or

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information

Seattle Public Schools Building Excellence IV Projects Under Construction

Seattle Public Schools Building Excellence IV Projects Under Construction Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee

More information

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Brochure More information from http://www.researchandmarkets.com/reports/2214808/ Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Description: This estimating guide for repair and remodeling

More information

HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA

HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

DRAPER ELEMENTARY SCHOOL

DRAPER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Estimating Database Checklist

Estimating Database Checklist Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to

More information

Ch. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM STORY HEIGHT

Ch. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM STORY HEIGHT Ch. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE Sec. 58.1. Division D-O occupancies. 58.2. Separation and mixed occupancy. OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM

More information

Construction Technologies Career Field Pathways and Course Structure

Construction Technologies Career Field Pathways and Course Structure Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry

More information

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number: 300-004

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number: 300-004 HOWARD UNIVERSITY Policy Number: 300-004 Policy Title: ASSET CAPITALIZATION Responsible Officer: Chief Financial Officer Responsible Offices: Office of the Controller, Departments of Strategic Sourcing

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

Solving Persistent Moisture Problems and Moisture Damage

Solving Persistent Moisture Problems and Moisture Damage B etter buildings Solving Persistent Moisture Problems and Moisture Damage Summary This three-storey, 15-unit, 1,300 square metre (13,993 sq. ft) walk-up was built in 1958. In the 1980s, the building started

More information

Policy on Repair and Renovation Funding

Policy on Repair and Renovation Funding Policy on Repair and Renovation Funding I. POLICY STATEMENT Auburn University s (the University s) Policy on Repair and Renovation Funding provides guidance and direction regarding the use of Repair and

More information

Single Family Residential Building Permit Questions & Answers

Single Family Residential Building Permit Questions & Answers Single Family Residential Building Permit Questions & Answers Prepared by Dept. of Public Works Revised 07/01/13 200 East Park Street Edwardsville, IL 62025 (618) 692-7535 (618) 692-7505(Fax) Hours: Monday

More information

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES Facilities Operations Customer Service Standards WORK ORDER PRIORITIES In order to provide fair and consistent maintenance service to all University faculty, staff and students, a work priority system

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Certification: Building Plans Examiner. Exam ID: B3

Certification: Building Plans Examiner. Exam ID: B3 Certification: Building Plans Examiner Exam ID: B3 Scope: A Building Plans Examiner will be responsible for reviewing submitted plans to determine if they meet the requirements of the various Building

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME 1 THE BUILDING PROCESS The focus of Woodland Homes building department is Quality, Service and Predictability. Through

More information

BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS

BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS DCD-0304 Identification # Rev. 9/08 County Date of Inspection NAME OF OPERATION BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS ADDRESS TELEPHONE: CITY STATE ZIP BUILDING INSPECTORS CERTIFICATE

More information

FORTHE ADMINISTRATION OF CERTAIN HUD-FUNDED ACTIVITIES IN THE UNIFIED GOVERNMENT OF KANSAS CITY, KANSAS AND WYANDOTTE COUNTY

FORTHE ADMINISTRATION OF CERTAIN HUD-FUNDED ACTIVITIES IN THE UNIFIED GOVERNMENT OF KANSAS CITY, KANSAS AND WYANDOTTE COUNTY PROGRAMMA TIC AGREEMENT BETWEEN THE KANSAS STATE mstoric PRESERVATION OFFICE, THE KANSAS DEPARTMENT OF HEALTH AND ENVmONMENT, AND THE THE ADVISORY COUNCIL ON mstoric PRESERVATION FORTHE ADMINISTRATION

More information

INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING

INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING GS 521C-521 requires a local school board to submit its long-range plan for meeting school facility needs to the State

More information

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

PARKVILLE HIGH SCHOOL LIMITED RENOVATION PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,

More information

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,

More information

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: Somewhere, FL CLIENT: GAIA GC ID No: 2015000 DATE: 12/31/2015 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792 FLORIDA

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation

More information

Mechanical, Plumbing, and Fire Protection Conditions

Mechanical, Plumbing, and Fire Protection Conditions Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred

More information

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER NOTICE TO PROPERTY OWNER Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. If your home or business is below

More information

Commercial Building Valuation Report

Commercial Building Valuation Report INSURED State Office of Risk Management Effective Date: 300 W 15th Street Expiration Date: Austin, TX 78701 Cost as of: 12/2013 BUILDING 1 Athletics/PCI - 206 3302 N. Ben Wilson Victoria, TX 77901 Location

More information

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C. CLIENT Inspection Report 271 Front St. Alert Bay, B.C. Island Building Inspections 2013 V ANCOUVER I SLAND B. C. Elevation Photos For the Property at 271 Front Street Alert Bay, BC ELEVATION PICTURES Front

More information

HOUSTON ELEMENTARY SCHOOL

HOUSTON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Exterior Elevated Elements Inspection Guidelines

Exterior Elevated Elements Inspection Guidelines Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code

More information

University of Northern Iowa Facilities Services

University of Northern Iowa Facilities Services University of Northern Iowa Facilities Services February 2013 Page 1 Table of Contents: 3 General Service Information 3 Maintenance Services 4 Non-Maintenance Services 5 Area Maintenance Program 6 Carpentry

More information

PUBLIC MINUTES PROPERTY MAINTENANCE APPEALS BOARD. Wednesday, November 25, 2015, 3:46 p.m. Committee Room B, City Hall

PUBLIC MINUTES PROPERTY MAINTENANCE APPEALS BOARD. Wednesday, November 25, 2015, 3:46 p.m. Committee Room B, City Hall PUBLIC MINUTES PROPERTY MAINTENANCE APPEALS BOARD Wednesday,, 3:46 p.m. Committee Room B, City Hall PRESENT: Mr. Ian Oliver, Chair Mr. Michael Brockbank, Vice-Chair Mr. Roy Fleming, Member Mr. Donald Stiller,

More information

Facility Assessment for. 11801 East Main Street, Huntley, IL

Facility Assessment for. 11801 East Main Street, Huntley, IL Facility Assessment for 11801 East Main Street, Huntley, IL July 12, 2012 Prepared by: Dewberry Architects Inc. 25 S. Grove Avenue, Suite 500 Elgin, IL 60120 (847) 695-5840 The Village of Huntley requested

More information

SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS

SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS PART 1 GENERAL 1.01 SUMMARY SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS A. This section provides a list of known and assumed hazardous materials that may be impacted during renovation, demolition,

More information

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS MEETING DATE: March 16, 2011 SUBJECT: PRESENTER: ATTACHMENTS: Construction Management Update David Berry Yes 1. Construction Management

More information

Repair Project for April 7, 2009

Repair Project for April 7, 2009 Repair Project for April 7, 2009 Scope of the Project HVAC Upgrades Roof Replacement Window Replacement/Exterior Openings Science Lab Renovations New Fire Alarm/Electrical AAB (accessibility) Upgrades

More information

May 5, 2010. Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client,

May 5, 2010. Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client, PROPERTY INSPECTION PROFESSIONALS May 5, 2010 Client Client Address Re: Inspection Address, Chicago, Illinois Dear Mr. Client, On May 4, 2010, Tomacor completed a property inspection of the above referenced

More information

The Uniform Building Inspection Report Condensed

The Uniform Building Inspection Report Condensed The Uniform Building Inspection Report Condensed Single Family Residence:, Scottsdale, AZ Condensed Report Version Prepared for: John Doe Inspection Date: 9/19/2005, 1:00:00 AM Report Number: 091805s Inspection

More information

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids

More information

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES 1. CALCULATION OF PERMIT FEES SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule: Permit Fee

More information

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

ST. MONICA FOOD PANTRY HOUSTON, TEXAS PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,

More information

VILLAGE OF HUDSON FALLS 220 MAIN STREET HUDSON FALLS, NY 12839 (518) 747-5426 /

VILLAGE OF HUDSON FALLS 220 MAIN STREET HUDSON FALLS, NY 12839 (518) 747-5426 / John E. Barton Mayor Ellen M. Brayman Clerk/Treasurer VILLAGE OF HUDSON FALLS 220 MAIN STREET HUDSON FALLS, NY 12839 (518) 747-5426 / Trustees: James Gallagher Robert Cook Michael Horrigan Thomas VanAernem

More information

Important Information for Owners of Buildings in Flood Zones

Important Information for Owners of Buildings in Flood Zones Important Information for Owners of Buildings in Flood Zones Rebuilding your home after the storm? Adding on, renovating, or remodeling your home? Here is information YOU need to know about the 50 percent

More information

Executive Summary. June 2005 Auke Bay Elementary School Condition Survey Report Page 4 of 228

Executive Summary. June 2005 Auke Bay Elementary School Condition Survey Report Page 4 of 228 Building History 1. The original building was built in 1968. It is essentially a 2 story building built into a hillside. A portion of the second floor steps up the hill a half level above the second floor

More information

Rehab Inspection Report Page 1

Rehab Inspection Report Page 1 Rehab Inspection Report Page 1 Home Address: Construction Style: Number of bedrooms Square footage: Value of offer: Estimated rehab cost: Value of resale: Orientation of house: N S E W Note: orientation

More information

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings Note: This information addresses complex issues in a summary fashion. Consideration should be given to the official version of the

More information

Estimated Cost of Repair

Estimated Cost of Repair 1 Applicant: Property: Home: Business: Assessor: Applicant Number: Type of Loss: Hurricane Date Contacted: 1/18/2014 Date of Loss: 10/29/2012 Date Received: 1/14/2014 Date Inspected: 2/4/2014 Date Entered:

More information

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE) NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE) If your home or business is located within a 100-year floodplain and it was constructed through a County Building

More information

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

Electrical. This section applies to the design and installation of building power distribution systems.

Electrical. This section applies to the design and installation of building power distribution systems. Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions

More information

NORTH PENN HIGH SCHOOL RENOVATIONS

NORTH PENN HIGH SCHOOL RENOVATIONS NORTH PENN HIGH SCHOOL RENOVTIONS PRELIMINRY SCOPE, BUDGET & PHSING CONSIDERTIONS 401 EST HNCOCK STREET LNSDLE, P 19446 PREPRED BY BONNETT SSOCITES INCORPORTED 220 BLDWIN TOWER, 1510 CHESTER PIKE EDDYSTONE,

More information

REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:

REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY: REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY: THE COMMUNITY DEVELOPMENT AGENCY OF THE CITY OF ORD JULY 2014 A. STATEMENT

More information

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION

More information

SECTION 3 ONM & J STRUCTURAL ANALYSIS

SECTION 3 ONM & J STRUCTURAL ANALYSIS Historic Boynton Beach High School Existing Building Assessment City of Boynton Beach February 10, 2011 SECTION 3 ONM & J STRUCTURAL ANALYSIS STRUCTURAL ENGINEERS SPECIAL INSPECTORS STRUCTURAL CONDITION

More information

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY

More information

Overview of Hotel Fire Safety Requirements

Overview of Hotel Fire Safety Requirements Overview of Hotel Fire Safety Requirements in the Fire Code Susan Clarke, P.Eng. Office of the Fire Marshal - January 10, 2012 1 Agenda Regulation History - Hotels Fire Code Overview (Parts 1 to 8) Defined

More information

Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL

Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 0 Overlea High School - Facility Summary Facility Opened: Auditorium Addition: Activity Room Addition: School Rated Capacity

More information

Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows:

Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows: Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows: UCC-F100, Construction Permit Application pg. 1. Applicant

More information

2. What building projects are exempted? (permit not required)

2. What building projects are exempted? (permit not required) BUILDING AND SAFETY DEPARTMENT 1. What building projects require a permit? Following is a list of projects that require building permits based on Appendix chapter 1 of the California Building Code and

More information

OFFICE OF THE STATE ARCHITECT ANNUAL REPORT 2015 PRIORITIZED STATEWIDE PROJECT FUNDING RECOMMENDATIONS FOR FY2015/2016

OFFICE OF THE STATE ARCHITECT ANNUAL REPORT 2015 PRIORITIZED STATEWIDE PROJECT FUNDING RECOMMENDATIONS FOR FY2015/2016 LEVEL 1 1 1 Office of the State Architect M80120 $2,000,000 $0 $2,000,000 Emergency Fund 2 3 Colorado State University 2015-073M14 $967,301 $0 $2,967,301 Replace Obsolete Fire Alarm, Various Buildings,

More information

C I T Y O F P E A R S A L L

C I T Y O F P E A R S A L L The Largest City Between San Antonio and Laredo COMMUNITY DEVELOPMENT C I T Y O F P E A R S A L L A Business-Friendly, Family-Oriented Community Building Department Application Information (Please read

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov

CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov Finishing a basement to make additional living space in a house is a popular construction project for many homeowners.

More information

MEMORANDUM. General: Foundation:

MEMORANDUM. General: Foundation: MEMORANDUM State of Alaska Department of Transportation and Public Facilities Central Region - Division of Construction and Operations Public Facilities Branch TO: Jennifer Murrel DATE: August 19, 2010

More information

Estimator: Miami Estimates Business: (305) 395-4362. Date Entered: 04/30/2008

Estimator: Miami Estimates Business: (305) 395-4362. Date Entered: 04/30/2008 Insured: Property: Claim Rep.: Business: Estimator: Miami Estimates Business: (305) 395-4362 Claim Number Policy Number Type of Loss Deductible Dates: Date of Loss: 10/24/2005 Dwelling $0.00 Other structures

More information

ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY

ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY HOWARD COUNTY MARYLAND ARCHITECTURAL DESIGN ACADEMY Architectural Design 1 Introduction / Overview of Course This course will introduce the basic principles

More information

Structure Survey Findings:

Structure Survey Findings: Structure Survey Findings: Visible portions of the following were observed: foundations; structure to walls, columns, floors, roofs, overhang posts, and columns; attached or firmly abutting decks, balconies,

More information

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 SELF EVALUATION CHECKLIST FOR RESIDENTIAL AND MULTI-FAMILY DWELLING INSPECTIONS The attached checklist

More information

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

D Sample Notices to Property Owners, Sample Affidavits, and Other Material D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792

More information

The University of Akron Main Campus Biennium 1 July 2016- June 2018. Priority Project Budget Description 1 Electrical Infrastructure Loop

The University of Akron Main Campus Biennium 1 July 2016- June 2018. Priority Project Budget Description 1 Electrical Infrastructure Loop The University of Akron Main Campus Biennium 1 July 2016- June 2018 1 Electrical Infrastructure Loop $2,400,000 Scope: Replace center campus deteriorated 4,160 volt cable and duct bank with 23,000 volt

More information

CHARLOTTE COUNTY Community Development Department

CHARLOTTE COUNTY Community Development Department CHARLOTTE COUNTY Community Development Department Building Construction Services Division 18400 Murdock Circle, Port Charlotte FL 33948 Phone: 941.743.1201 Fax: 941.764.4907 www.charlottecountyfl.gov 50

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone: Choctaw Date Recorded: Permit # RESIDENTIAL - BUILDING Permit APPLICATION Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone: YES NO Sec., Township, Range/Subdivision: Acres/Block:

More information

OHLONE COMMUNITY COLLEGE BOND MEASURE G

OHLONE COMMUNITY COLLEGE BOND MEASURE G Monthly Report OHLONE COMMUNITY COLLEGE BOND MEASURE G Fremont, California June 2014 TABLE OF CONTENTS 1. Executive Summary 2. Safety Status 3. Schedule Status 4. Design Progress 5. Construction Progress

More information

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Bond Referendum Presentation Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Mr. David Fowler President Floral Park- Bellerose Mr. David Del Santo Vice-President New Hyde Park Garden City Park

More information