1 Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

2 Robert C. Burns, AIA, LEED AP Principal Director of Historic Architecture , ext Commonwealth Architects 101 Shockoe Slip, Third Floor Richmond, VA Patrick MacClenahan Associate Principal Integral Group Nuckols Road, Suite 110 Glen Allen, VA

3 Sustainable Strategies / Overlaps / Opportunities For Historic Rehabilitation Projects Take advantage of the inherent nature of the project: Rehabilitating an existing structure is fundamentally green. Adaptive Reuse is the Ultimate Recycling. Restoration of historic fabric Natural Ventilation and Daylighting Insulated or storm sash windows where appropriate Eco-friendly material selection (local & renewable) Projects are often Urban Community connectivity is smart growth at its best.

4 Sustainable Strategies / Overlaps / Opportunities For Historic Rehabilitation Projects Opportunities for New Equipment and Systems Energy Efficient Modern HVAC Systems Possibility of Innovative technologies for renewable energy (solar, geothermal): Less sophisticated, Lower O&M costs Air Quality Ventilation / Circulation Monitoring of CO2 Water Conservation & Efficiency Rainwater Harvesting Cistern Graywater Reuse Reduced-Flow Plumbing Fixtures Waterless Urinals

5 Sustainable Historic Projects: Additional Project Issues The Secretary of the Interior s Standards for Rehabilitation vs. Sustainable Guidelines Flexibility required on both sides Historical Considerations Work with existing building characteristics Aesthetic Considerations New work must coexist in harmony with original LEED-NC vs. Renovations in General Designed for New Construction Not all credits will be applicable

6 Case Study 9 th Street State Office Building Richmond, Virginia PROJECT INFORMATION Original Building Constructed: 1904 / 1911 Renovation Completion Date: Projected March, 2016 Building Area: 175,892 gsf Estimated construction cost: $ 50,000,000. Owner: Commonwealth of Virginia Department of General Services Contractor: Kjellstrom + Lee Richmond, VA Projected LEED Certification Level: LEED-NC 2009 Silver Green Features: High Reflectivity Roof Materials Low Water Usage Plumbing Fixtures High Efficiency VRF Mechanical Equipment Specification of Low VOC emitting materials User controllability of Lighting Systems User controllability of Thermal Comfort Systems

7

8 9 th Street State Office Building: Building History Post Card ca. 1920

9 Hotel Richmond 1904

10 Hotel Richmond ca. 1904

11 Capitol Square 1920s

12 9 th Street Elevation

13 Ninth Street Elevation

14 Grace Street Elevation

15 Grace Street Elevation

16 Detail of Marquee and Stonework of Entrance Door

17 Detail of Two Upper Stories

18 First Floor Plan

19 Section-looking toward new entrance

20 9 th Street Office Building LEED Project Scorecard

21 Architectural Strategy: Restoration of Historic Fabric Research existing systems and building conditions Identify potential sources of water infiltration Specify materials and design repairs compatible with historic systems, BUT Consider modern materials where appropriate for improved performance Care and Craftsmanship in design and implementation

22 Architectural Strategy: Incorporation of New Building Insulation and Water / Air Barriers Perform selective demolition to determine existing building conditions and identify potential sources of air and water infiltration Determine acceptable level of resistance within historic context Consider alternative methods and materials for obtaining desired result Specify materials and design repairs compatible with historic systems, but Consider modern materials where appropriate for improved performance

23 Architectural Strategy: Replacement Windows Research historic window configurations to determine requirements Specify high quality insulated units to match historic configurations where appropriate Consider low maintenance cladding materials as replacement for painted wood units where appropriate

24 Architectural Strategy: Replacement Roof Perform selective demolition to determine full scope of existing roof removal and replacement Take advantage of the opportunity to maximize the insulation value of the new roof system Consider use of tapered insulation to correct preexisting roof drainage issues Specify light colored or coated roof membrane materials to minimize the heat island effect of the roof surface

25 Four Pipe System Central Plant Options: Central Plant in a New Dedicated Plant Structure (SKM-1, 1A and SKM-7) Advantages Provide added Space, more flexibility for future development Possible Lower operating cost Negatives Added first cost for 9th street Cooling tower location and plant access are difficult Central Plant in Basement of Existing Building (SKM-2) Advantages Keep all pertaining systems within the foot print of the 9th street building Lower first cost Negatives Very tight space, difficult access Difficulties with air intake With both options the cooling tower can be on the Roof of the 9th St Building. The existing design for each floor does not change

26 Ventilation air exhaust riser Ventilation air supply riser Fan coil unit 4 pipe riser TYPICAL FOUR PIPE SYSTEM OFFICE LAYOUT

27 Air Cooled VRF: 1 or two air cooled VRF condensing units per floor. About 20 Condensing units on roof. 4 pound of refrigerant per ton. High population spaces will require package DX units on roof and split systems for units in basement. It is difficult to locate condensing units at the lower levels. Water Cooled VRF: 2 or 3 water cooled VRF condensing units for a total of 16 ton per floor. One cooling tower on the roof. 2 pound of refrigerant per ton. High population spaces will use water cooled package condensing units or heat pumps. Floor Distribution: With either of the above options, fan coil units are wall mounted and can be incorporated in a ceiling plenum along the corridor wall.

28 Variable Flow Refrigerant Refrigerant Issues (ASHRAE 15 and IMC Chapter11): Refrigerant is considered hazardous in higher concentration. In case of system failure or leak, ASHRAE and the IMC define the concentration of refrigerant that can be safely released in the occupied space. The size of the space in which the release occur will affect the concentration. Considering that each floor is around 16 tons, the following is to be considered: Water cool system: Air cooled system: The smallest occupied room no smaller than 478 sf. The smallest occupied space no smaller than 925 sf. By providing air transfer between the spaces these limits go away. The open plenum ventilation air relief will provide sufficient transfer to eliminate the room size limit.

29 REFRIGERANT VOLUME SCHEDULE UNIT NO. CONDENSING UNIT LOCATION SPACE VOLUME *NOTE 1 (CUBIC FT) REFRIGERANT TYPE TOTAL CAPACITY (LB) SINGLE CIRCUIT CAPACITY (LB) SMALLEST VOLUME SERVED *NOTE 2 (CUBIC FT) MAXIMUM CHARGE ALLOWED (LB/1000 CF) MINIMUM VOLUME REQUIRED (CUBIC FT) REQUIRED SPACE VOLUME MET REMARKS HP B-1 ROOM B-21 3, A , YES HP B-2 UTILITY ROOM B-31 5, A , YES HP B-3 ROOM B-33 5, A , YES HP B-4 ROOM B-33 5, A , YES HP 1-1 MECHANICAL ROOM B-18 27, A , YES HP 1-2 ROOM , A , YES HP-12-1 MECHANICAL ROOM 120X 3, A , YES HP 12-2 ELEV. MACHINE RM. 10, A , YES AHU-B-1 MECHANICAL ROOM B-18 27, A , YES AHU-B-2 MECHANICAL ROOM B-09 2, A , YES AHU-2-1 MECHANICAL ROOM B-18 27, A , YES AHU-9-1 ROOF/OUTDOOR N/A 410A , YES MAU-1 ROOF/OUTDOOR N/A 410A , ,560 YES MAU-2 ROOF/OUTDOOR N/A 410A , ,920 YES VHP-0201 ROOM 209 7, A , ,216 YES VHP-0301 ROOM 309 7, A , ,064 YES VHP-0401 ROOM 409 7, A , ,064 YES VHP-0501 ROOM 509 7, A , ,064 YES VHP-0601 ROOM 609 7, A , ,064 YES VHP-0701 ROOM 709 7, A , ,064 YES VHP-0801 ROOM 810 5, A , ,064 YES VHP-0901 ROOM 901 7, A , ,216 YES VHP-1001 ROOM , A , ,216 YES VHP-1201 MECHANICAL ROOM 120X 3, A , ,216 YES HP-2-1 ROOM 209 2, A , YES HP-3-1 ROOM 309 2, A , YES HP-4-1 ROOM 409 1, A , YES HP-5-1 ROOM 509 2, A , YES HP-6-1 ROOM 609 1, A , YES HP-7-1 ROOM 709 1, A , YES HP-8-1 ROOM 810 2, A , YES HP-9-1 ROOM 901 2, A , YES HP-10-1 ROOM , A , YES NOTES: 1. VOLUME OF SPACE CONTAINING COMPRESSOR PER VCC AND VMC VOLUME OF THE SMALLEST SPACE SERVED PER VCC AND VMC

30 TYPICAL VRF OFFICE LAYOUT

31

32

33

34 23.6%

35 Water Saving Measures Use Low Flow Fixtures Toilets Pint Urinals Faucet sinks Future showers 1.6 GPF; Consider Dual Flush GPF 0.5 GPF 0.5 GPF Hot water Use heat recovery from condenser and refrigerant loop for domestic hot water. Make up water Reclaim condensate and rain water for cooling tower make up water. This will satisfy: 60% of the HVAC water

36 Summary of a Successful Project Approach For Sustainable Historic Rehabilitation Projects Take advantage of the inherent nature of the project: Rehabilitating an existing structure is fundamentally green. Building Opportunities Urban Opportunities Take advantage of new technologies where appropriate Eco-friendly material selection (local & renewable) Cost does not have to be an issue Be flexible and open minded in approach Secretary s Standards for Rehabilitation vs. Sustainable Strategies and Guidelines Remember: An integrated design approach leads to an efficient and sensible solution

37 Commonwealth Architects & Integral Group Thank You!

The Economic Development Advantages of High Performance Rehabilita;on Projects. 2013 VCU Energy & Sustainability Conference January 30, 2013

The Economic Development Advantages of High Performance Rehabilita;on Projects. 2013 VCU Energy & Sustainability Conference January 30, 2013 The Economic Development Advantages of High Performance Rehabilita;on Projects 2013 VCU Energy & Sustainability Conference January 30, 2013 Founding Firm Philosophy REBUILDING COMMUNITY As a practice,

More information

SYSTEMS INTEGRATION SYSTEMS INTEGRATION. Air handler uses heat recovery on exhaust air to temper incoming ventilation air Oxbow skylight

SYSTEMS INTEGRATION SYSTEMS INTEGRATION. Air handler uses heat recovery on exhaust air to temper incoming ventilation air Oxbow skylight 100% outside air intake Air handler uses heat recovery on exhaust air to temper incoming ventilation air Oxbow skylight Smoke evacuation Natural convection exhaust Atrium skylight Phase change material

More information

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks Presentation Outline Common Terms / Concepts HVAC Building Blocks Plant Level Building Blocks Description / Application Data Green opportunities Selection Criteria Air Distribution Building Blocks same

More information

MARQUETTE UNIVERSITY: McCabe Hall

MARQUETTE UNIVERSITY: McCabe Hall MARQUETTE UNIVERSITY: McCabe Hall THE SITE Newly acquired by Marquette, the vintage 1920 s building is located on the northeast corner of Wisconsin and 17th Streets. The urban setting offers immediate

More information

GREEN SCHOOLS CASE STUDY. West Wing Elementary

GREEN SCHOOLS CASE STUDY. West Wing Elementary GREEN SCHOOLS CASE STUDY School School name: School Deer Valley Union School District Address: 26716 N. High Desert Drive, Peoria, Arizona Contact: Jerry Cipriano Phone number: 602-467-5131 General location:

More information

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715, 4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.

More information

Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure

Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure Sustainable Features High-performance HVAC High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure Sustainable Landscaping Recycled and Regional Materials Storm-water Management District

More information

The District Energy Manager and Classroom Heating

The District Energy Manager and Classroom Heating Mt. Carmel Area School District Energy Conservation Policy Adopted 6/19/06 These guidelines supersede all previous instructions. It is crucial that these energy guidelines be observed in the operation

More information

We ve got you covered.

We ve got you covered. Mechanical & Plumbing We ve got you covered. Energy Savings Maintenance Contracts Cooling Towers Re-piping Air-conditioning Building Automated Systems Boiler Retrofits Sewer Cleaning Drain Systems THE ONLY

More information

Exhibit B. Property Acquisition and Disposition Division Residential Design & Performance Standards

Exhibit B. Property Acquisition and Disposition Division Residential Design & Performance Standards Exhibit B Property Acquisition and Disposition Division Residential Design & Performance Standards I. Introduction The Property Acquisition and Disposition Division ( PADD ) has developed design standards

More information

Sika Sarnafil World Class Roofing and Waterproofing

Sika Sarnafil World Class Roofing and Waterproofing The following is a brief summary of the Leadership in Energy and Environmental Design program (LEED, Version 3) and the sections Sika Sarnafil s roofing systems can help contribute to obtaining LEED points.

More information

Whistler Green: Project Checklist

Whistler Green: Project Checklist Whistler Green: Project Checklist (Detached and duplex dwellings) Whistler Green is our community standard for healthy homes that use energy and resources efficiently in a mountain setting. Considered

More information

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004 School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM

More information

LEED PRESENTATION OUTLINE

LEED PRESENTATION OUTLINE 16902 BOLSA CHICA STREET, SUITE 101 HUNTINGTON BEACH, CA 92649 TELEPHONE (714) 840-8230 FACSIMILE (714) 840-2490 LEED PRESENTATION OUTLINE I. Overview of Green Building and Risks Involved with Sustainability

More information

MEETING AGENDA. Project Administrator:

MEETING AGENDA. Project Administrator: MEETING AGENDA Project Administrator: To: Ann Green M. Baker, SLCS C. Bullinger, SLCS R. Clark, SLCS Board C. Cox, SLCS S. Dotinga, Granger J. Graham, SLCS J. Gusick, SLCS, Board C. Hanshaw, SLCS Board

More information

How To Rehabilitate The Ninth Street Office Building

How To Rehabilitate The Ninth Street Office Building SUSTAINABLE STRATEGIES FOR THE REHABILITATION OF AN HISTORIC STATE OFFICE BUILDING Industry Corner Robert C. Burns, AIA, LEED AP 1 FIGURE 1. View across Richmond s Capitol Square toward the Hotel Richmond,

More information

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy BPC Green Builders Green building for new and existing homes Health Comfort Energy Mechanical Systems Installed HVAC Systems Primary energy source large, roof mounted, solar thermal array (AET flat plate)

More information

MECHANICAL SYSTEMS DESIGN. Team 2010 2

MECHANICAL SYSTEMS DESIGN. Team 2010 2 MECHANICAL SYSTEMS DESIGN Andrew Bridges, Ben Hollon, Sean Kolich, Weston Arbogast, Kaitlin Page Andrew Bridges, Ben Hollon, Sean Kolich, Weston Arbogast, Kaitlin Page Team 2010 2 PRESENTATION OVERVIEW

More information

POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services

POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services May 200 Table of Contents NEW CONSTRUCTION/MAJOR RENOVATION Process... Design... 3 MINOR RENOVATIONS/PROJECTS Process...

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

MSHDA Affordable Green Enterprise Green Communities USGBC LEED

MSHDA Affordable Green Enterprise Green Communities USGBC LEED TAB M The ("QAP") is designed to further the Authority's mission by providing a process to allocate Low Income Housing Tax Credits ("LIHTC") to developments promoting safe, decent, affordable housing.

More information

Green House, Hungary

Green House, Hungary Further information Skanska AB www.skanska.com Contact Noel Morrin, SVP Sustainability & Green Support noel.morrin@skanska.se Green House, Hungary Case Study 109 Aspects of Sustainability This project

More information

Industrial Green Building Retrofit 101 Opportunities and Challenges. Light Industrial Green Building Retrofits. Why Green Retrofit?

Industrial Green Building Retrofit 101 Opportunities and Challenges. Light Industrial Green Building Retrofits. Why Green Retrofit? Industrial Green Building 101 Opportunities and Challenges Joanne Sawatzky Senior Project Manager, Light House Sustainability at Work Re-visioning a Sustainable False Creek Flats Light Industrial Green

More information

IMPROVING HEALTH FACILITY INFRASTRUCTURE (IHFI) Electrical Infrastructure Rehabilitation HUEH Hospital Emergency Ward Port-au-Prince, Haiti

IMPROVING HEALTH FACILITY INFRASTRUCTURE (IHFI) Electrical Infrastructure Rehabilitation HUEH Hospital Emergency Ward Port-au-Prince, Haiti IMPROVING HEALTH FACILITY INFRASTRUCTURE (IHFI) Electrical Infrastructure Rehabilitation HUEH Hospital Emergency Ward Port-au-Prince, Haiti Case Study December 2012 INTRODUCTION Built in 1918, the 540-bed

More information

Los Angeles Community College District

Los Angeles Community College District Los Angeles Community College District BLUE AND GREEN TOGETHER Developing Sustainable Integrated Approaches to Green Technologies and Water Usage Green California Schools and Community Colleges October

More information

GREEN DEVELOPMENT PLAN Developer Name: Project Name: Address (Street/City/State) Description of Process. Goals. Design & Development Team Members Name

GREEN DEVELOPMENT PLAN Developer Name: Project Name: Address (Street/City/State) Description of Process. Goals. Design & Development Team Members Name GREEN DEVELOPMENT PLAN Developer Name: Project Name: Address (Street/City/State) Description of Process A description of the process that was used to select the green building strategies, systems and materials

More information

This report presents the findings and recommendations of the assessment of energy use and

This report presents the findings and recommendations of the assessment of energy use and This report presents the findings and recommendations of the assessment of energy use and environmental stewardship of Arlington Street Church, Boston, MA. As stewards of the earth it is important that

More information

Energy Audit Data Collection Form

Energy Audit Data Collection Form SAVING ENERGY IN COMMERCIAL BUILDINGS Energy Audit Data Collection Form Site Data Building Name Address Building Square Footage (ft 2 ) Age of Building (years) Date of Last Major Renovation Purpose of

More information

Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings

Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings Advanced Energy Design Guide LEED Strategies for Schools and High Performance Buildings Today s Presenters Stephen Koontz, LEED AP Energy Services Leader Tampa Bay Trane Allen Irvine General Sales Manager

More information

Raising the Bar: A Comparison Study of Iowa s Current and Proposed Energy Code

Raising the Bar: A Comparison Study of Iowa s Current and Proposed Energy Code Raising the Bar: A Comparison Study of Iowa s Current and Proposed Energy Code Julia Gauthier, LEED AP BD+C Jeanne Huntsman, AIA, LEED Green Associate The Weidt Group Raising the Bar Special statements

More information

Water Distress in Growing Cities Issues & Challenges. Presented by: Neeta Sharma Managing Director IAPMO India

Water Distress in Growing Cities Issues & Challenges. Presented by: Neeta Sharma Managing Director IAPMO India Water Distress in Growing Cities Issues & Challenges Presented by: Neeta Sharma Managing Director IAPMO India Source: UNESCO Green Approach- A MUST today- for Sustainability (better life cycle costs and

More information

The ASHRAE HQ Building Can the energy efficiency of the different mechanical systems really be compared? RESIDENTIAL LIGHT COMMERCIAL COMMERCIAL

The ASHRAE HQ Building Can the energy efficiency of the different mechanical systems really be compared? RESIDENTIAL LIGHT COMMERCIAL COMMERCIAL The ASHRAE HQ Building Can the energy efficiency of the different mechanical systems really be compared? RESIDENTIAL LIGHT COMMERCIAL COMMERCIAL Technical Article April 2013 The ASHRAE HQ Building Can

More information

125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008

125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008 125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008 The Harvard Law School s 125 Mount Auburn office renovation project team was committed to sustainable design and construction,

More information

6 Schedule quarterly communications to keep employees involved in environmental improvements. WASTE REDUCTION REQUIRED MEASURES

6 Schedule quarterly communications to keep employees involved in environmental improvements. WASTE REDUCTION REQUIRED MEASURES GREEN BUSINESS CERTIFICATION (GBC) Business Name: Business Address: Plano, TX ZIP: Commercial Recycling 4200 W. Plano Parkway Plano, TX 75093 972-769-4393 OFFICE/RETAIL CHECKLIST General Education Waste

More information

UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01

UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

Rainwater Harvesting

Rainwater Harvesting Rainwater Harvesting With climate change now a reality rather than a speculated possibility, the demand on water resources has gone up, whilst the amount of water available for supply has gone down. Forth

More information

BUILDING SAFETY UNIT

BUILDING SAFETY UNIT POLICY Page 1 of 5 SUBMITTAL REQUIREMENTS FOR ONE AND TWO FAMILY DWELLINGS, ADDITIONS AND RENOVATIONS All submittals shall be site specific and designed to the provisions of the 2012 International Residential

More information

1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53%

1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53% 1 1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53% 2. How much money do commercial facilities spend per square foot on energy costs

More information

Mechanical, Plumbing, and Fire Protection Conditions

Mechanical, Plumbing, and Fire Protection Conditions Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred

More information

Tysons Sustainability Summit Evidence Based Urban Design. Roger E. Frechette III, PE, LEED-AP

Tysons Sustainability Summit Evidence Based Urban Design. Roger E. Frechette III, PE, LEED-AP Tysons Sustainability Summit Evidence Based Urban Design 2013 Autodesk Roger E. Frechette III, PE, LEED-AP Live in Harmony with Nature Transit Community Energy Waste Air Quality Water Yujiapu Financial

More information

Green Building at Virginia s Community Colleges

Green Building at Virginia s Community Colleges Green Building at Virginia s Community Colleges Presented by: Sandra Leibowitz Earley, AIA, LEED AP Principal for Member Greening Virginia Universities and Colleges Richmond, VA October 22, 2009 Sustainable

More information

EnergyPro Building Energy Analysis. Assisted Living Building

EnergyPro Building Energy Analysis. Assisted Living Building EnergyPro Building Energy Analysis Assisted Living Building EnergyPro Building Energy Analysis for an assisted living building Project Scope The purpose of the EnergyPro energy model was to evaluate the

More information

Rules of Thumb Energy Efficiency in Buildings

Rules of Thumb Energy Efficiency in Buildings Energy Efficiency in Buildings Energy Savings Cost Savings Increased Productivity Economic Development Other Standard lighting retrofits: $0.90-$1.20 per square foot. High-efficiency packaged and split

More information

CASE STUDY: The EVERGREEN

CASE STUDY: The EVERGREEN CASE STUDY: The EVERGREEN 1691 Palm Ave Summary Information Type: Residential Occupancy: Single Family Residence Size: 3,075 square feet Completed: 2009 Owner: Rob and Denise Smith Developer: E2 Homes,

More information

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building. MSV: Square Footage: 24,844 No. of Floors: 1 Year Built: 1963 Type of Use: Lounge and dining area open all night for snacks Steam Water-cooled condenser, 50-Ton York unit with a 6 cylinder-reciprocating

More information

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries

AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries Hot tips and cool ideas to save energy and money! Air conditioning units or systems are often used by foundries

More information

Residential HVAC Load Sizing Training October 14, 2015. David Kaiser Green Code Plan Reviewer

Residential HVAC Load Sizing Training October 14, 2015. David Kaiser Green Code Plan Reviewer Residential HVAC Load Sizing Training October 14, 2015 David Kaiser Green Code Plan Reviewer DCRA - Green Building Division Regulations of green codes including: Green Building Act Green Construction Code

More information

Building Energy Systems. - HVAC: Heating, Distribution -

Building Energy Systems. - HVAC: Heating, Distribution - * Some of the images used in these slides are taken from the internet for instructional purposes only Building Energy Systems - HVAC: Heating, Distribution - Bryan Eisenhower Associate Director Center

More information

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP research journal 2013 / VOL 05.01 www.perkinswill.com SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP ARCHITECTURE AND ENGINEERING OF SUSTAINABLE BUILDINGS Current Trends in Low-Energy HVAC Design

More information

Speaking the Same Language THE UNIVERSITY OF MICHIGAN LAW SCHOOL SOUTH HALL Ann Arbor, MI

Speaking the Same Language THE UNIVERSITY OF MICHIGAN LAW SCHOOL SOUTH HALL Ann Arbor, MI Speaking the Same Language THE UNIVERSITY OF MICHIGAN LAW SCHOOL SOUTH HALL Ann Arbor, MI 2 4 3 CAMPUS CONTEXT The University of Michigan Law School campus is a complex of buildings, organized around a

More information

An Introductory Overview of Green/Sustainable Retrofitting of Existing Buildings in the U.S. May 2010 THE CHEAPEST ENERGY IS SAVED ENERGY 1

An Introductory Overview of Green/Sustainable Retrofitting of Existing Buildings in the U.S. May 2010 THE CHEAPEST ENERGY IS SAVED ENERGY 1 An Introductory Overview of Green/Sustainable Retrofitting of Existing Buildings in the U.S. May 2010 THE CHEAPEST ENERGY IS SAVED ENERGY 1 Executive Summary The word Retrofit today, has many connotations

More information

WATER. Water Management Protect your building from water damage. Intent. Information & Tips

WATER. Water Management Protect your building from water damage. Intent. Information & Tips Water Management Protect your building from water damage If not managed properly, rain can drain into unwanted areas damaging your roof, windows, walls and facade. Eliminate water damage to your property

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary

RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary January 2013 TABLE OF CONTENTS INTRODUCTION... 3 GENERAL RECOMMENDATIONS... 3 Communication with customers in the field of environmental sustainability...

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

ELIGIBLE REPAIR PROJECT PARAMETERS

ELIGIBLE REPAIR PROJECT PARAMETERS THE DISTRICT MUNICIPALITY OF MUSKOKA ONTARIO RENOVATES PROGRAM FOR HOMEOWNERS ELIGIBLE REPAIR PROJECT PARAMETERS 1. To have your project considered and payment processed, all projects requiring a Building

More information

Print Shop/Mail Room

Print Shop/Mail Room Chapter XVIII Print Shop/Mail Room Page 110 CHAPTER XVIII Print Shop/Mail Room ARCHITECTURAL/STRUCTURAL A. BUILDING EXTERIOR 1.0 EXTERIOR WALLS The exterior walls are comprised of stone veneer. There were

More information

100% 50% 92% 99% LEED Facts PROJECT HIGHLIGHTS. Multi-occupant spaces have adjustable thermostats and lighting. Reduced water usage for landscaping

100% 50% 92% 99% LEED Facts PROJECT HIGHLIGHTS. Multi-occupant spaces have adjustable thermostats and lighting. Reduced water usage for landscaping UNIVERSITY OF RICHMOND CAROLE WEINSTEIN INTERNATIONAL CENTER 28 Westhampton Way, Richmond VA 23173 LEED NC v2.2 GOLD 2015 Completed in 2010, the Carole Weinstein International Center showcases the University

More information

Heating & Cooling Efficiency

Heating & Cooling Efficiency Heating & Cooling Efficiency Advantages of Geothermal HVAC Efficiency Keith Swilley Gulf Power Company Why Gulf Power Promotes Energy Efficiency? Customer Satisfaction Education Help Customers Make Smart

More information

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now

Air Conditioning. The opportunity for energy efficiency. Low cost actions to reduce energy usage now Fact Sheet #6 Air Conditioning In this fact sheet you will discover: The opportunity for energy efficiency How air conditioning works Low cost actions to reduce energy usage now Investments to reduce costs

More information

Siemens Gebze Location FIRST GREEN BUILDING IN TURKEY CERTIFICIED AS LEED GOLD

Siemens Gebze Location FIRST GREEN BUILDING IN TURKEY CERTIFICIED AS LEED GOLD FIRST GREEN BUILDING IN TURKEY CERTIFICIED AS LEED GOLD Slide 1 Energy Efficiency Workshop with KFW & TSKB Sep 28th, 2010 The LEED Green Building Rating System is a voluntary standard that defines high

More information

303 5 th Avenue, Suite 1702 New York, NY 10016 (212) 234-1027 www.greenstreetinc.com

303 5 th Avenue, Suite 1702 New York, NY 10016 (212) 234-1027 www.greenstreetinc.com GreenStreet Inc. High Performance Building Upper West Side In Progress 137 W77th Street is a total gut renovation and new addition located on the West Side. The space is approximately 4,972 sq/ft. The

More information

HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA

HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Our Triple Bottom Line...

Our Triple Bottom Line... Our Triple Bottom Line... A Better Approach We embrace what we consider to be our responsibility as developers to balance profits with environmental and social dividends. We believe that our long-term

More information

Klosterenga, Oslo, Norway, 1998-2000 page - 1

Klosterenga, Oslo, Norway, 1998-2000 page - 1 Klosterenga, Oslo, Norway, 1998-2000 page - 1 Introduction Klosterenga is an urban revitalisation project close to the city centre of Oslo. The 3 apartments were built with a focus on energy saving. Next

More information

Geothermal Ice Arenas

Geothermal Ice Arenas Geothermal Ice Arenas For more information, call: Ltd. 41 St. Paul Blvd. West St. Paul, MB R2P 2W5 Ph: (204) 255-5959 Fax: (204) 255-7365 Email: edlohrenz@shaw.ca Website: www.icekubeheat.com ICE Ice KUBE

More information

Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University.

Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University. Page 1 of 6 INTRODUCTION Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University. Millennium Hall is described as

More information

Building Energy Codes 101 October 23, 2013. Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance

Building Energy Codes 101 October 23, 2013. Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance Building Energy Codes 101 October 23, 2013 Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance OVERVIEW 1. Introduction 2. Energy Code Development 3. Adoption Process 4. Elements

More information

HVAC Systems: Overview

HVAC Systems: Overview HVAC Systems: Overview Michael J. Brandemuehl, Ph.D, P.E. University of Colorado Boulder, CO, USA Overview System Description Secondary HVAC Systems Air distribution Room diffusers and air terminals Duct

More information

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792

More information

Water Damage & Repair

Water Damage & Repair Water Damage & Repair Chinatown Preservation Talks 2015 James Engler, P.A Glenn Mason, AIA Mason Architects Program Outline Terminology & Waterproofing Basics Discussion of why this is important Below

More information

High Performance School Buildings Resource and Strategy Guide

High Performance School Buildings Resource and Strategy Guide High Performance School Buildings Resource and Strategy Guide Published by: Sustainable Buildings Industry Council With support from: California Energy Commission National Concrete Masonry Association

More information

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service

More information

MURCH ELEMENTARY SCHOOL

MURCH ELEMENTARY SCHOOL INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Geothermal Heat Pump Systems

Geothermal Heat Pump Systems Geothermal Heat Pump Systems GeoExchange Technology Curtis J. Klaassen, P.E. Iowa Energy Center Energy Resource Station Geothermal Heat Pump Technology Introduction What is Geothermal Energy? Geothermal

More information

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings J A NUARY 2015 INTRODUCTION This Research Report explores best practices and approaches for reducing greenhouse gas (GHG)

More information

Small Guide to BIG Savings: Energy Efficiency for your Small Business. Julia Sander Leidos Engineering, LLC

Small Guide to BIG Savings: Energy Efficiency for your Small Business. Julia Sander Leidos Engineering, LLC Small Guide to BIG Savings: Energy Efficiency for your Small Business Julia Sander Leidos Engineering, LLC TWO KEY MESSAGES 1. Every dollar saved is a profit of one dollar to your business» If you save

More information

Nominal Life Expectancy for Building Components

Nominal Life Expectancy for Building Components Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes

More information

Mechanical Systems Proposal revised

Mechanical Systems Proposal revised Mechanical Systems Proposal revised Prepared for: Dr. William Bahnfleth, Professor The Pennsylvania State University, Department of Architectural Engineering Prepared by: Chris Nicolais Mechanical Option

More information

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Maryland American Recovery and Reinvestment Act 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair Building 316 Electrical, HVAC, Plumbing,

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement

More information

HIGH EFFICIENCY RTU. www.reznorhvac.com HIGH EFFICIENCY, PACKAGED SPACE CONDITIONING. DX System IEER> 13.2 Gas Heat Efficiency > 92% Capacities Tons

HIGH EFFICIENCY RTU. www.reznorhvac.com HIGH EFFICIENCY, PACKAGED SPACE CONDITIONING. DX System IEER> 13.2 Gas Heat Efficiency > 92% Capacities Tons Capacities 10-25 Tons 100-400 MBH HIGH EFFICIENCY, PACKAGED SPACE CONDITIONING DX System IEER> 13.2 Gas Heat Efficiency > 92% HIGH EFFICIENCY RTU 30-120 kw 3,000-11,550 CFM Comfort Comfort is determined

More information

Virginia. American Recovery and Reinvestment Act. 83 DoD Projects ($ 75.7M) Completed or Under Way by August 31, 2009

Virginia. American Recovery and Reinvestment Act. 83 DoD Projects ($ 75.7M) Completed or Under Way by August 31, 2009 Virginia American Recovery and Reinvestment Act 83 DoD Projects ($ 75.7M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair/Replace Bathrooms in Wilcox Barracks Army

More information

TOWARD A SUSTAINABLE DALLAS

TOWARD A SUSTAINABLE DALLAS TOWARD A SUSTAINABLE DALLAS An Overview of LEED, Green Building Programs and recommendations for next steps Presented to the Dallas City Council OCTOBER 17, 2007 w w w. d a l l a s c i t y h a l l. c o

More information

The Future of Airport Design.. Sara Beardsley, AIA, LEED AP Senior Architect

The Future of Airport Design.. Sara Beardsley, AIA, LEED AP Senior Architect The Future of Airport Design.. Sara Beardsley, AIA, LEED AP Senior Architect Form follows PerFormance FKI Headquarters Tower Exterior Wall FKI Headquarters Tower Exterior Wall Energy Collection FKI Headquarters

More information

TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY... 3

TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY... 3 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY... 3 2.0 BACKGROUND... 5 2.1 Space Types 2.2 Occupancy and Use Schedules 2.3 Recent Building System Upgrades and Existing Conditions 2.4 Renewable Energy Assessment

More information

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional

More information

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live! U.S. Department of Housing and Urban Development Office of Public and Indian Housing A Good Place to Live! Introduction Having a good place to live is important. Through your Public Housing Agency (or

More information

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay Original HVAC Units: Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue Photo Essay One fan motor draws air from the lower section of the unit,

More information

FLORIDA SOLAR ENERGY CENTER

FLORIDA SOLAR ENERGY CENTER FLORIDA SOLAR ENERGY CENTER Creating Energy Independence High Performance Existing Homes Partnerships and Research Janet McIlvaine Research Analyst, Florida Solar Energy Center A Research Institute of

More information

EarthCents (DSM) Program Summary

EarthCents (DSM) Program Summary EarthCents (DSM) Program Summary Renewable Energy EarthCents Programs Solar Water Heating This program is available to residential customers for the installation of a qualifying solar thermal water heater.

More information

Innovation in Affordable Housing Incorporating GREEN in Development

Innovation in Affordable Housing Incorporating GREEN in Development Innovation in Affordable Housing Incorporating GREEN in Development 2014 Housing Innovation Marketplace Conference INTRODUCTION A small idea can grow into something that really bears fruit and, if good

More information

Innovent LASER Packaged Fresh Air Conditioning Units

Innovent LASER Packaged Fresh Air Conditioning Units LASER Latent And Sensible Energy Reduction Latent And Sensible Energy Reduction For Outside Air Innovent LASER Packaged Fresh Air Conditioning Units Innovent LASER units provide both sensible and latent

More information

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015 ADDENDUM NO. 1 DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015 RECEIPT DATE: March 17, 2015 at 2:30 p.m. OPENING DATE: March 18,

More information

Does Wall Township require an inspection by the building department on resale of a home?

Does Wall Township require an inspection by the building department on resale of a home? Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,

More information

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA Boggarm S. Setty, P.E., Fellow ASHRAE Setty & Associates, Ltd. 3040 Williams Drive, Suite 600, Fairfax,

More information

BOMA BESt Assessment Overview

BOMA BESt Assessment Overview BOMA BESt Assessment Overview BOMA Building Environmental Standards OFFICE Module August 2013 The Voice of the Commercial Real Estate Industry in Canada The Building Owners and Managers Association of

More information

HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY

HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY Benson Kwong, CVS, PE, CEM, LEED AP, CCE envergie consulting, LLC Biography Benson Kwong is an independent consultant providing