1 Virginia American Recovery and Reinvestment Act 83 DoD Projects ($ 75.7M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair/Replace Bathrooms in Wilcox Barracks Army Fort A P Hill 700 Gregg/Lent Road Bridge Army Fort A P Hill 575 Repair Bathrooms in 2nd Bn Area Barracks - Wilcox Army Fort A P Hill 426 Improve Safety of Wilcox Landing Site Army Fort A P Hill 290 Replace Doors Wilcox Camp Army Fort A P Hill 200 Lower Ceilings in Dining Facility (Wilcox) Army Fort A P Hill 150 Repair Beaver Dam Water Control Structure Army Fort A P Hill 150 Replace Exhaust Fans in Wilcox Dining Facilities Army Fort A P Hill 75 Install Siding and New Windows to 1637 Army Fort A P Hill 70 Replace Roof 1641 on Dining Facility in Wilcox Army Fort A P Hill 65 Paint Interior of Dining Facility Army Fort A P Hill 60 Replace All Wilcox Dining Facility Doors Army Fort A P Hill 60 Virginia 1 June 8, 2009

2 Decentralize Heating Plant, Building 808 Army Fort Belvoir 4,200 Decentralize Heating Plant, 12th Street Army Fort Belvoir 3,200 Replace Farrar Road Bridge (Building 3291), Davison Army Airfield Army Fort Belvoir 2,600 Repair/Alter Building 257, Staff Judge Advocate office Army Fort Belvoir 2,500 Replace HVAC System, Building 201 Army Fort Belvoir 2,000 Replace Windows/Repair Insulation, Exterior Façade, and Vapor Barrier, Volar Barracks, Building 2109 Army Fort Belvoir 1,900 Repair HVAC, Building 20, Officers Club Army Fort Belvoir 1,800 Replace Windows/Repair, Insulation, Exterior Façade and Vapor Barrier, Volar Barracks, Building 2111 Army Fort Belvoir 1,700 Replace Approach/Departure Lights/Controls, Davison AAF Army Fort Belvoir 1,215 Repair Facilities 3202, 3203 Fixed and Rotary Wing Parking Apron Army Fort Belvoir 945 Repair 16th Street Army Fort Belvoir 875 Replace central steam heat with individual boilers--6 Buildings Army Fort Belvoir 700 Removal and Replacement of fuel storage tanks Army Fort Belvoir 650 Building 200, Fire Suppression System Army Fort Belvoir 500 Repair HVAC. Building 246, Communications Center Army Fort Belvoir 500 Virginia 2 June 8, 2009

3 Repair Religious Education Center, Building 1028-Repair Doors, Windows, Finishes, Electric, HVAC Systems. Repair Building 2116, Physical Fitness Facility--Bathrooms, Showers, and Lockers, Heating, Ventilation, and Air Conditioning, Athletic Court Flooring, and Interior Finishes Army Fort Belvoir 500 Army Fort Belvoir 450 Replace central steam heat with individual boilers--2 Buildings Army Fort Belvoir 425 Bridge Repairs Army Fort Belvoir 400 Replace Storm Water Lines, Mount Vernon Road Army Fort Belvoir 400 Repair/Seal Leaking Basements, 200-Area Army Fort Belvoir 350 Replace Kitchen, Building 1003, Youth Center Army Fort Belvoir 79 Repair Steam Distribution at Central Heating and Cooling Plant, Building 801 Army Fort Eustis 2,573 Mill, Resurface & Restripe Runway, FAAF Army Fort Eustis 1,674 HVAC System Repairs for Energy Conservation, Building 814 Army Fort Eustis 1,022 HVAC System Repairs for Energy Conservation, Building 804 Army Fort Eustis 1,002 HVAC System Repairs for Energy Conservation, Building 810 Army Fort Eustis 918 HVAC System Repairs for Energy Conservation, Building 815 Army Fort Eustis 918 Alterations & Repairs to Main Fire Station, Building 648-Repair All Components of the Sleeping and Kitchen Area and Expand the Common Area Army Fort Eustis 911 Virginia 3 June 8, 2009

4 Renovate Latrines & HVAC, Building 810 Army Fort Eustis 910 Barracks Repair & Upgrade Building 698-Repaint, Repair Wall, Ceiling, Floor Finishes & Repair HVAC Barracks Repair & Upgrade Building 699-Repaint, Repair Wall, Ceiling, Floor Finishes & Repair HVAC. Army Fort Eustis 800 Army Fort Eustis 800 HVAC System Repairs For Energy Conservation, Building 805 Army Fort Eustis 753 Renovate Hangar, Building 2413, Ph 1 Army Fort Eustis 650 Install Left Turn Lanes & Repave Lee Blvd Army Fort Eustis 502 Mill & Repave Washington Blvd Army Fort Eustis 500 Restore Steam Dist/Cond Return System, 1400 Area and Barracks Mech Rooms Install Traffic Signal At Intersection of Madison Onto Lee, Construct New Left Turn Lane Install Sprinkler Systems in Public Assembly Building, Building 828 Army Fort Eustis 450 Army Fort Eustis 316 Army Fort Eustis 306 Upgrade & Expand Weight & Circuit Area, Building 643 Army Fort Eustis 272 Repairs to Building 601-Repaint, Repair Wall, Ceiling, Floor Finishes & Repair HVAC Army Fort Eustis 250 Install Cooling Tower, Building 2715 Army Fort Eustis 188 Install Left Turn Lanes & Repave Jefferson Blvd, Ph 1 Army Fort Eustis 154 Enhanced Equipment Energy Conservation Automation, 900 Block Army Fort Eustis 62 Virginia 4 June 8, 2009

5 Chemical Clean Boilers, Buildings 587 & 2701 Army Fort Eustis 50 Repair Sidewalks, Admin Building 300 Army Fort Eustis 12 Replace Disabled Access/Wheelchair Ramp, Building 643 Army Fort Eustis 10 Consolidated Dining Facility HVAC Replacement Army Fort Lee 3,000 Repair/Improve 11th Street, Quartermaster Rd to A Avenue Army Fort Lee 2,000 HVAC Replacement Phase A, Wing "A" ALMC Army Fort Lee 1,734 Replace HVAC, Clark Fitness Center Army Fort Lee 800 Repair Garrison Hq Building, Repair Finishes, Plumbing, Electric, HVAC, Doors, Windows. Army Fort Lee 750 Design & Construct Ordinance School Fitness Center Army Fort Lee 743 Design & Construct Fitness Center at Logistics University Army Fort Lee 731 Repair Bridges Army Fort Lee 572 Repair Building Dining Facility Dining Area & Canopy Army Fort Lee 500 Repair carpentry, electrical, plumbing, HVAC - Multiple Buildings Army Fort Lee 315 Maclaughlin Fitness Center, HVAC and Electrical, Cardio Room Army Fort Lee 250 Repair Building P-9302 Company Operations Army Fort Lee 222 Virginia 5 June 8, 2009

6 Renovate Building 249 Company Operations Army Fort Myer 8,675 Design & Install Fire Sprinkler System, Building 407, Myer Army Fort Myer 750 Chesapeake Bay Shoreline Restoration Army Fort Story 2,198 Repair Central Heating and Cooling Plant, Building 865 Army Fort Story 629 Replace Baths, Kitchens, and Repair Exteriors Upgrade Housing Services Office Renovate Exteriors and Repair Porches, SNCO Family Housing, Sheridan St. Army Family Housing Army Family Housing Army Family Housing Fort A P Hill 50 Fort Belvoir 70 Fort Myer 550 Replace Elevators #37 and #40 Building 171 Navy Naval Shipyard Norfolk 1,835 Replace Steam Lines Navy Naval Station Norfolk 1,054 Repair Roof Section C, Admin Fac. 330 Air Force Langley AFB 1,043 Repair Inefficient Motors In Water Source Heat Pumps, F. 693 Air Force Langley AFB 439 Repair Hangar Door Seals, 10 Buildings Air Force Langley AFB 105 Virginia 6 June 8, 2009

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Maryland American Recovery and Reinvestment Act 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair Building 316 Electrical, HVAC, Plumbing,

More information

Georgia. American Recovery and Reinvestment Act. 119 DoD Projects ($ 107.7M) Completed or Under Way by August 31, 2009

Georgia. American Recovery and Reinvestment Act. 119 DoD Projects ($ 107.7M) Completed or Under Way by August 31, 2009 Georgia American Recovery and Reinvestment Act 119 DoD Projects ($ 107.7M) Completed or Under Way by August 31, 2009 Project Title Component Installation Barracks Renovation to Correct Safety Issues -

More information

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town Hall Complete building restoration (state historic preservation award) High efficiency

More information

CENTRAL OHIO NORTHEAST OHIO

CENTRAL OHIO NORTHEAST OHIO CENTRAL OHIO Military Defense Supply Center Columbus Warehouse upgrades Columbus 1,000,000 Military Defense Supply Center Columbus Fire protection Columbus 500,000 Military Defense Supply Center Columbus

More information

BUNKER HILL ELEMENTARY SCHOOL

BUNKER HILL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

A Case Statement in Support Of Our Plans To Renovate and Restore our Campus Immaculate Conception Church Fort Smith, AR

A Case Statement in Support Of Our Plans To Renovate and Restore our Campus Immaculate Conception Church Fort Smith, AR A Case Statement in Support Of Our Plans To Renovate and Restore our Campus Immaculate Conception Church Fort Smith, AR Introduction Immaculate Conception Church is a vibrant community that dates back

More information

Building Description Project Description Estimated Cost Notes Total Deferred

Building Description Project Description Estimated Cost Notes Total Deferred Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field

More information

School Board Proposed Capital Improvements Program. Fiscal Years 2014-2023

School Board Proposed Capital Improvements Program. Fiscal Years 2014-2023 School Board Proposed Capital Improvements Program Fiscal Years 2014-2023 TABLE OF CONTENTS Summary Page 1 Capital Projects Pages 2-6 Capital Projects Description Pages 7-14 SCHOOL BOARD PROPOSED CAPITAL

More information

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

HOUSTON ELEMENTARY SCHOOL

HOUSTON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

DRAPER ELEMENTARY SCHOOL

DRAPER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Robert C. Burns, AIA, LEED AP Principal Director of Historic Architecture 804. 648. 5040, ext. 1107

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES 1. CALCULATION OF PERMIT FEES SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule: Permit Fee

More information

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 4/17/13 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 4/19/13 (delete following Hearing) KBE APPROVAL DATE: JUNE 2013 CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES

More information

November 3, 2015 Bond and District Additional Assistance Election Information

November 3, 2015 Bond and District Additional Assistance Election Information November 3, 2015 Bond and District Additional Assistance Election Information Proposition 432 - $22 million General Obligation Bond 150+ facility projects across all schools Building renovations and improvements

More information

In Partnership with. TDIndustries 13850 Diplomat Drive Dallas, Texas 75234 Phone: 1-972-888-6751 Fax: 1-972-888-9621 Website: TDIndustries.

In Partnership with. TDIndustries 13850 Diplomat Drive Dallas, Texas 75234 Phone: 1-972-888-6751 Fax: 1-972-888-9621 Website: TDIndustries. In Partnership with Schedule Contract #GS21F0118X Contract # TXMAS-12-03FAC0110 Schedule 03FAC Facilities Maintenance and Management Federal Supply Service Authorized Federal Supply Schedule Price List

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation

More information

MURCH ELEMENTARY SCHOOL

MURCH ELEMENTARY SCHOOL INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

PARKVILLE HIGH SCHOOL LIMITED RENOVATION PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,

More information

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete

More information

APPENDIX E: CAPITAL NEEDS SUMMARY

APPENDIX E: CAPITAL NEEDS SUMMARY APPENDIX E: CAPITAL NEEDS SUMMARY Building A Foundation Hall Building to be replaced ARCHITECTURAL Roof Repair North Structural Wall Repair Flooring Repairs Ceiling Repairs Lighting Repairs Lighting Repairs

More information

2014 British Columbia Building Code Changes

2014 British Columbia Building Code Changes District of Houston 250-845-2238 2014 British Columbia Building Code Changes A District of Houston interpretation of the 2014 Building Code Changes for 9.36 & 9.32 The following changes reflect the most

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

Notice to Property Owners

Notice to Property Owners Modification or Repair of your Flood Prone Property Notice to Property Owners Rebuilding or Remodeling Your Home If your home or business sustained damage, or if you are making improvements to the structure

More information

CAPITAL EXPENDITURES

CAPITAL EXPENDITURES CAPITAL EXPENDITURES 1 CAPITAL EXPENDITURES CAPITAL EXPENDITURES PLANNING On March 1, 2010 the AmherstPelham Regional School committee adopted a policy for developing a formal capital needs planning process.

More information

Sample Outline (courtesy of City of Guelph Museums) Building Conservation Plan

Sample Outline (courtesy of City of Guelph Museums) Building Conservation Plan Sample Outline (courtesy of City of Guelph Museums) Building Conservation Plan 1. Introduction 2. Commemorative Integrity Statement/Statement of Purpose 3. Contacts Staff City Contacts Ambulance Cold Storage

More information

Mechanical, Plumbing, and Fire Protection Conditions

Mechanical, Plumbing, and Fire Protection Conditions Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred

More information

Five-Year Capital Plan Request FY 2015-16 through FY 2019-20

Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance for Community Colleges bonded $417,500 Health and Safety bonded $91,088

More information

Print Shop/Mail Room

Print Shop/Mail Room Chapter XVIII Print Shop/Mail Room Page 110 CHAPTER XVIII Print Shop/Mail Room ARCHITECTURAL/STRUCTURAL A. BUILDING EXTERIOR 1.0 EXTERIOR WALLS The exterior walls are comprised of stone veneer. There were

More information

HOMEOWNER S PERMIT GUIDE

HOMEOWNER S PERMIT GUIDE HOMEOWNER S PERMIT GUIDE WHEN IS A PERMIT REQUIRED? Department of Development and Permits 306 Cedar Road, City Hall 2 nd Floor P.O. Box 15225 Chesapeake, VA 23328 Phone: (757) 382-6018 Fax: (757) 382-8448

More information

Schedule B to By-law 33-2009

Schedule B to By-law 33-2009 Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to

More information

Exterior Condition Report

Exterior Condition Report Scope of Work for Property Located at: 3918-20 West Cherry Street Date: 3/10/2014 Property is: Single Family Duplex Below is the minimum requirement to meet health and safety issues. The City of Milwaukee,

More information

KANSAS BOARD OF REGENTS

KANSAS BOARD OF REGENTS FOR IMMEDIATE RELEASE September 12, 2007 KANSAS BOARD OF REGENTS 1000 SW JACKSON SUITE 520 TOPEKA, KS 66612-1368 TELEPHONE 785-296-3421 FAX 785-296-0983 www.kansasregents.org STATE UNIVERSITIES BEGIN WORK

More information

7.0 REHABILITATION /RESTORATION / MAINTENANCE PLAN

7.0 REHABILITATION /RESTORATION / MAINTENANCE PLAN 7.0 REHABILITATION /RESTORATION / MAINTENANCE PLAN This section will detail and outline the rehabilitation, restoration, and maintenance plan for the 418 South June Street residence. Future work shall

More information

HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA

HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004 School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM

More information

Schedule B to By-law 33-2009 Part A Fees Payable for Permits

Schedule B to By-law 33-2009 Part A Fees Payable for Permits Floor Area Calculation Floor area shall: Part A Fees Payable for Permits (Effective January 1, 2015) a) be calculated by measuring to the outer face of exterior walls and to the centre of party walls or

More information

UNIVERSITY OF CALIFORNIA, SAN DIEGO

UNIVERSITY OF CALIFORNIA, SAN DIEGO UNIVERSITY OF CALIFORNIA, SAN DIEGO UCSD BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANTA BARBARA SANTA CRUZ UNIVERSITY CENTERS - 0076 PHONE: (858) 822-4987 9500 GILMAN

More information

RELEASE NOTES EG USA 3.0.0

RELEASE NOTES EG USA 3.0.0 RELEASE NOTES EG USA 3.0.0 Version 3.0 has a multitude of changes from version 2.8.05. One of the major changes is the ability to break up a home into Blocks with different HVAC systems. This includes

More information

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011 Facility Services Section Page Recharge Services, Maintenance and Construction PURPOSE 1 of 6 The purpose of this policy is to set forth standards for chargeable services for maintenance and construction

More information

SUMMARY ACT 45 OF 1998

SUMMARY ACT 45 OF 1998 SUMMARY This document is an explanation of Act 45 of 1998 which created an exemption called Building Machinery and Equipment (BME). The BME carve-out sets aside certain materials and items that are commonly

More information

Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL

Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 0 Overlea High School - Facility Summary Facility Opened: Auditorium Addition: Activity Room Addition: School Rated Capacity

More information

We ve got you covered.

We ve got you covered. Mechanical & Plumbing We ve got you covered. Energy Savings Maintenance Contracts Cooling Towers Re-piping Air-conditioning Building Automated Systems Boiler Retrofits Sewer Cleaning Drain Systems THE ONLY

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015)

Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015) Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015) What is a referendum? New Jersey school districts hold public referendum votes to seek approval

More information

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners

More information

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY

More information

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST It is essential to perform a Basic Damage Assessment (BDA) following an adverse event to help ensure the safety of building occupants as well as prevent additional losses from occurring. This checklist

More information

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION # BLOCK LOT VACANT YES NO CURRENT OWNER NAME ADDRESS TELEPHONE # PROSPECTIVE

More information

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are: When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory

More information

Before You Start an Energy Efficiency Retrofit The Building Envelope

Before You Start an Energy Efficiency Retrofit The Building Envelope ABOUT YOUR HOUSE Before You Start an Energy Efficiency Retrofit The Building Envelope The building envelope is the outer layer of the building that separates the indoor living space from the outdoor environment,

More information

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE) NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE) If your home or business is located within a 100-year floodplain and it was constructed through a County Building

More information

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS This guideline is intended to provide the homeowner/contractor with the

More information

CHARLOTTE COUNTY Community Development Department

CHARLOTTE COUNTY Community Development Department CHARLOTTE COUNTY Community Development Department Building Construction Services Division 18400 Murdock Circle, Port Charlotte FL 33948 Phone: 941.743.1201 Fax: 941.764.4907 www.charlottecountyfl.gov 50

More information

Policy on Repair and Renovation Funding

Policy on Repair and Renovation Funding Policy on Repair and Renovation Funding I. POLICY STATEMENT Auburn University s (the University s) Policy on Repair and Renovation Funding provides guidance and direction regarding the use of Repair and

More information

Texas Deparmtment of Housing and Community Affairs Community Development Block Grant (CDBG)

Texas Deparmtment of Housing and Community Affairs Community Development Block Grant (CDBG) Texas Deparmtment of Housing and Community Affairs Community Development Block Grant (CDBG) Subrecipient Name: Homeowner Name: Home Address: Homeowner Signature: Building Contractor Name and Address: Work

More information

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE

More information

APPLICATION FOR NEW CONSTRUCTION

APPLICATION FOR NEW CONSTRUCTION CITY OF ELKINS 401 DAVIS AVE ELKINS WV 26241 Date Pd: Receipt #: Session #: PHIL ISNER BLDG INSPECTOR / CODE ENFORCEMENT OFFICER 304-636-1414 Ext 1431 APP. DATE APPLICATION FOR NEW CONSTRUCTION APPLICANT

More information

Home Management Checklist: Spring

Home Management Checklist: Spring Home Management Checklist: Spring HVAC System Attic Plumbing and Electrical Service air conditioning unit (Ventilation inspected as part of service call). Ensure gutters are discharging water away from

More information

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live! U.S. Department of Housing and Urban Development Office of Public and Indian Housing A Good Place to Live! Introduction Having a good place to live is important. Through your Public Housing Agency (or

More information

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER NOTICE TO PROPERTY OWNER Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. If your home or business is below

More information

COMPREHENSIVE PROPERTY INSPECTIONS

COMPREHENSIVE PROPERTY INSPECTIONS COMPREHENSIVE PROPERTY INSPECTIONS Thank you for selecting CPI for your Deficiency Observation. A full home inspection was not performed on this property at the buyers request. This inspection is a limited

More information

Condensing Boiler Efficiency

Condensing Boiler Efficiency Condensing Boiler Efficiency Date: July 17, 2012 PRES E NT ED BY DO N L E O NA RDI LE O N A RD I I NC. HV AC T RAI N I N G & C ON SU LT IN G Concepts 1 The current state of evolution in boiler design 2

More information

May 5, 2010. Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client,

May 5, 2010. Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client, PROPERTY INSPECTION PROFESSIONALS May 5, 2010 Client Client Address Re: Inspection Address, Chicago, Illinois Dear Mr. Client, On May 4, 2010, Tomacor completed a property inspection of the above referenced

More information

PROPERTY INSPECTION REPORT

PROPERTY INSPECTION REPORT (850) 297-1998 1716 Monticello Dr Tallahassee, Florida 32303 PROPERTY INSPECTION REPORT THIS INSPECTION IS A DETAILED LISTING OF AREAS VISUALLY INSPECTED AT:, Tallahassee FL Client Tallahassee, FL 32304

More information

SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS

SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS Rebuilding or repairing your home/business after the storm? Adding on, renovating, or remodeling your home/business? Here s information YOU need

More information

PATTERSON ELEMENTARY SCHOOL

PATTERSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Project Close Out Summary

Project Close Out Summary Project Close Out Summary 1. Final Cleaning and Inspection 2. Testing and Certification 3. Demonstration of Systems and Equipment 4. Inspections by Authorities Having Jurisdiction 5. O&M Manuals and As

More information

AHERNE AIR CONDITIONING & mechanical services Complete Solution Partner

AHERNE AIR CONDITIONING & mechanical services Complete Solution Partner AHERNE AIR CONDITIONING & mechanical services Complete Solution Partner About Us Aherne Air Conditioning and Mechanical Services is an Irish owned company that has over 28 years of experience advising

More information

Columbus State Community College MASTER PLANNING

Columbus State Community College MASTER PLANNING Columbus State Community College MASTER PLANNING Current State Facilities and Utilities Assessment November 2011 Columbus State Community College MASTER PLANNING EXISTING UTILITIES AND FACILITIES ASSESSMENT

More information

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519 845-0801 Toll-free: 1-866-324-6912 Fax: 519

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables

More information

Accounting and Administrative Manual Section 100: Accounting and Finance

Accounting and Administrative Manual Section 100: Accounting and Finance No.: A-25 Page: 1 of 8 General: This policy establishes guidelines for determining when certain expenditures should be capitalized as capital assets and specifies the university s depreciation policy.

More information

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

D Sample Notices to Property Owners, Sample Affidavits, and Other Material D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully

More information

OFFICE OF THE STATE ARCHITECT ANNUAL REPORT 2015 PRIORITIZED STATEWIDE PROJECT FUNDING RECOMMENDATIONS FOR FY2015/2016

OFFICE OF THE STATE ARCHITECT ANNUAL REPORT 2015 PRIORITIZED STATEWIDE PROJECT FUNDING RECOMMENDATIONS FOR FY2015/2016 LEVEL 1 1 1 Office of the State Architect M80120 $2,000,000 $0 $2,000,000 Emergency Fund 2 3 Colorado State University 2015-073M14 $967,301 $0 $2,967,301 Replace Obsolete Fire Alarm, Various Buildings,

More information

Chignecto-Central Regional School Board. Highland Consolidated Middle School. Indoor Air Quality Issues Mechanical Systems

Chignecto-Central Regional School Board. Highland Consolidated Middle School. Indoor Air Quality Issues Mechanical Systems Chignecto-Central Regional School Board Highland Consolidated Middle School Mechanical Systems Prepared by: Neil Van Rossum, P.Eng. CJ MacLellan & Associates Antigonish, Nova Scotia November 2012 CJM File:

More information

SECTION.3400 - MECHANICAL: ELECTRICAL: PLUMBING

SECTION.3400 - MECHANICAL: ELECTRICAL: PLUMBING SECTION.3400 - MECHANICAL: ELECTRICAL: PLUMBING 10A NCAC 13D.3401 HEATING AND AIR CONDITIONING Heating and cooling systems shall meet the American Society of Heating, Refrigerating, and Air Conditioning

More information

ELIGIBLE REPAIR PROJECT PARAMETERS

ELIGIBLE REPAIR PROJECT PARAMETERS THE DISTRICT MUNICIPALITY OF MUSKOKA ONTARIO RENOVATES PROGRAM FOR HOMEOWNERS ELIGIBLE REPAIR PROJECT PARAMETERS 1. To have your project considered and payment processed, all projects requiring a Building

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal

More information

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW Parcel Number: Owner s Name: Co-Owner s Name: Owner s Mailing Address: Owner Phone Number: FIRM Panel: Lowest Floor Elevation (excluding garage):

More information

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It

More information

2015-2016 CAPITAL BUDGET 2016-2020 CAPITAL IMPROVEMENT PROGRAM CSA STRATEGIC SUPPORT CSA

2015-2016 CAPITAL BUDGET 2016-2020 CAPITAL IMPROVEMENT PROGRAM CSA STRATEGIC SUPPORT CSA CAPITAL BUDGET 2016-2020 CAPITAL IMPROVEMENT PROGRAM STRATEGIC SUPPORT CSA STRATEGIC SUPPORT CSA City Service Area Mission: To effectively develop, manage and safeguard the City s fiscal, physical, technological,

More information

Saint Cloud Business Center

Saint Cloud Business Center Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with

More information

Estimated Cost of Repair

Estimated Cost of Repair 1 Applicant: Property: Home: Business: Assessor: Applicant Number: Type of Loss: Hurricane Date Contacted: 1/18/2014 Date of Loss: 10/29/2012 Date Received: 1/14/2014 Date Inspected: 2/4/2014 Date Entered:

More information

2012 Annual Report. Greene County Buildings and Grounds

2012 Annual Report. Greene County Buildings and Grounds 2012 Annual Report Greene County Buildings and Grounds January, 2012 Added shelving for storage in the room off of room 430 Filing cabinets moved around in the Courthouse Reconfiguration of office space

More information

South Carolina Home Inspector Standards of Practice

South Carolina Home Inspector Standards of Practice South Carolina Home Inspector Standards of Practice The following Standards provide guidelines for the Residential Home Inspector and outline what the Residential Home Inspector should observe, identify,

More information

Facilities Maintenance Standards rev 9-1-2015

Facilities Maintenance Standards rev 9-1-2015 Facilities Maintenance Standards rev 9-1-2015 Purpose The purpose of these standards is to outline the minimum requirements for maintaining state owned facilities and infrastructures in a manner that will

More information

BUILDING SAFETY UNIT

BUILDING SAFETY UNIT POLICY Page 1 of 5 SUBMITTAL REQUIREMENTS FOR ONE AND TWO FAMILY DWELLINGS, ADDITIONS AND RENOVATIONS All submittals shall be site specific and designed to the provisions of the 2012 International Residential

More information

Unofficial. Resolution. Copy

Unofficial. Resolution. Copy SENATE COMMITTEE SUBSTITUTE FOR SENATE CONCURRENT RESOLUTION NO. 8 Relating to authorization for the issuance of bonds for certain state projects. Whereas, the General Assembly is desirous of approving

More information

Fort Lee. Base Realignment and Closure (BRAC) Update. Long and Foster. 24 March 2010

Fort Lee. Base Realignment and Closure (BRAC) Update. Long and Foster. 24 March 2010 BRAC Synchronization Office U.S. ARMY GARRISON, FORT LEE, VIRGINIA Fort Lee Base Realignment and Closure (BRAC) Update Long and Foster 24 March 2010 FORT LEE 2009 5907 Acres 7.5 Million SF of Facilities

More information

Financing Options to support Energy Efficiency & Contractors

Financing Options to support Energy Efficiency & Contractors Financing Options to support Energy Efficiency & Contractors Renovation Loan Overview Renovation Loans offer a buyer the opportunity to buy a property and close as-is, financing both the purchase and repair

More information

Contract NoDABT23-31-C-0008 TECHNICAL EXHIBIT 5.1-002 SERVICE ORDER (SO) PRIORITY CLASSIFICATIONS

Contract NoDABT23-31-C-0008 TECHNICAL EXHIBIT 5.1-002 SERVICE ORDER (SO) PRIORITY CLASSIFICATIONS Contract NoDABT23-31-C-0008 TECHNICAL EXHIBIT 5.1-002 SERVICE ORDER (SO) PRIORITY CLASSIFICATIONS Service orders will normally be classified based upon the following priority system: (1) Emergency (Priority

More information

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1 School Facilities Evaluation Project Page 1 Executive Summary In November 1999, Alberta Infrastructure, School Facilities Branch engaged Stephens Kozak Carr and Brown Architects to conduct evaluations

More information

The University of Akron Main Campus Biennium 1 July 2016- June 2018. Priority Project Budget Description 1 Electrical Infrastructure Loop

The University of Akron Main Campus Biennium 1 July 2016- June 2018. Priority Project Budget Description 1 Electrical Infrastructure Loop The University of Akron Main Campus Biennium 1 July 2016- June 2018 1 Electrical Infrastructure Loop $2,400,000 Scope: Replace center campus deteriorated 4,160 volt cable and duct bank with 23,000 volt

More information

ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY

ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY HOWARD COUNTY MARYLAND ARCHITECTURAL DESIGN ACADEMY Architectural Design 1 Introduction / Overview of Course This course will introduce the basic principles

More information

Services outsourced in 2013 to a third-party firm (not including parts, equipment purchased). Type of Service

Services outsourced in 2013 to a third-party firm (not including parts, equipment purchased). Type of Service Outsourcing Services outsourced in 2013 to a third-party firm (not including parts, equipment purchased). Type of Service Abandoned Vehicle Auction Auctioneer Accounts Payable Services Actuarial Services

More information

Rehab Inspection Report Page 1

Rehab Inspection Report Page 1 Rehab Inspection Report Page 1 Home Address: Construction Style: Number of bedrooms Square footage: Value of offer: Estimated rehab cost: Value of resale: Orientation of house: N S E W Note: orientation

More information