17,280 square feet Overview:
|
|
- Ruth Sanders
- 8 years ago
- Views:
Transcription
1 CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The structure consists of two occupied stories and an attic above grade and one basement storey. The building was first occupied as the district administrative office in 1964 after the completion of a new school on the same site. General Building Information: Total Building Area: Second Floor 5,760 square feet First Floor 5,760square feet Lower Level 5,760 square feet 17,280 square feet Overview: The intent in reviewing existing conditions at the Central Office is to evaluate the physical plant and its systems to identify deficiencies for the entire facility; including exterior envelope, interior finishes, structural elements, handicap accessibility, mechanical, electrical, plumbing and fire protection. Kaestle Boos Associates, Inc. ( KBA ) staff and consultants visited and photographed the building and reviewed existing available documents to gather all necessary data about each space. The Central Office building is the oldest building evaluated in the scope of this study. As a result it has several code and infrastructure deficiencies. This building has fire protection sprinklers only in the storage and boiler rooms in the basement. Given the building use and height, the fire marshal recommended that the building be fully sprinklered for safety. The buildings existing staircases provide adequate egress width but require updated tread nosing and hand and guard rails. The building is not handicapped accessible and would need significant upgrades to become compliant. The exterior windows and roof are showing signs of deterioration. The interior carpeting is over the existing hardwood floors and is showing significant signs of wear. The space has been subdivided and reworked many times over the years and some partitions and space finishes are newer than others. Moisture infiltration is a recurring issue in the basement, occupants complained of an odor, and the moisture infiltration could contribute to mold growth. Asbestos is present in locations throughout the building and should be considered during any renovations. The parking lot is deteriorated and does not provide adequate turning space for parking. A. Exterior Building Envelope: The building s exterior envelope was reviewed for overall soundness and water/air tightness. elements were evaluated as described below. A separate roof and structural report assessing the exterior envelope were also undertaken. Exterior Walls: The building consists of wood studs, with a brick veneer with plaster finishes on the inside. The structural system consists of wood framed stud walls and roof joists. The building sits on a mixed masonry foundation. Cracking was observed in the masonry veneer. Refer to the structural report for additional information. KBA No B - 1 Last Edit 09/28/11
2 East Lyme Central Office Exterior Doors and frames: The exterior doors and frames are hollow metal systems, in-filled into an original wood frame. Exterior Windows and louvers: The exterior windows are large single pane double-hung wood units, possibly original to the building, with aluminum storm windows added at a later date. The windows are showing signs of deterioration. They are permitting drafts and air infiltration, greatly diminishing the energy performance of the exterior wall assembly. Refer to windows report for additional information. A1 Roof: The roof system is the original slate roof and the interior shows clear signs of water infiltration. Downspouts carry the water collected by the gutters down and away from the building. Refer to roof report for additional information. A2 KBA No A3 2.2.B - 2 Last Edit 09/28/11
3 East Lyme Central Office B. Interior Building Elements: The building s interior spaces were evaluated for overall condition of architectural systems and appearance, including quality of equipment, materials and finishes. Accessibility and code compliance were also reviewed. Walls: The walls are plaster or gypsum board on wood studs. In one stairwell the walls have been refinished with a laminate panel system. Doors, Frames and Hardware: All the doors are stained wood. Original doors are in wood frames. Newer doors have hollow metal frames. The doors are generally in good condition. Door hardware on the existing doors is original and is either knob or thumb lever and are not ADA compliant. In general new hardware on new doors was found to be ADA compliant lever handles. Interior Finishes-Floors and Ceilings: The basement floor finish consists of a mixture of carpet, ACT, and exposed concrete. The basement is reported to have experienced unusual odors, possibly caused by moisture infiltration seeping into the carpet. The first floor is carpeted over the original hardwood floors, the second floor is partially carpeted and partially restored hardwood floors. The carpet is showing significant signs of wear and ripples and tears pose tripping hazards. A4 The majority of the ceilings are suspended acoustical systems, of various ages, with recessed light fixtures except in the basement where plaster infill panels close the ceiling between wood joists and all fixtures are flush mount. KBA No B - 3 Last Edit 09/28/11
4 The ceiling in the basement shows signs of water damage from sources in the kitchenette above. The light fixtures generally provide adequate lighting. Casework: The kitchenette casework is solid wood finish. It is not ADA compliant. Signage: Room signage is inadequate throughout the entire facility and is not ADA compliant. Miscellaneous Accessories and Equipment: Fire extinguishers were observed in high hazard areas. Typical Spaces: A5 Corridors: The Corridors are in good condition. The egress analysis shows that as part of the means of egress, the corridors, stairs and doors have ample width to accommodate the buildings occupants. However the corridor on the first floor is occupied as part of the business space and care should be used to maintain a clear passage to the means of egress. Ceilings are typically suspended acoustical panel with recessed light fixtures in good condition. The level of light is adequate. Water coolers are used in lieu of drinking fountains. Office Spaces: The Offices are generally in good condition, though the age and quality of finishes varied by the date of construction. The floors are generally carpet in poor condition. The walls are painted plaster or gypsum board. KBA No B - 4 Last Edit 09/28/11
5 The ceilings are typically suspended acoustical panel with recessed light fixtures in good condition. The level of light is adequate. The furniture observed (desks, cabinets, shelving, etc) was generally high quality and in excellent condition. Kitchenette: The floors are VCT in the cabinet area and carpeted throughout the remainder of the space. The walls are painted gypsum in good condition. The ceilings are typically suspended acoustical panel with recessed light fixtures in good condition. The level of light is adequate. The built-in sink is not accessible and neither are the appliances. The room is on the original stage platform and the narrow winder steps to this area are no longer compliant given the use of the space. The stairs to this space are not code compliant. (A6) A6 Stairs: The stairs provide vertical circulation between stories and are the primary means of egress from each end of the building. The stairs enclosure appears to be separated from the rest of the building by rated assemblies. However, the rated doors have kick-stand type hold-opens which are in violation of building code. (A7) The handrails are original and are not continuous down both sides of the stair or for the full length of the stairs run. (A8) The original central handrails are not continuous and are not high enough to act as a guardrail. The stair tread s contrasting color friction nosing s have either worn off or peeled off. (A9) KBA No B - 5 Last Edit 09/28/11
6 A7 A8 A9 Toilets: One designated male and one designated female toilet are present on the first floor and appear to be original to the building and two single occupancy toilets have been recently installed on the second floor. The men s toilet consists of two toilet stalls, two urinals and three sinks. The female toilet consists of four toilet stalls and three sinks. None of the fixtures in the building have proper accessibility compliance. Floor finishes in the original bathrooms are Ceramic tile and have been patched repeatedly, giving the floor a mottled appearance. The floor finish in the new bathrooms is VCT. Walls are painted gypsum or plaster walls, with ceramic tile to 5-0 above finish floor. Ceilings are typically suspended acoustical panel with recessed light fixtures. Toilet accessories are present including: mirror, paper towel dispenser, toilet paper dispenser and soap dispenser, do not meet accessibility requirements in their location or mounting height. Mechanical Room: The Boiler room is located in the basement. All the mechanical areas are enclosed and separated by rated assemblies as required by code. However, the fire protection system provided appears to be old and inadequate for the space. Refer to MEP reports for additional information. Recommendations: Replace manual hold-opens on fire doors with automated ones. Replace stair nosing strips. Replace stair handrails. Provide additional guardrail. Replace carpeting throughout. Remove carpeting from basement. Refinish existing bathroom floors with matching floor pattern. Upgrade entire facility to fully comply with ADA requirements. Provide code compliant access to kitchenette. Repair water damaged portions of the ceiling. Provide sprinkler system throughout. Refer to additional portions of the report for additional recommendations. KBA No B - 6 Last Edit 09/28/11
Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
More informationSODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST
SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000
More informationBuilding Condition Assessment Report
C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses
More information48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.
Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two
More information3. Tile used in the toilets is generally in good shape, though somewhat dated looking. The floor tile is slippery when wet.
Architectural Elements Support Facilities A. System Description 1. Architectural support facilities include the lobby, classroom, fitness room, office area, staff toilet/showers, public toilet/lockers,
More informationHamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year
Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service
More informationBUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES
Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE
More informationMemorandum. July 16, 2008. To: Plan Commission City of Madison
Memorandum July 16, 2008 To: Plan Commission City of Madison From: Marc Schellpfeffer Engberg Anderson Re: Structural/Architectural Assessment of Homes for Proposed Demolition Findorff Yards Office Lofts
More informationFacility Assessment Report, Montgomery Independent School District
THE LEARNING CENTER CAMPUS DATA THE LEARNING CENTER 700 Dr. Martin Luther King Jr. Drive, Montgomery TX 77356 Year Built 1958 Approx. Total Square Footage Grades Served Current Enrollment 22,050 n/a n/a
More informationFacility Assessment for. 11801 East Main Street, Huntley, IL
Facility Assessment for 11801 East Main Street, Huntley, IL July 12, 2012 Prepared by: Dewberry Architects Inc. 25 S. Grove Avenue, Suite 500 Elgin, IL 60120 (847) 695-5840 The Village of Huntley requested
More informationSECTION XI OPINION OF PROBABLE COST
SECTION XI OPINION OF PROBABLE COST OPINION OF PROPABLE COSTS HARBOR ISLAND THE PAVILION 1) Provide a sprinkler system for the entire building. 8000 SF X $15/SF $120,000 2) Remove and replace existing
More informationCity of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
More informationMURCH ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationCode Requirements for Existing Buildings
Code Requirements for Existing Buildings Kevin S. Hastings, P.E., LEED AP R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS)
More informationSlavic Village Building Condition Review
Slavic Village Building Condition Review Slavic Village Development May 8, 2015 Page 1 EXECUTIVE SUMMARY City Architecture was commissioned by Slavic Village Development to review five existing facilities
More informationBUNKER HILL ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationBuilding Condition Assessment Report
Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.
More informationMequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal
More informationHistoric Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345
Exterior Features 1 site and drainage 2 foundation 3 wood siding and trim 4 exterior doors 5 windows / storm windows 6 porches front and rear 7 chimneys 8 roofing Interior Features 9 frame 10 basement
More information8629 S. Kimbark, Chicago, IL PROJECT SPECIFIC SCOPE:
8629 S. Kimbark, Chicago, IL PROJECT SPECIFIC SCOPE: General: Remove existing base molding and install new 4-1/4 base molding throughout and spray white Remove existing window and door trim and install
More informationNC Rehab Code Case Study Cheerwine Building January 17, 2002; rev 4/12/02
NC Rehab Code Case Study Cheerwine Building January 17, 2002; rev 4/12/02 PART A: Project Data and Classification 1. Project name & location Renovation of the Cheerwine Building, 322 East Council St.,
More informationCOST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)
COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.
More informationReport Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10
Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10 PROPERTY DESCRIPTION PROPERTY INSPECTED: INSPECTION ADDRESS: 4722 Baltimore Avenue
More informationVJ ASSOCIATES 1825 K STREET NW, #1100 WASHINGTON, DC - 20006 TEL: (202) 609-7480 INITIAL PROJECT COST ANALYSIS
VJ ASSOCIATES 1825 K STREET NW, #1100 WASHINGTON, DC - 20006 TEL: (202) 609-7480 INITIAL PROJECT COST ANALYSIS January 7, 2014 0 BASIS OF ESTIMATE The estimate is based on the drawings and documents received
More informationHAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA
INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationwww.maurerarchitecture.com
Design Guidelines, Historic Districts and Codes as Downtown Development Tools The NC Rehab Code and Its Benefits for Older Buildings North Carolina Main Street Conference January 25-27, 2012 History of
More informationLITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -
The original section of this building was constructed in 1941. The exterior walls are built of good quality stone. In the early 1980 s a similar addition was added to the north elevation. The exterior
More informationNORTH PENN HIGH SCHOOL RENOVATIONS
NORTH PENN HIGH SCHOOL RENOVTIONS PRELIMINRY SCOPE, BUDGET & PHSING CONSIDERTIONS 401 EST HNCOCK STREET LNSDLE, P 19446 PREPRED BY BONNETT SSOCITES INCORPORTED 220 BLDWIN TOWER, 1510 CHESTER PIKE EDDYSTONE,
More informationCONDITION OF QUALITY ITEMS
CONDITION OF QUALITY ITEMS FOUNDATION Always look for moisture problems and any bulges or irregularities in the walls. Lines on the walls or floors may indicate water problems. Have these been cured? If
More informationPoint Auditorium Design Narrative PROJECT NAME: Point Auditorium DATE: 06/25/15 TO: Lance Francis FROM: Leslie Ellsworth
INTRODUCTION: Kronberg Wall Architects is pleased to present the Design Narrative for the Point University Auditorium conversion from the existing warehouse space. General Project Description: This project
More informationD Sample Notices to Property Owners, Sample Affidavits, and Other Material
D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully
More informationFREEBORN HALL SYSTEMS ASSESSMENT
FREEBORN HALL SYSTEMS ASSESSMENT Project No. 2829570 Prepared by the Engineering and Commissioning Group and PRIMEbusiness April 23, 2013 Table of Contents Page Executive Summary 1 1. Architectural System
More informationLindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1
School Facilities Evaluation Project Page 1 Executive Summary In November 1999, Alberta Infrastructure, School Facilities Branch engaged Stephens Kozak Carr and Brown Architects to conduct evaluations
More informationPUBLIC RESTROOMS, DESIGN INTENT
PUBLIC RESTROOMS, DESIGN INTENT 1.01 STRUCTURAL A. Where feasible, metal stud partitions will be constructed on a 6 high concrete curb. 1.02 MECHANICAL A. Restrooms will have a minimum of 15 air changes
More informationHow To Plan A Building
State of Nevada Department of Administration Purchasing Division Las Vegas Purchasing Warehouse Facility Condition Analysis LAS VEGAS PURCHASING WAREHOUSE 1054 South Commerce Street Las Vegas, Nevada Site
More informationAll substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
More informationBuilding Code Clarifications - 7. Fire Resistance
Building Code Clarifications - 7. Fire Resistance 7.1 (15-12-030) Use of combustibles in Type III construction roof assemblies Code Section (15-12-030) Use of Combustibles was revised on May 17, 2000,
More informationThe replacement or modification of existing windows shall comply with the following requirements:
City of La Habra Heights Building Division 1245 N. Hacienda Road La Habra Heights, CA 90631 Office: (562) 694-6302 ext. 228 Fax: (562) 690-5010 WINDOW REPLACEMENT 2010 CALIFORNIA RESIDENTIAL CODE (CRC)
More information1. Maintenance. Mechanical, Electrical & Plumbing Improve ligh>ng control an sensoring $230,239
1. Maintenance Building Component Detail Est. Cost. Alkali Building Envelope Replace windows $40,425 Replace worn and rippling carpet $81,335 Improve ligh>ng control an sensoring $230,239 Repair and replace
More informationBUILDING PERMIT SPECIFICATIONS
BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide
More informationRehab Inspection Report Page 1
Rehab Inspection Report Page 1 Home Address: Construction Style: Number of bedrooms Square footage: Value of offer: Estimated rehab cost: Value of resale: Orientation of house: N S E W Note: orientation
More informationSPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)
SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME) Construction Criteria The unit costs for ADP Mainframe space types are based on the construction quality and design features in the following
More information201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE
STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,
More informationEstimating Database Checklist
Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to
More informationTotal Home Inspection Checklist
Total Home Inspection Checklist Use a checklist like this to make sure that you are looking at all parts of the house. Check off those items that are in good condition and make notes about those that are
More information29 Broadway- 14 th Fl Tel: 212.888.8334 New York NY 10006 Fax: 212.419.1939. Due Diligence Report. New York, New York
Due Diligence Report New York, New York Prepared for Mr. On February 8, 2010 P a g e 1 Table of Contents PAGE 3.. GENERAL INFORMATION PAGE 4 FILINGS PERMITS AND ENCUMBRANCES PAGE 6. CORE AND SHELL PAGE
More informationWASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST
0 RIVERSIDE DRIVE, OTTAWA, ON A0.0 COVER SHEET / DRAWING LIST A0. LEGEND AND GENERAL NOTES A0. GENERAL NOTES A0. GENERAL NOTES A0. TYPICAL WASHROOM WALL/SINK SECTION A0. DETAIL - CONTROL JOINT A0. DETAIL
More informationInspection Item COMMENTS
APPENDIX 9 AFFORDABLE HOUSING PROGRAM INSPECTION CHECKLIST Participating Jurisdiction: Homeowner Name: Assisted Property Address: Date of Physical Inspection of Property: Total Square Footage of Property:
More informationBuilding Condition Assessment: 109-111 North Howard Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
More informationIMPROVEMENT COST ESTIMATE powered by HomeFixers
IMPROVEMENT COST ESTIMATE powered by HomeFixers 123 Main St, Anytown, USA 12345 2000 SF $ 45,041.06 100.0% $22.52 per sq. ft. Stage 1: Pre-Construction $ 1,461.00 3.2% 1 House Secured $ 106.00 0.2% Lockbox
More informationIntegrating Healthy Housing Considerations into Weatherization Inspections. Jim LaRue
Cleveland Cuyahoga County Healthy House Project Training Integrating Healthy Housing Considerations into Weatherization Inspections Jim LaRue Joint inspections for housing health hazards Weatherization
More informationBOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER
BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION # BLOCK LOT VACANT YES NO CURRENT OWNER NAME ADDRESS TELEPHONE # PROSPECTIVE
More informationU.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!
U.S. Department of Housing and Urban Development Office of Public and Indian Housing A Good Place to Live! Introduction Having a good place to live is important. Through your Public Housing Agency (or
More informationCity of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov
City of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov BUILDING CODE REQUIREMENTS FOR CHILD DAY CARE The purpose of this document is to provide the user with a basic level
More informationBuilding Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
More informationPLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationTown of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015
Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town Hall Complete building restoration (state historic preservation award) High efficiency
More informationcosts and billing Facilities Services State-Funded and Billable Services Centrally Funded Services for State Supported Spaces Billable Services
Facilities Services State-Funded and Facilities Services receives funding to provide maintenance in eligible state-supported areas. State-supported areas, equipment, and facilities are those that are utilized
More informationNumber Northern Arizona University Facility Services Section Page. Effective April 1, 2011
Facility Services Section Page Recharge Services, Maintenance and Construction PURPOSE 1 of 6 The purpose of this policy is to set forth standards for chargeable services for maintenance and construction
More informationSECTION 3 ONM & J STRUCTURAL ANALYSIS
Historic Boynton Beach High School Existing Building Assessment City of Boynton Beach February 10, 2011 SECTION 3 ONM & J STRUCTURAL ANALYSIS STRUCTURAL ENGINEERS SPECIAL INSPECTORS STRUCTURAL CONDITION
More informationREPLACEMENT COST ESTIMATOR FORM
REPLACEMENT COST ESTIMATOR FORM GENERAL INFORMATION Policy Number: Current Coverage: Insured Name: Property Address: Property Zip: Davis, Clark & Latham Ins. Agency 1 Pleasant Street, Suite 3 Reading,
More informationBUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS
DCD-0304 Identification # Rev. 9/08 County Date of Inspection NAME OF OPERATION BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS ADDRESS TELEPHONE: CITY STATE ZIP BUILDING INSPECTORS CERTIFICATE
More informationHOMEOWNER S PERMIT GUIDE
HOMEOWNER S PERMIT GUIDE WHEN IS A PERMIT REQUIRED? Department of Development and Permits 306 Cedar Road, City Hall 2 nd Floor P.O. Box 15225 Chesapeake, VA 23328 Phone: (757) 382-6018 Fax: (757) 382-8448
More informationAcceptable Donations List
Acceptable Donations List Thank you so much for you donation to Habitat for Humanity, through your contribution Habitat is able to fund house construction and continue to follow our mission as a non-profit
More informationPresentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals
Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional
More informationOPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY
Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic
More informationYour Company Name. Your Company Address Your City, State, Zip Your Phone Number Your Email Address. Project Information
Your Company Address Your City, State, Zip Your Phone Number Your Email Address Customer Information John Smith 0 Sandy Lane Blvd Tampa, FL 3342 Project Information Estimate Prepared By: Jones Estimating
More informationDIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION
More informationwww.citiesinspection.com October 5, 2015 Dear Client,
www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.
More informationBuilding Control Guidance Note
Issued 01/01/13 Rev Page 1 of 5 If you intend to convert an existing loft space into additional rooms you will need to apply for Building Regulation Approval. You may also need Planning Permission if you
More informationBoard Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities
Board Seminar Facilities School Year 2012-2013 Submitted by Joseph L. Lisa-Director of Facilities High School Installed new fence for Pre-K activities by weight room. Installed new rails and side walks
More informationCONSERVATION MAINTENANCE WORKSHEET Universal Checklist
3.1 SITE 1 Concrete curbs Check for cracks, spalling, growth from joints X 2 Stone curbs Check for cracks, spalling, growth from joints X 3 Concrete walkways Look for uneven surfaces, ponding, growth from
More informationORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation
More informationVision Home Inspection
Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the
More informationMAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015
MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015 **Disclaimer: This document is to serve as informational purposes only. This is not a code book or a final interpretation of the
More informationGeorgia Home Inspection Services
Cover Page Property Inspection Report My street, Anytown GA, 30000 Inspection prepared for: John Doe Inspection Date: 7/18/2011 Time: 5pm Age: 25+ Size: >1500 Weather: Clear This ranch style home is in
More informationSelf-Home Inspection Checklist
To be used as a first home visit for note taking. Visit www.homeinspectiondirect.com for more tips and information about buying a home and hiring a home inspector. This form in no way replaces a professional
More informationBROWNSVILLE STRUCTURES STUDY. July 2012. Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208
BROWNSVILLE STRUCTURES STUDY July 2012 Prepared by LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208 TABLE OF CONTENTS I. SUMMARY OF BUILDING ANALYSIS.. 1 II. INDIVIDUAL BUILDING
More informationDesigning Schools To Reduce On-Going And Future Maintenance and Repair Costs
Designing Schools To Reduce On-Going And Future Maintenance and Repair Costs Charles H. Johnson, Consultant School Facilities Planning Division California Department of Education March 7, 2001 1 Designing
More informationHOUSTON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationDesign Development Quality Management Phase Checklist Project Phase Checklist Series
Best Practices Design Checklist Project Phase Checklist Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA
More informationResidential Adjustments. Overview 4.1
Overview 4.1 Summary This chapter contains an overview of residential structural components, quality of construction, main dwellings, and construction types. It also provides adjustments such as wall height,
More informationSaint Cloud Business Center
Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with
More informationDate: March 7, 2006 Report for [removed]
Date: March 7, 2006 Report for [removed] The Preservation Resource Center Of New Orleans, in conjunction the National Trust for Historic Preservation, has conducted a condition survey of your property.
More informationSubstantial Improvement/Damage (FEMA 50% Rule) Frequently Asked Questions and Information
SUBSTANTIAL IMPROVEMENT/DAMAGE WORKSHEET (FEMA 50% RULE) South County: Development Services North County: Development Services 4000 Tamiami Trail S. Room 122 1001 Sarasota Center Blvd Venice, Florida 34293-5076
More informationCertification: Building Plans Examiner. Exam ID: B3
Certification: Building Plans Examiner Exam ID: B3 Scope: A Building Plans Examiner will be responsible for reviewing submitted plans to determine if they meet the requirements of the various Building
More informationORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables
More informationWhy does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL?
Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL? 1. BASIC FACTS: The current Abington High School building is 111,831
More informationFive-Year Capital Plan Request FY 2015-16 through FY 2019-20
Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance for Community Colleges bonded $417,500 Health and Safety bonded $91,088
More informationThis report presents the findings and recommendations of the assessment of energy use and
This report presents the findings and recommendations of the assessment of energy use and environmental stewardship of Arlington Street Church, Boston, MA. As stewards of the earth it is important that
More informationREVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N
PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N
More informationExecutive Summary. June 2005 Auke Bay Elementary School Condition Survey Report Page 4 of 228
Building History 1. The original building was built in 1968. It is essentially a 2 story building built into a hillside. A portion of the second floor steps up the hill a half level above the second floor
More informationJuly 29, 2014. Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following:
ADDENDUM NO. 2 TO REQUEST FOR QUALIFICATIONS FOR NEW DEVELOPMENT OF OAKLAND UNIFIED SCHOOL DISTRICT PROPERTIES, INCLUDING THE PARCELS HOUSING THE PAUL ROBESON ADMINISTRATION BUILDING AND DEWEY HIGH SCHOOL
More informationRRIO Checklist. Use of checklist: Definitions: Limitations
CITY OF SEATTLE RENTAL REGISTRATION AND INSPECTION ORDINANCE (RRIO) RRIO Checklist Use of checklist: Property owners will use the RRIO Checklist to confirm that their rental housing properties and units
More informationCOMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS
COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS Permit applicants shall submit three (3) COMPLETE SETS of plans and specifications with each application for a permit. Plans and specifications
More informationYour Basement Remodeling Specialist LLC
Your Basement Remodeling Specialist LLC Contents Introduction 3 Remodel Details 4 Basement Bid Scope 5 Financial Arrangements 6 Homeowners Shopping Guide 7 The following is provided with your actual quote:
More informationSECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request
SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table
More informationBuilding Foundation and Structure
Building Foundation and Structure Overview The construction of the Hall of Waters building began in 1936, and was constructed over the original site of the Siloam and Sulpho-Saline Springs. The original
More informationOpen House and Home Tour Checklist
1 The House Address: Number of floors: Listing price: Basement? Property tax: Outdoor space? Eugh closet space? Style: Eugh storage space? Square footage: Room for expansion? Number of bedrooms: What appliances
More informationPUBLIC MINUTES PROPERTY MAINTENANCE APPEALS BOARD. Wednesday, November 25, 2015, 3:46 p.m. Committee Room B, City Hall
PUBLIC MINUTES PROPERTY MAINTENANCE APPEALS BOARD Wednesday,, 3:46 p.m. Committee Room B, City Hall PRESENT: Mr. Ian Oliver, Chair Mr. Michael Brockbank, Vice-Chair Mr. Roy Fleming, Member Mr. Donald Stiller,
More information