HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION

Similar documents
Centinela Valley Union High School District. Measure CV Masterplan Update June 2011

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL

1/9/2015 P:\ \Project Management\Program\Ripon Space Program - 7 January 2015.xlsx

SCHEMATIC DESIGN PRESENTATION ACTON ELEMENTARY SCHOOL

November 3, 2015 Bond and District Additional Assistance Election Information

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN

HOUSTON ELEMENTARY SCHOOL

SCHEMATIC DESIGN PRESENTATION NEW JOSHUA MIDDLE SCHOOL

Frequently Asked Questions

MURCH ELEMENTARY SCHOOL

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

PAGE INTENTIONALLY LEFT BLANK

21 st CENTURY HIGH SCHOOLS

PLUMMER ELEMENTARY SCHOOL

FIRE EXTINGUISHER DORM #1 SYMPHONY

BUNKER HILL ELEMENTARY SCHOOL

BOARD OF EDUCATION Attachment: Discussion 10. PALO ALTO UNIFIED SCHOOL DISTRICT Date:

DESIGN DEVELOPMENT PRESENTATION

Items in red were complete Items in green were complete on Lined out items are Life Safety Codes.

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010

Schematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects

Cherokee Trail High School East Arapahoe Road Aurora, Colorado 80016

DRAPER ELEMENTARY SCHOOL

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

PATTERSON ELEMENTARY SCHOOL

HERMANTOWN COMMUNITY SCHOOLS. New High School Addition End of DD Design Review

Article 11. Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools

Performing Arts Wing. Existing Auditorium. Library. Student Entry. Omni Room Athletics/JROTC. Dance Bus Drop

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN

Bond Priorities. Repairs and Maintenance. School Safety. Capacity

HAMILTON SCHOOL Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA

DESIGN DEVELOPMENT PRESENTATION

Repair Project for April 7, 2009

Facilities Advisory Committee Recommendations. Presentation to the Administrative Council May 22, 2013

Public Building Commission of Chicago. Board Meeting August 20, 2013

Bensalem High School Renovation

NYC Department of Education Building Condition Assessment Survey :37AM :14AM. Description

FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009

NYC Department of Education Building Condition Assessment Survey P.S. 64 (OLD 71) - MANHATTAN, 600 EAST 6 STREET, MANHATTAN, NY, 10009

NYC Department of Education Building Condition Assessment Survey :48AM :39AM. Description Mechanical Room Basement

Board of Regents Meeting June 16-17, 2005 Agenda Item #11 Arizona State University EXECUTIVE SUMMARY Page 1 of 5

NORTH PENN HIGH SCHOOL RENOVATIONS

BUILD NYC RESOURCE CORPORATION PROJECT COST/BENEFIT ANALYSIS January 7, 2016

Policy on Repair and Renovation Funding

Five-Year Capital Plan Request FY through FY

Scituate Public Facilities Master Plan Final Report to the Board of Selectmen

New Jersey City University Gilligan Student Union Center

Board Seminar Facilities. School Year Submitted by Joseph L. Lisa-Director of Facilities

Building Condition Assessment Report

Chicago Public Schools

Regular Public Meeting-Study Session June 23, 2011

SCHEMATIC DESIGN PRESENTATION

Designing a Facility: Making It a Place Where Every Student Succeeds

Building Description Project Description Estimated Cost Notes Total Deferred

CONSTRUCTION UPDATE November 6, 2015

PUBLIC BUILDING COMMISSION OF CHICAGO. Alexander Graham Bell Elementary School Addition and Renovation

A Project Description/Project Title and Data: Building Area: (sf) Addition 28,142 Renovation 14,302. Cost per Square Foot: +/- $106.

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

QUALIFIED SCHOOL CONSTRUCTION BONDS (QSCB) FIRST YEAR REVIEW

Education, Entrepreneurship & Urban Revitalization

RSU 21 Board of Directors considering major renovation projects

SELECTED SPECIAL EVENTS PROJECTS

CAMPUS HIGH SCHOOL ADDITION AND RENOVATION

Project Management Division

Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL?

Election Type: Bond, BEST, Mill Levy District. Nov. 4: Pass/Fail. Bond, BEST, Mill Levy Override, Sales Tax. Comments (optional) Dollar Amount

STICKLEY AUDITORIUM RENOVATION Community and Stakeholder Presentation

DISTRICT-WIDE ELEMENTARY PROGRAMMING

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

July 29, Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following:

We know what brings schools together.

Educational. Educational-Existing 1/28/2014. OCCUPANT LOADS [no change] Application. Application

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Capital Projects Town Hall Meeting

Those tables are provided at the end of this section in the following order.

Code Requirements for Existing Buildings

Centinela Valley Union High School District. Measure CV Program Update July 23, 2012

SOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ******************************************************************************

Higher Education Projects University of Illinois at Urbana-Champaign Gorski Reifsteck

JMS Phone List. dial and small conference capability

EAST LYME HIGH SCHOOL

Van Vleck ISD Bond Election

School Board Proposed Capital Improvements Program. Fiscal Years

AGENDA. BUILDING AND GROUNDS COMMITTEE MEETING April 21, :30 PM School Board Room

FREQUENTLY ASKED QUESTIONS

ARTS. presented by: TOM SHERRY HAMILTON ANDERSON ASSOCIATES

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011

Request for Proposal for Construction Management Services

OHLONE COMMUNITY COLLEGE BOND MEASURE G

TD AMERITRADE Park Omaha

The University of Akron Main Campus Biennium 1 July June Priority Project Budget Description 1 Electrical Infrastructure Loop

Yale Arts Complex. The design results from the integration of programmatic, structural and mechanical needs. It includes

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations

Ridgewood Public Schools

RESOLUTION NO

Construction Technologies Career Field Pathways and Course Structure

Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015)

REGIONAL UNIVERSITY SYSTEM OF OKLAHOMA

Transcription:

HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION 1

AGENDA Hazelwood 1 st Planning Process High School Program Schematic Designs Schedule 2

HAZELWOOD 1 ST GOALS Life, health and safety improvements Improving wiring for up-to-date technology Updating heating and air conditions systems Modernizing science labs and classrooms Replacing hazardous floor tile Replace chalk boards with marker boards New or expanded libraries Providing elevators to improve access 3

PLANNING PROCESS Prepared Classroom Utilization Analysis Identified areas for facility improvement Science consultant: Tours Workshops Design Guidelines Education specifications review by Learning Facilitators and teachers of: Science, Technology, Engineering & Mathematics (STEM) Library 4

PLANNING PROCESS Meetings with Executive Management Team Meetings with High School Management Team Conceptual Design reviewed by Learning Leadership Team Schematic Design Package 5

HSD S.T.E.M. / SCIENCE COMMITTEE Joni Pukala Cindy Bober Brett Barron Jim Wright Matt McClellan Christina Hughes Jim Patterson Kevin Fischer Jennifer Bolla Cheryol Mitchell Jacqueline Kelly Kashina Bell Gail Stewart Carrie Launius Cathy French Darrell Strong Tom Mangogna Dwight Lindhorst 6

HIGH SCHOOL PROGRAM Science Technology Engineering & Math (S.T.E.M.) Studios Science (Physics, Chemistry, Biology) Project Lead The Way (PLTW) Health Occupations Industrial Technology Robotics design and storage spaces 7

HIGH SCHOOL PROGRAM Student Services Reconfigured main office to enhance public access and consolidate functions Relocated satellite administrative areas to improve building supervision Improved access to guidance counselors Upgrade nurse area Distribute teacher workrooms 8

HIGH SCHOOL PROGRAM Special School District (SSD) Life skills General classrooms Support spaces Individual education program / testing room Changing room 9

HIGH SCHOOL PROJECTS Building additions and major renovations (Varies per site) Library STEM Studios & Science Labs Various classrooms Student services General improvements Replace chalk boards with marker boards Upgrade classroom power and data infrastructure Repaint hallway lockers Extensive repainting of school Heating and air conditioning upgrades 10

HIGH SCHOOL PROJECTS Enhance Safety Security vestibule (adjacent to administration) Controlled after hour access Fire alarm modernization Replace hazardous floor tile New interior signage Accessibility improvements Additional elevators Fine arts at East HS and West HS Locker room Pool 11

HAZELWOOD WEST HIGH SCHOOL SCHEMATIC DESIGN 12

SCOPE OF WORK Hazelwood West High School 53,000 SF building addition (1 & 3 story) 100,000 SF major building renovation Other project features: New entrance/front image New, centralized main stair Food service circulation/commons upgrade Staff restrooms on each level 13

SCHEMATIC DESIGN Major Renovations (In Color) New Addition New Elevator for Visual/Performing Arts ENTRY LEVEL (First Floor) Main Entry 14

SCHEMATIC DESIGN New Elevator New Central Stair Library Nurse Guidance Main Entry Administration ENTRY LEVEL (First Floor) 15

SCHEMATIC DESIGN Athletics Control Points Commons Library Auditorium Main Entry Administration ENTRY LEVEL (First Floor) 16

SCHEMATIC DESIGN Teacher Work Room STEM Studio STEM Physics & Chemistry (Renovated & New Addition) Library Commons Upgraded Main Entry SSD ENTRY LEVEL (First Floor) 17

SCHEMATIC DESIGN Major Renovations New Addition New Elevator for Visual/Performing Arts SECOND FLOOR Main Entry Below 18

SCHEMATIC DESIGN Teacher Work Room New Elevator Instructional & Learning Coach Offices Satellite Administration New Central Stair Journalism (14) New Classrooms SECOND FLOOR 19

SCHEMATIC DESIGN Health Occupations STEM Studio STEM Biology (Existing & New) and Biomedical with Forensics Library SECOND FLOOR 20

SCHEMATIC DESIGN New Addition LOWER LEVEL 21

SCHEMATIC DESIGN Teacher Work Room Student Services (Satellite Administration) STEM Studio STEM Library Physics & Engineering LOWER LEVEL 22

SITE IMPACT Existing quantity of parking spaces maintained New entry plaza and entrance 23

BUILDING IMAGE Before After 24

BUILDING IMAGE (FROM PARKING LOT) Insulated Composite Metal Panels Brick Insulated Glass 25

BUILDING IMAGE Before After 26

BUILDING IMAGE After 27

HAZELWOOD CENTRAL HIGH SCHOOL SCHEMATIC DESIGN 28

SCOPE OF WORK Hazelwood Central High School 23,000 SF Science lab addition 60,000 SF Major building renovation Other project features: Linked B, C and D Halls together to improve building safety, security and passing period times Replace folding partitions and accordion walls with permanent walls 29

EXISTING FIRST FLOOR 30

SCHEMATIC DESIGN FIRST FLOOR 31

EXISTING SECOND FLOOR 32

SCHEMATIC DESIGN SECOND FLOOR 33

SCHEMATIC DESIGN CHS LIBRARY

SCHEMATIC DESIGN COURTYARD VIEW BETWEEN C & D HALL

SCHEMATIC DESIGN COURTYARD VIEW BETWEEN B & C HALL

SCHEMATIC DESIGN VIEW FROM E-HALL, BETWEEN B & C HALL

SCHEMATIC DESIGN VIEW FROM E-HALL, BETWEEN C & D HALL

HAZELWOOD EAST HIGH SCHOOL SCHEMATIC DESIGN 39

SCOPE OF WORK Hazelwood East High School 45,200 SF new building additions Entrances, classrooms, athletics/pe, library & STEM studio 65,400 SF of major renovations Other project features: New entrance/front image Provide sprinklers at students commons area Accessible theater entrance Accessible restrooms at auditorium and gymnasium Dedicated vehicular drop off Drainage repairs 40

SCHEMATIC DESIGN NEW MAIN ENTRANCE LIBRARY VESTIBULE AND ELEVAROR ADMINISTRATION NURSE NEW GYM ACCESSIBLE RESTROOMS GYM STORAGE LOCKERS FIRST FLOOR 41

SCHEMATIC DESIGN CLASSROOM AND TEACHER WORKROOM HEALTH OCCUPATION CLASSROOM HOME REPAIR & PLTW CLASSROOMS STEM STUDIO AND ROBOTICS STORAGE SECOND FLOOR 42

SCHEMATIC DESIGN JOURNALISM GUIDANCE OFFICES & STUDENT CAREER CENTER SPECIAL SCHOOL DISTRICT CLASSROOMS SATELLITE ADMIN. OFFICES SATELLITE ADMIN. OFFICES STEM STUDIOS THIRD FLOOR 43

SCHEMATIC DESIGN ACCESSIBLE SWIMMING POOL CHANGING ROOM MULTIPURPOSE ROOMS LOCKERS ATHLETIC STORAGE 44 LOCKER ROOM FLOOR

BUILDING IMAGE BEFORE NEW LIBRARY 45

BUILDING IMAGE AFTER NEW LIBRARY COMPOSITE METAL PANELS INSULATED GLASS SPLIT FACE BLOCK COMPOSITE METAL PANELS INSULATED GLASS SPLIT FACE BLOCK 46

ENTRY PLAZA BEFORE ENTRANCE PLAZA 47

ENTRY PLAZA AFTER 48 ENTRANCE PLAZA

NEW AUXILIARY GYM BEFORE NEW GYM 49

NEW AUXILIARY GYM AFTER COMPOSITE METAL PANELS INSULATED GLASS SPLIT FACE BLOCK NEW GYM 50

SITE IMPACT New vehicular dropoff New entry plaza New accessible secondary entrances for theater and gymnasium 51

HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN SCHEDULE 52

SCHEDULE Schematic Design Approval Issue for Permits & Let for Bidding Bids Approved / Begin Construction Construction Complete Hazelwood Central High School Hazelwood East High School Hazelwood West High School Nov. 2011 Nov. 2011 Nov. 2011 Feb. 2012 Mar. 2012 Apr. 2012 Apr. 2012 Apr. 2012 May 2012 Summer 2013 Summer 2014 Summer 2014 53

HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION 54