HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION 1
AGENDA Hazelwood 1 st Planning Process High School Program Schematic Designs Schedule 2
HAZELWOOD 1 ST GOALS Life, health and safety improvements Improving wiring for up-to-date technology Updating heating and air conditions systems Modernizing science labs and classrooms Replacing hazardous floor tile Replace chalk boards with marker boards New or expanded libraries Providing elevators to improve access 3
PLANNING PROCESS Prepared Classroom Utilization Analysis Identified areas for facility improvement Science consultant: Tours Workshops Design Guidelines Education specifications review by Learning Facilitators and teachers of: Science, Technology, Engineering & Mathematics (STEM) Library 4
PLANNING PROCESS Meetings with Executive Management Team Meetings with High School Management Team Conceptual Design reviewed by Learning Leadership Team Schematic Design Package 5
HSD S.T.E.M. / SCIENCE COMMITTEE Joni Pukala Cindy Bober Brett Barron Jim Wright Matt McClellan Christina Hughes Jim Patterson Kevin Fischer Jennifer Bolla Cheryol Mitchell Jacqueline Kelly Kashina Bell Gail Stewart Carrie Launius Cathy French Darrell Strong Tom Mangogna Dwight Lindhorst 6
HIGH SCHOOL PROGRAM Science Technology Engineering & Math (S.T.E.M.) Studios Science (Physics, Chemistry, Biology) Project Lead The Way (PLTW) Health Occupations Industrial Technology Robotics design and storage spaces 7
HIGH SCHOOL PROGRAM Student Services Reconfigured main office to enhance public access and consolidate functions Relocated satellite administrative areas to improve building supervision Improved access to guidance counselors Upgrade nurse area Distribute teacher workrooms 8
HIGH SCHOOL PROGRAM Special School District (SSD) Life skills General classrooms Support spaces Individual education program / testing room Changing room 9
HIGH SCHOOL PROJECTS Building additions and major renovations (Varies per site) Library STEM Studios & Science Labs Various classrooms Student services General improvements Replace chalk boards with marker boards Upgrade classroom power and data infrastructure Repaint hallway lockers Extensive repainting of school Heating and air conditioning upgrades 10
HIGH SCHOOL PROJECTS Enhance Safety Security vestibule (adjacent to administration) Controlled after hour access Fire alarm modernization Replace hazardous floor tile New interior signage Accessibility improvements Additional elevators Fine arts at East HS and West HS Locker room Pool 11
HAZELWOOD WEST HIGH SCHOOL SCHEMATIC DESIGN 12
SCOPE OF WORK Hazelwood West High School 53,000 SF building addition (1 & 3 story) 100,000 SF major building renovation Other project features: New entrance/front image New, centralized main stair Food service circulation/commons upgrade Staff restrooms on each level 13
SCHEMATIC DESIGN Major Renovations (In Color) New Addition New Elevator for Visual/Performing Arts ENTRY LEVEL (First Floor) Main Entry 14
SCHEMATIC DESIGN New Elevator New Central Stair Library Nurse Guidance Main Entry Administration ENTRY LEVEL (First Floor) 15
SCHEMATIC DESIGN Athletics Control Points Commons Library Auditorium Main Entry Administration ENTRY LEVEL (First Floor) 16
SCHEMATIC DESIGN Teacher Work Room STEM Studio STEM Physics & Chemistry (Renovated & New Addition) Library Commons Upgraded Main Entry SSD ENTRY LEVEL (First Floor) 17
SCHEMATIC DESIGN Major Renovations New Addition New Elevator for Visual/Performing Arts SECOND FLOOR Main Entry Below 18
SCHEMATIC DESIGN Teacher Work Room New Elevator Instructional & Learning Coach Offices Satellite Administration New Central Stair Journalism (14) New Classrooms SECOND FLOOR 19
SCHEMATIC DESIGN Health Occupations STEM Studio STEM Biology (Existing & New) and Biomedical with Forensics Library SECOND FLOOR 20
SCHEMATIC DESIGN New Addition LOWER LEVEL 21
SCHEMATIC DESIGN Teacher Work Room Student Services (Satellite Administration) STEM Studio STEM Library Physics & Engineering LOWER LEVEL 22
SITE IMPACT Existing quantity of parking spaces maintained New entry plaza and entrance 23
BUILDING IMAGE Before After 24
BUILDING IMAGE (FROM PARKING LOT) Insulated Composite Metal Panels Brick Insulated Glass 25
BUILDING IMAGE Before After 26
BUILDING IMAGE After 27
HAZELWOOD CENTRAL HIGH SCHOOL SCHEMATIC DESIGN 28
SCOPE OF WORK Hazelwood Central High School 23,000 SF Science lab addition 60,000 SF Major building renovation Other project features: Linked B, C and D Halls together to improve building safety, security and passing period times Replace folding partitions and accordion walls with permanent walls 29
EXISTING FIRST FLOOR 30
SCHEMATIC DESIGN FIRST FLOOR 31
EXISTING SECOND FLOOR 32
SCHEMATIC DESIGN SECOND FLOOR 33
SCHEMATIC DESIGN CHS LIBRARY
SCHEMATIC DESIGN COURTYARD VIEW BETWEEN C & D HALL
SCHEMATIC DESIGN COURTYARD VIEW BETWEEN B & C HALL
SCHEMATIC DESIGN VIEW FROM E-HALL, BETWEEN B & C HALL
SCHEMATIC DESIGN VIEW FROM E-HALL, BETWEEN C & D HALL
HAZELWOOD EAST HIGH SCHOOL SCHEMATIC DESIGN 39
SCOPE OF WORK Hazelwood East High School 45,200 SF new building additions Entrances, classrooms, athletics/pe, library & STEM studio 65,400 SF of major renovations Other project features: New entrance/front image Provide sprinklers at students commons area Accessible theater entrance Accessible restrooms at auditorium and gymnasium Dedicated vehicular drop off Drainage repairs 40
SCHEMATIC DESIGN NEW MAIN ENTRANCE LIBRARY VESTIBULE AND ELEVAROR ADMINISTRATION NURSE NEW GYM ACCESSIBLE RESTROOMS GYM STORAGE LOCKERS FIRST FLOOR 41
SCHEMATIC DESIGN CLASSROOM AND TEACHER WORKROOM HEALTH OCCUPATION CLASSROOM HOME REPAIR & PLTW CLASSROOMS STEM STUDIO AND ROBOTICS STORAGE SECOND FLOOR 42
SCHEMATIC DESIGN JOURNALISM GUIDANCE OFFICES & STUDENT CAREER CENTER SPECIAL SCHOOL DISTRICT CLASSROOMS SATELLITE ADMIN. OFFICES SATELLITE ADMIN. OFFICES STEM STUDIOS THIRD FLOOR 43
SCHEMATIC DESIGN ACCESSIBLE SWIMMING POOL CHANGING ROOM MULTIPURPOSE ROOMS LOCKERS ATHLETIC STORAGE 44 LOCKER ROOM FLOOR
BUILDING IMAGE BEFORE NEW LIBRARY 45
BUILDING IMAGE AFTER NEW LIBRARY COMPOSITE METAL PANELS INSULATED GLASS SPLIT FACE BLOCK COMPOSITE METAL PANELS INSULATED GLASS SPLIT FACE BLOCK 46
ENTRY PLAZA BEFORE ENTRANCE PLAZA 47
ENTRY PLAZA AFTER 48 ENTRANCE PLAZA
NEW AUXILIARY GYM BEFORE NEW GYM 49
NEW AUXILIARY GYM AFTER COMPOSITE METAL PANELS INSULATED GLASS SPLIT FACE BLOCK NEW GYM 50
SITE IMPACT New vehicular dropoff New entry plaza New accessible secondary entrances for theater and gymnasium 51
HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN SCHEDULE 52
SCHEDULE Schematic Design Approval Issue for Permits & Let for Bidding Bids Approved / Begin Construction Construction Complete Hazelwood Central High School Hazelwood East High School Hazelwood West High School Nov. 2011 Nov. 2011 Nov. 2011 Feb. 2012 Mar. 2012 Apr. 2012 Apr. 2012 Apr. 2012 May 2012 Summer 2013 Summer 2014 Summer 2014 53
HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION 54