1 Project Description/Project Title and Data: KEVIN I. SULLIVAN CAMPUS CENTER ADDITION & RENOVATION Medaille College - Buffalo, NY Functioning as Medaille College's campus heart, The Kevin I Sullivan Campus Center contains athletic facilities, the student union, primary dining facilities, and is the main venue for many of Medaille's various special events. The goals of the addition & renovation were two-fold; 1.) Enhance the existing facility to promote campus community & provide a more comfortable environment in which to gather, study, and eat, 2.) Increase the quality of the athletic facilities to a level representative of Medaille's high standing within Division III College Athletics. A growing student body, modest campus size, and "landlocked" location within the city of Buffalo dictated that each space have flexibility & adaptability to accommodate various events and activities. Renovation to the existing student center included relocating the campus bookstore to create larger, more open dining and gathering spaces, and to create a stronger physical & visual connection to the Main Gymnasium. New booth and counter seating was added to the existing & expanded dining areas to provide a variety of seating options. An underutilized second floor study area has been transformed into a focal point of the facility. Anchored by the fireplace, the ceiling clouds and custom furniture create an inviting location that acts as a "living room" for the campus. Visible from the lower level dining area, the lounge draws in students, faculty and staff and has proved very successful in creating a place where all spend much more time together in the Sullivan Center. The addition to the rear of the existing building provides new and upgraded spaces to the facility: a new Gymnasium/Events Center, President's Dining Room, Locker Rooms, and a large Fitness Center. Spaces have been arranged to allow views into each other to activate the facility and engage the users. A Building Area: (sf) Addition 28,142 Renovation 14,302 Cost per Square Foot: +/- $ Construction Cost 4.5 million Date of Substantial Completion: August, 2012 Location of Project: Buffalo, NY Type of Project: Renovation/Addition Construction materials, mechanical systems or other pertinent information: NA The new Entry Vestibule and Fitness Center provide an all glass "Lantern like" presence, welcoming students and visitors on the campus at night and in the grey months of winter. The exterior of the addition seamlessly adjoins the existing building; matching the existing masonry & EIFS exterior finishes. Playfully adorned with Medaille's school colors, the new Gymnasium exterior further promotes a sense of community and provides a lasting impression of Medaille College to athletes, students, and visitors alike. 1
2 SITE PLAN 1. Kevin I Sullivan Campus Center 2. Admissions Building 3. Main Building 4. Huber Hall/Library 5. South Residence Hall 6. North Residence Hall 7. Campus Entrance/Exit N 2
3 FIRST FLOOR PLAN 1. New Gymnasium 2. Locker Rooms 3. Training Room 4. New Lobby 5. Coaches Offices 6. Existing Gymnasium 7. Existing Dining Hall 8. Follets Bookstore N 3
4 SECOND FLOOR PLAN 9. Fitness Room 10. President s Dining Room 11. Coaches Offices 12. New Freshens Café 13. New Computer Lab 14. Renovated Lounge N 4
5 ADDITION ELEVATIONS EAST ELEVATION SOUTH ELEVATION 5
6 ADDITION EXTERIOR: This photograph, taken from the SE corner of the addition, highlights the second floor Fitness Room enclosed with curtain wall glazing to allow for a bright & comfortable environment to exercise in. The new gymnasium on the left side of the photograph is enclosed with Dryvit, finished to match the existing building, and is adorned with Medaille s school colors (blue and yellow). The first floor masonry veneer, also a match to the existing building, encloses the new locker room facilities. NEW ADDITION Credit: Don Cochran Photography EXISTING EXTERIOR 6
7 ADDITION EXTERIOR: Highlighting the main entrance to the addition, this photo also depicts the custom wood ceiling in the new lobby space & the seamless tie-in to the existing facility on the right side of the image. MAIN ENTRY ADDITION Credit: Don Cochran Photography 7
8 ADDITION INTERIOR: President s Dining Room The Presidents Dining Room functions as a multi purpose space for the facility. In addition to functioning as the President s Dining Room for special functions; it is host to small lectures/guest speaker events, college board meetings, light aerobics classes, athletic team meetings, etc. Finishes in this spaces were kept simple & elegant; a cork wood floor, a highly durable woven vinyl coated polyester wall covering, & slotted drywall ceiling (concealing mechanical diffusers & lighting tracks). Dimmable track lighting was installed to allow for maximum flexibility for the various events within the space. Window slots around the space allow for limited view into adjacent spaces, such a the new gymnasium, lobby and fitness room; and help activate the space and facility. BOARD MEETING COCKTAIL PARTY Credit: Don Cochran Photography 8
9 ADDITION INTERIOR: Fitness Room The new fitness room provides student athletes with a much needed state of the art environment in which to train for their sport of choice, it also affords students & faculty/staff an opportunity to maintain a healthy lifestyle. The exposed & efficiently organized structure, ductwork, and lighting provide an open feeling in the space. The curtain wall glazing around the exterior walls, and white paint throughout provide a very bright & welcoming environment; acoustical ceiling panels between structural framing greatly minimizes noise pollution throughout the space. The all glass entrance (not pictured) and windows into the new gym assist in activating the space and facility. Credit: Don Cochran Photography 9
10 RENOVATION INTERIOR: Lounge The renovated lounge, located on the second floor atrium space of the existing dining hall serves as a living room for students, faculty & staff alike. A custom fireplace, & elliptical acoustical plaster ceiling clouds serve to make the space more inviting and deaden noise from adjacent spaces, making this space more enjoyable and functional than the original configuration. A new Freshens café and seating space (located in the back left of the photo), along with various seating options enclosed by the ceiling clouds provide users with a plethora of options and make this space functional for many activities. AFTER BEFORE 10
11 RENOVATION INTERIOR: Lounge This view of the lounge highlights the custom fireplace & custom elliptical booth seating on the right side of the photo, along with the custom elliptical couch on the left side. The elliptical ceiling shapes were also playfully carried through to the blue and yellow carpet patterns. 11
How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No. 0714108. December 2014
How to Estimate the Cost of Interior Building Finishes from Schematic Drawings CPE Candidate No. 0714108 December 2014 1 How to Estimate the Cost of Interior Building Finishes from Schematic Drawings Table
More informationStudents were surveyed by Brailsford & Dunlavey in the fall of 2000 to determine their priorities for Commons program spaces.
I-1 2.0 INTRODUCTION 2.1 BACKGROUND Located in the rapidly growing Inland Empire area of Southern California (Riverside and San Bernardino Counties), the University of California, Riverside is well positioned
More informationASSISTED LIVING FACILITIES
ASSISTED LIVING FACILITIES PREPARED BY KARA LEGAKO kara@tlccontractgroup.com 150 Glass Street Dallas, TX 75207 PH: 214.378.8778 F: 214.378.8558 tlccontractgroup.com 1 Design Services To The Senior Living
More informationSODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST
SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000
More informationEMR Shielding of single level home from 3G mobile phone tower
YSHIELD Shielding Paints EMR Shielding of single level home from 3G mobile phone tower Project carried out by YSHIELD Australia using HSF 54 shielding paint and Eco 30 shielding fabric. 1) Shielding paint
More informationFRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009
FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009 FRANCIS L. CARDOZO HIGH SCHOOL SCHOOL HISTORY Francis L. Cardozo High School, located at 1200 Clifton Street and bounded by Florida
More informationTAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE
TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE 1/22/2008 1 STORES & COMMERCIAL BUILDINGS 1. General Construction Class Descriptions 2. Types a. Class A - Fireproofed
More informationFIRE EXTINGUISHER DORM #1 SYMPHONY
FIRE EXTINGUISHER DORM #1 SYMPHONY 101 ABC (Dry Chem) Basement (Downbeat Café Pool Tables) 102 ABC (Dry Chem) Hall Men s room (Downbeat Café) 103 ABC (Dry Chem) Hallway across chiller (Downbeat Café) 104
More informationBuilding Condition Assessment: 109-111 North Howard Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
More informationMURCH ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationMARQUETTE UNIVERSITY: McCabe Hall
MARQUETTE UNIVERSITY: McCabe Hall THE SITE Newly acquired by Marquette, the vintage 1920 s building is located on the northeast corner of Wisconsin and 17th Streets. The urban setting offers immediate
More informationVideoconferencing Room Guide
Videoconferencing Room Guide IVN RoomGuide.doc Page 1 Introduction This guide will serve as a tool to plan the design and implementation of a videoconference room. The information in this guide should
More informationUniversity of California, San Diego CAL IT 2
University of California, San Diego CAL IT 2 Brian Smith Senior Thesis 2006 Pennsylvania State University Architectural Engineering Lighting/Electrical Option 10 April 2006 Building Overview California
More informationNew Jersey City University Gilligan Student Union Center
New Jersey City University Gilligan Student Union Center The RBA Group worked with New Jersey City University in a major renovation of their Gilligan Student Union building. We were contracted to reassess,
More informationSOUND CENTRAL CONTROL. Conferencing Facilities. Video Conferencing Video Conferencing Lighting Large Display Multi Signal Matrix Sound Central Control
SOUND Having fine sound and acoustic control is getting more awareness than ever. Leveraging feedback elimination and noise cancellation technologies, our central acoustic control employs matrix mixer
More informationArticle 11. Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools
Article 11 Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools MSBA Accelerated Repair Program Program targets replacement of roofs, windows, doors, and boilers Goal is to
More informationPRESERVATION PLANNING ASSOCIATES 519 Fig Avenue, Santa Barbara, CA 93101 Telephone (805) 450-6658 Email: accole5@yahoo.com
PRESERVATION PLANNING ASSOCIATES 519 Fig Avenue, Santa Barbara, CA 93101 Telephone (805) 450-6658 Email: accole5@yahoo.com June 17, 2015 Ms. Kimberley Heaton McCarthy Supervising Planner Building and Safety
More informationHAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION
HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION 1 AGENDA Hazelwood 1 st Planning Process High School Program Schematic Designs Schedule 2 HAZELWOOD 1 ST GOALS Life, health and safety improvements
More informationBROWNSVILLE STRUCTURES STUDY. July 2012. Prepared by. LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208
BROWNSVILLE STRUCTURES STUDY July 2012 Prepared by LDA ARCHITECTS 33 Terminal Way, Suite 317 Pittsburgh, Pennsylvania 15219 1208 TABLE OF CONTENTS I. SUMMARY OF BUILDING ANALYSIS.. 1 II. INDIVIDUAL BUILDING
More informationFRED JONES JR. MUSEUM OF ART THE STUART WING AND ADKINS GALLERY ADDITION
Client: Fred Jones Jr. Museum of Art, The Stuart Wing and Adkins Gallery Completion: October 2011 Scope: Renovation of existing gallery and addition of new galleries - 54,570 SF Cost: $13 Million Awards:
More informationCARMEL PLACE, NEW YORK, NY
CARMEL PLACE, NEW YORK, NY Carmel Place (formerly known as MY MICRO NY), winner of the adapt NYC competition, optimizes modular construction to provide the city with housing solutions for the expanding
More informationMequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal
More informationPhoto 1: This photograph shows drywall, joint compound, cove base mastic, carpet adhesive, and ceiling tile in store front No. 1.
APPENDIX B PHOTOLOG Photo 1: This photograph shows drywall, joint compound, cove base mastic, carpet adhesive, and ceiling tile in store front No. 1. Photo 2: This photograph shows layered floor tile and
More informationSELECTED SPECIAL EVENTS PROJECTS
1 5 SELECTED SPECIAL EVENTS PROJECTS 3 1 DONNA AND MARVIN SCHWATZ CENTER FOR PERFORMING ARTS, ATLANTA, GEORGIA, USA. COBB ENERGY PERFORMING ARTS CENTRE, COBB COUNTY, GEORGIA, USA. 3 OLYMPIC AQUATIC CENTER,
More informationWalmart 4th Wall. Advertising and Lease Line Guidelines. June 2009. Customerexperience
Walmart 4th Wall Advertising and Lease Line Guidelines June 2009 Customerexperience Contents Storefront Design Control Zone 1 Unacceptable Sign Types in 5-0 Control Zone 2 Tenant Promotional Signs 3 Hours
More information1/9/2015 P:\130217-03\Project Management\Program\Ripon Space Program - 7 January 2015.xlsx
MIDDLE SCHOOL Administration Office Principal's Office 200 1 200 Desk, conference table for 4-6 Conference Room 250 1 250 Conference table for 12 Open Office Area 250 1 250 2 Workstations Mail / copier
More informationAgriculture & Business Multipurpose Classroom Building Prairie View A&M University. 100% Design Development Review Meeting.
OVERLAND PARTNERS ARCHITECTS Agriculture & Business Multipurpose Classroom Building Prairie View A&M University 100% Design Development Review Meeting May 22, 2013 AGENDA 10:00 10:15 Introductions / Outline
More informationSECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront
PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system
More informationINDUSTRIALS COLD STORAGE FACILITIES
CAL 98 INDUSTRIALS COLD STORAGE FACILITIES AVERAGE CLASS C LOW/AVERAGE CLASS S OCCUPANCY DESCRIPTION: Cold storage facilities are designed to keep stored commodities at various temperature levels. Some
More informationjohn jay college of criminal justice
AIA NEW YORK CHAPTER 2013 DESIGN AWARDS ARCHITECTURE john jay college of criminal justice NEW YORK, NEW YORK FULL PROJECT NARRATIVE John Jay College of Criminal Justice s new building provides all the
More informationCASE STUDY: Washington D.C. School Overview. Original Site. Current Site. Construction Cost 1.5.31
1.5.31 School Overview The School for Educational Evolution and Development (SEED) Charter School is located in Washington, D.C. and is best known as the nation s first inner-city public charter boarding
More informationSCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM
Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and
More information17,280 square feet Overview:
CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The
More informationGrace Lane, Arroyo Grande
Grace Lane, Arroyo Grande The Affordable Collection The Affordable Collection at Grace Lane consists of four single-family detached homes on generously sized homesites. This quaint collection of spectacular
More informationREQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:
REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY: THE COMMUNITY DEVELOPMENT AGENCY OF THE CITY OF ORD JULY 2014 A. STATEMENT
More informationWork Space and Office Furniture Standards December 2014
Work Space and Office Furniture Standards December 2014 HISTORY Interior building space is a precious and finite resource at most universities, including Notre Dame. In 2008 an assessment of administrative
More information25 PARSON STREET WILNECOTE TAMWORTH B77 5BD
A traditional semi-detached home ideal for first time buyers offered with immediate vacant possession and being known as:- 25 PARSON STREET WILNECOTE TAMWORTH B77 5BD A.51474 The property is offered complete
More information09 00 03 GENERAL PROVISIONS
09 00 03 GENERAL PROVISIONS A. For renovation projects, consider the building s character and existing finishes. All material patches should blend as closely as possible. Some buildings on campus have
More informationA Complete Solution CREATING WALLS THAT DEFINE SPACE
A Complete Solution CREATING WALLS THAT DEFINE SPACE COMPANY HISTORY CLIPPER WALL Clipper partitions are part of the Saint- Gobain Group, one of the worldwide leaders in the construction products industry.
More informationRehab Inspection Report Page 1
Rehab Inspection Report Page 1 Home Address: Construction Style: Number of bedrooms Square footage: Value of offer: Estimated rehab cost: Value of resale: Orientation of house: N S E W Note: orientation
More informationBUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES
Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE
More informationHow does Architecture Affect the Acoustics of a Space
How does Architecture Affect the Acoustics of a Space Grade Level This lesson plan was developed for a 9 th grade Physical Science Class. Objectives To develop aural senses of spatial awareness To understand
More information32284 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 MAY 1, 2014
32284 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 MAY 1, 2014 BOARD OF TRUSTEES OF COMMUNITY COLLEGE DISTRICT NO. 508 COUNTY OF COOK AND STATE OF ILLINOIS JOB ORDER CONTRACT (JOC) PROJECTS
More informationEAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
More informationWaterleaf Space Optimization Study
Waterleaf Space Optimization Study Board of Trustees Meeting June 25, 2015 Option 1 Convert to Classroom Space Existing Dining Room Existing Conditions Kitchen & Dining Room Classroom Conversion Option
More informationDroveway ARCHITECTURAL SERVICES. Disability Access Audit. Sample Gospel Hall. 22 September 2005. For
22 September 2005 Disability Access Audit For Droveway ARCHITECTURAL SERVICES Droveway House 11 Lilac Avenue, Streetly Sutton Coldfield West Midlands B74 3TH Tel : 0121 352 0150 www.droveway.co.uk Page
More informationSECTION 3 ONM & J STRUCTURAL ANALYSIS
Historic Boynton Beach High School Existing Building Assessment City of Boynton Beach February 10, 2011 SECTION 3 ONM & J STRUCTURAL ANALYSIS STRUCTURAL ENGINEERS SPECIAL INSPECTORS STRUCTURAL CONDITION
More information2015-2016 Design Scenario Interior Design STAR Event
2015-2016 Design Scenario Interior Design STAR Event The Pocono s Children s Camp Developed with input by professional members of The American Society of Interior Designers (ASID) Project Overview and
More informationOffice of Residence Life. Welcome to the Lincoln University Office of Residence Life residence hall virtual tour
Office of Residence Life Welcome to the Lincoln University Office of Residence Life residence hall virtual tour Vision of Residence Life The Office of Residence Life at The Lincoln University seeks to
More informationWenatchee Valley College Music and Arts Center Wenatchee, Washington 27, 696 SF
Wenatchee Valley College Music and Arts Center Wenatchee, Washington 27, 696 SF The MAC is a shared facility for the Music and Art programs, providing much-needed studio space for Art, and state-of-the-art,
More informationBEGIN YOUR JOURNEY HERE
BEGIN YOUR JOURNEY HERE SET THE Begin your new life together in the heart of the city you love. Steps from Union Square and Yerba Buena Gardens, Four Seasons Hotel San Francisco is a sophisticated downtown
More informationCase History WORKING FOR Y OU
Harris Stowe State University Case History St. Louis, Missouri WORKING FOR Y OU Challenge: Create space for students to meet, study and relax in Harris Stowe s first on-campus housing facility. Provide
More informationA1.5 Classroom Standards
A1.5 Classroom Standards Note: The following standards have been developed and adopted by KU's Instructional and Mediated Spaces Committee (IMSAC), which includes representatives from DCM, Instructional
More informationIFMA Building Tour THE MAIN LIBRARY AT GOODWOOD. a library in the park ~ a park in the library 07.15.2014
IFMA Building Tour THE MAIN LIBRARY AT GOODWOOD a library in the park ~ a park in the library 07.15.2014 COLLABORATIVE PROJECT TEAM The location of the library and its development within Independence Park
More informationHistoric Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345
Exterior Features 1 site and drainage 2 foundation 3 wood siding and trim 4 exterior doors 5 windows / storm windows 6 porches front and rear 7 chimneys 8 roofing Interior Features 9 frame 10 basement
More informationDISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf
DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf Discovery Hall reflects its dynamic program and dramatic site, as well as the collaborative and student-centered spirit of
More informationInspecting to a higher standard.
Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com
More informationFOR SALE Office Building
1712 West State Street Bristol, Tennessee 37620 State TR # 13-11-003 Open house on April 26, 2016 from 1:00-3:00pm EST FOR SALE Office Building OFFERING MEMORANDUM Contact Information Jeff Jones 615-445-9984
More informationEducational Facility Innovation Award
2013 CEFPI Utah Educational Facility Innovation Award Granger High School Granite School District Granger High School New Secondary School (High School) Category James H. Day, AIA The Granger High Lancers
More informationLITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -
The original section of this building was constructed in 1941. The exterior walls are built of good quality stone. In the early 1980 s a similar addition was added to the north elevation. The exterior
More informationBROWN & McRAE 33 KNOCKIE ROAD TURRIFF AB53 4BG LAWYERS ESTATE AGENTS NOTARIES PUBLIC. www.brown-mcrae.co.uk
BROWN & McRAE www.brown-mcrae.co.uk turriff@brown-mcrae.co.uk LAWYERS ESTATE AGENTS NOTARIES PUBLIC 10 High Street Turriff Aberdeenshire AB53 4DS Tel: 01888 568950 Fax: 01888 563031 Anderson House 9 11
More informationHERMANTOWN COMMUNITY SCHOOLS. New High School Addition End of DD Design Review
HERMANTOWN COMMUNITY SCHOOLS New High School Addition End of DD Design Review SITE AERIAL HIGH SCHOOL ELEMENTARY SCHOOL BUS GARAGES HOCKEY ARENA / DISTRICT OFFICE SITE FORCES EXISTING BUILDING INFORMATION
More informationYale Arts Complex. The design results from the integration of programmatic, structural and mechanical needs. It includes
New Haven, Connecticut 1 2 Yale University s Rudolph Building formerly known as the Art and Architecture Building was designed in 1963 by the modern master and then chair of the School of Architecture,
More informationCALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN
DISTRICT "SHELL" SUBMISSION DATE: 4/17/13 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 4/19/13 (delete following Hearing) KBE APPROVAL DATE: JUNE 2013 CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES
More informationInfrared Moisture Detection
What it can do for you... what it can t and why 1. Infrared camera basics 2. Examples Lew Harriman MoistureDM.com 3. Summary - The 4 most important facts about infrared moisture detection 1 of 19 Infrared
More informationcasino Gaming Floor Skycity WEBB + has reinvigorated the interior and activated the street edges of Skycity Adelaide WEBB
WEBB+ GAMING W WW casino Gaming Floor Skycity AdelaidE 1. WEBB + has reinvigorated the interior and activated the street edges of Skycity Adelaide Artichoke, 13 September, 2005 3. 2. 4. 1. North Entry
More informationDecember 24, 2008. twalker@sedaconstruction.com. SEDA Construction Attn: Ted Walker 2120 Corporate Square Boulevard Jacksonville, Florida 32216
December 24, 2008 twalker@sedaconstruction.com SEDA Construction Attn: Ted Walker 2120 Corporate Square Boulevard Jacksonville, Florida 32216 RE: Georgetown Community 2C - Revised Assessment Date: October
More informationTURN-KEY LAB SPACE AVAILABLE
TURN-KEY LAB SPACE AVAILABLE 910 CLOPPER ROAD LOCATION... Tech Park 270 910 Clopper Road BUILDING... 180,650 rentable square feet TURN-KEY LAB/OFFICE SPACE AVAILABLE Second Floor 9,800 SF 14,644 SF (can
More informationEvents and Conferences AT THE COLLEGE OF SAINT BENEDICT. Facility Guide. Experience A Place...
Events and Conferences AT THE COLLEGE OF SAINT BENEDICT Facility Guide Experience A Place... 15 Minutes West of St. Cloud Contact Jessica Reiter at 320-363-5791 or email jreiter@csbsju.edu www.csbsju.edu/csb-events-and-conferences
More informationMeeting Facilities. Building: Alumni Hall Room #: 312 Seating Capacity: 28
Building: Allen Hall Room #: Lecture Hall 104 Seating Capacity: 125 Fixed tiered seating Smart board Stage Project screen Room #: 301 Seating Capacity: 40/28 Setup: hollow square / classroom Room #: 307
More informationFAUQUIER HIGH SCHOOL FAUQUIER HIGH SCHOOL 200 E MARKET STREET, CHARLOTTESVILLE, VA PH : 434.296.5684 WWW VMDO.COM
FAUQUIER HIGH SCHOOL 00 E MARKET STREET, CHARLOTTESVILLE, VA PH :.9. WWW VMDO.COM PROJECT OVERVIEW The strategy for the addition and renovation of Fauquier High School unites disparate school wings into
More informationDamage and Dilapidations Report
Damage and Dilapidations Report Address of the property 118 Nowhere Drive, Orpington, Kent, BR5 3SS Date of Job 04/10/2010 Tenancy Length Tenants Name Summary 15 Months Tenant The property overall has
More informationChildren s Medical Center Dallas, Lobby Renovation Dallas, Texas. Photo by: Chad M Davis, AIA
Children s Medical Center Dallas, Lobby Renovation Dallas, Texas Commemorating 100 Years of Care Children s Medical Center Dallas, Lobby Renovation Dallas, Texas Children s Medical Center in Dallas, Texas
More informationSpecial Events & Space Rentals
Special Events & Space Rentals history University Settlement is the nation s first settlement house, pioneering social justice programs for nearly 130 years that continue to shape New York City today.
More informationWEBSTER ELEMENTARY SCHOOL New Rochelle, New York Evaluation of Collapsed Ceiling Room 204
WEBSTER ELEMENTARY SCHOOL New Rochelle, New York Evaluation of Collapsed Ceiling Room 204 Structural Inspection Report Client: CSArch Architecture Engineering Construction Management 19 Front Street, Newburgh,
More informationRiverside Community College District / Renaissance Block
Riverside Community College District / Renaissance Block Site Location Parking Structure Four levels 224 parking spaces Access Street Coil School of the Arts Two levels 36,420 sf Plaza of the Arts Culinary
More informationCOMMUNITY RESOURCE CENTRE Greenfield, Nova Scotia. Project of the Canadian Wood Council
COMMUNITY RESOURCE CENTRE Greenfield, Nova Scotia Project of the Canadian Wood Council Table of Contents 2. Creating a sense of community 3. Greenfield Community Resource Centre 4. Building Design - Structure
More informationDRAPER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationDelaware Valley College
FOCUSED ON CREATION PASSION TO DELIVER Delaware Valley College Life Sciences Building Delaware Valley College Services Provided Design Development Feasibility Study Bridging Documents Location Doylestown,
More informationPLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationVista Condominiums. VISTA SALES OFFICE Telephone: 913.432.3838 Fax: 913.432.3844
Vista Condominiums has undergone extensive renovations. The Vista is offering a unique opportunity designed to meet the growing needs of the KU Medical Center/39th Street Corridor community. Across the
More informationRemodel Projects. Photos by Marvin Dodge
Remodel Projects Photos by Marvin Dodge Lucy Phillips Classroom Building Highlights: All new heating and air conditioning systems ducts, air handler, VAV boxes, pumps, etc. All new electrical/data wiring,
More informationPATTERSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationReport Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10
Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10 PROPERTY DESCRIPTION PROPERTY INSPECTED: INSPECTION ADDRESS: 4722 Baltimore Avenue
More informationProgram Summary: 10,000 square foot contemporary library addition and restoration of historic house for community use
Program Summary: 10,000 square foot contemporary library addition and restoration of historic house for community use Program Statement: This branch library in the Broadmoor neighborhood of New Orleans
More informationSignage. Information / Admissions Desk. Gift Shop. Atrium. Scope Responsibility Architecture / Exhibit Design. Notes. Responsibility.
ure / Exhibit Design Exterior Building Exterior Temporary Exhibit Graphics X X X Structure Exterior Life Safety/Room Wayfinding -Exterior Parking-related Wayfinding -Interior Staff Space Public Space Public
More information32315 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JUNE 5, 2014
32315 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JUNE 5, 2014 BOARD OF TRUSTEES OF COMMUNITY COLLEGE DISTRICT NO. 508 COUNTY OF COOK AND STATE OF ILLINOIS JOB ORDER CONTRACT (JOC) PROJECTS
More informationFacility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
More informationHigher Education Projects University of Illinois at Urbana-Champaign Gorski Reifsteck
Laboratories Bevier Hall Food Labs Renovation College of ACES Everitt Lab 4th Floor Remodel - Phase I Renovation College of Engineering MATSE Kiln House Renovation Phase I College of Engineering MATSE
More informationconferences and banqueting
conferences and banqueting almada negreiros lounge Title Text One of the most beautiful lounges in Lisbon, the Almada Negreiros Lounge is perfect for evening cocktails and welcome receptions, fitting up
More informationDISTRICT-WIDE ELEMENTARY PROGRAMMING
DISTRICT-WIDE ELEMENTARY PROGRAMMING PREPARED BY: GIBRALTAR DESIGN SUBMITTED TO: BOARD OF SCHOOL TRUSTEES School Board Meeting September 17, 2015 2015 Gibraltar Design, Inc. Table of Contents SECTION I.
More informationSpecial Use Commercial Properties
Contents Overview of Special Use Commercial Properties...3 Understanding Fast Food Restaurants...3 Understanding Gasoline Service Stations...4 Understanding Self-Service Cashier Booths...5 Understanding
More informationUniversity of North Florida Student Union Jacksonville, FL
University of North Florida Student Union Jacksonville, FL Elkins provided CM at Risk services for this 148,019 SF, threestory facility for The University of North Florida. This iconic building is the
More informationChecklist for Home Sellers
Checklist for Home Sellers Checklist for Home Sellers Home Inspection Consider having your home inspected before you list it. In doing this, you will learn if there are any major repairs needed and can
More informationCentinela Valley Union High School District. Measure CV Masterplan Update June 2011
Centinela Valley Union High School District Measure CV Masterplan Update June 2011 Hawthorne High School (Phase 1) Hawthorne High School Phase 1: Science, Engineering, and Media Arts Center (Funded) 3
More informationYork Comprehensive. A Case Study. York comprehensive high school auditorium
York Comprehensive High School A Case Study York comprehensive high school auditorium York Comprehensive High School Exterior Imagine three individual schools in one district each representing a community
More informationLower Level (Level L) Exhibit Halls A, B & C
Floor Plans Wal t e r E. Was h i n g ton Con v e n t i on C e n t e r Lower Level (Level L) Exhibit Halls A, B & C Lower Level (Level L) Lower Level (Level L) Halls A, B & C Hall A 151,000 square feet
More informationRefurbishments & fi t-out for any interior. Retrofi t solutions-reducing carbon footprint
Advice, Design & CAD Refurbishments & fi t-out for any interior Furniture space planning Facilities management Retrofi t solutions-reducing carbon footprint New office space search 0333 600 1234 Offices
More informationAngelo State University Construction Report
May 12, 2009 Angelo State University Construction Report Modular buildings will temporarily house ASU staff during the Hardeman renovation starting this fall. Prepared for: John Russell, Director of Planning
More informationAPPLICANT: ORANGE COUNTY, NEW YORK
Figure 1 Div 1 3 rd Flr Leakage in County Executives Office Figure 2 Div 1 3 rd Flr Location 067 approximately 2 SF of visible mold growth above entrance to Room 341 Figure 3 Div 1 3 rd Flr Location 067
More information