EXAMPLE OF A DATA CENTRE BUILD



Similar documents
Tour of new eircom Data Centre Blanchardstown by Dervan Engineering Consultants 11 th March 2015

Legacy Data Centres Upgrading the cooling capabilities What are the options?

Data Centre Testing and Commissioning

University of St Andrews. Energy Efficient Data Centre Cooling

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America

Containment Solutions

Managing Data Centre Heat Issues

Capgemini UK Infrastructure Outsourcing

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Energy Efficient Data Centre at Imperial College. M. Okan Kibaroglu IT Production Services Manager Imperial College London.

Site Preparation Management Co., Ltd. March 1st 2013 By Nara Nonnapha, ATD UPTIME

Data Center Components Overview

Technical Systems. Helen Bedford

This 5 days training Course focuses on Best Practice Data Centre Design, Operation and Management leading to BICSI credits.

The Pros and Cons of Modular Systems

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Webinar: Precision Cooling in Data Centres and other applications 24 June 2014

Energy Efficiency Best Practice Guide Data Centre and IT Facilities

Datacentre Studley. Dedicated managed environment for mission critical services. Six Degrees Group

Datacentre Capability March 2015

CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers

Free Cooling in Data Centers. John Speck, RCDD, DCDC JFC Solutions

National Grid Your Partner in Energy Solutions

European Code of Conduct for Data Centre. Presentation of the Awards 2014

Title: Design of a Shared Tier III+ Data Center: A Case Study with Design Alternatives and Selection Criteria

Data Centre Solutions energy efficient by design

Introducing UNSW s R1 Data Centre

Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED.

Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009

DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER

LDeX Group. Colocation Solutions for High Expectations

Introduction to Datacenters & the Cloud

Energy Efficiency Opportunities in Federal High Performance Computing Data Centers

CANNON T4 MODULAR DATA CENTRE HALLS

Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION

Specialty Environment Design Mission Critical Facilities

Onsite Support: 24/7/365 onsite team. Security: 24/7/365 onsite manned security and CCTV. Monitoring: 24/7/365 Environmental monitoring and management

Direct Fresh Air Free Cooling of Data Centres

Portable Energy Efficient Data Centre Solution

In Row Cooling Options for High Density IT Applications

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia

- White Paper - Data Centre Cooling. Best Practice

Data Centre. Flexible, high efficiency cooling solutions. CONDITIONING CONDENSING UNITS CONTROLS SERVICE TRAINING

Dealing with Thermal Issues in Data Center Universal Aisle Containment

Data Center Energy Profiler Questions Checklist

Product description NCC Data Center

Element D Services Heating, Ventilating, and Air Conditioning

IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT

Data Centre Basiglio, Milan Flexible, advanced and efficient by design.

Datacentre London 1. Dedicated managed environment for mission critical services. Six Degrees Group

Blade Server & Data Room Cooling Specialists

Data Centre. Flexible, high efficiency cooling solutions. CONDITIONING CONDENSING UNITS CONTROLS SERVICE TRAINING

Energy and Cost Analysis of Rittal Corporation Liquid Cooled Package

AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY

Data Center Solutions - The Containerized Evolution

Choosing Close-Coupled IT Cooling Solutions

Colocation Selection Guide. Workspace Technology Ltd

NetApp Data Center Design

ASX Australian Liquidity Centre. ASXCoLo

Data Center Technology: Physical Infrastructure

Mechanical &Electrical Services Modernisation. Presentation to The Commons & Lords Management Boards 26 th November 2008

Power and Cooling for Ultra-High Density Racks and Blade Servers

Paul Oliver Sales Director. Paul Oliver, Airedale Tom Absalom, JCA

CANNON T4 MINI / MICRO DATA CENTRE SYSTEMS

Data center upgrade proposal. (phase one)

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

THE OPTIMAL SOLUTION FOR SMALL AND MEDIUM DATA CENTER

Recommendations for Measuring and Reporting Overall Data Center Efficiency

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions

Scalable. Affordable. Flexible. Fast.

Statement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary

BCA-IDA Green Mark for Existing Data Centres Version EDC/1.0

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)

Elements of Energy Efficiency in Data Centre Cooling Architecture

Challenges In Intelligent Management Of Power And Cooling Towards Sustainable Data Centre

Benefits of. Air Flow Management. Data Center

Data Center Consolidation Trends & Solutions. Bob Miller Vice President, Global Solutions Sales Emerson Network Power / Liebert

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

Introducing Computational Fluid Dynamics Virtual Facility 6SigmaDC

Datacentre South London Data sheet

Data Center Industry Leaders Reach Agreement on Guiding Principles for Energy Efficiency Metrics

APC APPLICATION NOTE #112

ICT and the Green Data Centre

Sovereign. The made to measure data centre

BELLE VUE MANCHESTER DATA CENTRE

Understanding Power Usage Effectiveness (PUE) & Data Center Infrastructure Management (DCIM)

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

Data Centre Cooling Air Performance Metrics

South Asia s First Uptime Institute Certified TIER- IV IDC in Mumbai delivering % uptime

OPERATOR - FACILITY ADDRESS - DATE

Managing Cooling Capacity & Redundancy In Data Centers Today

Standard Comms Rooms Specification

LEVEL 3 DATA CENTER ASSESSMENT

Integrated Building Management Systems in Data Centers

The New Data Center Cooling Paradigm The Tiered Approach

GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY. Public Sector ICT Special Working Group

Transcription:

EXAMPLE OF A DATA CENTRE BUILD BT Harmondsworth Data Centre Hall 2 Upgrade Temperature Control have been involved in providing specialist to data centres for over 20 years, starting from providing specialist close control cooling to full Turnkey M&E projects. The majority of our experience has been gained in a close working partnership with British Telecom and part of their 21st Century Network Upgrade (21CN). This experience has enabled us to offer design and build solutions to many clients as well as continuing our relationship with BT. GENERATOR BT Derby Computer Centre Refurbishment on live data centre Removal of existing LV Switchgear, UPS and Generator PLC system and replace with Static Transfer Switches plus associated UPS Output Panel extensions and BMS modifications and general construction works. January July 2011 1,400,000.00 RAF Croughton Full Data Centre with M&E Building 30 Full replacement of all M&E to a live data centre. Scaffold decking was installed at high level to protect the data centre and temporary cooling utilised to maintain critical operation throughout the refurbishment. Building 180 installation of new CRAC systems and chillers to data centre. Existing chillers were retained in N+1 operation and BMS package provided to allow automatic operation to all items of plant. January 2009 November 2010 1,400,000.00 and 260,000.00

BT Harmondsworth Computer Centre Full Data Centre with M&E Installation and commissioning of new 1500kva HV supply, HV panel extension, transformer, LV Panel, UPS Input and Output Panels, UPS module, CCU s, HVAC Panels, Generators, gantry extensions, associated BMS, F/A, Door Access to Data Centre Media Hall refurbishment including small power, lighting, new suspended ceiling, raised floor tile installation and general construction works. March November 2009 3,000,000.00 BT Harmondsworth Computer Centre Full Data Centre with M&E Installation and commissioning of 2 No 2000kva HV supplies, HV panel extension, transformers, LV Panels, UPS Input and Output Panels, UPS modules, Generators, HVAC Panels, CCU s, gantry extensions, BMS, F/A, Door Access. Media Hall refurbishment including small power, lighting, suspended ceiling, raised floor installation etc and general construction works. January December 2006 6,000,000.00

LV SWITCH ROOM BT St Albans Computer Centre Full Data Centre with M&E Installation and commissioning of new 1500kva HV supply, HV panel extension, transformer, LV Panel, UPS Input and Output Panels, UPS module, CCU s, HVAC Panels, Generators, gantry extensions, associated BMS, F/A, Door Access to Data Centre. Media Hall refurbishment including small power, lighting, new suspended ceiling, raised floor tile installation and general construction works. January November 2005 3,000,000.00 London Data Exchange Brent Cross Full mechanical Supply and Installation of 4 No DX CRAC systems to cold aisle contained racks. New company started by ex UK Grid directors and have been appointed as specialist cooling provider. Phase 2 is installation of 4 No CRAC units to the UPS Room, 16 No chilled water CRAC systems and 3 No 450kW free cooling chillers. January 2012 January 2013 (estimated) 800,000.00

LV SWITCH ROOM BT Bletchley Refurbishment of live Data Centre with M&E Removal and replacement of existing chiller / condensers inclusive of new HVAC panel, sub mains cabling, switchboard modifications, BMS, small power, civil engineering and general construction works. March 2012 June 2012 500,000.00 BT Harmondsworth Computer Centre Refurbishment of live Data Centre with mechanical PLANT ROOM Removal of R22 refrigerant in 11 No CRAC units in critical live data centre. We introduced a new ISCEON MO99, R22 refrigerant replacement to BT and conducted the first live trails of MO99 in this application in Europe. Working closely with DuPont, the refrigerant manufacturers, the equipment was fully tested before and after the conversion and the results showed conclusive proof of a successful conversion. Once satisfied BT released 10 No CRAC systems all completed in a 3 week window without any downtime of the data centre. The trial was showcased at the Air Conditioning & Refrigeration Show at the Birmingham NEC (March 2012) and will be used as a test case to encourage use throughout the industry. February March 2012 50,000.00

PLANT ROOM BT Derby Computer Centre Refurbishment of live Data Centre with mechanical Removal and replacement of 3 No Denco CRAC units inclusive of modifications to BMS, Vesda and additional free cooling pipework to Computer Hall 5. October December 2011 170,000.00 UK Grid Manchester Full mechanical Installation and commissioning of 23 No Airedale new 45kW to 120kW CRAC units within halls 1,2 3 & 4 over a three year development period. Equipment designed to work with cold aisle containment by use of inverter fans on the CRAC units. Between 2008 2011 400,000.00

PLANT ROOM Confidential Client, Great Yarmouth Design, installation and commissioning of mechanical Installation and commissioning of 3 No 85kW Airedale Free Cool Chillers to serve the APC InRow Rack Cooling Solution, with Airedale Down Flow units securing the UPS room, specialist underfloor leak detection and fault alarm panel interface system. During load test at 11DC ambient system achieved, a PUE of 1.2 based (241kW room load, 45kW energy input). December - February 2010 200,000.00 British Energy Hinkley B Nuclear Power Station ROOF ROOM Refurbishment of live Data Centre with mechanical Strip out and replacement of 2 No 100kW chillers serving Data suite. Data suite remained operational at all times and chilled water circuits were modified whilst maintaining water flow. Each chiller was replaced individually, tested and commissioned before removal of the other. Equipment was configured into run and standby. May July 2010 60,000.00

BT St Albans Computer Centre Refurbishment of live Data Centre with M&E Installation of 2 No new Hitachi chiller units, condensers, HVAC panels, associated BMS and new Reverse Osmosis installation to existing AHU s and general construction works. February May 2010 750,000.00 Co-operative Bank, Salford Installation and commissioning of mechanical Installation and commissioning of 4 No Airedale 120kW CRAC units to data suite serving cold aisle containment and hot aisle return through extended plenums. Installation and commissioning of fire suppression extract ventilation system with BMS interface. Installation of 1st phase chilled water pipework through data suite to serve future chiller and On Rak rear door coolers. December February 2010 65,000.00

UPS ROOM EMIS, Leeds Installation and commissioning of mechanical Supply and installation of Eaton Williams rear door rack cooling systems to high density blade server cabinets. The specialist cooling systems used free cooling chilled water to provide temperature neutrality across the servers and provide a low energy cooling solution to High Density 30kW Racks. The energy savings achieved from these systems was 39% less than a traditional chilled water system with pay backs of the additional costs achieved within 8 months. October November 2009 195,000.00 Confidential Client, Bristol Design, installation and commissioning of mechanical Installation and commissioning of 3 No 80kW Aquasnap Liquid Chillers to serve the APC InRow Cooling Solution and Airedale chilled water down flow units. Along with a specialist underfloor water leak detection system and fault alarm panel interface system. Pipework method used was George Fischer COOL-FIT pre-insulated ABS. June August 2009 235,000.00

DATA CENTRE United Utilities, Manchester Design, installation and commissioning of mechanical Supply and Installation of 2 No CRAC systems and supplementary inverter controlled cooling to main IT Suite. Provided cold aisle arrangement with racks and environmental control package. November 2007 35,000.00 Sumitomo Bank, London Installation and commissioning of mechanical Supply and Installation of 5 No CRAC systems to main IT suite, 2 No CRAC systems to UPS Room and 2 No dedicated cooling to the battery rooms, all with auto changer over controls. Supply and Installation of 20 No comms room cooling units across 5 floors. Installation of environmental controls system, water leak and refrigerant leak detection system to all areas. Forming of proprietary gantry to house external plant to comply with City of Westminster planning requirements. October January 2007 280,000.00

Bank of New York, Manchester Installation and commissioning of electrical Supply and Installation of 3 No CRAC systems to main IT suite. Supply and Installation of 2 No CRAC systems to UPS Room. Forming of plantrooms within underground car park including additional builders works and cages for condensers. September November 2005 165,000.00 Bank of New York, Manchester Installation and commissioning of mechanical Supply and Installation of 3 No CRAC systems to main IT suite. Supply and Installation of 2 No CRAC systems to UPS Room. Forming of plantrooms within underground car park including additional builders works and cages for condensers. September November 2005 165,000.00