1 IT Infrastructure Services Ltd Holborn Gate, 330 High Holborn, London, WC1V 7QT Telephone: +44 (0) Fax: +44 (0) Introducing Computational Fluid Dynamics Virtual Facility 6SigmaDC 2009 IT Infrastructure Services Ltd
2 The Concept 6SigmaDC software was developed by Future Facilities to build and create a virtual representation of the Data Centre facility and the IT infrastructure deployed within them. These simulation techniques replace inadequate estimations and rules of thumb with scientific precision in order to manage and predict the performance of the data room facility. ITIS s aim is to reduce thermally induced equipment downtimes and poor manageability, and improve the performance and operational efficiency of the data centre. The key to our methodology is the Virtual Facility (VF). The VF provides a full 3 dimensional, mathematical representation of any data centre at any point in time. The custom built VF provides an accurate and holistic perspective, allowing the operator to track past events, investigate the present status and predict the impact of future changes, with no risk to the real facility IT Infrastructure Services Ltd 2
3 The increasing power demands of IT components, in particular blade architecture; affects the data centre environment and the Mechanical and Electrical infrastructure in place to support the facility. Due to a lack of effective communication between IT suppliers and the Building Services industry, this produces problems for Facility Managers. Data Room Facility Equipment Manufacturer Communications Breakdown Facilities Manager Our aim is to provide a communication path between the associated disciplines to enhance the understanding and maximise the performance of a data room facility IT Infrastructure Services Ltd 3
4 Data Centre Design Whether you are creating a design concept or simulating an existing facility, 6SigmaDC software uses the same design concepts to create the VF. The VF contains the entire room layout and configuration; this includes all items of equipment and infrastructure deployed within the facility. These items are provisioned for an entire library of generic and specific models The audit of a data room facility includes every detail within the room; structural dimensions, ACU s, PDU s, cabinets, cabling routes, lighting detail, fire suppression, floor void and even floor grilles, down to the IT equipment deployed within the cabinet is documented and imported into the VF. The audit detail is critical to the accuracy of the VF to ensure that we create as accurate a representation as possible IT Infrastructure Services Ltd 4
5 Construct the model The four stages to construct the VF: Stage 1 Create the basic room infrastructure Room size, floor void depth, columns, beams... Stage 2 Introduce cabinets and testing layout Stage 3 Add ACU s, PDU s, floor grilles, fire suppression and cabling Stage 4 Introduce equipment and produce results 2009 IT Infrastructure Services Ltd 5
6 Simulation results Once the VF has been created we can examine the model and highlight areas of concern. Room temperature reference points are taken at 0.2m, 1.0m and 2.0m above the floor. The following model illustrates jets of hot exhaust are clearly visible entering neighbouring cabinets which will be causing thermal issues for the equipment housed within. This measurement was produce at 1.0m and shows air exhaust at temperatures exceeding 30 c 2009 IT Infrastructure Services Ltd 6
7 The average inlet air temperature is another characteristic that is interrogated. This plot shows the average inlet air temperature for the equipment in each cabinet. In this instance many cabinets are predicted to have equipment breathing in air over 35 C. For card chassis and Cisco equipment this may not be a problem but for typical server technology this could cause thermal shutdown. Each cabinet that has a potential problem is investigated and the thermal characteristics of the cabinet can be fully analysed. This plot shows that internal issues of the cabinets are increasing the inlet temperatures of the equipment. This cooling air is supplied to the equipment at low level and then exhausted into the cabinet. In this scenario the rear door is solid; the hot air has no way to escape so rises through the cabinet supplying equipment in higher U slots. The temperature of the air steadily rises as it moves through the equipment, causing the high inlet temperatures IT Infrastructure Services Ltd 7
8 The cabinet may not only have a thermal issue but it may have air exhaust issues as well This plot shows that the problem is worsened by the complex air paths involved to cool the equipment deployed within the cabinet. This scenario shows a Cisco 6509 reliant on front to back and side to side cooling. When placed in cabinets with no blanking or perforated doors, the exhaust air re-circulates internally raising the inlet air temperature to the equipment. Cabinets without side panels also allow air to move between cabinets adding to the problems IT Infrastructure Services Ltd 8
9 The data centre airflow characteristic from the AHU are evaluated. The following plot shows a typical air path from the perimeter CRAC units into the main area of the facility. This shows that air is heating up as it travels into the centre of the room. Air is supplied to the centre cabinets are 5 C warmer then the edge cabinets. There are areas of the data hall receiving low levels of cold air from the CRAC supplies IT Infrastructure Services Ltd 9
10 Making changes at the cabinet level and room level can provide significant overall energy savings. By ensuring air takes the most efficient path from CRAC supply to equipment and back to CRAC return. By adhering to best practise the following savings could be made:- > Lower airflow requirement thus reduced fan power > Higher CRAC supply temperatures to reduce chilled water system power > Higher chilled water set points to reduce chilled water system power 2009 IT Infrastructure Services Ltd 10
11 Comparison of Virtual Facility with Real Facility During the survey physical measurements of temperature and airflows are taken to allow comparison between the real and virtual facility. I-buttons are placed on the inlets and outlets of all the CRAC units to measure the air temperature entering and leaving the units. Temperatures within the room are also monitored using I-buttons. Airflow measurements are made at the return grilles on the CRAC and these measured flow rate are used in the simulation. Using a balometer, temperatures and flow rate measurements through each floor grilles are recorded. Pressure measurements are also taken in the floor void IT Infrastructure Services Ltd 11
12 CRAC performance is monitored A summary of the measured and simulated CRAC return and supply Temperatures are produced. The match between the simulated and measured results in the example table is very good. Only two units are supplying outside their range. Since we use an average return temperature to control the units in simulation we are likely to see some variation against the real units which will be taking a single sensor value. In both these cases if we reduce the return temperature by 1.5 C we will be inside both the supply and return ranges for all CRAC units IT Infrastructure Services Ltd 12
13 Floor Void Pressure is Monitored The pressure difference across a floor is measured in various areas of the facility to ensure a good match between the Virtual Facility and the real facility IT Infrastructure Services Ltd 13
14 The Service Our services are provided by a dedicated team of consultant engineers, who will undertake surveying, data collection, equipment inventory and modelling in order to ensure your virtual facility matches your requirements as exactly as possible. The service is provided over two phases, the audit phase and the reporting phase. Audit Phase The audit information required for the thermal model is critical to its accuracy in order to control cost and keep them as low as possible. ITIS will audit all cabinets within the data hall facility, produce an equipment inventory and input into a CSV format which will be imported into the thermal model. A snap shot of the load within the cabinets will be documented and imported into the thermal model; if this information is not available a clamp test of all the cabinets will be undertaken. It will also form part of the review of the load balancing across the phases. Import all essential data into the 6SigmaDC software database and construct a thermal model and present findings. All of these works will be documented and managed by the ITIS consultant management team Report Phase To evaluate the thermal model and produce a Recommendation document for the data hall facility. This report will contain the following information:- > CFD virtual facility conclusions > Evaluate any changes that need to be made to the physical cabinet infrastructure, produce report detailing critical timeline, resource and budgetary requirements > Evaluate any server/infrastructure restack changes that need to made, produce report detailing critical timeline, implementation plan, resource and budgetary requirements > Evaluate and assess the Mechanical and Electrical services within the data hall facility, produce report on findings detailing estimated energy consumption savings, potential payback in terms of low years and an estimate PUE rating > Recommend thermal model reiterations Specialist Areas Covered The assessment will be carried out on the Mechanical and Electrical services as well as the IT Infrastructure services. Areas that we will focus on to achieve improved efficiency are as follows: > Cabinet/rack data room layout > Cabinet internal configuration air flow efficiency > Under floor airflow efficiency > Server deployment strategy > Chilled water temperatures > Free cooling > M&E infrastructure redundancy > Ambient data hall temperatures > Evaluate Variable Speed Drive efficiency > CRAC control strategy 2009 IT Infrastructure Services Ltd 14
Introducing the. Virtual Facility
Introducing the Virtual Facility At future facilities, we have developed a groundbreaking methodology enabling owner/operators to improve the performance of a data centre throughout its entire lifecycle.
Using Simulation to Improve Data Center Efficiency
A WHITE PAPER FROM FUTURE FACILITIES INCORPORATED Using Simulation to Improve Data Center Efficiency Cooling Path Management for maximizing cooling system efficiency without sacrificing equipment resilience
Thinking Outside the Box Server Design for Data Center Optimization
Thinking Outside the Box Server Design for Data Center Optimization Marie Ross, Senior Applications Engineer Tom Gregory, Consultant Engineer October 2013 The benefits of analyzing thermal performance
Airflow Simulation Solves Data Centre Cooling Problem
Airflow Simulation Solves Data Centre Cooling Problem The owner s initial design for a data centre in China utilized 40 equipment racks filled with blade servers spread out in three rows along the length
Dealing with Thermal Issues in Data Center Universal Aisle Containment
Dealing with Thermal Issues in Data Center Universal Aisle Containment Daniele Tordin BICSI RCDD Technical System Engineer - Panduit Europe [email protected] AGENDA Business Drivers Challenges
Data center upgrade proposal. (phase one)
Data center upgrade proposal (phase one) Executive Summary Great Lakes began a recent dialogue with a customer regarding current operations and the potential for performance improvement within the The
Data centers have been cooled for many years by delivering
The Increasing Challenge of Data Center Design and Management: Is CFD a Must? Mark Seymour, Christopher Aldham, Matthew Warner, Hassan Moezzi Future Facilities, San Jose, California, USA Mark Seymour,
GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY. Public Sector ICT Special Working Group
GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY Public Sector ICT Special Working Group SERVER ROOM ENERGY EFFICIENCY This guide is one of a suite of documents that aims to provide guidance on ICT energy efficiency.
Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009
Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009 Agenda Overview - Network Critical Physical Infrastructure Cooling issues in the Server Room
Data Center Components Overview
Data Center Components Overview Power Power Outside Transformer Takes grid power and transforms it from 113KV to 480V Utility (grid) power Supply of high voltage power to the Data Center Electrical Room
Benefits of Cold Aisle Containment During Cooling Failure
Benefits of Cold Aisle Containment During Cooling Failure Introduction Data centers are mission-critical facilities that require constant operation because they are at the core of the customer-business
Benefits of. Air Flow Management. Data Center
Benefits of Passive Air Flow Management in the Data Center Learning Objectives At the end of this program, participants will be able to: Readily identify if opportunities i where networking equipment
Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION
Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION The heat load in data centers is increasing rapidly, the adaptation of a cooling strategy is often necessary. Many data centers and server rooms use
Optimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009
Optimum Climate Control For Datacenter - Case Study T. Prabu March 17 th 2009 Agenda 2 About EDEC (Emerson) Facility Data Center Details Design Considerations & Challenges Layout Design CFD Analysis Of
Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential
TECHNICAL REPORT Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential By Lars Strong, P.E., Upsite Technologies, Inc. Bruce Long, Upsite Technologies, Inc. +1.888.982.7800 upsite.com
Supporting Cisco Switches In Hot Aisle/Cold Aisle Data Centers
CABINETS: ENCLOSED THERMAL MOUNTING MANAGEMENT SYSTEMS WHITE PAPER Supporting Cisco Switches In Hot Aisle/Cold Aisle Data Centers 800-834-4969 [email protected] www.chatsworth.com All products
Free Cooling in Data Centers. John Speck, RCDD, DCDC JFC Solutions
Free Cooling in Data Centers John Speck, RCDD, DCDC JFC Solutions Why this topic Many data center projects or retrofits do not have a comprehensive analyses of systems power consumption completed in the
Prediction Is Better Than Cure CFD Simulation For Data Center Operation.
Prediction Is Better Than Cure CFD Simulation For Data Center Operation. This paper was written to support/reflect a seminar presented at ASHRAE Winter meeting 2014, January 21 st, by, Future Facilities.
Data Centre Infrastructure Assessment
Data Centre Infrastructure Assessment Prepared for: ACME INC SAMPLE REPORT Attention: Mr DC Manager This report represents a generic sample data centre audit for a generic customer by Focus Group Technologies.
APC APPLICATION NOTE #92
#92 Best Practices for Designing Data Centers with the InfraStruXure InRow RC By John Niemann Abstract The InfraStruXure InRow RC is designed to provide cooling at the row and rack level of a data center
Managing Data Centre Heat Issues
Managing Data Centre Heat Issues Victor Banuelos Field Applications Engineer Chatsworth Products, Inc. 2010 Managing Data Centre Heat Issues Thermal trends in the data centre Hot Aisle / Cold Aisle design
Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001
Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001 Presented by: Liberty Engineering, LLP 1609 Connecticut Avenue
Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers
Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers Deploying a Vertical Exhaust System www.panduit.com WP-09 September 2009 Introduction Business management applications and rich
Server Room Thermal Assessment
PREPARED FOR CUSTOMER Server Room Thermal Assessment Analysis of Server Room COMMERCIAL IN CONFIDENCE MAY 2011 Contents 1 Document Information... 3 2 Executive Summary... 4 2.1 Recommendation Summary...
Virtual Data Centre Design A blueprint for success
Virtual Data Centre Design A blueprint for success IT has become the back bone of every business. Advances in computing have resulted in economies of scale, allowing large companies to integrate business
Using CFD for optimal thermal management and cooling design in data centers
www.siemens.com/datacenters Using CFD for optimal thermal management and cooling design in data centers Introduction As the power density of IT equipment within a rack increases and energy costs rise,
Air, Fluid Flow, and Thermal Simulation of Data Centers with Autodesk Revit 2013 and Autodesk BIM 360
Autodesk Revit 2013 Autodesk BIM 360 Air, Fluid Flow, and Thermal Simulation of Data Centers with Autodesk Revit 2013 and Autodesk BIM 360 Data centers consume approximately 200 terawatt hours of energy
How To Improve Energy Efficiency Through Raising Inlet Temperatures
Data Center Operating Cost Savings Realized by Air Flow Management and Increased Rack Inlet Temperatures William Seeber Stephen Seeber Mid Atlantic Infrared Services, Inc. 5309 Mohican Road Bethesda, MD
Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER
Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER Lylette Macdonald, RCDD Legrand Ortronics BICSI Baltimore 2011 Agenda: Discuss passive thermal management at the Rack
AisleLok Modular Containment vs. Legacy Containment: A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings
WH I TE PAPE R AisleLok Modular Containment vs. : A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings By Bruce Long, Upsite Technologies, Inc. Lars Strong, P.E., Upsite Technologies,
Data Centre Testing and Commissioning
Data Centre Testing and Commissioning What is Testing and Commissioning? Commissioning provides a systematic and rigorous set of tests tailored to suit the specific design. It is a process designed to
- White Paper - Data Centre Cooling. Best Practice
- White Paper - Data Centre Cooling Best Practice Release 2, April 2008 Contents INTRODUCTION... 3 1. AIR FLOW LEAKAGE... 3 2. PERFORATED TILES: NUMBER AND OPENING FACTOR... 4 3. PERFORATED TILES: WITH
Rittal Liquid Cooling Series
Rittal Liquid Cooling Series by Herb Villa White Paper 04 Copyright 2006 All rights reserved. Rittal GmbH & Co. KG Auf dem Stützelberg D-35745 Herborn Phone +49(0)2772 / 505-0 Fax +49(0)2772/505-2319 www.rittal.de
Great Lakes Data Room Case Study
Great Lakes Data Room Case Study WeRackYourWorld.com Problem: During a warm summer period in 2008, Great Lakes experienced a network outage due to a switch failure in the network enclosure. After an equipment
Green Data Centre: Is There Such A Thing? Dr. T. C. Tan Distinguished Member, CommScope Labs
Green Data Centre: Is There Such A Thing? Dr. T. C. Tan Distinguished Member, CommScope Labs Topics The Why? The How? Conclusion The Why? Drivers for Green IT According to Forrester Research, IT accounts
Element D Services Heating, Ventilating, and Air Conditioning
PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer
Energy Efficiency Opportunities in Federal High Performance Computing Data Centers
Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Prepared for the U.S. Department of Energy Federal Energy Management Program By Lawrence Berkeley National Laboratory
BRUNS-PAK Presents MARK S. EVANKO, Principal
BRUNS-PAK Presents MARK S. EVANKO, Principal Data Centers of the Future and the Impact of High Density Computing on Facility Infrastructures - Trends, Air-Flow, Green/LEED, Cost, and Schedule Considerations
How to Meet 24 by Forever Cooling Demands of your Data Center
W h i t e P a p e r How to Meet 24 by Forever Cooling Demands of your Data Center Three critical aspects that are important to the operation of computer facilities are matching IT expectations with the
Data Center Cooling & Air Flow Management. Arnold Murphy, CDCEP, CDCAP March 3, 2015
Data Center Cooling & Air Flow Management Arnold Murphy, CDCEP, CDCAP March 3, 2015 Strategic Clean Technology Inc Focus on improving cooling and air flow management to achieve energy cost savings and
The Benefits of Supply Air Temperature Control in the Data Centre
Executive Summary: Controlling the temperature in a data centre is critical to achieving maximum uptime and efficiency, but is it being controlled in the correct place? Whilst data centre layouts have
HIGHLY EFFICIENT COOLING FOR YOUR DATA CENTRE
HIGHLY EFFICIENT COOLING FOR YOUR DATA CENTRE Best practices for airflow management and cooling optimisation AIRFLOW MANAGEMENT COLD AND HOT AISLE CONTAINMENT DC ASSESSMENT SERVICES Achieving true 24/7/365
Modeling Rack and Server Heat Capacity in a Physics Based Dynamic CFD Model of Data Centers. Sami Alkharabsheh, Bahgat Sammakia 10/28/2013
Modeling Rack and Server Heat Capacity in a Physics Based Dynamic CFD Model of Data Centers Sami Alkharabsheh, Bahgat Sammakia 1/28/213 2 ES2 Vision To create electronic systems that are self sensing and
Data Center Technology: Physical Infrastructure
Data Center Technology: Physical Infrastructure IT Trends Affecting New Technologies and Energy Efficiency Imperatives in the Data Center Hisham Elzahhar Regional Enterprise & System Manager, Schneider
How to Build a Data Centre Cooling Budget. Ian Cathcart
How to Build a Data Centre Cooling Budget Ian Cathcart Chatsworth Products Topics We ll Cover Availability objectives Space and Load planning Equipment and design options Using CFD to evaluate options
Cheat Sheets to Data Center Infrastructure Management
^ Business-wise, Future-drivenTM Cheat Sheets to Data Center Infrastructure Management The Brands You Trust. Table of Contents Introduction...3 How DCIM helps operations...4 How DCIM helps planning...5
Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings
WHITE PAPER Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings By Lars Strong, P.E., Upsite Technologies, Inc. Kenneth G. Brill, Upsite Technologies, Inc. 505.798.0200
Thermal Optimisation in the Data Centre
Thermal Optimisation in the Data Centre Best Practices for achieving optimal cooling performance and significant energy savings in your data centre 1. Thermal analysis 2. Cold-Aisle-Containment 3. Seal
How Row-based Data Center Cooling Works
How Row-based Data Center Cooling Works White Paper 208 Revision 0 by Paul Lin and Victor Avelar Executive summary Row-based data center cooling is normally regarded as a cold air supply architecture that
AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY
AEGIS DATA CENTER SERVICES POWER AND COOLING ANALYSIS SERVICE SUMMARY The Aegis Services Power and Assessment Service provides an assessment and analysis of your data center facility and critical physical
How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions
Intel Intelligent Power Management Intel How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Power and cooling savings through the use of Intel
Measure Server delta- T using AUDIT- BUDDY
Measure Server delta- T using AUDIT- BUDDY The ideal tool to facilitate data driven airflow management Executive Summary : In many of today s data centers, a significant amount of cold air is wasted because
Unified Physical Infrastructure (UPI) Strategies for Thermal Management
Unified Physical Infrastructure (UPI) Strategies for Thermal Management The Importance of Air Sealing Grommets to Improving Smart www.panduit.com WP-04 August 2008 Introduction One of the core issues affecting
Data Centers: How Does It Affect My Building s Energy Use and What Can I Do?
Data Centers: How Does It Affect My Building s Energy Use and What Can I Do? 1 Thank you for attending today s session! Please let us know your name and/or location when you sign in We ask everyone to
Application of CFD modelling to the Design of Modern Data Centres
Application of CFD modelling to the Design of Modern Data Centres White Paper March 2012 By Sam Wicks BEng CFD Applications Engineer Sudlows March 14, 2012 Application of CFD modelling to the Design of
Analysis of the UNH Data Center Using CFD Modeling
Applied Math Modeling White Paper Analysis of the UNH Data Center Using CFD Modeling By Jamie Bemis, Dana Etherington, and Mike Osienski, Department of Mechanical Engineering, University of New Hampshire,
Energy Management Services
February, 2012 Energy Management Services Data centers & IT environments are often critical to today s businesses, directly affecting operations and profitability. General & Mechanical Services has the
DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences
DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences November 2011 Powered by DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no
Managing Cooling Capacity & Redundancy In Data Centers Today
Managing Cooling Capacity & Redundancy In Data Centers Today About AdaptivCOOL 15+ Years Thermal & Airflow Expertise Global Presence U.S., India, Japan, China Standards & Compliances: ISO 9001:2008 RoHS
LEVEL 3 DATA CENTER ASSESSMENT
Nationwide Services Corporate Headquarters 410 Forest Street Marlborough, MA 01752 USA Tel: 800-342-5332 Fax: 508-303-0579 www.eecnet.com LEVEL 3 DATA CENTER ASSESSMENT Submitted by: Electronic Environments
DATA CENTER ASSESSMENT SERVICES
DATA CENTER ASSESSMENT SERVICES ig2 Group Inc. is a Data Center Science Company which provides solutions that can help organizations automatically optimize their Data Center performance, from assets to
Cooling Audit for Identifying Potential Cooling Problems in Data Centers
Cooling Audit for Identifying Potential Cooling Problems in Data Centers By Kevin Dunlap White Paper #40 Revision 2 Executive Summary The compaction of information technology equipment and simultaneous
Capgemini UK Infrastructure Outsourcing
Together. Free your energies Capgemini UK Infrastructure Outsourcing Project Arthur Improved Data Centre Efficiency Paul Feeney Capgemini Tony Mills Spie Matthew Hall Project Arthur The Toltec data centre,
How To Run A Data Center Efficiently
A White Paper from the Experts in Business-Critical Continuity TM Data Center Cooling Assessments What They Can Do for You Executive Summary Managing data centers and IT facilities is becoming increasingly
Cabcon. Data Centre Solutions. www.cabcon.co.uk. an acal group company UK +44 (0)1189 122980 IRE (00353) 1 629 2640
Data Centre Solutions www.cabcon.co.uk UK +44 (0)1189 122980 IRE (00353) 1 629 2640 About Us are a specialist distributor of copper, fibre, power, security, active and cable management products for the
Energy-efficient & scalable data center infrastructure design
Seminar am 30. September 2010 in Wetzlar Nachhaltigkeit durch UPI (Unified Physical Infrastructure) Vortrag von Stefan Fammler: Energieeffiziente Strategien im Rechenzentrum Energy-efficient & scalable
APC APPLICATION NOTE #112
#112 Best Practices for Deploying the InfraStruXure InRow SC By David Roden Abstract The InfraStruXure InRow SC (ACSC100 and ACSC101) is a self-contained air conditioner for server rooms and wiring closets.
Data center lifecycle and energy efficiency
Data center lifecycle and energy efficiency White Paper Lifecycle management, thermal management, and simulation solutions enable data center energy modernization Introduction Data centers are coming under
High Density Data Centers Fraught with Peril. Richard A. Greco, Principal EYP Mission Critical Facilities, Inc.
High Density Data Centers Fraught with Peril Richard A. Greco, Principal EYP Mission Critical Facilities, Inc. Microprocessors Trends Reprinted with the permission of The Uptime Institute from a white
Power and Cooling for Ultra-High Density Racks and Blade Servers
Power and Cooling for Ultra-High Density Racks and Blade Servers White Paper #46 Introduction The Problem Average rack in a typical data center is under 2 kw Dense deployment of blade servers (10-20 kw
Data Center Lifecycle and Energy Efficiency
Data Center Lifecycle and Energy Efficiency Lifecycle infrastructure management, power management, thermal management, and simulation solutions enable data center modernization. White Paper October 2014
Selecting Rack-Mount Power Distribution Units For High-Efficiency Data Centers
C P I P O W E R M A N A G E M E N T WHITE PAPER Selecting Rack-Mount Power Distribution Units For High-Efficiency Data Centers By Anderson Hungria Sr. Product Manager of Power, Electronics & Software Published
University of St Andrews. Energy Efficient Data Centre Cooling
Energy Efficient Data Centre Cooling St. Andrews and Elsewhere Richard Lumb Consultant Engineer Future-Tech Energy Efficient Data Centre Cooling There is no one single best cooling solution for all Data
Driving Data Center Efficiency Through the Adoption of Best Practices
Data Center Solutions 2008 Driving Data Center Efficiency Through the Adoption of Best Practices Data Center Solutions Driving Data Center Efficiency Through the Adoption of Best Practices Executive Summary
How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions
Intel Intelligent Power Management Intel How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Power savings through the use of Intel s intelligent
Improving Rack Cooling Performance Using Airflow Management Blanking Panels
Improving Rack Cooling Performance Using Airflow Management Blanking Panels By Neil Rasmussen White Paper #44 Revision 3 Executive Summary Unused vertical space in open frame racks and rack enclosures
Energy Efficiency Best Practice Guide Data Centre and IT Facilities
2 Energy Efficiency Best Practice Guide Data Centre and IT Facilities Best Practice Guide Pumping Systems Contents Medium-sized data centres energy efficiency 3 1 Introduction 4 2 The business benefits
IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT
DATA CENTER RESOURCES WHITE PAPER IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT BY: STEVE HAMBRUCH EXECUTIVE SUMMARY Data centers have experienced explosive growth in the last decade.
Energy Performance Optimization of Server Room HVAC System
International Journal of Thermal Technologies E-ISSN 2277 4114 2 INPRESSCO, All Rights Reserved Available at http://inpressco.com/category/ijtt/ Research Article Manoj Jadhav * and Pramod Chaudhari Department
COMPARATIVE ANALYSIS OF WIDELY USED AIR CONTAINMENT SYSTEMS IN COMMERCIAL DATA CENTERS FOR MAXIMUM COOLING PERFORMANCE KASTURI RANGAN RAJAGOPALAN
COMPARATIVE ANALYSIS OF WIDELY USED AIR CONTAINMENT SYSTEMS IN COMMERCIAL DATA CENTERS FOR MAXIMUM COOLING PERFORMANCE by KASTURI RANGAN RAJAGOPALAN Presented to the Faculty of the Graduate School of The
Data Center 2020: Delivering high density in the Data Center; efficiently and reliably
Data Center 2020: Delivering high density in the Data Center; efficiently and reliably March 2011 Powered by Data Center 2020: Delivering high density in the Data Center; efficiently and reliably Review:
Choosing Close-Coupled IT Cooling Solutions
W H I T E P A P E R Choosing Close-Coupled IT Cooling Solutions Smart Strategies for Small to Mid-Size Data Centers Executive Summary As high-density IT equipment becomes the new normal, the amount of
Data Centre Energy Efficiency Operating for Optimisation Robert M Pe / Sept. 20, 2012 National Energy Efficiency Conference Singapore
Data Centre Energy Efficiency Operating for Optimisation Robert M Pe / Sept. 20, 2012 National Energy Efficiency Conference Singapore Introduction Agenda Introduction Overview of Data Centres DC Operational
Rack Blanking Panels To Fill or Not to Fill
Rack Blanking Panels To Fill or Not to Fill A Dell Technical White Paper Dell Data Center Infrastructure David L. Moss Joyce F. Ruff Learn more at Dell.com/PowerEdge/Rack THIS WHITE PAPER IS FOR INFORMATIONAL
Reducing Data Center Energy Consumption
Reducing Data Center Energy Consumption By John Judge, Member ASHRAE; Jack Pouchet, Anand Ekbote, and Sachin Dixit Rising data center energy consumption and increasing energy costs have combined to elevate
Statement Of Work. Data Center Power and Cooling Assessment. Service. Professional Services. Table of Contents. 1.0 Executive Summary
Statement Of Work Professional Services Data Center Power and Cooling Assessment Data Center Power and Cooling Assessment Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features
Green Data Centre Design
Green Data Centre Design A Holistic Approach Stantec Consulting Ltd. Aleks Milojkovic, P.Eng., RCDD, LEED AP Tommy Chiu, EIT, RCDD, LEED AP STANDARDS ENERGY EQUIPMENT MATERIALS EXAMPLES CONCLUSION STANDARDS
11 Top Tips for Energy-Efficient Data Center Design and Operation
11 Top Tips for Energy-Efficient Data Center Design and Operation A High-Level How To Guide M e c h a n i c a l a n a l y s i s W h i t e P a p e r w w w. m e n t o r. c o m When is Data Center Thermal
Strategies for Deploying Blade Servers in Existing Data Centers
Strategies for Deploying Blade Servers in Existing Data Centers By Neil Rasmussen White Paper #125 Revision 1 Executive Summary When blade servers are densely packed, they can exceed the power and cooling
Improving Rack Cooling Performance Using Airflow Management Blanking Panels
Improving Rack Cooling Performance Using Airflow Management Blanking Panels White Paper 44 Revision 4 by Neil Rasmussen > Executive summary Unused vertical space in open frame racks and rack enclosures
Power and Cooling Guidelines for Deploying IT in Colocation Data Centers
Power and Cooling Guidelines for Deploying IT in Colocation Data Centers White Paper 173 Revision 0 by Paul Lin and Victor Avelar Executive summary Some prospective colocation data center tenants view
The New Data Center Cooling Paradigm The Tiered Approach
Product Footprint - Heat Density Trends The New Data Center Cooling Paradigm The Tiered Approach Lennart Ståhl Amdahl, Cisco, Compaq, Cray, Dell, EMC, HP, IBM, Intel, Lucent, Motorola, Nokia, Nortel, Sun,
Effect of Rack Server Population on Temperatures in Data Centers
Effect of Rack Server Population on Temperatures in Data Centers Rajat Ghosh, Vikneshan Sundaralingam, Yogendra Joshi G.W. Woodruff School of Mechanical Engineering Georgia Institute of Technology, Atlanta,