Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009
|
|
|
- Percival Jerome Lang
- 10 years ago
- Views:
Transcription
1 Education Evolution: Scalable Server Rooms George Lantouris Client Relationship Manager (Education) May 2009
2 Agenda Overview - Network Critical Physical Infrastructure Cooling issues in the Server Room Server Room cooling types and configurations 10 steps to improve existing computer room cooling Conclusions
3 Today s IT Projects - Education Virtualization Storage and Server consolidation VOIP Unified Communications Wireless Relocations All of the above projects are affecting your Server rooms. At the same time we are in a financial crisis.
4 Network-Critical Physical Infrastructure Each layer depends on everything below it Reliable Business Operations People Process Information Technology Critical Foundation of Business Continuity Power Cabling Racks and Physical Structure Fire Security and Network Critical Physical Infrastructure Cooling
5 Introduction Cooling is a critical IT environment process Not well understood by many IT professionals Heat-related failure is the number one cause of downtime in IT facilities 57% of businesses cite cooling as a major Server Room / Data Centre challenge As servers become more powerful and more compact, power consumption and therefore heat generation increases
6 Computing Changes Moves to Blade Infrastructure - High Density
7 Cooling the Server Room space Power In = Heat Out 1kW Power = 1kW Heat 1 kw = 3413 BTU/HR
8 Server Room cooling approaches
9 Comfort versus Precision Cooling 10KW heat DESIGN Humans 60 / 40% 17KW unit 170% Electricity 3-5 yr design 21 o +/- 3 o C 50% - 15%RH 8 hours/office $ Cooling Load Sensible/Latent Unit Size Opp Ex Lifecycle Temperature Humidity Workday Unit Cost Computers 98 / 2% 10KW unit 100% Electricity yr design 21 o +/- 1 o C 50% +/- 5%RH 24 hours/365 day $$$
10 Today s Main Cooling Architectures Air Cooled Servers Central Air Handling Unit Room Based Architecture Computer Room Air Handler Room Based Architecture InRow Air Handler Row Based Architecture
11 Traditional Room Cooling Ducted supply air for delivery to heat load Open or ducted return air for heat removal Fixed fan speeds to deliver consistent plenum pressures Airflow restrictions in under floor plenum Non-uniform airflow distribution Central Air Handling Unit (CAHU) Fixed flow tiles/grates Limited capacity resolution Delivery of colder air to the space Reduced Sensible Heat Ratio (SHR) Computer Room Air Handler (CRAH)
12 Effects of different cooling approaches Same racks, same room, different cooling design Totally different cooling airflow results!
13 Room Cooling - Raised Floor Air Distribution High density requires more air and more cables
14 Limitations of Raised Floor Air Distribution KW (Sensible Heat) = Delta T x CFM / Rack Power (kw) that can be cooled by one tile with this airflow Typical Capability Perf tile With Effort cfm Blade Servers Grate tile Extreme Standard IT Equipment Upper limits of raised floor Using grate-type tiles Impractical [47.2] [94.4] [141.6] [188.8] [236.0] [283.2] [330.4] [377.6] [424.8] [471.9] cfm
15 InRow Eliminates Mixing Predictable Cooling Focus on Heat Removal Doesn t require raised floor for air distribution All racks in the row share cooling capacity Allows for better of matching of cooling to rack power Flexibility for Rack loading to change (not to exceed capacity) Enables predictable redundancy Racks sharing capacity (No Containment shown) Simulation of Failed InRow Cooling Unit
16 InRow Variable Speed Fans Reduced fan power as a function of load 100% 90% In-row Variable Load Power Consumption Power savings is logarithmic Minimum fan speed to ensure heat removal Power Consumption 80% 70% 60% 50% 40% 30% 20% Variable IT Load In-row variable unit power 10% 0% 0% 20% 40% 60% 80% 100% Load
17 Ten short-term steps to improve existing computer room cooling
18 Government Building & Infrastructure Funds 10 Practical Steps and Best Practice to improve existing computer room cooling Operational - Cost Savings 60% of your power usage in your computer room is used by cooling By making your cooling more efficient you will save money and lower your schools carbon footprint Future proofing of your Computer Room APC have Education Pricing
19 1 Perform a health check (either in-house or by APC or one of partners) Maximum cooling capacity CRAC (computer room air conditioning) units Chiller water/ condenser loop Room temperatures Rack temperatures Tile air velocity Condition of subfloors Airflow within racks Aisle & floor tile arrangement
20 2 Initiate maintenance regime Regular servicing and preventive maintenance is essential to keeping the computer room operating at peak performance If the system has not been serviced for some time then this should be initiated immediately A regular maintenance regime should be implemented to meet the recommended guidelines of the manufacturers of the cooling components
21 3 Utilise blanking panels Snap-in blanking panel
22 Prevents recirculation within the rack BEFORE AFTER 32ºC 27ºC 35ºC Rack front 24ºC 22ºC 22ºC Rack front Blanking panels 28ºC 22ºC 21ºC SIDE VIEW 22ºC 22ºC 22ºC SIDE VIEW
23 4 Implement cable management regime Unnecessary or unused cabling should be removed Data cables should be cut to the right length and patch panels used where appropriate Power to the equipment should be fed from rack-mounted PDUs with cords cut to the proper length
24 5 Remove under-floor obstructions Sub-floor cable trays Replace missing tiles Seal around cable cut-outs Replace unused cutouts Replace unused vents with full tiles
25 6 Separate high-density racks = 10 kw rack, others 2.6 kw The fundamental reason why spreading out highdensity loads is effective is because isolated high power racks can effectively borrow underutilized cooling capacity from neighboring racks.
26 7 Implement hot-aisle/cold-aisle arrangement Row 1 Row 2 Row 3 Row 4 Without hot/cold aisles: the hot air from row 1 is exhausted into the adjacent aisle, where it mixes with supply or room air and then enters into the front of the racks in row 2
27 8 Align CRAC units with hot aisles Hot-aisle positioning of CRAC units (raised floor) Raised floor - Align CRACS with hot aisles Hot air return path in line with CRAC Reduces mixing and recirculation Tile airflow increased (farther from CRAC) Warmer return air increases capacity Non-raised floor - Align CRACs with cold aisles Cold air distribution directly in front of CRAC Requires at least one CRAC per cold aisle Only adequate up to 1.5 kw
28 9 Manage floor vents CRAC or CRAH Rack cabinets Strong airflow Weak airflow Improper location of floor vents can cause cooling air to mix with hot exhaust air before reaching the load equipment
29 10 Install airflow-assisting devices Hot air scavenging systems Collect hot air at the point of generation Route directly to CRAC Snap-on retrofit 470 L/s airflow Variable speed: as needed Dual path power and N+1 Flexible, movable Hard floor or raised floor Limit: 8kW per rack
30 10 Rack Air Containment Rack Level Thermal Containment to improve efficiency and predictability to address individual racks and small zones. For 300 and 600mm Netshelter Racks, UPS, PDU, and InRow cooling products Maximizes cooling predictability, efficiency, and capacity Prevents hot air recirculation to sensitive IT equipment System can be easily configured for redundancy Noise dampening
31 10 In-Row rack-coupled CRAC InfraStruXure Cooling Distribution The Association Unit of Independent Schools of NSW ½ Rack form factor N+1 hot-swap variable speed fans Captures hot air exhaust from nearby IT racks ½ Rack form factor N+1 hot-swap variable speed fans Captures hot air exhaust from nearby IT racks Add units for redundancy or density Up to 30kW rating
32 10 Active Response Controls Included on All InRow Products Additional Energy Savings by varying fan speed. Improves Reliability by ensuring Inlet Tempers to IT equipment are maintained More Detail on how these controls work available in APC Application Notes: AN AN-142
33 10 Hot Aisle Containment Systems (HACS) Hot Aisle Ceiling Tiles/Cable Trough Seals in hot air, prevents mixing with room air High Density Zones Supports InRow products Optimize InRow Cooling Increase Efficiency Improve Predictability Use at any density InRow Cooling Units Row-based cooling solution cools hot chamber air Chamber Doors Access to hot aisle, locks for security
34 NetBotz Architecture Monitor, Detect NetBotz 3 rd Party Equipment InfraStruXure Central GSM SMS Alert Sensor Pod NetBotz IP Network , SNMP, HTTP, FTP NetBotz Rack Access PX NetBotz Sensor Pod Temp Sensor Key Features Works seamlessly with existing IP networks Distributed architecture Easy to install appliances and sensors Integration with enterprise network managers Centralized management Camera Pod Fluid Sensor Protect Switched PDU Output Relay Pod
35 Conclusion
36 Conclusion Every Server room is different, there are cooling solutions that can address your current and future needs. Your data centre s Network Critical Physical Infrastructure (NCPI) must support dynamic processing In-row, close-coupled cooling maximises efficiency Cooling system audit increases availability and reduces TCO of existing systems High-density server deployment requires unique cooling and power solutions Management of the physical infrastructure layer is crucial to IT availability
37 APC Trade-UPS Help protect the environment You can trade-in your single phase UPS regardless of make, model or working condition for a brand new UPS and receive a rebate!* The 3 easy steps to improved power protection 1. Tell us what you have: 2. Advise us of your choice of replacement UPS: 3. Register Trade-UPS Website link -> Receive a rebate!* FREE return shipping of old units FREE environmentally friendly disposal of your old UPS * Terms & Conditions apply.
38 Learning more about data centre cooling Data Centre University Courses are free for a limited time Visit Vendor neutral education on data centre design and operation Courses available include: Calculating Total Cooling Requirements Fundamentals of Cooling Architecture Fundamentals of Cooling, Part 1 Fundamentals of Cooling, Part 2 Advantages of Row and Rack Oriented Cooling Architecture I Advantages of Row and Rack-Oriented Cooling Architectures II Optimising Cooling Layouts for the Data Centre
39 Thank you Contact Details Name: George Lantouris Client Relationship Manager (Public Sector) Level 4, 65 Berry Street, North Sydney NSW 2060 Phone (02) Web ABN
Power and Cooling for Ultra-High Density Racks and Blade Servers
Power and Cooling for Ultra-High Density Racks and Blade Servers White Paper #46 Introduction The Problem Average rack in a typical data center is under 2 kw Dense deployment of blade servers (10-20 kw
APC APPLICATION NOTE #112
#112 Best Practices for Deploying the InfraStruXure InRow SC By David Roden Abstract The InfraStruXure InRow SC (ACSC100 and ACSC101) is a self-contained air conditioner for server rooms and wiring closets.
Ten Steps to Solving Cooling Problems Caused by High- Density Server Deployment
Ten Steps to Solving Cooling Problems Caused by High- Density Server Deployment By Peter Hannaford White Paper #42 Revision 1 Executive Summary High-density servers present a significant cooling challenge.
Dealing with Thermal Issues in Data Center Universal Aisle Containment
Dealing with Thermal Issues in Data Center Universal Aisle Containment Daniele Tordin BICSI RCDD Technical System Engineer - Panduit Europe [email protected] AGENDA Business Drivers Challenges
Re Engineering to a "Green" Data Center, with Measurable ROI
Re Engineering to a "Green" Data Center, with Measurable ROI Alan Mamane CEO and Founder Agenda Data Center Energy Trends Benchmarking Efficiency Systematic Approach to Improve Energy Efficiency Best Practices
APC APPLICATION NOTE #92
#92 Best Practices for Designing Data Centers with the InfraStruXure InRow RC By John Niemann Abstract The InfraStruXure InRow RC is designed to provide cooling at the row and rack level of a data center
Choosing Close-Coupled IT Cooling Solutions
W H I T E P A P E R Choosing Close-Coupled IT Cooling Solutions Smart Strategies for Small to Mid-Size Data Centers Executive Summary As high-density IT equipment becomes the new normal, the amount of
Benefits of. Air Flow Management. Data Center
Benefits of Passive Air Flow Management in the Data Center Learning Objectives At the end of this program, participants will be able to: Readily identify if opportunities i where networking equipment
2006 APC corporation. Cooling Solutions and Selling Strategies for Wiring Closets and Small IT Rooms
Cooling Solutions and Selling Strategies for Wiring Closets and Small IT Rooms Agenda Review of cooling challenge and strategies Solutions to deal with wiring closet cooling Opportunity and value Power
Strategies for Deploying Blade Servers in Existing Data Centers
Strategies for Deploying Blade Servers in Existing Data Centers By Neil Rasmussen White Paper #125 Revision 1 Executive Summary When blade servers are densely packed, they can exceed the power and cooling
Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER
Optimizing Network Performance through PASSIVE AIR FLOW MANAGEMENT IN THE DATA CENTER Lylette Macdonald, RCDD Legrand Ortronics BICSI Baltimore 2011 Agenda: Discuss passive thermal management at the Rack
Airflow Simulation Solves Data Centre Cooling Problem
Airflow Simulation Solves Data Centre Cooling Problem The owner s initial design for a data centre in China utilized 40 equipment racks filled with blade servers spread out in three rows along the length
Data Centre Energy Efficiency Operating for Optimisation Robert M Pe / Sept. 20, 2012 National Energy Efficiency Conference Singapore
Data Centre Energy Efficiency Operating for Optimisation Robert M Pe / Sept. 20, 2012 National Energy Efficiency Conference Singapore Introduction Agenda Introduction Overview of Data Centres DC Operational
Unified Physical Infrastructure (UPI) Strategies for Thermal Management
Unified Physical Infrastructure (UPI) Strategies for Thermal Management The Importance of Air Sealing Grommets to Improving Smart www.panduit.com WP-04 August 2008 Introduction One of the core issues affecting
Data Centre Solutions... energy efficient by design. APC by Schneider Electric Elite Data Centre Partner. APC s leading Elite Data Centre Solutions
Data Centre Solutions... energy efficient by design APC by Schneider Electric Elite Data Centre Partner APC s leading Elite Data Centre Solutions Partner providing customers with expert advice, integration
Data Center Power Consumption
Data Center Power Consumption A new look at a growing problem Fact - Data center power density up 10x in the last 10 years 2.1 kw/rack (1992); 14 kw/rack (2007) Racks are not fully populated due to power/cooling
Free Cooling in Data Centers. John Speck, RCDD, DCDC JFC Solutions
Free Cooling in Data Centers John Speck, RCDD, DCDC JFC Solutions Why this topic Many data center projects or retrofits do not have a comprehensive analyses of systems power consumption completed in the
Cooling Audit for Identifying Potential Cooling Problems in Data Centers
Cooling Audit for Identifying Potential Cooling Problems in Data Centers By Kevin Dunlap White Paper #40 Revision 2 Executive Summary The compaction of information technology equipment and simultaneous
Elements of Energy Efficiency in Data Centre Cooling Architecture
Elements of Energy Efficiency in Data Centre Cooling Architecture Energy Efficient Data Center Cooling 1 STULZ Group of Companies Turnover 2006 Plastics Technology 400 Mio A/C Technology 200 Mio Total
Power and Cooling Guidelines for Deploying IT in Colocation Data Centers
Power and Cooling Guidelines for Deploying IT in Colocation Data Centers White Paper 173 Revision 0 by Paul Lin and Victor Avelar Executive summary Some prospective colocation data center tenants view
Data Center Technology: Physical Infrastructure
Data Center Technology: Physical Infrastructure IT Trends Affecting New Technologies and Energy Efficiency Imperatives in the Data Center Hisham Elzahhar Regional Enterprise & System Manager, Schneider
Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED.
Liquid Cooling Solutions for DATA CENTERS - R.M.IYENGAR BLUESTAR LIMITED. Presentation Goals & Outline Power Density Where we have been- where we are now - where we are going Limitations of Air Cooling
Managing Cooling Capacity & Redundancy In Data Centers Today
Managing Cooling Capacity & Redundancy In Data Centers Today About AdaptivCOOL 15+ Years Thermal & Airflow Expertise Global Presence U.S., India, Japan, China Standards & Compliances: ISO 9001:2008 RoHS
Data center upgrade proposal. (phase one)
Data center upgrade proposal (phase one) Executive Summary Great Lakes began a recent dialogue with a customer regarding current operations and the potential for performance improvement within the The
Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers
Unified Physical Infrastructure SM (UPI) Strategies for Smart Data Centers Deploying a Vertical Exhaust System www.panduit.com WP-09 September 2009 Introduction Business management applications and rich
Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001
Verizon SMARTS Data Center Design Phase 1 Conceptual Study Report Ms. Leah Zabarenko Verizon Business 2606A Carsins Run Road Aberdeen, MD 21001 Presented by: Liberty Engineering, LLP 1609 Connecticut Avenue
GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY. Public Sector ICT Special Working Group
GUIDE TO ICT SERVER ROOM ENERGY EFFICIENCY Public Sector ICT Special Working Group SERVER ROOM ENERGY EFFICIENCY This guide is one of a suite of documents that aims to provide guidance on ICT energy efficiency.
How To Run A Data Center Efficiently
A White Paper from the Experts in Business-Critical Continuity TM Data Center Cooling Assessments What They Can Do for You Executive Summary Managing data centers and IT facilities is becoming increasingly
How Row-based Data Center Cooling Works
How Row-based Data Center Cooling Works White Paper 208 Revision 0 by Paul Lin and Victor Avelar Executive summary Row-based data center cooling is normally regarded as a cold air supply architecture that
Optimum Climate Control For Datacenter - Case Study. T. Prabu March 17 th 2009
Optimum Climate Control For Datacenter - Case Study T. Prabu March 17 th 2009 Agenda 2 About EDEC (Emerson) Facility Data Center Details Design Considerations & Challenges Layout Design CFD Analysis Of
Air, Fluid Flow, and Thermal Simulation of Data Centers with Autodesk Revit 2013 and Autodesk BIM 360
Autodesk Revit 2013 Autodesk BIM 360 Air, Fluid Flow, and Thermal Simulation of Data Centers with Autodesk Revit 2013 and Autodesk BIM 360 Data centers consume approximately 200 terawatt hours of energy
How to Meet 24 by Forever Cooling Demands of your Data Center
W h i t e P a p e r How to Meet 24 by Forever Cooling Demands of your Data Center Three critical aspects that are important to the operation of computer facilities are matching IT expectations with the
White Paper. Data Center Containment Cooling Strategies. Abstract WHITE PAPER EC9001. Geist Updated August 2010
White Paper Data Center Containment Cooling Strategies WHITE PAPER EC9001 Geist Updated August 2010 Abstract Deployment of high density IT equipment into data center infrastructure is now a common occurrence
Avoidable Mistakes that Compromise Cooling Performance in Data Centers and Network Rooms
Avoidable Mistakes that Compromise Cooling Performance in Data Centers and Network Rooms By Neil Rasmussen White Paper #49 Executive Summary Avoidable mistakes that are routinely made when installing cooling
Containment Solutions
Containment Solutions Improve cooling efficiency Separate hot and cold air streams Configured to meet density requirements Suitable for commercial and SCEC endorsed cabinets Available for retrofit to SRA
Blade Server & Data Room Cooling Specialists
SURVEY I DESIGN I MANUFACTURE I INSTALL I COMMISSION I SERVICE SERVERCOOL An Eaton-Williams Group Brand Blade Server & Data Room Cooling Specialists Manufactured in the UK SERVERCOOL Cooling IT Cooling
Energy Efficiency Opportunities in Federal High Performance Computing Data Centers
Energy Efficiency Opportunities in Federal High Performance Computing Data Centers Prepared for the U.S. Department of Energy Federal Energy Management Program By Lawrence Berkeley National Laboratory
Selecting Rack-Mount Power Distribution Units For High-Efficiency Data Centers
C P I P O W E R M A N A G E M E N T WHITE PAPER Selecting Rack-Mount Power Distribution Units For High-Efficiency Data Centers By Anderson Hungria Sr. Product Manager of Power, Electronics & Software Published
Data Centre Infrastructure Assessment
Data Centre Infrastructure Assessment Prepared for: ACME INC SAMPLE REPORT Attention: Mr DC Manager This report represents a generic sample data centre audit for a generic customer by Focus Group Technologies.
How To Improve Energy Efficiency Through Raising Inlet Temperatures
Data Center Operating Cost Savings Realized by Air Flow Management and Increased Rack Inlet Temperatures William Seeber Stephen Seeber Mid Atlantic Infrared Services, Inc. 5309 Mohican Road Bethesda, MD
DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences
DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no significant differences November 2011 Powered by DataCenter 2020: hot aisle and cold aisle containment efficiencies reveal no
How To Power And Cool A Data Center
Architecting the Green Data Center Viktor Hagen Field Business Development Data Center & High Performance Computing 1 Where we are Today Environmental sustainability is a major global trend for the 21st
Introducing Computational Fluid Dynamics Virtual Facility 6SigmaDC
IT Infrastructure Services Ltd Holborn Gate, 330 High Holborn, London, WC1V 7QT Telephone: +44 (0)20 7849 6848 Fax: +44 (0)20 7203 6701 Email: [email protected] www.itisltd.com Introducing Computational
Hot Air Isolation Cools High-Density Data Centers By: Ian Seaton, Technology Marketing Manager, Chatsworth Products, Inc.
Business Management Magazine Winter 2008 Hot Air Isolation Cools High-Density Data Centers By: Ian Seaton, Technology Marketing Manager, Chatsworth Products, Inc. Contrary to some beliefs, air is quite
CURBING THE COST OF DATA CENTER COOLING. Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers
CURBING THE COST OF DATA CENTER COOLING Charles B. Kensky, PE, LEED AP BD+C, CEA Executive Vice President Bala Consulting Engineers OVERVIEW Compare Cooling Strategies in Free- Standing and In-Building
IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT
DATA CENTER RESOURCES WHITE PAPER IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT BY: STEVE HAMBRUCH EXECUTIVE SUMMARY Data centers have experienced explosive growth in the last decade.
Managing Data Centre Heat Issues
Managing Data Centre Heat Issues Victor Banuelos Field Applications Engineer Chatsworth Products, Inc. 2010 Managing Data Centre Heat Issues Thermal trends in the data centre Hot Aisle / Cold Aisle design
Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION
Cooling a hot issue? MINKELS COLD CORRIDOR TM SOLUTION The heat load in data centers is increasing rapidly, the adaptation of a cooling strategy is often necessary. Many data centers and server rooms use
The Efficient Enterprise. Juan Carlos Londoño Data Center Projects Engineer APC by Schneider Electric
Ee The Efficient Enterprise Juan Carlos Londoño Data Center Projects Engineer APC by Schneider Electric Keystrokes Kilowatts Heat OUT Electricity IN Need for bandwidth exploding Going hyperbolic! 30,000
Data Centers. Mapping Cisco Nexus, Catalyst, and MDS Logical Architectures into PANDUIT Physical Layer Infrastructure Solutions
Data Centers Mapping Cisco Nexus, Catalyst, and MDS Logical Architectures into PANDUIT Physical Layer Infrastructure Solutions 1 Introduction The growing speed and footprint of data centers is challenging
Top 5 Trends in Data Center Energy Efficiency
Top 5 Trends in Data Center Energy Efficiency By Todd Boucher, Principal Leading Edge Design Group 603.632.4507 @ledesigngroup Copyright 2012 Leading Edge Design Group www.ledesigngroup.com 1 In 2007,
AisleLok Modular Containment vs. Legacy Containment: A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings
WH I TE PAPE R AisleLok Modular Containment vs. : A Comparative CFD Study of IT Inlet Temperatures and Fan Energy Savings By Bruce Long, Upsite Technologies, Inc. Lars Strong, P.E., Upsite Technologies,
BRUNS-PAK Presents MARK S. EVANKO, Principal
BRUNS-PAK Presents MARK S. EVANKO, Principal Data Centers of the Future and the Impact of High Density Computing on Facility Infrastructures - Trends, Air-Flow, Green/LEED, Cost, and Schedule Considerations
Improving Rack Cooling Performance Using Airflow Management Blanking Panels
Improving Rack Cooling Performance Using Airflow Management Blanking Panels By Neil Rasmussen White Paper #44 Revision 3 Executive Summary Unused vertical space in open frame racks and rack enclosures
APC by Schneider Electric
APC by Schneider Electric Energy Efficiency - The Green Power Solution James Taylor Business Development manager, UK APC by Schneider Electric The Efficient Enterprise Components Close Coupled Cooling
Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency
A White Paper from the Experts in Business-Critical Continuity TM Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency Executive Summary Energy efficiency
Server Room Thermal Assessment
PREPARED FOR CUSTOMER Server Room Thermal Assessment Analysis of Server Room COMMERCIAL IN CONFIDENCE MAY 2011 Contents 1 Document Information... 3 2 Executive Summary... 4 2.1 Recommendation Summary...
Green Data Centre Design
Green Data Centre Design A Holistic Approach Stantec Consulting Ltd. Aleks Milojkovic, P.Eng., RCDD, LEED AP Tommy Chiu, EIT, RCDD, LEED AP STANDARDS ENERGY EQUIPMENT MATERIALS EXAMPLES CONCLUSION STANDARDS
Thermal Monitoring Best Practices Benefits gained through proper deployment and utilizing sensors that work with evolving monitoring systems
NER Data Corporation White Paper Thermal Monitoring Best Practices Benefits gained through proper deployment and utilizing sensors that work with evolving monitoring systems Introduction Data centers are
Data Center Cooling Best Practices
Data Center Cooling Best Practices By Peter Sacco Experts for Your Always Available Data Center White Paper #2 1 EXECUTIVE SUMMARY Maintaining a suitable environment for information technologies is arguably
High Density Data Centers Fraught with Peril. Richard A. Greco, Principal EYP Mission Critical Facilities, Inc.
High Density Data Centers Fraught with Peril Richard A. Greco, Principal EYP Mission Critical Facilities, Inc. Microprocessors Trends Reprinted with the permission of The Uptime Institute from a white
7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America
7 Best Practices for Increasing Efficiency, Availability and Capacity XXXX XXXXXXXX Liebert North America Emerson Network Power: The global leader in enabling Business-Critical Continuity Automatic Transfer
Data Center Cooling & Air Flow Management. Arnold Murphy, CDCEP, CDCAP March 3, 2015
Data Center Cooling & Air Flow Management Arnold Murphy, CDCEP, CDCAP March 3, 2015 Strategic Clean Technology Inc Focus on improving cooling and air flow management to achieve energy cost savings and
Data Center Design Guide featuring Water-Side Economizer Solutions. with Dynamic Economizer Cooling
Data Center Design Guide featuring Water-Side Economizer Solutions with Dynamic Economizer Cooling Presenter: Jason Koo, P.Eng Sr. Field Applications Engineer STULZ Air Technology Systems jkoo@stulz ats.com
Energy-efficient & scalable data center infrastructure design
Seminar am 30. September 2010 in Wetzlar Nachhaltigkeit durch UPI (Unified Physical Infrastructure) Vortrag von Stefan Fammler: Energieeffiziente Strategien im Rechenzentrum Energy-efficient & scalable
Energy Efficiency Best Practice Guide Data Centre and IT Facilities
2 Energy Efficiency Best Practice Guide Data Centre and IT Facilities Best Practice Guide Pumping Systems Contents Medium-sized data centres energy efficiency 3 1 Introduction 4 2 The business benefits
DATA CENTER SOLUTIONS
DATA CENTER SOLUTIONS Nobody Makes Better Data Center Equipment Maximize availability, manageability and efficiency with cost-effective solutions from a dependable partner. Provide reliable, efficient
Great Lakes Data Room Case Study
Great Lakes Data Room Case Study WeRackYourWorld.com Problem: During a warm summer period in 2008, Great Lakes experienced a network outage due to a switch failure in the network enclosure. After an equipment
Data Center Components Overview
Data Center Components Overview Power Power Outside Transformer Takes grid power and transforms it from 113KV to 480V Utility (grid) power Supply of high voltage power to the Data Center Electrical Room
Rack Hygiene. Data Center White Paper. Executive Summary
Data Center White Paper Rack Hygiene April 14, 2011 Ed Eacueo Data Center Manager Executive Summary This paper describes the concept of Rack Hygiene, which positions the rack as an airflow management device,
Fundamentals of CFD and Data Center Cooling Amir Radmehr, Ph.D. Innovative Research, Inc. [email protected]
Minneapolis Symposium September 30 th, 2015 Fundamentals of CFD and Data Center Cooling Amir Radmehr, Ph.D. Innovative Research, Inc. [email protected] Learning Objectives 1. Gain familiarity with Computational
Analysis of the UNH Data Center Using CFD Modeling
Applied Math Modeling White Paper Analysis of the UNH Data Center Using CFD Modeling By Jamie Bemis, Dana Etherington, and Mike Osienski, Department of Mechanical Engineering, University of New Hampshire,
AIR-SITE GROUP. White Paper. Green Equipment Room Practices
AIR-SITE GROUP White Paper Green Equipment Room Practices www.air-site.com Common practices to build a green equipment room 1 Introduction Air-Site (www.air-site.com) is a leading international provider
Office of the Government Chief Information Officer. Green Data Centre Practices
Office of the Government Chief Information Officer Green Data Centre Practices Version : 2.0 April 2013 The Government of the Hong Kong Special Administrative Region The contents of this document remain
ADC-APC Integrated Cisco Data Center Solutions
Advanced Infrastructure Solution for Cisco Data Center 3.0 Ordering Guide ADC-APC Integrated Cisco Data Center Solutions The evolution of data centers is happening before our eyes. This is due to the
Raised Floor Data Centers Prepared for the Future
Raised Floor Data Centers Prepared for the Future Raised Floors Protect My Investment by Providing a Foundation for Current and Future Technologies. Creating the Future Proof Data Center Environment The
Creating Data Center Efficiencies Using Closed-Loop Design Brent Goren, Data Center Consultant
RESEARCH UNDERWRITER WHITE PAPER LEAN, CLEAN & GREEN Wright Line Creating Data Center Efficiencies Using Closed-Loop Design Brent Goren, Data Center Consultant Currently 60 percent of the cool air that
abstract about the GREEn GRiD
Guidelines for Energy-Efficient Datacenters february 16, 2007 white paper 1 Abstract In this paper, The Green Grid provides a framework for improving the energy efficiency of both new and existing datacenters.
Data Center Energy Profiler Questions Checklist
Data Center Energy Profiler Questions Checklist Step 1 Case Name Date Center Company State/Region County Floor Area Data Center Space Floor Area Non Data Center Space Floor Area Data Center Support Space
QUALITATIVE ANALYSIS OF COOLING ARCHITECTURES FOR DATA CENTERS
WHITE PAPER #30 QUALITATIVE ANALYSIS OF COOLING ARCHITECTURES FOR DATA CENTERS EDITOR: Bob Blough, Emerson Network Power CONTRIBUTORS: John Bean, APC by Schneider Electric Robb Jones, Chatsworth Products
CANNON T4 MINI / MICRO DATA CENTRE SYSTEMS
CANNON T4 MINI / MICRO DATA CENTRE SYSTEMS Air / Water / DX Cooled Cabinet Solutions Mini Data Centre All in One Solution: Where there is a requirement for standalone computing and communications, or highly
Supporting Cisco Switches In Hot Aisle/Cold Aisle Data Centers
CABINETS: ENCLOSED THERMAL MOUNTING MANAGEMENT SYSTEMS WHITE PAPER Supporting Cisco Switches In Hot Aisle/Cold Aisle Data Centers 800-834-4969 [email protected] www.chatsworth.com All products
The New Data Center Cooling Paradigm The Tiered Approach
Product Footprint - Heat Density Trends The New Data Center Cooling Paradigm The Tiered Approach Lennart Ståhl Amdahl, Cisco, Compaq, Cray, Dell, EMC, HP, IBM, Intel, Lucent, Motorola, Nokia, Nortel, Sun,
Improving Rack Cooling Performance Using Airflow Management Blanking Panels
Improving Rack Cooling Performance Using Airflow Management Blanking Panels White Paper 44 Revision 4 by Neil Rasmussen > Executive summary Unused vertical space in open frame racks and rack enclosures
- White Paper - Data Centre Cooling. Best Practice
- White Paper - Data Centre Cooling Best Practice Release 2, April 2008 Contents INTRODUCTION... 3 1. AIR FLOW LEAKAGE... 3 2. PERFORATED TILES: NUMBER AND OPENING FACTOR... 4 3. PERFORATED TILES: WITH
Mejora la Eficiencia Operativa en Centros de Datos
Mejora la Eficiencia Operativa en Centros de Datos Marco Antonio Damián Data Center Specialist Panduit Data Center Operational Efficiency Operational Efficiency is done through: Cabinets and racks Cable
National Grid Your Partner in Energy Solutions
National Grid Your Partner in Energy Solutions National Grid Webinar: Enhancing Reliability, Capacity and Capital Expenditure through Data Center Efficiency April 8, 2014 Presented by: Fran Boucher National
Small Data / Telecommunications Room on Slab Floor
Small Data / Telecommunications Room on Slab Floor Small Data / Telecommunications Room on Slab Floor During a warm summer period in 2008, Great Lakes experienced a network outage due to a switch failure
The Advantages of Row and Rack- Oriented Cooling Architectures for Data Centers
The Advantages of Row and Rack- Oriented Cooling Architectures for Data Centers By Kevin Dunlap Neil Rasmussen White Paper #130 Executive Summary Room cooling is an ineffective approach for next-generation
Thermal Optimisation in the Data Centre
Thermal Optimisation in the Data Centre Best Practices for achieving optimal cooling performance and significant energy savings in your data centre 1. Thermal analysis 2. Cold-Aisle-Containment 3. Seal
Center Thermal Management Can Live Together
Network Management age e and Data Center Thermal Management Can Live Together Ian Seaton Chatsworth Products, Inc. Benefits of Hot Air Isolation 1. Eliminates reliance on thermostat 2. Eliminates hot spots
Statement Of Work Professional Services
Statement Of Work Professional Services Data Center Cooling Analysis using CFD Data Center Cooling Analysis Using Computational Fluid Dynamics Service 1.0 Executive Summary Table of Contents 1.0 Executive
NetApp Data Center Design
NetApp Data Center Design Presentation for SVLG Data Center Efficiency Summit November 5, 2014 Mark Skiff, PE, CEM, CFM Director, IT Data Center Solutions Data Center Design Evolution Capacity Build Cost
Using Simulation to Improve Data Center Efficiency
A WHITE PAPER FROM FUTURE FACILITIES INCORPORATED Using Simulation to Improve Data Center Efficiency Cooling Path Management for maximizing cooling system efficiency without sacrificing equipment resilience
Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential
TECHNICAL REPORT Sealing Gaps Under IT Racks: CFD Analysis Reveals Significant Savings Potential By Lars Strong, P.E., Upsite Technologies, Inc. Bruce Long, Upsite Technologies, Inc. +1.888.982.7800 upsite.com
Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings
WHITE PAPER Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings By Lars Strong, P.E., Upsite Technologies, Inc. Kenneth G. Brill, Upsite Technologies, Inc. 505.798.0200
Data Centre Cooling Air Performance Metrics
Data Centre Cooling Air Performance Metrics Sophia Flucker CEng MIMechE Ing Dr Robert Tozer MSc MBA PhD CEng MCIBSE MASHRAE Operational Intelligence Ltd. [email protected] Abstract Data centre energy consumption
HIGHLY EFFICIENT COOLING FOR YOUR DATA CENTRE
HIGHLY EFFICIENT COOLING FOR YOUR DATA CENTRE Best practices for airflow management and cooling optimisation AIRFLOW MANAGEMENT COLD AND HOT AISLE CONTAINMENT DC ASSESSMENT SERVICES Achieving true 24/7/365
Best Practices. for the EU Code of Conduct on Data Centres. Version 1.0.0 First Release Release Public
Best Practices for the EU Code of Conduct on Data Centres Version 1.0.0 First Release Release Public 1 Introduction This document is a companion to the EU Code of Conduct on Data Centres v0.9. This document