Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

Improving Access in Florida International University Biscayne Bay Campus Executive Summary

Executive Summary. Literature/Community Review. Traffic Flows and Projections. Final Report Truck Route System for Miami-Dade County CORRADINO

Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:

Informational Workshop Public Meeting Kanawha Falls Bridge Project

INDOT Long Range Plan

EXHIBIT A Accessible Truck Routes Map

Section 6 Traffic Analysis

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

The Need for Traffic Incident Management

HERS_IN. HIGHWAY ECONOMIC REQUIREMENTS SYSTEM (for) INDIANA. AASHTO Transportation Estimator Association Conference October 16, 2001

SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS

FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005

DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST

Public Involvement Meeting Handout

KYTC, District 2 Chief District Engineer KYTC, District 2 Planning Supervisor & LPA Coordinator. KYTC, Central Office Planning

Earth Retaining Structures

Planning Level Cost Estimation Tool. User s Manual

Corridor Goals and Objectives

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS

AIR QUALITY TECHNICAL MEMORANDUM

8+ %!0"% 8+1!%"'$%,$"$

Section ALTERNATIVES. 3. Alternatives

US 281 AT PREMONT PUBLIC HEARING. US 281 at Premont Public Hearing

Surface Transportation Program (STP)

CHAPTERTWO. Alternatives 2.1 ALTERNATIVES DEVELOPMENT PROCESS

PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015

Downtown Louisville Two-Way Street Study

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project

TABLE OF CONTENTS TABLES FIGURES

Transportation Policy and Design Strategies. Freight Intensive. Level of Freight Presence

Maryland Invests $845 Million in New Highway and Bridge Projects

Mount Royal College Transit Service Plan

I-25 / Rio Bravo Interchange

TH 23 Access Management Study Richmond to Paynesville

Chapter 5 Financial Plan

SAN DIEGO GAS & ELECTRIC COMPANY SOUTH BAY SUBSTATION RELOCATION PROJECT TRAFFIC MANAGEMENT PLAN SEPTEMBER 2014

Brookdale Site. CB6 Update April 1, 2015

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015

FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST

Guidelines for Fiber Optic Cable Permits

SECTION 2 CORRIDOR A

Southern California International Gateway Project Description

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

100 Design Controls and Exceptions

Transportation Management Plan Template

EXPERIENCE WITH GEOGRAPHIC INFORMATION SYSTEMS (GIS) / MAPPING

The Preservation of Local Truck Routes: A Primary Connection between Commerce and the Regional Freight Network

Surface Transportation Program (STP) Projects

City of Springboro 320 West Central Avenue, Springboro, Ohio. Planning Commission Regular Meeting. Wednesday, June 25, 2014

Massachusetts Department of Transportation, Highway Division Ten Park Plaza, Boston, MA A Guide on Traffic Analysis Tools

Background and Goals for the Project

TRAFFIC IMPACT ANALYSIS

3.1 Historical Considerations

REHABILITATION PACKAGE 1-a

Crash Analysis. Identify/Prioritize. Gather Data. Analyze Crashes and Identify Improvements. Review Funding Options. Implement Improvements

1What purpose do guard

Highway 138 Corridor Solutions Study Roseburg, Oregon. Technical Memorandum #4: Concept Development and Screening DRAFT

7.0 Transportation Management

Executive Director s Recommendation Commission Meeting: July 11, 2013

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL

When ODOT Needs Your Property

Exhibit A Scope of Work

Central Regional Traffic Management Center

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

FLC 4th Annual Summer Research Symposium: Planes, Trains, Ports & Highways What Keeps Florida Moving?

Presentation to Knox County Commission Monday, February 23, 2015

The total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016.

IH-635 MANAGED LANES PROJECT, SEG. 3.2

GENERAL. This manual addresses five local programs that are funded under the current Highway Act:

North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High

Program guidance that details the eligibility, criteria and application process. Ferry Boat Program. Ohio Department of Transportation

SEEKING COMPLETENESS WAIVERS AND PRELIMINARY & FINAL SITE PLAN APPROVAL

Alternatives Presentation Meeting Middlebury WCRS(23)

Six Points Interchange Reconfiguration Class Environmental Assessment Study

Ohio Department of Transportation

Transcription:

Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park Drive South North Baltimore, Ohio 45872 Presented By: Ohio Department of Transportation District 2 317 East Poe Road Bowling Green, Ohio 43402 Phone (419) 353-8131 http://www.dot.state.oh.us

Oil Center Road 75 235 Liberty Hi Road Mitchell Road N Range Line Road Needles Road Wingston Road Quarry Road Village of Hoytville Entrance RR Grade Seperation (under construction) Hough Road Alt. 1 Exit 168 Village of North Baltimore Thrush Road 235 Wood County Potter Road Belmore Road Exit 167 Hancock County Alt. 4 75 Alternatives Alternative 1 Alternative 4 0 SCALE 1 Mile 2 Miles May 19, 2011

SR- Corridor Improvements in Wood County Project Description The SR- corridor between the newly constructed CSX-Northwest Ohio Trans-Shipment Intermodal Facility, located west of the Village of North Baltimore, and Interstate 75 (IR-75) is in need of transportation infrastructure improvements to address congestion, accommodate large commercial vehicles, and address potential safety issues associated with the CSX Intermodal Facility and planned commercial and industrial development. The existing primary route for trucks to access IR-75 is along State Route (SR-) through the Village of North Baltimore. The current alignment and geometrics of State Route through the Village includes a number of intersections and turning movements that are difficult for trucks to negotiate. Traffic studies indicate that the CSX Facility and future commercial development will substantially increase the number and volume of trucks using SR- and other local roadways through downtown North Baltimore to access IR-75. Therefore, there is a need to re-route truck traffic away from the downtown North Baltimore area to improve traffic flow and potential safety issues caused by high volumes of commercial truck traffic while still providing access to the businesses in downtown North Baltimore. In doing this, it is also necessary to address the projected long-range transportation mobility needs in the study area through consideration of the Projected Land Use Plan for Wood County (Wood County 2007 Comprehensive Plan Update). Feasibility Study ODOT commissioned a Feasibility Study that was completed by EMH&T as part of a pilot Project Development Process (PDP) designed to streamline the process of planning, designing and building Ohio s critical transportation infrastructure needs. The Feasibility Study evaluated four (4) potential alternatives in order to assist the Ohio Department of Transportation (ODOT) in identifying a timely and cost-effective short-term process for identifying the range of possible solutions for routing commercial traffic between the CSX Intermodal Facility, its supporting developments and IR-75 in a manner most effective. In addition to this Feasibility Study and as a part of the recommended alignments further development, ODOT will identify additional long-term transportation needs and priorities that may be required in a continuing effort to address the region s anticipated growth as a result of the CSX Intermodal Facility and its supporting developments. Where feasible, ODOT will look at options to address these long-term needs in conjunction with implementation of the preferred alignment. Description of Alternatives The study evaluated four (4) potential alternative transportation routes between the CSX Intermodal Facility and IR-75. Pursuant to the evaluation process Alternatives 2 and 3 were eliminated from further consideration by ODOT and the local stakeholder group.

A description the two (2) remaining Alternative alignments and the No Build Alternative is provided below. Alternative 1 New Roadway Alignment Alternative 1 is a new alignment, not along an existing roadway, within the proposed study area. Construction of a 2.24 mile new two-lane road segment is proposed between the SR- (Deshler Road)/Liberty Hi Road intersection and the South Main Street/SR- intersection in the Village of North Baltimore. The new alignment extends southeast from the SR- (Deshler Road)/Liberty Hi Road intersection and crosses Hough Road approximately 0.25 mile north of the existing Hough Road/Belmore Road intersection. Hough Road will have two cul-de-sacs, one on the north and one on the south of the new alignment, to eliminate the need for an intersection. The new alignment continues east into the Village of North Baltimore, forming a new intersection with Mitchell Road approximately 0.25 mile north of the Mitchell Road/Belmore Road intersection. On the south side of the Village of North Baltimore, the new alignment ends at the existing intersection of South Main Street and SR-. This intersection will have a modern roundabout to facilitate the safe flow of traffic through the intersection. Deweyville Road is proposed to end in a cul-de-sac prior to the roundabout. It is anticipated the entire length of the new roadway will be controlled access to maximize the capacity of the relocated SR-. To access IR-75, vehicles would then travel east on existing SR- to the IR-75/SR- interchange. The entire length of route from the CSX Intermodal Facility to IR-75 is 3.4 miles. Alternative 4 Liberty Hi Road/Belmore Road Alternative 4 is a two-lane roadway utilizing primarily existing roadways within the proposed study area along Liberty-Hi Road and Belmore Road. The route for Alternative 4 follows Liberty-Hi Road south from the SR- (Deshler Road)/Liberty Hi intersection approximately 0.75 mile to the CR-139/Belmore Road intersection. The route then follows Belmore Road east for approximately 1.5 miles into the Village of North Baltimore. An approximately 2,700 linear foot section of new alignment, not along an existing roadway, would be built between Mitchell Road and North Baltimore Road. This new roadway segment is proposed to avoid two four-way stop/ 90 degree intersections that trucks would have to navigate along the existing roadway alignment. Deweyville Road is proposed to end in a cul-de-sac prior to the roundabout. The existing pavement along these roadways would be completely removed and replaced as the pavement build-up is not sufficient for heavy truck traffic. It is anticipated the entire length of the new roadway will be controlled access to maximize the capacity of the relocated SR-. On the south side of the Village of North Baltimore, the alignment ends at the existing intersection of South Main Street and SR-. To access IR-75, vehicles would then travel east on SR- to the IR-75/SR- interchange. The entire length of route from the CSX Intermodal Facility to IR-75 is approximately 3.7 miles. The three (3) intersections (SR-/Liberty Hi, Liberty Hi/Belmore, and SR-/South Main) on this Alternative will have modern roundabouts to facilitate the safe flow of traffic through the intersections. No Build Alternative The No Build Alternative is also an option that will be carried through the decision making process. The No Build Alternative consists of minor, short-term safety, and routine maintenance activities to SR-. SR- Business Loop Many discussions have taken place regarding making the section of existing SR- through the Village of North Baltimore a Business Loop once the project is completed. At this time ODOT is in support of a Business Loop through the Village and as we progress in the project development we will be communicating with the Village and County to pass the proper resolutions to make the Business Loop a reality. ODOT is not responsible for the maintenance of business loops. ODOT would supply appropriate route shields to the Village or County.

WOO- COMPARISON FACTORS ALTERNATIVE ALIGNMENT ALTERNATIVE 1 ALTERNATIVE 4 MOBILITY Entire Length of Route to I-75 3.4 miles 3.7 miles Average Travel Time to I-75 without roundabouts 281 seconds 314 seconds Average Travel Time to I-75 with roundabouts 279 seconds 307 seconds Intersection Controls 1 0 to 2 stops; 1 yield 0 to 2 stops; 3 yields ENVIRONMENTAL & COMMUNITY ISSUES Right-of-Way Impacts (approximate acres) 23.8 acres 19.7 acres Building Impacts (# of buildings) 0 3 Parcel Impacts (approx. # of parcels) 9 22 Cultural Resources Impacts No impacts (no known resources) No impacts (no known resources) Farmland Impacts 2 acres 14.3 acres Potential Stream 3 Impacts None anticipated 20 Linear Feet; Low Quality Section 4(f) Resources 1 resource present; could be avoided 1 Resource Present; could be avoided CONSTRUCTABILITY Bridge/Culvert Improvements (# of replacements/ widenings) 0 1 Utility Relocations (# and type) 4 - Overhead; 1-Gas Line 6 - Overhead; 1-Gas Line Constructability and Maintenance of Traffic (Good, Fair, Poor) Good; Minimal impact Good; Minimal impact COST EFFECTIVENESS Length of Roadway Improvements (Lin. Ft.) 11,850 Lin.Ft. (2.24 miles) 13,450 Lin.Ft. (2.55 miles) Estimated Right-of-Way Costs ($ Million (2011)) $0.64 $0.79 Estimated Construction Costs ($ Million (2011)) $8.98 $10.27 Estimated Total Project Costs ($ Million (2011)) $9.62 $11.06 SCHEDULE Estimated Design Duration 4 8 months 8 months Estimated Right-of-Way Acquisition Duration 5 8 months 14 months Estimated Construction Duration 6-9 months 9-12 months Estimated Total Duration 6 15- months 24-27 months 1 Number of Stops based on stop controlled approach or signalized intersection. For signalized intersections, a range is provided since the vehicle may or may not receive a red signal. Accounts for entering and exiting truck movements, to/from CSX Facility, to/from I-75 northbound ramp 2 Impacts to farmland enrolled in the Current Agricultural Use Value (CAUV) program 3 Potential streams/roadside ditches could be determined wetlands upon further field investigation 4 Time includes Preliminary Engineering, Detailed Design, and Environmental Clearance 5 Time inclues Utility Relocation 6 Total duration assumes right-of-way and design/environmental will be done concurrently with a one m

COMMENT SHEET PUBLIC MEETING WOO--9.52 Corridor Improvement Project in Wood County May 19, 2011 10:00 A.M. to 1:00 P.M. Hancock-Wood Electric Cooperative 1399 Business Park Drive South, North Baltimore, Ohio Anyone wishing to submit comments concerning the WOO--9.52 Corridor Improvement Project in Wood County may do so by presenting this form at this meeting or by mailing it to the Ohio Department of Transportation, Office of Planning and Programs, 317 East Poe Rd., Bowling Green, Ohio 43402. The Final date for submission of comments is June 2, 2011. You may review and print these documents directly from our Web Page at: http//www.dot.state.oh.us/districts/d02/staterouterelocationproject NAME TELEPHONE ADDRESS: CITY and ZIP Code Email: COMMENTS: This sheet can be folded in thirds, taped or stapled, and mailed without an envelope. Postage is required.

OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF PLANNING AND PROGRAMS ATTN: Tricia Hines 317 EAST POE ROAD BOWLING GREEN, OHIO 43402