1 UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line Highway and Northlake Blvd. between Seminole Pratt Whitney Rd. and Coconut Blvd.? A. Seminole Pratt Whitney Rd., Southern Blvd to North of Sycamore Dr. Currently under construction, this project involves widening the roadway to 4 lanes (2 lanes in each direction) with a raised, grassed median separating the northbound from southbound lanes, and sidewalks on both sides of the roadway. This construction project is nearing completion. B. Seminole Pratt Whitney Rd., S. of 60 th Street to Orange Blvd. Also currently under construction, this project involves widening the roadway to 4 lanes (2 lanes in each direction) with a raised, grassed median separating the northbound from southbound lanes, and sidewalks on both sides of the roadway. This construction project is anticipated to be completed by July, C. Seminole Pratt Whitney Rd., Orange Blvd. to Northlake Blvd. This project is under design with the existing roadway to be widened to 4 lanes (2 lanes in each direction) with a raised, grassed median separating the northbound from southbound lanes, and sidewalks on both sides of the roadway. Construction is scheduled to start in D. Seminole Pratt Whitney Rd., Northlake Blvd. to Bee Line Highway The project has no plans at the present time. A future 2 lane road is planned. E. Northlake Blvd., Seminole Pratt Whitney Rd. to E. of Apache Blvd. westbound lanes, and sidewalks on both sides of the roadway. Construction is scheduled to start in F. Northlake Blvd., E. of Apache Blvd. to Grapeview Blvd. westbound lanes, and sidewalks on both sides of the roadway. Construction is scheduled to start in G. Northlake Blvd., Grapeview Blvd. to Coconut Blvd. westbound lanes, and sidewalk on the south side of the roadway. Construction is scheduled to start in Page 1 of 5
2 Q. 2. Why does the County need to widen these roads? Isn t there enough road Construction already? A. Studies show that existing and future traffic volumes will exceed the capacity of the major routes into and through the Acreage. Rather than wait until gridlock occurs, it is the County s policy to plan, design & construct in advance, to prevent this gridlock. Q. 3. Will access to and from Seminole Pratt Whitney Rd and Northlake Blvd be different after Construction? A. The Palm Beach County roadway projects do not include closure of existing intersecting streets, and will not affect the ability of traffic to enter or leave Seminole Pratt Whitney Rd. as they currently do, with the exception of impacts at intersections that will not have median openings. At these locations, turning movements at side streets will be limited to right in, right out movements. Indian Trail Improvement District has repeatedly stated their desire to close off many of the intersections with Seminole Pratt Whitney Road, and they should be contacted for further information in that regard. Q. 4. Will there be median openings at all of the side streets after construction? A. Cross streets in this area are too closely spaced to allow proper traffic movements. While some street intersections will have fully open medians (making left turns as well as u-turns possible), essentially every other street will have a filled in median. These roadways will be limited to right in, right out turning movements, which will require the driver entering the roadway to proceed either north or south on Seminole Pratt Whitney Rd. and east or west on Northlake Blvd. to the next opening to do a u-turn if desired. Q. 5. Will my land be taken for the construction, and if so, when? Continued on next page A. For widening Seminole Pratt Whitney Road projects from Southern Blvd. to N. of Sycamore Drive and 60 th Street to Orange Blvd., Right of Way has been acquired as needed. Additionally, it was necessary to acquire easements (some temporary and some permanent) to allow for construction of the road and proper drainage adjacent to it. Finally, the County has acquired entire parcels of open land in several areas to allow for construction of drainage ponds to store surface water runoff Page 2 of 5
3 A. For widening Seminole Pratt Whitney Rd. from Orange Blvd. and Northlake Blvd., the County already owns an easement for the required width of right of way, and only those parcels required for detention ponds are being acquired, as well as embankment easements and construction easements throughout the project, and corner clips at some side streets. For widening of Northlake Blvd. from Seminole Pratt Whitney Rd. to Coconut Blvd., acquisition of Right of Way and Easements is currently in process. Q. 6. What will be included in the Appraisals and offers? A. An appraised value will be placed on any land required for right of way, or for easements for the project, based upon recent sales of similar properties in the area. Additionally, values will be placed on items that must be removed from the work area, such as irrigation systems, fences & trees, driveways, etc. Replacement costs will be determined and made part of the offer. Q. 7. What are my options when I receive an offer for my land? A. Generally, you can accept the offer as given, or make a counter-offer wherein you may state your objections and what you think the offer should be, or you can refuse the offer outright. In that case the County will bring the matter before a judge as an eminent domain proceeding. All options available to you will be provided in writing when an offer is made. Q. 8. Will any reimbursements be made for items damaged by storms, etc. which Owners already took care of? A. No. If improvements do not exist on the property at the time of the appraisal, they cannot be included. Q. 9. If I have a sale pending on my property, who gets the check for acquisitions and easements? A. The record owner at the time of executing the deed will be the Payee. If a transfer is in the process, it is important that the current owner inform the buyer as to the County s acquisition. Page 3 of 5
4 Q. 10. What will happen to existing fences and improvements within the construction areas? A. Items currently within proposed work areas to be acquired by the county will be paid for as part of the Appraisal process. If the owners want to retain those items they must remove them at their own expense, prior to work starting. If items are not removed, the Contractor is responsible for removing and disposing of them. Items which are within land already owned by the County must also be removed or they will be removed and disposed of by the Contractor. Q. 11. Will temporary fencing be put up during construction for security and pets? A. If there is an existing fence which provides a protective barrier for animals or children, a temporary fence will be erected by the Contractor before he removes the existing fence. This temporary fence will then be removed by the contractor upon completion of work, so it is incumbent upon property owners to have their own permanent replacement fence constructed before the Road work is finished. If the existing fence is decorative or does not provide security, such as a split rail fence or a wire fence with gaps, then no temporary fence will be installed. The contractor will be given the option of relocating the existing fence and using that in its temporary location instead of installing a new, temporary fence. Q. 12. Will walls be constructed to block the sound and provide security from traffic? A. No. The Board of County Commissioners has reaffirmed their policy that walls are not to be built. Q. 13. Will guardrail be put up to prevent vehicles from coming across the sidewalk, onto my property? A. Guardrail is not warranted along this roadway, except when in close proximity to canals and steep drop offs. Q. 14. If I have a well or septic system within the construction area, what will happen to it? A. At the time of the offer, the owner will be asked to provide any information available as to the well or septic system location. If necessary, the proposed construction will be modified to avoid impacts to wells or septic systems. Page 4 of 5
5 Q. 15. Will my driveway be damaged by the construction? A. Driveways will be reconstructed within the limits of the existing right of way or road easement to match the proposed roadway. Q. 16. What will the speed limit be after construction is done? A. Design Speed and Posted Speed will be 45 MPH. Q. 17. Will there be any restrictions on truck traffic after construction is done? A. None are anticipated at this time. Q. 18. Will there be sidewalks and will they be protected by barriers of any kind? A. Sidewalks will be constructed along each side of the roadway in most areas, separated from the pavement by a grass strip (approximately 15 ft wide). No barrier will be placed between the roadway and the sidewalks. Q. 19. Will additional traffic signals be installed? A. Existing signals may be upgraded during construction, and one new traffic signal has already been added at the intersection with 60 th Street. Q. 20. Will street lights be installed? A. Street lights will be installed on both sides of the roadway. Q. 21. Will there be crossing guards during school times? A. For information concerning school crossing guard & bussing issues, please contact the School District at tel.no Q. 22. Will there be turn-outs for bus stops? A. None are included in the roadway construction. Page 5 of 5
Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.
Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library
More informationBond Release Process for New Subdivision Developments in Fairfax County
Bond Release Process for New Subdivision Developments in Fairfax County An Overview for Homeowners Associations A Fairfax County, Va., publication April 2009 For more information or to request this document
More informationTHE RIGHT-OF-WAY ACQUISITION SECTION
THE RIGHT-OF-WAY ACQUISITION SECTION A SECTION OF THE ROADWAY PRODUCTION DIVISION PALM BEACH COUNTY ENGINEERING & PUBLIC WORKS DEPARTMENT WORKING WITH YOU TO HELP MEET OUR GROWING TRANSPORTATION NEEDS
More informationThe Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08
The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are
More informationEXHIBIT A Accessible Truck Routes Map
EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT
More informationInformational Workshop Public Meeting Kanawha Falls Bridge Project
Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal
More information14-97. 14-97.002 Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:
14-97 14-97.001 Purpose. This rule chapter sets forth an access control classification system and access management standards to implement the State Highway System Access Management Act of 1988. The implementation
More informationWelcome! Purpose of Tonight s Meeting. Informational Open House to discuss two City projects: Goal is to LISTEN TO YOU
Purpose of Tonight s Meeting Informational Open House to discuss two City projects: Fairchild Street Subway Phase I Engineering: Immediate need to replace subway Bowman Avenue Feasibility Study Future
More informationHow To Improve Safety
Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,
More informationSurface Transportation Program (STP)
Project Name: Project Sponsor: FEDERAL FUNDS PROJECT APPLICATION TRANSPORTATION IMPROVEMENT PROGRAM 2008-2013 SALT LAKE and OGDEN/ LAYTON URBAN AREAS Surface Transportation Program (STP) Urban Surface
More informationAlternatives Design Report. Draft
Draft 3/4/2014 TABLE OF CONTENTS I Introduction... 1 A. HISTORY... 1 B. PROJECT BACKGROUND... 1 II. ALTERNATIVES DEVELOPMENT... 8 A. ALTERNATE 1 NO BUILD... 8 B. ALTERNATE 2 IMPROVE ROADWAY ON EXISTING
More informationExhibit A Scope of Work
Exhibit A Scope of Work The agreement for S.P. 3116-142 (T.H. 169-Cross Range Expressway) includes final design plans for a 1.55 mile length of a 2 lane to 4 lane expansion project located 0.66 miles SW
More informationWalkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps
More informationHow To Build A City Of Virginia Beach Arena
City of Virginia Beach Arena Infrastructure Preliminary Conceptual Cost Estimates Doug Smith, Deputy City Manager Carl Tewksbury, Kimley-Horn City Council Briefing July 8, 2014 July 8, 2014 Presentation
More informationAPPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must
More informationImproving Access in Florida International University Biscayne Bay Campus Executive Summary
EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared
More information3 Tappan Zee Bridge Rehabilitation Options
3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:
More informationTransportation Network Analysis. A. Overview
Transportation Network Analysis A. Overview The goal of this analysis is to evaluate existing roadways and specific intersections within the County. The focus will be on areas identified as probable growth
More informationDISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST
State of California Business, Transportation and Housing Agency DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST District / EA: District 3/ EA 03-3E380 Date Prepared: 1/10/2013 Prepared By: Robert Himes Stage
More information11 p.m. to. Tuesday, June. will remain open. 14. closed
June 3, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 marcia.mcallister@dullesmetro.com Important Lane Closures June 5 11 Include Northbound Beltway Lanes, Eastbound Dulles Airport Access
More informationAnnual Report HB 10-1014
- - DEPARTM&lTOfTRANSPORTATJON Annual Report HB 10-1014 February 8, 2011 Senator Evie Hudak, Madame Chairman Representative Glenn Vaad, Chairman Honorable Members of the Joint Senate and House Transportation
More informationADA POST INSPECTION CHECKLIST. Job No. Route County Location
ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks
More informationAlternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011
Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for
More informationKENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs
KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality
More information1161.01 CONFORMITY WITH PLANS; DRAINAGE.
CHAPTER 1161 Subdivision Requirements 1161.01 Conformity with plans; drainage 1161.07 Easements 1161.02 Trees 1161.08 Streets 1161.03 Subdivision name 1161.09 Blocks 1161.04 Street names 1161.10 Lots 1161.05
More informationTransportation Management Plan Template
DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County
More informationTHE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330
THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330 REVIEW NOTES by CHUCK DUNN CHAPTER 10 Copyright 2010 by the Real Estate Division and Chuck Dunn. All rights reserved ARE 3 rd EDITION REVIEW
More informationSR-18 Corridor Improvements in Wood County
Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park
More informationREGULATIONS FOR DRIVEWAY AND ENCROACHMENT CONTROL
REGULATIONS FOR DRIVEWAY AND ENCROACHMENT CONTROL State of Georgia Department of Transportation State Traffic Safety & Design Engineer Wayne Shackelford Building 935 Confederate Avenue Building 24 Atlanta,
More informationRight-Of-Way Acquisition Information
Right-Of-Way Acquisition Information Introduction Larimer County covers 2,600 square miles, and has over 1,000 lineal miles of public roads. These roads are located within public right-of-way (an area
More informationGoals & Objectives. Chapter 9. Transportation
Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system
More informationMAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements
MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850
More informationLight Rail Transit in Phoenix
4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February
More informationRESOLUTION NO. 1539 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BONNEY LAKE, PIERCE COUNTY, WASHINGTON, APPROVING THE 192 ND CORRIDOR STUDY AND DIRECTING THE MAYOR TO PROCEED WITH PARTIAL DESIGN AND
More information1What purpose do guard
g u a r d F c a b A l e Q f re q u e n t l y a s k e d q u e s t i o n s 1What purpose do guard cables serve? Cross-Median Fatalities The purpose of high-tension guard cable is to prevent vehicles that,
More informationSir Francis Drake Boulevard Rehabilitation Project Bicyclist and Pedestrian Intercept Interviews Report
Sir Francis Drake Boulevard Rehabilitation Project Bicyclist and Pedestrian Intercept Interviews Report Sir Francis Drake Boulevard Rehabilitation Project Bicyclist and Pedestrian Intercept Interviews
More information8+ %!0"% 8+1!%"'$%,$"$
8+ 8+ %!0"% The next step in developing recommendations for improvements to Grand Avenue was to identify, develop and evaluate alternatives to address the issues and needs identified in the previous chapter.
More informationTH 23 Access Management Study Richmond to Paynesville
TH 23 Access Management Study Richmond to Paynesville Prepared For: Minnesota Department of Transportation District 8 Prepared By: Short Elliott Hendrickson Inc. July 2015 Table of Contents I. Introduction...
More informationSoapstone Connector Feasibility Study
Technical Report Soapstone Connector Feasibility Study Prepared by ATCS, plc., 2553 Dulles View Drive, Herndon, VA 20171, (703) 430-7500 www.atcsplc.com In association with: Michael Baker Corporation,
More informationBelmont Street Bridge Rehabilitation Project
Belmont Street Bridge Rehabilitation Project Christian Gospel Church Worcester 43 Belmont Street Worcester MA February 20, 2015 7:00PM Agenda Introductions Project site and overview Project history Construction
More informationCorridor Goals and Objectives
Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty
More informationEvanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions
Evanston Main Street Station TOD Plan and Study Appendix A.1: Station Area Existing Conditions EvanstonMainStreetStation TODPlanandStudy A 1 AppendixA.1: ExistingConditions Table of Contents Station Locations
More informationAPPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations
More informationAccident Analysis of Sheridan Road between Isabella Street and South Boulevard
Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Prepared for TranSystems Corporation for the City of Evanston Submitted by Regina Webster & Associates, Inc. Date: 08/15/2008
More informationChapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationProject Rankings. Fiscal Year 2015 2019 Capital Improvement Plan
Fiscal Year 2015 2019 Capital Improvement Plan Project Rankings 99 CIP Ranking Worksheet 101 104 Final Ranking Scores The following matrix shows all of the projects within the five-year period that were
More informationThe Transect Zones
T1 TABLE 1. TRANSECT ZONE DESCRIPTIONS TABLE 1: Transect Zone Descriptions. The following are general descriptions of the character of each Transect Zone. They may be interpreted as a constituent part
More informationDesigning Pedestrian Facilities for Accessibility. ADA Compliance Training. Local Programs Engineer FHWA NJ Division
Keith et P. Skilton Local Programs Engineer FHWA NJ Division 840 Bear Tavern Road, Suite 310 West Trenton, NJ 08628 Phone: 609-637-4203 Fax: 609-538-4919 keith.skilton@dot.gov Note: Pictures may depict
More informationA. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.
19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property
More informationTemporary Traffic Control for Building and Maintaining Single and Multi-Lane Roundabouts
Purpose and Background Temporary Traffic Control for Building and Maintaining Single and Multi-Lane Roundabouts Although roundabouts have recently gained popularity and use in the United States, minimal
More informationPartial Acquisition Appraisals for Public Projects
Partial Acquisition Appraisals for Public Projects The appraisal of real property for public projects often represent unique and challenging appraisal assignments. Many of these assignments are partial
More informationAlternatives Presentation Meeting Middlebury WCRS(23)
Alternatives Presentation Meeting Middlebury WCRS(23) Main Street (VT 30/TH 2 Bridge 102) and Merchants Row (TH 8 Bridge 2) over Vermont Railway June 4, 2013 Twilight Hall Auditorium, Middlebury College
More informationWESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24
Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge
More informationUNIVERSITY OF MISSISSIPPI FIXED ASSET CAPITALIZATION POLICY
UNIVERSITY OF MISSISSIPPI FIXED ASSET CAPITALIZATION POLICY The term capitalized fixed assets includes land, improvements to land, easements, buildings, building improvements, vehicles, machinery, furniture,
More informationMaryland Invests $845 Million in New Highway and Bridge Projects
Maryland Invests $845 Million in New Highway and Bridge Projects Completing Widening of MD 404 Talbot And Caroline Counties Top Regional Priority Queen Anne s, Talbot, and Caroline Counties Widening MD
More informationWILLIAMS RANCH HOMEOWNERS ASSOCIATION Frequently Asked Questions for Unit Owners
WILLIAMS RANCH HOMEOWNERS ASSOCIATION Frequently Asked Questions for Unit Owners Living in Williams Ranch Homeowners Association ( Association ) can and should be a great experience. After all, it s your
More informationCENTRELINE REMOVAL TRIAL
Road Space Management Directorate Surface Transport Transport for London 4 th Floor, Palestra 197 Blackfriars Road London SE1 8NJ www.tfl.gov.uk CENTRELINE REMOVAL TRIAL Issue Date Prepared by Reviewed
More informationFILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request
FILE NO.: Z-6915-C NAME: Gamble Road Short-form PCD and Land Alteration Variance Request LOCATION: Located on the Northwest corner of Chenal Parkway and Gamble Road DEVELOPER: Davis Properties P.O. Box
More informationGUIDELINES FOR WORKING ON ROADS
GUIDELINES FOR WORKING ON ROADS Guide to the Safety, Health and Welfare at Work (Construction)(Amendment)(No. 2) Regulations 2008 (S.I. No. 423 of 2008) 7 CONTENTS Page Introduction.....................................................
More informationPROJECT MANAGEMENT HANDBOOK, PART 1 - ISSUES COMMON TO ALL PROJECT MANAGERS
CHAPTER 11 - Project Continuity Contents Introduction... 2 Phase Hand-Offs... 3 Project Feedback... 9 Project Management Team Approach... 10 Page 1 of 15 Introduction A primary objective of all Project
More informationENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES
How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all
More informationI-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015
I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA PSPE Presentation, December 3, 2015 Location Map N PROJECT LOCATION 22 nd 18 th Streets PHILADELPHIA, PA General
More informationPRIORITIZATION PROCESSES
PROJECT SELECTION & PRIORITIZATION PROCESSES STIP Workshop Presented by: Bill Lawrence April 2011 Purpose and Review Overview of Project Selection Process Review Various Prioritization Processes Tk Take
More informationNew Hampshire State Laws Pertaining To Bicycles. CHAPTER 230 STATE HIGHWAYS Planning and Laying Out Bicycle Routes
New Hampshire State Laws Pertaining To Bicycles Current as of April 21, 2009; most but not all laws mentioning bicycles are included below. For current laws, see http://www.gencourt.state.nh.us/rsa/. Compiled
More informationPLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
More informationWalking Route the assigned or authorized route a pupil walks to arrive at school or at the designated bus stop.
BUSINESS NON-INSTRUCTION OPERATION 3541 TRANSPORTATION I. GENERAL It is the goal of the Board of Education to establish for the public schools an appropriate transportation system one which will enable
More informationChapter 10.48 BICYCLES
Chapter 10.48 BICYCLES Sections: 10.48.010 Traffic Laws Applied to Persons Riding Bicycles. 10.48.110 Equipment on Bicycles; Brakes and Lights. 10.48.130 Right-of-Way. 10.48.140 Right Turn Lanes. 10.48.150
More informationPublic Involvement Meeting Handout
Public Involvement Meeting Handout WIS 93 Detloff Drive to WIS 95 Trempealeau County Project ID 7130-01-72 June 18, 2014 5:00 P.M. 401 W. Main Street Arcadia WI Purpose of the meeting The Wisconsin Department
More informationThe Transportation Package
The Transportation Package The transportation package raises $4.2 billion over 10 years, to invest in highway, rail, mobility, ferry, and transit projects throughout the state. These new revenues, combined
More informationPREFERRED ALTERNATIVE RECOMMENDATION FOR THE COLLEGE AVENUE SAFETY ENHANCEMENT (CASE) PROJECT COLUMBIA, MISSOURI
PREFERRED ALTERNATIVE RECOMMENDATION FOR THE COLLEGE AVENUE SAFETY ENHANCEMENT (CASE) PROJECT COLUMBIA, MISSOURI Prepared For: Columbia Public Works 701 East Broadway Columbia, Missouri Prepared By: Engineering
More informationChapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL
Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois
More informationPreliminary Plan Application and Checklist
ALL APPLICATIONS ARE DUE AT 12:00 NOON ON THE FILING DATE Office Use Only PRELIMINARY / REVISED PRELIMINARY PLAN $300.00 Fee Paid: $ Date Paid: ALL FIELDS HIGHLIGHTED IN RED ARE REQUIRED FIELDS Case No.:
More informationCHESTERFIELD COUNTY BOARD OF SUPERVISORS Page 1 of 3 AGENDA
CHESTERFIELD COUNTY BOARD OF SUPERVISORS Page 1 of 3 AGENDA Meeting Date: December 16, 2015 Item Number: 17.G. Subject: Public Hearing to Consider the Exercise of Eminent Domain for the Acquisition of
More informationManaging Public Use of Freeway Emergency Access Gates and Median Crossovers
Managing Public Use of Freeway Emergency Access Gates and Median Crossovers Operational Instruction Transport Services Division TRAFFIC MANAGEMENT Operational Instructions Managing Public Use of Freeway
More informationInfrastructure assets are distinguished from other capital assets because they normally:
4. REPORTING 4.2 Government-Wide Financial Statements 4.2.6 Infrastructure Reporting 4.2.6.10 Governments are required to report all of their capital assets in the statement of net position. Infrastructure
More informationSECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.
Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to
More informationLEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS
For discussion on 2 April 2001 LC Paper No. CB(1)907/00-01(03) LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS PWP Item No. 277CL Tseung Kwan O development, phase II, Remaining engineering works
More informationS.R. 37 Pavement Rehabilitation Project. Wednesday, March 5, 2014 Orange County Community Center 6:30 p.m.
S.R. 37 Pavement Rehabilitation Project Wednesday, March 5, 2014 Orange County Community Center 6:30 p.m. Welcome Purpose and explanation of public meeting Public meeting format Visit our sign-in table
More informationPlanning Level Cost Estimation Tool. User s Manual
Planning Level Cost Estimation Tool User s Manual Atlanta Regional Commission Submitted By: User s Manual Table of Contents 1. INTRODUCTION... 1 2. OBJECTIVE... 1 3. FRAMEWORK OF THE TOOL... 2 4. HOW TO
More informationNashville Area MPO Regional Freight Study fast action projects
Project #1 Beechcroft road (sr 247) at csx crossing Motor carrier survey location Maury County (Spring Hill, Tn) / City of Spring Hill Current at-grade railway crossing causes traffic delays as a result
More informationArchitectural Processing and Inspections for Home Mortgage Insurance
Page 1 of 5 [Text Only] Architectural Processing and Inspections for Home Mortgage Insurance Directive Number: 4145.1 SITE GRADING AND DRAINAGE GUIDELINES Construction complaints and structural defect
More informationThe partnership has selected three intersections where enforcement, education, and engineering initiatives are being implemented to improve safety:
Hamilton-Finn Suite 310 Tel. (403) 207-6000 Road Safety 3016 5th Avenue N.E. Fax. (403) 273-3440 Consultants Ltd. Calgary, Alberta dawatt.dawatt.com www.hamiltonfinn.ca January 19, 2005 Mr. Don Szarko,
More informationChapter 5 Financial Plan
The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA_LU) requires that the MTP incorporate a financial plan for the planning period. The MTP is required to
More informationSpot Safety Project Evaluation
Spot Safety Project Evaluation Project Log # 200610094 Spot Safety Project # 04-01-219 Spot Safety Project Evaluation of the Traffic Signal and Left Turn Lane Installation at SR 1010 and SR 1526 in Johnston
More informationLIMITED SCOPE CONCEPT DEVELOPMENT REPORT
LIMITED SCOPE CONCEPT DEVELOPMENT REPORT Route 33 Resurfacing Project Eastbound: Milepost 24.2 to Milepost 28.9 Westbound: Milepost 24.3 to Milepost 28.9 Manalapan & Freehold Townships, Monmouth County
More informationLAND USE CODE CHAPTER 18.68 GENERAL REGULATIONS
CHAPTER 18.68 GENERAL REGULATIONS SECTIONS: 18.68.010 Fences. 18.68.020 Vision Clearance Area. 18.68.030 Access. 18.68.040 Yard Requirements. 18.68.050 Special Setback Requirements. 18.68.070 Land Surveys.
More informationDisputed Red Light Accidents: A Primer on Signal Control. Jon B. Landerville, MSME, PE Edward C. Fatzinger, MSME, PE Philip S.
Disputed Red Light Accidents: A Primer on Signal Control Jon B. Landerville, MSME, PE Edward C. Fatzinger, MSME, PE Philip S. Wang, MSME Intersection Accident Statistics Intersection accidents occur on
More informationCHAPTER 27 New Public Road Connections. Table of Contents
Chapter 27 New Public Road Connections Table of Contents CHAPTER 27 New Public Road Connections Table of Contents CHAPTER 27 New Public Road Connections... 27-3 ARTICLE 1 - General... 27-3 Responsibility...
More information5. MAJOR STREET CONSTRUCTION The B-Permit. 5.1. B-Permit Description and Purpose
5. MAJOR STREET CONSTRUCTION The B-Permit 5.1. B-Permit Description and Purpose The B-Permit is required for major street construction in the public right-of-way. This includes the widening of streets,
More informationREAL ESTATE ACQUISITION
REAL ESTATE ACQUISITION Summary of Real Estate Acquisition Guidelines Planning Phase 1. Define the right-of-way needed through preliminary design of the project; 2. Obtain surveys for right-of-way needed;
More informationAppendix J Transportation Management Plan Report. Traffic Operational Analysis Report
Appendix J Transportation Management Plan Report Traffic Operational Analysis Report Transportation Management Plan Report VIRGINIA AVENUE TUNNEL RECONSTRUCTION PROJECT WASHINGTON, DC PRELIMINARY TRANSPORTATION
More informationHow To Modernize And Maintain Roads, Highways And Bridges In Maine
MAINE TRANSPORTATION BY THE NUMBERS: Meeting the State s Need for Safe and Efficient Mobility OCTOBER 2012 202-466-6706 www.tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit organization
More informationSection ALTERNATIVES. 3. Alternatives
Section 3 ALTERNATIVES 3. Alternatives 3.0 Alternatives The Springfield Rail Improvements Project Build Alternatives would utilize different routes. The No Build Alternative includes the continuation of
More informationWhen the County Acquires Your Property
When the County Acquires Your Property The Right-of-Way Acquisition Process Acquiring public right-of-way doesn t have to be a tough road to travel... To keep pace with our growing population, the Pierce
More informationAPPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES
Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan
More informationKYTC, District 2 Chief District Engineer KYTC, District 2 Planning Supervisor & LPA Coordinator. KYTC, Central Office Planning
MINUTES Field Visit for Local Officials and Stakeholders Bluegrass Crossings Regional Business Centre Improved Access Road Study Ritatsu Manufacturing (Board Room) Beaver Dam, Kentucky June 11, 2014 1:30
More informationCOURTING YOUR BICYCLE AND PEDESTRIAN FACILITIES... FROM A FORENSIC ENGINEERING AND PLANNING PERSPECTIVE
COURTING YOUR BICYCLE AND PEDESTRIAN FACILITIES... FROM A FORENSIC ENGINEERING AND PLANNING PERSPECTIVE 1 PRESENTED BY: J.M. TEAGUE ENGINEERING, PLLC 2 OBJECTIVES 1. What is Transportation Forensic Engineering
More informationSection 6 Traffic Analysis
Section 6 Traffic Analysis Traffic Operations of the Preferred Network Alternative After the Preferred Network was identified and confirmed by local policy makers and area residents, detailed traffic analysis
More informationBEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.
Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation
More information