1 Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for prioritizing projects identified as alternatives to the Circ. This methodology is being presented as a beginning point for discussion and is open to changes and refinements. CCRPC and the Circ Task Force seek to develop a process to rank projects identified as alternatives to the Circ Highway. CCRPC staff developed a process that is comprised of three factors as follows. A portion of the project score is to come from CCRPCs current prioritization methodology. This methodology was developed in 2005 and uses planning factors MPOs are required to consider in their planning process, as stated in Federal legislation (ISTEA and reiterated in SAFTEA-LU). As such, this methodology captures factors that CCRPC, and the Federal government, consider important in transportation planning. The planning factors are: Economic Vitality; Safety and Security; Accessibility, Mobility and Connectivity; Environment, Energy and Quality of Life; Preservation of Existing System; and, Efficient System Management. The methodology specifies project characteristics that result in scores of High, Medium-High, Medium, Low and No Impact. A sample scoring sheet is attached. A second portion of the score is to be based on the Purpose and Need Statement of the Circ Highway as contained in the 1986 Environmental Impact Statement (see attachment). This portion of the score is based on five factors presented in the Purpose and Need Statement as goals of the project. These factors are: Road System Hierarchy (mobility), Capacity and Level of Service (congestion), Transportation Demand (future demand), Social Demands and Economic Development, and Existing and Potential Safety Hazards. A scoring sheet detailing these factors is attached. The third portion of the score is based on readiness of the project to proceed to construction. One goal of this process it to identify projects that can advance to construction in a timely manner. As a result, use of this factor in the scoring of projects will identify those projects that satisfy other goals and are also ready to advance quickly. A scoring sheet detailing the readiness factor is attached. In response to concerns about how the prioritization methodology address environmental goals such as greenhouse gas reduction and reducing vehicle miles traveled, and how the methodology addresses economic development goals, also attached is a summary of factors included in the methodology that address these goals.
2 CCRPC Criteria (check the highest impact box for each factor) Economic Vitality High Impact Projects that provide new or improved access to regional activity centers Projects that enhance freight movement on interstate or principal arterial Projects that improve airport access Projects that improve access to tourism facilities Projects that maintain existing access facilities on interstate Safety and Security VTrans identified High Crash Location intersection or section of roadway. Improvements might include: sight distance, alignment, pedestrian crossing, new signal, speed control Bridge safety improvements for bridges with sufficiency rating up to 25 Other project deemed very important to the safety of the transportation system Medium- High Impact Projects that provide new or improved access to local activity centers Projects that provide access to planned future activity centers Projects that improve access facilities important to rural communities Address environmental issues that could impact economic development Improve emergency access Bridge safety improvements for bridges with sufficiency rating of 25.1 to 50 New median barriers, guardrail or shoulder Intersection/roadway safety improvements (sight distance, alignment, pedestrian crossing, new signal, speed control) in location with a perceived safety problem Projects that maintain existing access facilities on principal arterial Rail grade crossing improvements and warning signs New/expanded Park and Ride Lots Medium Impact Streetscape or bike/pedestrian improvements in regional activity centers that improve commercial attractiveness Supports mobility needs of rural community Transit equipment for safety or security. For example, shelters. Bridge safety improvements for bridges with sufficiency ratings from Projects that enhance freight movement on minor arterial or major collector Bicycle/pedestrian projects that encourage tourism Projects that maintain existing access facilities on minor arterial or major collector Repaving interstate or principal arterial Dedicated bike/pedestrian facilities Upgrading signage and pavement markings to improve safety Low Impact Supports mobility needs of business or industry not in an activity center Other improvements that support tourism Other streetscape or bike/ped improvement in activity centers Paving minor arterial or major collector Other safety improvements No Impact No discernable benefits No discernable benefits Page 1
3 Accessibility, Mobility and Connectivity High Impact New/expanded transit infrastructure, service or dedicated facilities for buses Bicycle /pedestrian facilities making intermodal linkages or regional connections New/expanded access to airports, freight distribution facilities, major industrial centers or regional activity centers Provides gap closure in major regional corridor, including new bridges Bridge rehab or replacement in areas with limited alternative routes Medium- High Impact Medium Impact Bridge rehab or replacement on interstate or principal arterials Bicycle/pedestrian facility connecting neighborhoods Upgrade to existing access facilities to airports, freight distribution facilities, major industrial centers or regional activity centers Projects that improve connectivity and mobility for rural communities Access to local activity centers Bicycle/pedestrian facility making connections within an established neighborhood or activity center Signing and informational systems (other than ITS) Improvements to interstates, freeways and principal arterials that do not provide direct access to airports, freight distribution facilities, major industrial centers or regional activity centers Provides gap closure in minor regional corridor New facilities to remove traffic from parallel congested routes Bridge rehab/replacement on minor arterial or principal collector or other rural bridges Low Impact Provides gap closure in local corridor Bridge rehab/replacement to other urban bridges Improvements to minor arterials Environment, Energy and Quality of Life Traffic calming project within established neighborhood or activity center Bus replacement for vehicles beyond useful life Bicycle/pedestrian facilities within an established neighborhood or activity center Significant reduction in the quantity and improvement to the quality of water runoff Clean fuel buses/vehicles. Alternative fuel infrastructure. Transportation demand strategies, programs and incentives, including park and ride lots Projects that encourage compact land use or transit oriented design Necessary bridge improvements in areas with limited alternative routes where bridges provide critical connectivity to the community. Streetscape enhancement project Rehabilitation or reconstruction of transit vehicles or facilities that increases ridership Signal updating and interconnections Projects that remove traffic from a neighborhood within an established activity center Addresses stormwater or water quality issues associated with existing transportation system New roundabout or signal projects Necessary bridge improvements in areas with limited alternative routes. Streetscape enhancement associated with another project Stormwater treatment or water quality improvements associated with another project New bike/pedestrian facility associated with another project Traffic calming associated with another project Other intersection improvements to reduce congestion Necessary bridge improvements in areas where detours would have negative impacts on businesses and/or individuals. No Impact No discernable benefits No discernable benefits Page 2
4 Preservation of Existing System Efficient System Management High Impact Reconstruction, resurfacing or intersection improvements for project with perceived critical need (preservation projects) Bridge structural improvements for bridges with sufficiency rating of less than 25, or in imminent danger of being closed or weight restricted Reconstruction or resurfacing of existing bike/ped facilities that are in danger of being closed due to deficiencies TDM strategies, programs and incentives including new or expanded park and ride lots Increases transit service capacity and/or reliability New or improved intermodal transportation center Traffic signal interconnect or other ITS improvements Improvements to roadways, corridors or intersections with significant congestion (LOS E or F) including roundabouts Improvements to intersections accessing bicycle/pedestrian facilities serving primarily a transportation use Medium- High Impact Reconstruction, resurfacing or intersection improvements for project with perceived significant need (preservation projects) Improvements to congested roadways, corridors or intersections (LOS D) including roundabouts Bridge structural improvements for bridges with sufficiency rating of 25 50, or with significant structural deficiencies New interchanges on limited access highways, in locations with significant congestion, to relieve congestion Reconstruction or resurfacing of existing bike/ped facilities with significant need. Existing transit facility replacement/rehab that prolongs useful life of assets Transit vehicle replacement/rehab consistent with FTA Standards New signals or roundabouts where warranted Reduces congestion on congested parallel route (LOS D, E or F) Necessary bridge improvements in areas with limited alternative routes. Medium Impact Reconstruction, resurfacing or intersection improvements for project with perceived need (preservation projects) Improvements to existing interchanges, intersections or roadways (LOS C) including roundabouts Bridge structural improvements for bridges with sufficiency raging of , or with moderate structural deficiencies Reconstruction or resurfacing of existing bike/ped facilities with perceived need. Necessary improvements to existing park and ride lots Addresses environmental issues impacting the existing transportation system Introduces new connections between existing street patterns Improvements that reduce travel time New signal which relieves congestion Median treatments or access management Left or center turn lanes Reduces congestion on parallel route Bicycle/pedestrian facility within established neighborhood or activity center, or access improvements at existing intersections Low Impact Other improvements to the existing transportation system Transportation improvements that have an indirect benefit to the existing transportation system Bus station/stop amenities and shelters Traffic flow improvements Necessary bridge improvements in areas where detours would have negative impact businesses and/or residents. No Impact No discernable benefits No discernable benefits Page 3
5 Circ Purpose and Need Criteria (check boxes that apply for each category) Road System Hierarchy (Mobility) Facilitates travel between the new North End of Burlington to I-89 and east of I-89 Facilitates travel from western portion of Colchester to I-89 and east of I-89 Improves access to I-89 at Exits 12 and 16. Improves mobility over the Winooski River in Colchester, Essex, Essex Junction and Williston. Improves connections between exiting I-289 and the local road network at VT117 in the southeast and VT2A in the northwest. Capacity and Level of Service (Congestion) Roadway/intersection improvements to reduce congestion at the locations identified in the Circ EIS or in locations ITS improvements that reduce congestion in the locations identified in the Circ EIS or in locations Transit improvements to reduce demand in the locations identified in the Circ EIS or in locations Bicycle and pedestrian improvements to reduce demand in the locations identified in the Circ EIS or in locations impacted by not constructing the Circ Transportation Demand Addresses projected future traffic congestions in the locations identified in the Circ EIS or in locations New park and ride lots that reduce congestions in the locations identified in the Circ EIS or in locations Project increases accessibility to a designated downtown development district Social Demands and Economic Development Improves access to businesses in the locations identified in the Circ EIS or in locations impacted by not constructing the Circ. Streetscape and traffic calming projects in the locations identified in the Circ EIS or in locations Existing and Potential Safety Hazards Addresses existing or future safety issues in the locations identified in the Circ EIS or in locations Page 4
6 Readiness Methodology Project Readiness Criteria (score projects according to when construction can be implemented) Short term (1-2 years) Short/mid term (3 5 years) Mid term (5 10 years) Mid/long term (10 15 years) Long term (more than 15 years) Page 5
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must
HRTPO PROJECT PRIORITIZATION AND SELECTION PROCESS PROJECT CATEGORIES AND EVALUATION CRITERIA
HRTPO PROJECT PRIORITIZATION AND SELECTION PROCESS PROJECT CATEGORIES AND EVALUATION CRITERIA September 24, 2009 Intermodal Projects Better Accommodates Intermodal Movements Improves Rail or Vehicular
Goals & Objectives. Chapter 9. Transportation
Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system
South Carolina Multimodal Transportation Plan Vision, Goals, Objectives, and Performance Measures
South Carolina Multimodal Transportation Plan Vision, Goals, Objectives, and Performance Measures Prepared for: Prepared by: June 2013 TABLE OF CONTENTS 1. Introduction... 1 1.1 Baseline Understanding...
PRIORITIZATION PROCESSES
PROJECT SELECTION & PRIORITIZATION PROCESSES STIP Workshop Presented by: Bill Lawrence April 2011 Purpose and Review Overview of Project Selection Process Review Various Prioritization Processes Tk Take
The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.
3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation
Examples of Transportation Plan Goals, Objectives and Performance Measures
Examples of Transportation Plan Goals, Objectives and Performance Measures The next step in the Long Range Transportation Plan (LRTP) process is to develop goals, objectives, and performance measures.
CHAPTER 4 SURFACE TRANSPORTATION PROGRAM (STP)
Local Assistance Program Guidelines Chapter 4 CHAPTER 4 SURFACE TRANSPORTATION PROGRAM (STP) CONTENTS Section Subject Page Number 4.1 INTRODUCTION... 4-1 4.2 ELIGIBILITY CRITERIA... 4-1 General... 4-1
Alternatives Evaluation Overview
Alternatives Evaluation Overview 124 Alternatives were analyzed against the evaluation criteria Criteria and criteria weighting were set by the Community Task Force Ratings were quantitative and qualitative
Surface Transportation Program (STP)
Project Name: Project Sponsor: FEDERAL FUNDS PROJECT APPLICATION TRANSPORTATION IMPROVEMENT PROGRAM 2008-2013 SALT LAKE and OGDEN/ LAYTON URBAN AREAS Surface Transportation Program (STP) Urban Surface
SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS
SURFACE TRANSPORTATION PROGRAM (STP) PROCEDURES FOR THE OKLAHOMA CITY URBANIZED AREA FUNDS October 2015 Background The Surface Transportation Program (STP) was originally established as Section 133 of
CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND)
Regional Transportation Plan 2035 28 CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND) The Cache Transportation Vision Plan shows roadway, bicycle, transit and pedestrian projects that attempt
Technical Memorandum PERFORMANCE MEASURES. Prepared by:
Technical Memorandum PERFORMANCE MEASURES Prepared by: March 2014 TABLE OF CONTENTS Executive Summary... 1 1. Introduction... 2 1.1 Performance Measures and the Public Sector... 2 1.2 National Focus: MAP
Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps
TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES
TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES Background One of the most critical public services provided by a community is the community s transportation system. An effective
RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS
RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS Please provide the following information when applying to RPA 14/ATURA for Surface Transportation Program (STP) funding for projects
Light Rail Transit in Phoenix
4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February
KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs
KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality
Chapter VIII: Long-Term Outlook and the Financial Plan
A. Long-Term Outlook Chapter VIII: Long-Term Outlook and the Financial Plan When examining the long-term outlook for transportation planning and programming over the foreseeable future, there are several
Federal Funds Obligated in Chittenden County Federal Fiscal Year 2000
Federal Funds Obligated in Chittenden County Federal Fiscal Year 2000 CCMPO ID# Burlington IN001 Burlington Transit Center - Downtown Intermodal $1,196,128 $1,196,128 / / HC001E Champlain Parkway - Engineering
HERS_IN. HIGHWAY ECONOMIC REQUIREMENTS SYSTEM (for) INDIANA. AASHTO Transportation Estimator Association Conference October 16, 2001
AASHTO Transportation Estimator Association Conference October 16, 2001 HERS_IN HIGHWAY ECONOMIC REQUIREMENTS SYSTEM (for) INDIANA OVERVIEW HERS Background System Planning Tool Development HERS_IN Structure
Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.
Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library
Surface Transportation Program (STP) Projects
Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE
Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High
Multi-Modal Corridor Degree of Complexity: Cost/Benefit: Maintain the same level of service for Ensures continuous flow through the Might impact other transportation Consider road diet and/or different
Transportation Policy and Design Strategies. Freight Intensive. Level of Freight Presence
Appendix G Transportation Policy and Design Strategies CONTEXT SENSITIVE SOLUTIONS To address the need to describe freight systems which account for the population distress which may result, an analysis
DRAFT Freight Performance Measures
DRAFT Freight Performance Measures The purpose of the Industrial Areas Freight Access Project is to conduct a focused and pragmatic technical evaluation to identify and assess current and future freight
Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 202-366-4000
1 of 8 12/27/2013 8:21 AM U.S. Department of Transportation Federal Highway Administration 1200 New Jersey Avenue, SE Washington, DC 20590 202-366-4000 MAP-21 - Moving Ahead for Progress in the 21st Century
CALIFORNIA TRANSPORTATION BY THE NUMBERS:
CALIFORNIA TRANSPORTATION BY THE NUMBERS: Meeting the State s Need for Safe and Efficient Mobility SEPTEMBER 2014 202-466-6706 tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit organization
Chapter 5. Transportation. Decatur County Comprehensive Plan. Introduction. Goals and Objectives. Goal. Objectives. Goal.
Chapter 5 Transportation Chapter 5: Transportation Introduction The transportation system forms the backbone of a community. I-74 connects Decatur County with the large metropolitan areas of Cincinnati
INDOT 2000-2025 Long Range Plan
Chapter 9 INDOT 2000-2025 Long Range Plan Highway Needs Analysis Overview The statewide transportation planning process provides for the identification of highway needs through a comprehensive process
2009-3. The Preservation of Local Truck Routes: A Primary Connection between Commerce and the Regional Freight Network
2009-3 The Preservation of Local Truck Routes: A Primary Connection between Commerce and the Regional Freight Network July 2009 This Goods Movement Challenges and Opportunities Report was prepared jointly
Transportation Alternatives
1 Transportation Alternatives Transportation alternatives involve a variety of components: Location Alternatives - when and where service is provided - general location as well as level of service on the
Downtown Tampa Transportation Vision
Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org
14-97. 14-97.002 Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:
14-97 14-97.001 Purpose. This rule chapter sets forth an access control classification system and access management standards to implement the State Highway System Access Management Act of 1988. The implementation
OM-13: Transportation Management and Operations
: Transportation and Operations 1-15 points Goal: Maximize the utility of the existing roadway network through use of technology and management of operations strategies. Sustainability Linkage Transportation
MAP 21 themes. Strengthens America s highway and public transportation systems. Supports the Department s aggressive safety agenda
MAP 21 themes Strengthens America s highway and public transportation systems Creates jobs and supports economic growth Supports the Department s aggressive safety agenda Simplifies and focuses the Federal
APPENDIX A Dallas-Fort Worth Region Transportation System Management Strategies and Projects
APPENDIX A Transportation System Management Strategies and Projects Transportation System Transportation System Management Projects Management Strategies Traffic Signalization and Control New Signal Installation
Improving Access in Florida International University Biscayne Bay Campus Executive Summary
EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared
Section ALTERNATIVES. 3. Alternatives
Section 3 ALTERNATIVES 3. Alternatives 3.0 Alternatives The Springfield Rail Improvements Project Build Alternatives would utilize different routes. The No Build Alternative includes the continuation of
Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey
Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey In its second meeting, the Infrastructure and Growth Leadership Advisory Group expanded and refined the list of approaches/ideas
Virginia's Transportation Performance Management System
Virginia's Transportation Performance Management System Office of Intermodal Planning and Investment Commonwealth Transportation Board Presented by: David Tyeryar, Deputy Secretary of Transportation September
Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013
Near Westside Neighborhood and University Avenue Corridor Transportation Study Public Workshop #2 September 12 and 23, 2013 Presentation Outline: Brief Review of Study Scope, Background, and Current Conditions
CHAPTER 13. Transportation Systems Management & Operations
CHAPTER 13 TABLE OF CONTENTS Overview / Summary... 1 Introduction... 2 System Management Strategies used in the ROCOG area... 2 Key Management Strategies / Access Management... 13 Implementation Directions
Executive Summary. Literature/Community Review. Traffic Flows and Projections. Final Report Truck Route System for Miami-Dade County CORRADINO
Executive Summary The Miami-Dade County Metropolitan Planning Organization (MPO) has prepared a Truck Route System Plan for Miami-Dade County. The MPO and its consultants have worked closely with the MPO
GENERAL. This manual addresses five local programs that are funded under the current Highway Act:
OVERVIEW The Local Public Agency Manual published by the Missouri Department of Transportation (MoDOT) is intended to be used as a guide for cities and counties that sponsor projects utilizing federal
How To Improve Road Quality
A Customer Service Level Approach for Maine DOT s Asset Management System Jeffrey L. Zavitski, B.A. Senior Implementation Specialist Deighton Associates Limited Chip Getchell, P.E. Director, Work Plan
CONNECTICUT S TOP TRANSPORTATION ISSUES:
CONNECTICUT S TOP TRANSPORTATION ISSUES: Meeting the State s Need for Safe, Smooth and Efficient Mobility NOVEMBER 2015 202-466-6706 tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit
Tier 1 Strategies. WV Route 14 Corridor Management Plan
1.1 1.2 1.3 1.4 Signal timing optimization system improvements. Improve geometry traffic control at high crash intersections. Construct intersection capacity improvement projects. Widen longer sections
Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay
Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay Peter Hsu, P.E. FDOT District Seven Safety Office Presentation Overview FDOT Traffic Safety Focus Areas
OVERVIEW PROJECT SUMMARY
OVERVIEW Cesar Chavez showcases how to successfully redesign a primary arterial route into a neighborhood destination, improving modal share, water sensitive design, biodiversity and safety whilst maintaining
Transportation Management Plan Template
DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County
Chapter 9: Transportation
Chapter 9: Transportation What is this chapter about? The goals and policies in this chapter convey the City s intent to: Create a coordinated, efficient, and more affordable multimodal transportation
CHAPTER 13. Transportation Systems Management & Operations
CHAPTER 13 TABLE OF CONTENTS Overview / Summary... 1 Introduction... 2 System Management Strategies used in the ROCOG area... 2 Key Management Strategies / Access Management... 12 Implementation Directions
Corridor Goals and Objectives
Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty
CHAPTER 4 EXISTING TRANSPORTATION MANAGEMENT
CHAPTER 4 EXISTING TRANSPORTATION MANAGEMENT TRANSPORTATION MANAGEMENT SYSTEMS Prior to 1991, the Missouri Department of Transportation (MoDOT) had begun development of several independent management systems.
Federal Guidelines for STP-U Funding
MPC 5.f Attachment 1 STP-U Eligibility Guidelines Page 1 of 5 Federal Guidelines for STP-U Funding SURFACE TRANSPORTATION PROGRAM (STP) ELIGIBLE EXPENDITURES PERIOD AVAILABLE: FY + 3 Years FUND: Highway
H: Road Asset Management Plan February 2015
H: Road Asset Management Plan February 2015 Document Format This plan forms one part of a suite of Asset Management Plans that have been developed: A. Bridges B. Buildings C. Drainage D. Footpath E. Levee
EPA Technical Assistance for Sustainable Communities Building Blocks
EPA Technical Assistance for Sustainable Communities Technical Assistance Tool: Complete Streets Deerfield Beach, Florida February 16, 2012 To: CC: Amanda Martinez, City of Deerfield Beach Roger Millar,
Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City
Mayors Welcome Strong Surrey Votes Yes Coalition Support Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City February 11, 2015 Vancouver, BC The Mayors Council on Regional Transportation
Accident Analysis of Sheridan Road between Isabella Street and South Boulevard
Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Prepared for TranSystems Corporation for the City of Evanston Submitted by Regina Webster & Associates, Inc. Date: 08/15/2008
Introduction to Station Area Planning The Charlotte Story
Introduction to Station Area Planning The Charlotte Story Boston 2009 Steve Hamwey - Sasaki Associates, Inc. Troy Russ - Glatting Jackson, Inc. October 31 st, 2009 Station Area Planning October 15th History
2010 Salida Community Priorities Survey Summary Results
SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive
Rural Road Safety Policy in Korea: Lesson Learned
Regional Seminar on Safe, Climate Adaptive and Disaster Resilient Transport for Sustainable Development Nov. 17 th, Seoul Rural Road Safety Policy in Korea: Lesson Learned Sangjin HAN Korea Transport Institute
Executive Summary. Transportation Needs CHAPTER. Existing Conditions
CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in
ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES
How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all
ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A
ORANGE COUNTY TRANSPORTATION AUTHORITY Final Long-Range Transportation Plan - Destination 2035 Attachment A DESTINATION 2035 DESTINATION 2035 EXECUTIVE SUMMARY ATTACHMENT A Moving Toward a Greener Tomorrow
CAPACITY AND LEVEL-OF-SERVICE CONCEPTS
CHAPTER 2 CAPACITY AND LEVEL-OF-SERVICE CONCEPTS CONTENTS I. INTRODUCTION...2-1 II. CAPACITY...2-2 III. DEMAND...2-2 IV. QUALITY AND LEVELS OF SERVICE...2-2 Service Flow Rates...2-3 Performance Measures...2-3
3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
WORK ZONE SAFETY & MOBILITY GUIDANCE DOCUMENT
WORK ZONE SAFETY & MOBILITY GUIDANCE DOCUMENT August 2007 Prepared by: Vermont Agency of Transportation The following document was drafted in response to updates made to the work zone regulations at 23
Roadway Cost Per Centerline Mile Revised June 2014
Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743
How To Improve Safety
Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,
Business Plan: Roadway Planning & Design
Business Plan: Roadway Planning & Design How does this service contribute to the results identified in the City of London Strategic Plan? A Strong Economy A Sustainable Infrastructure London s transportation
CHAPTERTWO. Alternatives 2.1 ALTERNATIVES DEVELOPMENT PROCESS
2. Section 2 TWO CHAPTERTWO 2.1 ALTERNATIVES DEVELOPMENT PROCESS This EIS has been prepared in compliance with the Council on Environmental Quality (CEQ) regulations for implementing NEPA (40 CFR 1500-1508).
Implementation Strategy
Implementation Strategy 6 The following implementation strategy defines strategic points of intervention for complete streets programming, including visioning, goal-setting, local agency plans, coordination
Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure
Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state
Maryland Invests $845 Million in New Highway and Bridge Projects
Maryland Invests $845 Million in New Highway and Bridge Projects Completing Widening of MD 404 Talbot And Caroline Counties Top Regional Priority Queen Anne s, Talbot, and Caroline Counties Widening MD
Where Do We Want to Go? How Can We Get There?
Where Do We Want to Go? How Can We Get There? The BRTB has adopted nine goals, with supporting strategies, performance measures, and performance targets. Together, these goals, strategies, measures, and
ROAD SAFETY ASSESSMENTS AND ROAD SAFETY AUDITS ON THE EXISTING ABU DHABI INTERNAL ROAD NETWORK
ROAD SAFETY ASSESSMENTS AND ROAD SAFETY AUDITS ON THE EXISTING ABU DHABI INTERNAL ROAD NETWORK Siegfried GROSSKOPF, Tawab KAZEMI*, John HUGHES* & Sami ALMUSAWI Bani Hashim # Parsons International Limited,
SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS
UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line
Re: Truck Route Management and Community Impact Reduction Study Report
Hon. Iris Weinshall Commissioner, NYC Dept. of Transportation New York City Department of Transportation Room 1105 Attn: Truck Study 40 Worth Street New York, NY 10013 Re: Truck Route Management and Community
Section 6 Traffic Analysis
Section 6 Traffic Analysis Traffic Operations of the Preferred Network Alternative After the Preferred Network was identified and confirmed by local policy makers and area residents, detailed traffic analysis
Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL
Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois
Dallas-Fort Worth Area Major Transportation Projects
Dallas-Fort Worth Area Major Transportation Projects Presented by: Jeffrey C. Neal Program Manager Transportation North Central Texas Council of Governments (NCTCOG) August 14, 2014 Texas Society of Professional
DESIGN PUBLIC HEARING. August 10, 2015 WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM. 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM
DESIGN PUBLIC HEARING August 10, 2015 AT WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM FOR THE PROPOSED Rehabilitation & Stormwater Improvements