North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014
|
|
|
- Vivien Hunt
- 10 years ago
- Views:
Transcription
1 North Avenue Corridor Study Advisory Committee Meeting #5 June 11, 2014
2 Agenda Welcome and introductions Concept refinement and evaluation: Public meeting and web survey General cross-section concepts pros and cons Intersection concepts Evaluation matrix/scores Estimated costs Advisory Committee recommendations for Corridor Implementation Plan: Short-, medium-, long-term Next steps, potential AC meeting #6 2
3 Public Input Public meeting outcome: 85 attendees! Voting for cross-sections is not useable Online input tool results (ongoing): Cross section voting is not as high not as many people noticed the second tab, but new FPF post and reminder is going out this week Long-term cross section concepts: no strong results, but buffered bike lanes and on-street cycle tracks (1-way) seem to be preferred vote margins are closest or slightly showing a majority of favorable votes for this concept over the others Roundabout is preferred at VT 127 ramps but not at Institute Rd North St permitted/protected left is preferred 3
4 Short, Medium, & Long Term Processes Short term = minimal design, public process as required for regulatory changes Medium term = design needed, public process included in design process Long term = evaluation, scoping and design needed, public process included throughout 4
5 Cross Section Concepts
6 Corridor-wide Improvements Short term: Parking on one side, where present Bike facilities where feasible 1 3 additional bus shelters (depends on funding, site restrictions and land availability) 3 5 high priority pedestrian crossings: Gosse Ct, Green Acres Dr / Cayuga Ct, Loaldo Dr, Saratoga Ave, Killarney Dr / Village Green Dr, Lakewood Pkwy, Poirier Pl, Burlington College, Ward St Medium term: Remaining pedestrian crossings Additional bus shelters at high use stops 15-minute peak bus service and new Sunday service Gateway treatments: Plattsburg Ave, VT 127 ramps, Washington St, and North St Long term: Stormwater treatments Planting strip: landscaping, lighting, and utilities Gateway treatments 6
7 Revisions to Cross Section Concepts Since the last AC meeting Maintained 4-lane concept for short-term (30 mph) Removed Concept A1 (sharrows in both directions) between Washington St and North St 11 paved lane width (10.5 striped lanes) adjacent to curb or onstreet parking* Wider separated bicycle facilities: 5 7 on-street one-way cycle tracks (was 5 ) 6.5 raised one-way cycle tracks* (was 5 ) 12 raised two-way cycle track* (was 10 ) 3 minimum cycle track buffer* (was 2 ) paved delineation between sidewalk/raised cycle tracks * Narrower dimensions between Shore Rd to VT 127 ramps if maintaining 4 lanes 7
8 Short-Term Cross-Section Concepts Short-term concepts = within existing street width Concept A: Cross Street Plattsburg Ave Shore Rd VT 127 Ramps Institute Rd Washington St Bike Facilities SB Bike lane Sharrows Bike lane Buffered bike lane Sharrows NB Bike lane Sharrows Bike lane Buffered bike lane Bike lane Local Motion Concept: Two-way on-street cycle track on west (SB) side of North Ave 3-lane configuration from Shore Rd to VT 127 ramps Washington St to North St options: With parking Without parking North St 8
9 Short-Term Cross Sections: Pros and Cons Concept A: Local Motion Concept: Pros: Improved cycling facilities Feasible: constructability, cost, relatively straightforward design Greater political support Cons: Discontinuous bicycle facilities Conventional bike lanes more stressful for cyclists than separated facilities Pros: Better protection for cyclists (Potentially) continuous cycle track Cons: Safety concerns with lane widths and at SB bus stops Incompatible with 4-lane segment High costs for short-term solution New signals, flexible posts Less political support as a shortterm solution: 3-lane conversion from Shore to 127 Potential loss of parking south of Washington 9
10 Medium-Term Cross-Section Concept Medium-term concepts = minor reconstruction Concept A Pilot Project: 4- to 3-lane conversion between Shore Rd and VT 127 ramps 10
11 Medium-Term Concepts for the Cross Sections Public feedback: Greater preference for 3-lane cross section from the public workshops and the online input tool Pros: Safer conditions for all users Space for continuous bicycle facilities Calmed traffic (25 mph) Simpler left turns dedicated left-turn lanes and fewer blind spots Enables long-term concepts compatible with NACTO and Burlington Complete Streets Guidelines recommended dimensions Evaluated as a pilot project Cons: Some increased delay at intersections 11
12 Long-Term Concepts for the Cross Sections Long-term concepts = new curbs, corridor reconstruction Concept B: 5 minimum bike lanes Concept C: Buffered bike lanes Concept D: On-street one-way cycle tracks Concept E: Raised one-way cycle tracks Concept F: Raised two-way cycle track (SB side) revisit during Evaluation portion of agenda 12
13 Long-Term Concepts for the Cross Sections Concept B: 5 Minimum Bike Lanes 13
14 Long-Term Concepts for the Cross Sections Concept C: Buffered Bike Lanes 14
15 Long-Term Concepts for the Cross Sections Concept D: On-Street One-Way Cycle Tracks 15
16 Long-Term Concepts for the Cross Sections Concept E: Raised One-Way Cycle Tracks 16
17 Long-Term Concepts for the Cross Sections Concept F: Raised Two-Way Cycle Track (SB Side) 17
18 Intersection Concepts
19 Revisions to Intersection Concepts Since the last AC meeting Added 4-lane concept at Shore Rd, Ethan Allen Shopping Center, Ethan Allen Pkwy, and VT 127 ramps Plattsburg Ave: Concept 1 and 2: Added no right on red Concept 2: South crosswalk LPI instead of exclusive pedestrian phase due to narrow roadway width Ethan Allen Pkwy: Concept 1: Relocated park entrance for signalized intersection concept Concept 2: Larger roundabout North St: Removed Concept 1 (split phasing) Concept 2: Added south crosswalk pedestrian refuge Slight realignment of north crosswalk to meet pedestrian push button Right in, right out at parking lot access point near Depot St 19
20 Short-Term Corridor-wide Intersection Improvements All intersections include the following short-term improvements: ADA curb ramps and crosswalks on all approaches Audible, pedestrian countdown timers with 5-second (push-button) leading pedestrian intervals (LPI) Bicycle facilities (where provided) maintained through intersection, for example: Combined bike lane/turn lane Crossbike markings 20
21 Short-Term Concepts for Intersections Short-Term: Shore Rd/Heineberg Rd: Concept 1* Ethan Allen Shopping Center: Concept 1* VT 127 Ramps: Concept 1* * 3-lane versions of these concepts are proposed for the medium term only Institute Rd: Concept 1 All approaches are LOS D or better, unless noted 21
22 Short-Term Concepts for Intersections Shore Rd/Heineberg Rd: Concept 1 (4 Lane) (3 lane concept medium term only) Pedestrian crossing times long enough for seniors No right on red Split phasing Ethan Allen Shopping Center: Concept 1 (4 Lane) (3 lane concept medium term only) Pedestrian crossing times long enough for seniors No right on red 22
23 Short-Term Concepts for Intersections VT 127 Ramps: Concept 1 (4 Lane) (3 lane concept medium term only) Remove high-speed NB on-ramp Remove free WB right-turn Institute Rd: Concept 1 No right on red Reduce intersection footprint Relocate NB bus shelter 23
24 Medium-Term Concepts for Intersections Medium Term: Plattsburg Ave: Concept 1 Shore: Concept 2 (*ROW) (3- or 4-lane concept) Ethan Allen Pkwy: Concept 1 (3- or 4-lane concept) Washington St: raised intersection North St: Concept 2 Institute Rd: Concept 1 phase 2 (NB bus shelter relocation, resolve bus driveway and sidewalk alignment) All approaches LOS D or better, unless noted 24
25 Medium-Term Concepts for Intersections Plattsburg Ave: Concept 1 No right on red High-speed NB right eliminated w/ curb extension Exclusive pedestrian phase at south crosswalk Shore Rd/Heineberg Rd: Concept 2 (3 Lane) (or 4-lane concept) Pedestrian crossing times long enough for seniors No right on red Shore Rd realignment 25
26 Medium-Term Concepts for Intersections Ethan Allen Pkwy: Concept 1 (3 Lane) (or 4-lane concept) Little Eagle Bay included in signal High-speed NB right eliminated w/ curb extension Relocate Ethan Allen Park entrance LOS E (3 lane)/los D (4 lane) EA Pkwy in AM peak North St: Concept 2 No right on red Parking lot right in, right out or curb cut removal North and south crosswalk realignment Protected/permitted SB left turns 26
27 Long-Term Concepts for Intersections Long Term: Plattsburg Ave: Concept 2 and 3 Ethan Allen Shopping Center: Concept 2 (3- or 4-lane concept) Ethan Allen Pkwy: Concept 2 (3- or 4-lane concept) VT 127 ramps: Concept 2 and 3 (3- or 4-lane concept) Institute Rd: Concept 2 All approaches LOS D or better, unless noted 27
28 Long-Term Concepts for Intersections Plattsburg Ave: Concept 2 Plattsburg Ave: Concept 3 No right on red Mini-roundabout (no flare on approaches) High-speed NB right eliminated w/ curb extension High-speed NB right eliminated w/ curb extension Consolidated NB through/right turn lane Consolidated NB through/right turn lane 28
29 Long-Term Concepts for Intersections Ethan Allen Shopping Center: Concept 2 (3 Lane) (or 4-lane concept) Pedestrian crossing times long enough for seniors No right on red Farrington s Mobile Home Park private drive and Bamboo Hut sidewalk and curb reconstruction Institute Rd: Concept 2 Roundabout with SB right-turn lane (no flare on approaches) Resolve bus driveway access 29
30 Long-Term Concepts for Intersections Ethan Allen Parkway: Concept 2 (3 Lane) Roundabout with dual SB approach lanes and NB right-turn lane, no flare on approaches. Relocate Ethan Allen Park entrance LOS E SB in AM peak, LOS E NB and WB in PM peak Ethan Allen Parkway: Concept 2 (4 Lane) Roundabout with dual SB and NB approach lanes, no flare on approaches. Relocate Ethan Allen Park entrance LOS E WB in AM peak, LOS E EB in PM peak 30
31 Long-Term Concepts for Intersections VT 127 ramps: Concept 2 (3 Lane) (or 4-lane concept) Remove high-speed NB on-ramp Remove free WB right-turn Dual SB left-turn lanes VT 127 ramps: Concept 3 (3 Lane) (or 4-lane concept) Roundabout with dual SB approach lanes and WB right-turn bypass lane (no flare on approaches) Remove high-speed NB on-ramp 31
32 Concept Evaluation
33 Concept Evaluation North Ave vision and goals Design guidelines Level of traffic stress Health Evaluation matrix criteria: Burlington Complete Street Design Guidelines Improves safety for all users Balances transportation choices Improves multimodal connectivity Impacts right-of-way Maintainability 33
34 Corridor Vision North Avenue will provide for safe, inviting, and convenient travel for all users of all ages and abilities including motorists, pedestrians, bicyclists, and public transportation riders. The need to move people through the corridor will be balanced with the need to provide access to homes, businesses, and local institutions. The corridor will develop into an attractive public space through creative streetscape, signage, and other site design features. The corridor will become more livable and desirable by promoting social interaction and public health. 34
35 Goals for Proposed Improvements Remake the North Ave corridor into a Complete Street that accommodates the safe and efficient travel for all users of all abilities and provides transportation choices. Improve safety for all users. Provide a range of convenient and efficient travel options and improve multimodal connections. Develop strategies that support vibrant and livable neighborhoods in the New North End; enhance the quality of life of residents and visitors; and support sustainable economic growth. 35
36 Scoring Scores range from 1 to 5, higher is better Scores are relative to existing conditions: 1 point Much worse than existing conditions 2 points Worse than existing conditions 3 points Approximately the same as existing conditions 4 points Better than existing conditions 5 points Much better than existing conditions Results are averages of scoring criteria: Subtotals are averages for a limited number of criteria grouped by study goals Final score is an average across all criteria 36
37 Cross Section Evaluation Results Short Term Concept Existing Conditions: No Build Concept A: Within Existing Width Config. Medium Term Concept Concept A: Within Existing Width + 4-to-3-Lane Conversion Burlington Complete Streets Consistency Improves Safety for All Users Improves Multimodal Connectivity ROW Impacts Final Score 4 Lanes Lanes Config. Burlington Complete Streets Consistency Improves Safety for All Users Improves Multimodal Connectivity ROW Impacts Maintainability Maintainability Final Score 3 Lanes
38 Cross Section Evaluation Results Long Term Concept Concept B: 5 Minimum Bike Lanes Concept C: Buffered Bike Lanes Concept D: One-Way On-Street Cycle Tracks Concept E: One-Way Raised Cycle Tracks Concept F: Two-Way Raised Cycle Track Config. Burlington Complete Streets Consistency Improves Safety for All Users Improves Multimodal Connectivity ROW Impacts Maintainability Final Score 3 Lanes Lanes Lanes Lanes Lanes Lanes Lanes Lanes Lanes Lanes
39 Intersection Evaluation Results Plattsburg Avenue Concept Existing Configuration (No Build) Timeline Balances Transportation Choices Improves Safety for All Users ROW Impacts Final Score Short term Concept 1: High-speed right eliminated Exclusive pedestrian phase at south crosswalk Concept 2: High-speed right eliminated Right-turn lane eliminated Concept 3: Mini-roundabout High-speed right eliminated Right-turn lane eliminated Medium term Long term Long term
40 Intersection Evaluation Results Shore Road/Heineberg Road Concept Config. Timeline Balances Transportation Choices Improves Safety for All Users ROW Impacts Final Score Existing Configuration (No Build) 4 Lanes Short term Concept 1: Pedestrian crossing times long enough for seniors No right on red Split phasing Concept 2: Pedestrian crossing times long enough for seniors No right on red Shore Rd realignment 3 Lanes Medium term Lanes Short term Lanes 4 Lanes Medium term Medium term
41 Intersection Evaluation Results Ethan Allen Shopping Center Concept Config. Timeline Balances Transportation Choices Improves Safety for All Users ROW Impacts Final Score Existing Configuration (No Build) 4 Lanes Short term Concept 1: Pedestrian crossing times long enough for seniors No right on red 3 Lanes Medium term Lanes Short term Concept 2: Pedestrian crossing times long enough for seniors No right on red Farrington s Mobile Home Park private drive reconstruction Bamboo Hut sidewalk and curb reconstruction 3 Lanes Long term Lanes Long term
42 Intersection Evaluation Results Ethan Allen Parkway Concept Config. Timeline Balances Transportation Choices Improves Safety for All Users ROW Impacts Final Score Existing Configuration (No Build) 4 Lanes Short term Concept 1: Little Eagle Bay included in signal High-speed NB right turn lane eliminated Relocate park entrance and add curb extension to further slow right turns Concept 2: Roundabout with dual SB approach lanes and NB rightturn lane, no flare on approaches Relocate park entrance 3 Lanes 4 Lanes Medium term Medium term Lanes Long term Lanes Long term
43 Intersection Evaluation Results VT 127 Ramps Concept Config. Timeline Balances Transportation Choices Improves Safety for All Users ROW Impacts Final Score Existing Configuration (No Build) 4 Lanes Short term Concept 1: Remove high-speed NB and WB right turn lanes 3 Lanes Medium term Lanes Short term Concept 2: Remove high-speed NB and WB right-turn lanes Dual SB left-turn lanes Concept 2: Remove high-speed NB rightturn lane Roundabout with dual SB approach lanes, a WB rightturn bypass lane, and no flare on approaches 3 Lanes Long term Lanes Long term Lanes Long term Lanes Long term
44 Intersection Evaluation Results Institute Rd Concept Timeline Balances Transportation Choices Improves Safety for All Users ROW Impacts Final Score Existing Configuration (No Build) Short term Concept 1: No right on red Reduce intersection footprint Relocate NB bus stop to far side Resolve bus driveway access Concept 2: Roundabout with SB right-turn bypass and no flare on approaches Resolve bus driveway access Short term Long term
45 Intersection Evaluation Results North St Concept Existing Configuration (No Build) Timeline Balances Transportation Choices Improves Safety for All Users ROW Impacts Final Score Short term Concept 1: Removed Concept 2: No right on red Parking lot right in, right out or curb cut removal. South crosswalk realignment and pedestrian refuge North crosswalk realignment to be located adjacent to push button Protected/permitted SB left turns Medium term
46 High-Level Cross Section Cost Estimates
47 High-Level Cross Section Cost Estimates Note: Utility burial assumed for all concepts where curb line moved (Concepts B F) Estimated Costs Concept Timeline Low High Concept A: Within Existing Width (4 lane) Short term $139,000 $169,000 Concept A: Within Existing Width (3 lane) Medium term $203,000 $243,000 Concept B: 5 Minimum Bike Lanes Long term $2,928,000 $2,973,000 Concept C: Buffered Bike Lanes Long term $5,523,000 $5,568,000 Concept D: On-Street One-Way Cycle Tracks Long term $7,479,000 $7,787,000 Concept E: Raised One-Way Cycle Tracks Long term $12,945,000 Concept F: Raised Two-Way Cycle Track Long term $12,945,000 47
48 Implementation Plan
49 Selecting Preferred Concepts Discussion: Short-, medium-, long-term concepts: Cross sections Intersections Stakeholder votes: One vote per organization/agency/department Voting to support / oppose short- and medium term concepts Voting among long-term concepts Prioritizing new crosswalks 49
50 Preferred Short-Term Concepts Do you support the Short-Term Concepts? Cross-Sections Intersections Cross Street Plattsburg Ave Shore Rd VT 127 Ramps Institute Rd Washington St North St Bike Facilities SB Bike lane Sharrows Bike lane Buffered bike lane Sharrows NB Bike lane Sharrows Bike lane Buffered bike lane Bike lane All intersections: ADA curb ramps and crosswalks on all approaches Audible, pedestrian countdown timers with 5-second (push-button) leading pedestrian intervals (LPI) Bicycle facilities (where provided) maintained through intersection Shore Rd/Heineberg Rd Concept 1: longer crossing times, no right on red, split phasing Shopping Center Concept 1: longer crossing times, no right on red VT 127 Concept 1: remove ramps Institute Rd Concept 1: no right on red, reduce SB lane width after intersection, relocate NB bus shelter 50
51 Preferred Medium-Term Concepts Do you support the Medium-Term Concepts? Cross-Sections Concept A Pilot Project: 4 to 3 lane conversion between Shore Rd and VT 127 ramps Intersections Shore Rd Concept 2: Realign depending willing landowner (ROW donation?) Washington St: raised intersection North St Concept 2: no right on red, parking lot right in/out, realign crosswalks, protect/permit SB left Institute Rd Concept 1 (phase 2) resolve bus driveway and sidewalk alignment
52 Preferred Cross Section Concept Vote for your preferred concept Long-Term Cross Section Concept Final Evaluation Score 3-Lane Segment 2 4-Lane Segment 2 Concept B: 5 Minimum Bike Lanes Concept C: Buffered Bike Lanes Concept D: On-Street One-Way Cycle Tracks Concept E: Raised One-Way Cycle Tracks Concept F: Raised Two-Way Cycle Track
53 Preferred Intersection Concepts Vote for your preferred concept Plattsburg Avenue Concept Timeline Final Score Concept 1: High-speed right eliminated Exclusive pedestrian phase at south crosswalk Concept 2: High-speed right eliminated Right-turn lane eliminated Medium term 3.5 Long term 4.0 Concept 3: Mini-roundabout High-speed right eliminated Right-turn lane eliminated Long term
54 Preferred Intersection Concepts Vote for your preferred concept Ethan Allen Shopping Center Concept Config. Timeline Final Score Concept 1: Pedestrian crossing times long enough for seniors No right on red 3 Lanes Medium term Lanes Short term 2.6 Concept 2: Pedestrian crossing times long enough for seniors No right on red Farrington s Mobile Home Park private drive reconstruction Bamboo Hut sidewalk and curb reconstruction 3 Lanes Long term Lanes Long term
55 Preferred Intersection Concepts Vote for your preferred concept Ethan Allen Parkway Concept Config. Timeline Final Score Concept 1: Little Eagle Bay included in signal High-speed NB right turn lane eliminated Relocate park entrance and add curb extension to further slow right turns Concept 2: Roundabout with dual SB approach lanes and NB rightturn lane, no flare on approaches Relocate park entrance 3 Lanes 4 Lanes Medium term 3.0 Medium term Lanes Long term Lanes Long term
56 Preferred Intersection Concepts Vote for your preferred concept VT 127 Ramps Concept Config. Timeline Final Score Concept 1: Remove high-speed NB and WB right turn lanes 3 Lanes Medium term Lanes Short term 3.5 Concept 2: Remove high-speed NB and WB right-turn lanes Dual SB left-turn lanes Concept 2: Remove high-speed NB rightturn lane Roundabout with dual SB approach lanes, a WB rightturn bypass lane, and no flare on approaches 3 Lanes Long term Lanes Long term Lanes Long term Lanes Long term
57 Preferred Intersection Concepts Vote for your preferred concept Institute Rd Concept Timeline Final Score Concept 1: No right on red Reduce intersection footprint Relocate NB bus stop to far side Resolve bus driveway access Concept 2: Roundabout with SB right-turn bypass and no flare on approaches Resolve bus driveway access Short term 3.4 Long term
58 Preferred Pedestrian Crossing Locations Narrow list to 3 5 high priority pedestrian crossings (see map handout for locations): Gosse Ct Green Acres Dr / Cayuga Ct Loaldo Dr Saratoga Ave Killarney Dr / Village Green Dr Lakewood Pkwy Poirier Pl Burlington College Ward St 58
59 Next Steps Draft implementation plan Advisory Committee Review ( ) Draft report TEUC Meeting (July) City council meeting acceptance of the plan (July/August) Final report (September) 59
BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.
Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation
Florida Avenue Multimodal Transportation Study. June 19, 2013
Florida Avenue Multimodal Transportation Study June 19, 2013 Today s Agenda Team & project introduction Project Timeline What you said Tools we use Mapped data and what clues it can provide Highlights
Measuring the Street:
Measuring the Street: New Metrics for 21st Century Streets 1 Measuring the Street: New Metrics for 21st Century Streets New York City s streets are constantly called on to the meet new and varied needs
ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES
How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all
Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High
Multi-Modal Corridor Degree of Complexity: Cost/Benefit: Maintain the same level of service for Ensures continuous flow through the Might impact other transportation Consider road diet and/or different
Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013
Near Westside Neighborhood and University Avenue Corridor Transportation Study Public Workshop #2 September 12 and 23, 2013 Presentation Outline: Brief Review of Study Scope, Background, and Current Conditions
Topic 2 11/28/2012 Blocks & Street Network
TOPIC 2 Blocks & Street Network Implementation Note: 1. Some recommendations are summarized in the tables herein. For complete recommendation language, please see the. 2. Recommendations referenced in
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must
Goals & Objectives. Chapter 9. Transportation
Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system
Light Rail Transit in Phoenix
4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February
Harlem River Bridges Access Plan
Harlem River Bridges Access Plan Workshop Round 2 September 10, 2015 Harlem River Bridges Access Plan: Overview Agenda Presentation: Background + overview of concepts for review (15 20 min) Participation:
Improving Access in Florida International University Biscayne Bay Campus Executive Summary
EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared
Developing Street Standards That Allow Flexibility
Developing Street Standards That Allow Flexibility ABSTRACT GWEN OWENS City of Sacramento 927 10th Street Sacramento, CA 95814 [email protected] The City of Sacramento, California, recently updated its
Downtown Tampa Transportation Vision
Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org
Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps
Lincoln Downtown Master Plan Update
Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating
SECTION 6: TRANSPORTATION
6.0 INTRODUCTION SECTION 6: TRANSPORTATION This section covers the design of the transportation system including but not limited to roadways, lanes, sidewalks and pathways located within road right of
Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street
City of Seattle Department of Transportation Stone Way N Rechannelization: Before and After Study N 34th Street to N 50th Street May, 2010 INTRODUCTION Population density in Seattle is increasing within
IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY
IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY The term " Complete Streets" describes a comprehensive, integrated transportation network with
Accident Analysis of Sheridan Road between Isabella Street and South Boulevard
Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Prepared for TranSystems Corporation for the City of Evanston Submitted by Regina Webster & Associates, Inc. Date: 08/15/2008
Tier 1 Strategies. WV Route 14 Corridor Management Plan
1.1 1.2 1.3 1.4 Signal timing optimization system improvements. Improve geometry traffic control at high crash intersections. Construct intersection capacity improvement projects. Widen longer sections
BIKEWAY TYPOLOGIES COMPLETE STREETS WORKSHOP JULY 2014. John Cock, Principal/Planner Alta Planning + Design
BIKEWAY TYPOLOGIES COMPLETE STREETS WORKSHOP JULY 2014 John Cock, Principal/Planner Alta Planning + Design Alta Planning + Design Creating active communities where bicycling and walking are safe, healthy,
AGENCY COORDINATION AND PUBLIC INVOLVEMENT
5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included
OVERVIEW PROJECT SUMMARY
OVERVIEW Cesar Chavez showcases how to successfully redesign a primary arterial route into a neighborhood destination, improving modal share, water sensitive design, biodiversity and safety whilst maintaining
N Street Protected Bikeway
N Street Protected Bikeway The N Street Protected Bikeway project was identified in the 2005 City of Lincoln Downtown Master Plan and the 2012 Downtown Master Plan Update as the completion of the last
KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs
KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality
BETTER STREETS PLAN SAN FRANCISCO POLICIES AND GUIDELINES FOR THE PEDESTRIAN REALM DRAFT PLAN RELEASE PACKET JUNE 2008. inside:
SAN FRANCISCO BETTER STREETS PLAN POLICIES AND GUIDELINES FOR THE PEDESTRIAN REALM DRAFT PLAN RELEASE PACKET JUNE 2008 inside: LETTER FROM MAYOR GAVIN NEWSOM EXECUTIVE SUMMARY SAN FRANCISCO PLANNING DEPARTMENT
How To Improve Safety
Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,
Revised January 2015. Bicycle Policy & Design Guidelines Maryland State Highway Administration
Revised January 2015 Bicycle Policy & Design Guidelines Maryland State Highway Administration RECORD OF CHANGES TO THE MAY 2013 BICYCLE POLICY & DESIGN GUIDELINES Introduction The 2013 Bicycle Policy &
Alternatives Evaluation Overview
Alternatives Evaluation Overview 124 Alternatives were analyzed against the evaluation criteria Criteria and criteria weighting were set by the Community Task Force Ratings were quantitative and qualitative
Executive Summary. Transportation Needs CHAPTER. Existing Conditions
CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in
EPA Technical Assistance for Sustainable Communities Building Blocks
EPA Technical Assistance for Sustainable Communities Technical Assistance Tool: Complete Streets Deerfield Beach, Florida February 16, 2012 To: CC: Amanda Martinez, City of Deerfield Beach Roger Millar,
8+ %!0"% 8+1!%"'$%,$"$
8+ 8+ %!0"% The next step in developing recommendations for improvements to Grand Avenue was to identify, develop and evaluate alternatives to address the issues and needs identified in the previous chapter.
AN ALTERNATIVE PROPOSAL FOR THE RECONSTRUCTION OF ELMWOOD AVENUE
AN ALTERNATIVE PROPOSAL FOR THE RECONSTRUCTION OF ELMWOOD AVENUE logos here e City s plan for the reconstruction of Elmwood Avenue basically rebuilds the road from the Scajaquada Expressway to Forest Avenue,
SAFE Streets for CHICAGO
Overview Each day, hundreds of thousands of Chicagoans walk or drive in the city. Ensuring their safety is the City s top priority. Over the past several years, Chicago has developed many successful strategies
These "rules of the road" are based on Texas Transportation Code statutes. Find the complete bicycle code at the bottom of the page
Texas Bicycle Laws These "rules of the road" are based on Texas Transportation Code statutes. Find the complete bicycle code at the bottom of the page Bicyclists have the rights and duties of other vehicle
HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015
HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 PROPOSED REDEVELOPMENT The project consists of demolishing
Greg Stuart, Executive Director, Broward MPO
Diana Alarcon, Director, Transportation & Mobility Dept. Darlene Pfeiffer, CAPP, Business Manager Renee Cross, AICP, LEED AP, Principal Planner Kevin Walford, Transportation Planner Greg Stuart, Executive
Protected Bicycle Lanes in NYC
Protected Bicycle Lanes in NYC New York City Department of Transportation Polly Trottenberg, Commissioner September 2014 NEW YORK CITY DEPARTMENT OF TRANSPORTATION 1 Overview Since 2007, the New York City
City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN
Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,
ADA POST INSPECTION CHECKLIST. Job No. Route County Location
ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks
Schenk-Atwood Neighborhood Business District Master Plan
Schenk-Atwood Neighborhood Business District Master Plan Prepared for the Schenk-Atwood Revitalization Association (SARA) and the City of Madison SCHREIBER/ANDERSON ASSOCIATES, INC. BEST Real Estate Group,
Implementation Strategy
Implementation Strategy 6 The following implementation strategy defines strategic points of intervention for complete streets programming, including visioning, goal-setting, local agency plans, coordination
Aerial View E Looking West
Figure 3-9 Aerial View E Looking West 3-19 Urban Design Figure 3-10 Aerial View F Looking North West 3-20 Urban Design Figure 3-11 Skyline and Massachusetts Avenue Gateway 3-21 Urban Design 4.0 TRANSPORTATION
MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements
MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850
Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011
Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for
Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.
Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library
Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay
Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay Peter Hsu, P.E. FDOT District Seven Safety Office Presentation Overview FDOT Traffic Safety Focus Areas
DESIGN ASSISTANCE APPLICATION
DESIGN ASSISTANCE APPLICATION for FY 2016 NEW RIVER MULTI USE PATH: PINNACLE PEAK ROAD TO HAPPY VALLEY ROAD CITY OF PEORIA APPLICATIONS ARE DUE VIA ONLINE SUBMITTAL BY 10:00 AM ON MONDAY, JUNE 29, 2015
MEMORANDUM. Robert Nichols, Acting Corridor Design Manager Northgate Link Extension
MEMORANDUM DATE: September 23, 2014 TO: Robert Nichols, Acting Corridor Design Manager Northgate Link Extension FROM: SUBJECT: COPIES: Katherine Casseday, PE, PTOE, Casseday Consulting Tony Lo, PE, Parsons
- FREE! - The Official San Francisco BIKE GUIDE. 1st Edition
- FREE! - The Official San Francisco BIKE GUIDE 1st Edition SF BIKE LAWS SAN FRANCISCO BICYCLISTS MUST: Yield to People Walking Whether they re in a crosswalk or not, ALWAYS yield to people walking. Stop
Pedestrian & Bicycle Plan
RAMSEY COMMUNITIES COUNTYWIDE Pedestrian & Bicycle Plan PRIMER: LEGAL FRAMEWORK PRIMER: LEGAL FRAMEWORK Walking and Biking for All e 2 CHAPTER 2: Walking and Biking for All This page intentionally left
Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City
Mayors Welcome Strong Surrey Votes Yes Coalition Support Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City February 11, 2015 Vancouver, BC The Mayors Council on Regional Transportation
Corridor Goals and Objectives
Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty
FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM
CITYOFOBERLIN OHIO CITY OF OBERLIN, OHIO FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM Background In October, 2011, the City of Oberlin Planning
Review Public Input Report Jenn Toothaker. Approval of Meeting Summaries: May 21, May 23, May 30, & June 20, 2013 Meetings
Call to the Audience Guidelines 2 Call to the Audience opportunities Must fill out participant card Participants called in the order cards are received 3 minutes allowed per participant CTF Facilitator
Pavement Management Program
Pavement Management Program 2014 Street Maintenance Program Executive Summary 01/21/2014 Presented by Mark Thiel Assistant Director of Public Works Program Overview Start of current program 2005 825.1
Citizen Advisory Group Meeting #1 December 8, 2011 6:00 p.m.
Citizen Advisory Group Meeting #1 December 8, 2011 6:00 p.m. Meeting Agenda 1. Background Information 2. Policy Framework 3. Plan Development Process 4. Public Input Results 5. Vision Statement 6. Group
Downtown Louisville Two-Way Street Study
Final Draft Report Downtown Louisville Two-Way Street Study Submitted to Downtown Development Corporation Submitted by ENTRAN, PLC Submitted October 2009 Table of Contents Introduction Study Purpose...1
Bicycle riding is a great way to get into shape
Bicycle riding is a great way to get into shape and have fun. To remain safe on Illinois roads, it is important to follow the same traffic safety laws that govern vehicle drivers. No amount of bicycle
3 Tappan Zee Bridge Rehabilitation Options
3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:
Smart Cycling IN SANTA MONICA SANTA MONICA POLICE DEPARTMENT BE SMART. BE VISIBLE. BE ATTENTIVE. HAVE FUN!
Smart Cycling IN SANTA MONICA BE SMART. BE VISIBLE. BE ATTENTIVE. HAVE FUN! Safety Tips and Rules of the Road for Cyclists SANTA MONICA POLICE DEPARTMENT Rules of the Road Drivers, bicyclists, and pedestrians
KYTC, District 2 Chief District Engineer KYTC, District 2 Planning Supervisor & LPA Coordinator. KYTC, Central Office Planning
MINUTES Field Visit for Local Officials and Stakeholders Bluegrass Crossings Regional Business Centre Improved Access Road Study Ritatsu Manufacturing (Board Room) Beaver Dam, Kentucky June 11, 2014 1:30
Bicycle Safety Quiz Answers Parental Responsibilities
Bicycle riding is a great way to get into shape and enjoy the outdoors. To remain safe on Illinois roads, it is important to follow the same traffic safety laws that govern vehicle drivers. No amount of
Is Encouraging More Bike Ridership On El Camino Real A Good Idea?
Is Encouraging More Bike Ridership On El Camino Real A Good Idea? In the above illustration there is a shared right turn lane on southbound El Camino Real at the intersection with Santa Cruz Avenue. Turning
UNEP recommendations to KURA on Improving Safety and Reducing Congestion on UN Avenue (7 October 2009; revised 23 November 2009)
UNEP recommendations to KURA on Improving Safety and Reducing Congestion on UN Avenue (7 October 2009; revised 23 November 2009) UN Avenue extends for 2 km between Limuru Road and Ruaka Road (Runda Roundabout).
Tennessee Traffic Laws Relating to Bicycles A HANDBOOK FOR MOTORISTS & BICYCLISTS
Tennessee Traffic Laws Relating to Bicycles A HANDBOOK FOR MOTORISTS & BICYCLISTS About the Knoxville Regional Bicycle Program The Knoxville Regional Transportation Planning Organization (TPO) coordinates
Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016
Rapid City Downtown Area Master Plan Draft Plan Concepts April 2016 CALL TO ACTION! A Thriving Downtown = Regional Economic Prosperity Rapid City is competing nationally for a limited supply of young skilled
Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL
Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois
CHAPTERTWO. Alternatives 2.1 ALTERNATIVES DEVELOPMENT PROCESS
2. Section 2 TWO CHAPTERTWO 2.1 ALTERNATIVES DEVELOPMENT PROCESS This EIS has been prepared in compliance with the Council on Environmental Quality (CEQ) regulations for implementing NEPA (40 CFR 1500-1508).
Surface Transportation Program (STP)
Project Name: Project Sponsor: FEDERAL FUNDS PROJECT APPLICATION TRANSPORTATION IMPROVEMENT PROGRAM 2008-2013 SALT LAKE and OGDEN/ LAYTON URBAN AREAS Surface Transportation Program (STP) Urban Surface
The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.
3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation
College of Southern Maryland. Hughesville Transportation Study
College of Southern Maryland Project Overview Existing Conditions Transit Service Land Use CSM Student Demographics Recommendations Methodology Transit Recommendations Transportation Demand Management
Needs Analysis. Long Beach Bicycle Master Plan. Bicycle Commuter Needs. LONG BEACH BICYCLE MASTER PLAN Needs Analysis
Long Beach Bicycle Master Plan Needs Analysis The purpose of reviewing the needs of commuter and recreational bicyclists is twofold: (1) it is instrumental when planning a system which must serve both
REGIONAL NON-MOTORIZED TRANSPORTATION NETWORK
Chapter 10 Bicycle and Pedestrian SAFETEA-LU legislation requires that non-motorized users be considered in the LRTP. The legislation allows for bicycle and pedestrian safety to be incorporated into the
6: LANE POSITIONS, TURNING, & PASSING
6: LANE POSITIONS, TURNING, & PASSING BASIC LANE POSITIONS Traffic law says that slower vehicles should stay to the right. But where exactly should bicycles ride? Here are some basics. Never Ride Against
TEST ON Driving Safely Among Bicyclists and Pedestrians
TEST ON Driving Safely Among Bicyclists and Pedestrians Next you will take a 16 question test about driving safely among bicyclists and pedestrians. Please take out a sheet of paper to mark down and score
San Francisco Complete Streets Strategy
San Francisco Complete Streets Strategy Timothy Papandreou Deputy Director Sustainable Streets 2013 Sacramento 2 million San Francisco Bay Area 8 million Central Valley 4 million Los Angeles 19 million
Route Development Plan
WSDOT Northwest Washington Division, Planning and Policy Office Route Development Plan State Route 99 North/Aurora Avenue North From the North end of the Battery Street Tunnel (Mile Post 32.44) to N. 145th
City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address
City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address July 005 Prepared by DMCG Disability Management Consulting Group L.L.C. 801 Jonquil Place Columbia, MO 650 In
