North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014

Size: px
Start display at page:

Download "North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014"

Transcription

1 North Avenue Corridor Study Advisory Committee Meeting #5 June 11, 2014

2 Agenda Welcome and introductions Concept refinement and evaluation: Public meeting and web survey General cross-section concepts pros and cons Intersection concepts Evaluation matrix/scores Estimated costs Advisory Committee recommendations for Corridor Implementation Plan: Short-, medium-, long-term Next steps, potential AC meeting #6 2

3 Public Input Public meeting outcome: 85 attendees! Voting for cross-sections is not useable Online input tool results (ongoing): Cross section voting is not as high not as many people noticed the second tab, but new FPF post and reminder is going out this week Long-term cross section concepts: no strong results, but buffered bike lanes and on-street cycle tracks (1-way) seem to be preferred vote margins are closest or slightly showing a majority of favorable votes for this concept over the others Roundabout is preferred at VT 127 ramps but not at Institute Rd North St permitted/protected left is preferred 3

4 Short, Medium, & Long Term Processes Short term = minimal design, public process as required for regulatory changes Medium term = design needed, public process included in design process Long term = evaluation, scoping and design needed, public process included throughout 4

5 Cross Section Concepts

6 Corridor-wide Improvements Short term: Parking on one side, where present Bike facilities where feasible 1 3 additional bus shelters (depends on funding, site restrictions and land availability) 3 5 high priority pedestrian crossings: Gosse Ct, Green Acres Dr / Cayuga Ct, Loaldo Dr, Saratoga Ave, Killarney Dr / Village Green Dr, Lakewood Pkwy, Poirier Pl, Burlington College, Ward St Medium term: Remaining pedestrian crossings Additional bus shelters at high use stops 15-minute peak bus service and new Sunday service Gateway treatments: Plattsburg Ave, VT 127 ramps, Washington St, and North St Long term: Stormwater treatments Planting strip: landscaping, lighting, and utilities Gateway treatments 6

7 Revisions to Cross Section Concepts Since the last AC meeting Maintained 4-lane concept for short-term (30 mph) Removed Concept A1 (sharrows in both directions) between Washington St and North St 11 paved lane width (10.5 striped lanes) adjacent to curb or onstreet parking* Wider separated bicycle facilities: 5 7 on-street one-way cycle tracks (was 5 ) 6.5 raised one-way cycle tracks* (was 5 ) 12 raised two-way cycle track* (was 10 ) 3 minimum cycle track buffer* (was 2 ) paved delineation between sidewalk/raised cycle tracks * Narrower dimensions between Shore Rd to VT 127 ramps if maintaining 4 lanes 7

8 Short-Term Cross-Section Concepts Short-term concepts = within existing street width Concept A: Cross Street Plattsburg Ave Shore Rd VT 127 Ramps Institute Rd Washington St Bike Facilities SB Bike lane Sharrows Bike lane Buffered bike lane Sharrows NB Bike lane Sharrows Bike lane Buffered bike lane Bike lane Local Motion Concept: Two-way on-street cycle track on west (SB) side of North Ave 3-lane configuration from Shore Rd to VT 127 ramps Washington St to North St options: With parking Without parking North St 8

9 Short-Term Cross Sections: Pros and Cons Concept A: Local Motion Concept: Pros: Improved cycling facilities Feasible: constructability, cost, relatively straightforward design Greater political support Cons: Discontinuous bicycle facilities Conventional bike lanes more stressful for cyclists than separated facilities Pros: Better protection for cyclists (Potentially) continuous cycle track Cons: Safety concerns with lane widths and at SB bus stops Incompatible with 4-lane segment High costs for short-term solution New signals, flexible posts Less political support as a shortterm solution: 3-lane conversion from Shore to 127 Potential loss of parking south of Washington 9

10 Medium-Term Cross-Section Concept Medium-term concepts = minor reconstruction Concept A Pilot Project: 4- to 3-lane conversion between Shore Rd and VT 127 ramps 10

11 Medium-Term Concepts for the Cross Sections Public feedback: Greater preference for 3-lane cross section from the public workshops and the online input tool Pros: Safer conditions for all users Space for continuous bicycle facilities Calmed traffic (25 mph) Simpler left turns dedicated left-turn lanes and fewer blind spots Enables long-term concepts compatible with NACTO and Burlington Complete Streets Guidelines recommended dimensions Evaluated as a pilot project Cons: Some increased delay at intersections 11

12 Long-Term Concepts for the Cross Sections Long-term concepts = new curbs, corridor reconstruction Concept B: 5 minimum bike lanes Concept C: Buffered bike lanes Concept D: On-street one-way cycle tracks Concept E: Raised one-way cycle tracks Concept F: Raised two-way cycle track (SB side) revisit during Evaluation portion of agenda 12

13 Long-Term Concepts for the Cross Sections Concept B: 5 Minimum Bike Lanes 13

14 Long-Term Concepts for the Cross Sections Concept C: Buffered Bike Lanes 14

15 Long-Term Concepts for the Cross Sections Concept D: On-Street One-Way Cycle Tracks 15

16 Long-Term Concepts for the Cross Sections Concept E: Raised One-Way Cycle Tracks 16

17 Long-Term Concepts for the Cross Sections Concept F: Raised Two-Way Cycle Track (SB Side) 17

18 Intersection Concepts

19 Revisions to Intersection Concepts Since the last AC meeting Added 4-lane concept at Shore Rd, Ethan Allen Shopping Center, Ethan Allen Pkwy, and VT 127 ramps Plattsburg Ave: Concept 1 and 2: Added no right on red Concept 2: South crosswalk LPI instead of exclusive pedestrian phase due to narrow roadway width Ethan Allen Pkwy: Concept 1: Relocated park entrance for signalized intersection concept Concept 2: Larger roundabout North St: Removed Concept 1 (split phasing) Concept 2: Added south crosswalk pedestrian refuge Slight realignment of north crosswalk to meet pedestrian push button Right in, right out at parking lot access point near Depot St 19

20 Short-Term Corridor-wide Intersection Improvements All intersections include the following short-term improvements: ADA curb ramps and crosswalks on all approaches Audible, pedestrian countdown timers with 5-second (push-button) leading pedestrian intervals (LPI) Bicycle facilities (where provided) maintained through intersection, for example: Combined bike lane/turn lane Crossbike markings 20

21 Short-Term Concepts for Intersections Short-Term: Shore Rd/Heineberg Rd: Concept 1* Ethan Allen Shopping Center: Concept 1* VT 127 Ramps: Concept 1* * 3-lane versions of these concepts are proposed for the medium term only Institute Rd: Concept 1 All approaches are LOS D or better, unless noted 21

22 Short-Term Concepts for Intersections Shore Rd/Heineberg Rd: Concept 1 (4 Lane) (3 lane concept medium term only) Pedestrian crossing times long enough for seniors No right on red Split phasing Ethan Allen Shopping Center: Concept 1 (4 Lane) (3 lane concept medium term only) Pedestrian crossing times long enough for seniors No right on red 22

23 Short-Term Concepts for Intersections VT 127 Ramps: Concept 1 (4 Lane) (3 lane concept medium term only) Remove high-speed NB on-ramp Remove free WB right-turn Institute Rd: Concept 1 No right on red Reduce intersection footprint Relocate NB bus shelter 23

24 Medium-Term Concepts for Intersections Medium Term: Plattsburg Ave: Concept 1 Shore: Concept 2 (*ROW) (3- or 4-lane concept) Ethan Allen Pkwy: Concept 1 (3- or 4-lane concept) Washington St: raised intersection North St: Concept 2 Institute Rd: Concept 1 phase 2 (NB bus shelter relocation, resolve bus driveway and sidewalk alignment) All approaches LOS D or better, unless noted 24

25 Medium-Term Concepts for Intersections Plattsburg Ave: Concept 1 No right on red High-speed NB right eliminated w/ curb extension Exclusive pedestrian phase at south crosswalk Shore Rd/Heineberg Rd: Concept 2 (3 Lane) (or 4-lane concept) Pedestrian crossing times long enough for seniors No right on red Shore Rd realignment 25

26 Medium-Term Concepts for Intersections Ethan Allen Pkwy: Concept 1 (3 Lane) (or 4-lane concept) Little Eagle Bay included in signal High-speed NB right eliminated w/ curb extension Relocate Ethan Allen Park entrance LOS E (3 lane)/los D (4 lane) EA Pkwy in AM peak North St: Concept 2 No right on red Parking lot right in, right out or curb cut removal North and south crosswalk realignment Protected/permitted SB left turns 26

27 Long-Term Concepts for Intersections Long Term: Plattsburg Ave: Concept 2 and 3 Ethan Allen Shopping Center: Concept 2 (3- or 4-lane concept) Ethan Allen Pkwy: Concept 2 (3- or 4-lane concept) VT 127 ramps: Concept 2 and 3 (3- or 4-lane concept) Institute Rd: Concept 2 All approaches LOS D or better, unless noted 27

28 Long-Term Concepts for Intersections Plattsburg Ave: Concept 2 Plattsburg Ave: Concept 3 No right on red Mini-roundabout (no flare on approaches) High-speed NB right eliminated w/ curb extension High-speed NB right eliminated w/ curb extension Consolidated NB through/right turn lane Consolidated NB through/right turn lane 28

29 Long-Term Concepts for Intersections Ethan Allen Shopping Center: Concept 2 (3 Lane) (or 4-lane concept) Pedestrian crossing times long enough for seniors No right on red Farrington s Mobile Home Park private drive and Bamboo Hut sidewalk and curb reconstruction Institute Rd: Concept 2 Roundabout with SB right-turn lane (no flare on approaches) Resolve bus driveway access 29

30 Long-Term Concepts for Intersections Ethan Allen Parkway: Concept 2 (3 Lane) Roundabout with dual SB approach lanes and NB right-turn lane, no flare on approaches. Relocate Ethan Allen Park entrance LOS E SB in AM peak, LOS E NB and WB in PM peak Ethan Allen Parkway: Concept 2 (4 Lane) Roundabout with dual SB and NB approach lanes, no flare on approaches. Relocate Ethan Allen Park entrance LOS E WB in AM peak, LOS E EB in PM peak 30

31 Long-Term Concepts for Intersections VT 127 ramps: Concept 2 (3 Lane) (or 4-lane concept) Remove high-speed NB on-ramp Remove free WB right-turn Dual SB left-turn lanes VT 127 ramps: Concept 3 (3 Lane) (or 4-lane concept) Roundabout with dual SB approach lanes and WB right-turn bypass lane (no flare on approaches) Remove high-speed NB on-ramp 31

32 Concept Evaluation

33 Concept Evaluation North Ave vision and goals Design guidelines Level of traffic stress Health Evaluation matrix criteria: Burlington Complete Street Design Guidelines Improves safety for all users Balances transportation choices Improves multimodal connectivity Impacts right-of-way Maintainability 33

34 Corridor Vision North Avenue will provide for safe, inviting, and convenient travel for all users of all ages and abilities including motorists, pedestrians, bicyclists, and public transportation riders. The need to move people through the corridor will be balanced with the need to provide access to homes, businesses, and local institutions. The corridor will develop into an attractive public space through creative streetscape, signage, and other site design features. The corridor will become more livable and desirable by promoting social interaction and public health. 34

35 Goals for Proposed Improvements Remake the North Ave corridor into a Complete Street that accommodates the safe and efficient travel for all users of all abilities and provides transportation choices. Improve safety for all users. Provide a range of convenient and efficient travel options and improve multimodal connections. Develop strategies that support vibrant and livable neighborhoods in the New North End; enhance the quality of life of residents and visitors; and support sustainable economic growth. 35

36 Scoring Scores range from 1 to 5, higher is better Scores are relative to existing conditions: 1 point Much worse than existing conditions 2 points Worse than existing conditions 3 points Approximately the same as existing conditions 4 points Better than existing conditions 5 points Much better than existing conditions Results are averages of scoring criteria: Subtotals are averages for a limited number of criteria grouped by study goals Final score is an average across all criteria 36

37 Cross Section Evaluation Results Short Term Concept Existing Conditions: No Build Concept A: Within Existing Width Config. Medium Term Concept Concept A: Within Existing Width + 4-to-3-Lane Conversion Burlington Complete Streets Consistency Improves Safety for All Users Improves Multimodal Connectivity ROW Impacts Final Score 4 Lanes Lanes Config. Burlington Complete Streets Consistency Improves Safety for All Users Improves Multimodal Connectivity ROW Impacts Maintainability Maintainability Final Score 3 Lanes

38 Cross Section Evaluation Results Long Term Concept Concept B: 5 Minimum Bike Lanes Concept C: Buffered Bike Lanes Concept D: One-Way On-Street Cycle Tracks Concept E: One-Way Raised Cycle Tracks Concept F: Two-Way Raised Cycle Track Config. Burlington Complete Streets Consistency Improves Safety for All Users Improves Multimodal Connectivity ROW Impacts Maintainability Final Score 3 Lanes Lanes Lanes Lanes Lanes Lanes Lanes Lanes Lanes Lanes

39 Intersection Evaluation Results Plattsburg Avenue Concept Existing Configuration (No Build) Timeline Balances Transportation Choices Improves Safety for All Users ROW Impacts Final Score Short term Concept 1: High-speed right eliminated Exclusive pedestrian phase at south crosswalk Concept 2: High-speed right eliminated Right-turn lane eliminated Concept 3: Mini-roundabout High-speed right eliminated Right-turn lane eliminated Medium term Long term Long term

40 Intersection Evaluation Results Shore Road/Heineberg Road Concept Config. Timeline Balances Transportation Choices Improves Safety for All Users ROW Impacts Final Score Existing Configuration (No Build) 4 Lanes Short term Concept 1: Pedestrian crossing times long enough for seniors No right on red Split phasing Concept 2: Pedestrian crossing times long enough for seniors No right on red Shore Rd realignment 3 Lanes Medium term Lanes Short term Lanes 4 Lanes Medium term Medium term

41 Intersection Evaluation Results Ethan Allen Shopping Center Concept Config. Timeline Balances Transportation Choices Improves Safety for All Users ROW Impacts Final Score Existing Configuration (No Build) 4 Lanes Short term Concept 1: Pedestrian crossing times long enough for seniors No right on red 3 Lanes Medium term Lanes Short term Concept 2: Pedestrian crossing times long enough for seniors No right on red Farrington s Mobile Home Park private drive reconstruction Bamboo Hut sidewalk and curb reconstruction 3 Lanes Long term Lanes Long term

42 Intersection Evaluation Results Ethan Allen Parkway Concept Config. Timeline Balances Transportation Choices Improves Safety for All Users ROW Impacts Final Score Existing Configuration (No Build) 4 Lanes Short term Concept 1: Little Eagle Bay included in signal High-speed NB right turn lane eliminated Relocate park entrance and add curb extension to further slow right turns Concept 2: Roundabout with dual SB approach lanes and NB rightturn lane, no flare on approaches Relocate park entrance 3 Lanes 4 Lanes Medium term Medium term Lanes Long term Lanes Long term

43 Intersection Evaluation Results VT 127 Ramps Concept Config. Timeline Balances Transportation Choices Improves Safety for All Users ROW Impacts Final Score Existing Configuration (No Build) 4 Lanes Short term Concept 1: Remove high-speed NB and WB right turn lanes 3 Lanes Medium term Lanes Short term Concept 2: Remove high-speed NB and WB right-turn lanes Dual SB left-turn lanes Concept 2: Remove high-speed NB rightturn lane Roundabout with dual SB approach lanes, a WB rightturn bypass lane, and no flare on approaches 3 Lanes Long term Lanes Long term Lanes Long term Lanes Long term

44 Intersection Evaluation Results Institute Rd Concept Timeline Balances Transportation Choices Improves Safety for All Users ROW Impacts Final Score Existing Configuration (No Build) Short term Concept 1: No right on red Reduce intersection footprint Relocate NB bus stop to far side Resolve bus driveway access Concept 2: Roundabout with SB right-turn bypass and no flare on approaches Resolve bus driveway access Short term Long term

45 Intersection Evaluation Results North St Concept Existing Configuration (No Build) Timeline Balances Transportation Choices Improves Safety for All Users ROW Impacts Final Score Short term Concept 1: Removed Concept 2: No right on red Parking lot right in, right out or curb cut removal. South crosswalk realignment and pedestrian refuge North crosswalk realignment to be located adjacent to push button Protected/permitted SB left turns Medium term

46 High-Level Cross Section Cost Estimates

47 High-Level Cross Section Cost Estimates Note: Utility burial assumed for all concepts where curb line moved (Concepts B F) Estimated Costs Concept Timeline Low High Concept A: Within Existing Width (4 lane) Short term $139,000 $169,000 Concept A: Within Existing Width (3 lane) Medium term $203,000 $243,000 Concept B: 5 Minimum Bike Lanes Long term $2,928,000 $2,973,000 Concept C: Buffered Bike Lanes Long term $5,523,000 $5,568,000 Concept D: On-Street One-Way Cycle Tracks Long term $7,479,000 $7,787,000 Concept E: Raised One-Way Cycle Tracks Long term $12,945,000 Concept F: Raised Two-Way Cycle Track Long term $12,945,000 47

48 Implementation Plan

49 Selecting Preferred Concepts Discussion: Short-, medium-, long-term concepts: Cross sections Intersections Stakeholder votes: One vote per organization/agency/department Voting to support / oppose short- and medium term concepts Voting among long-term concepts Prioritizing new crosswalks 49

50 Preferred Short-Term Concepts Do you support the Short-Term Concepts? Cross-Sections Intersections Cross Street Plattsburg Ave Shore Rd VT 127 Ramps Institute Rd Washington St North St Bike Facilities SB Bike lane Sharrows Bike lane Buffered bike lane Sharrows NB Bike lane Sharrows Bike lane Buffered bike lane Bike lane All intersections: ADA curb ramps and crosswalks on all approaches Audible, pedestrian countdown timers with 5-second (push-button) leading pedestrian intervals (LPI) Bicycle facilities (where provided) maintained through intersection Shore Rd/Heineberg Rd Concept 1: longer crossing times, no right on red, split phasing Shopping Center Concept 1: longer crossing times, no right on red VT 127 Concept 1: remove ramps Institute Rd Concept 1: no right on red, reduce SB lane width after intersection, relocate NB bus shelter 50

51 Preferred Medium-Term Concepts Do you support the Medium-Term Concepts? Cross-Sections Concept A Pilot Project: 4 to 3 lane conversion between Shore Rd and VT 127 ramps Intersections Shore Rd Concept 2: Realign depending willing landowner (ROW donation?) Washington St: raised intersection North St Concept 2: no right on red, parking lot right in/out, realign crosswalks, protect/permit SB left Institute Rd Concept 1 (phase 2) resolve bus driveway and sidewalk alignment

52 Preferred Cross Section Concept Vote for your preferred concept Long-Term Cross Section Concept Final Evaluation Score 3-Lane Segment 2 4-Lane Segment 2 Concept B: 5 Minimum Bike Lanes Concept C: Buffered Bike Lanes Concept D: On-Street One-Way Cycle Tracks Concept E: Raised One-Way Cycle Tracks Concept F: Raised Two-Way Cycle Track

53 Preferred Intersection Concepts Vote for your preferred concept Plattsburg Avenue Concept Timeline Final Score Concept 1: High-speed right eliminated Exclusive pedestrian phase at south crosswalk Concept 2: High-speed right eliminated Right-turn lane eliminated Medium term 3.5 Long term 4.0 Concept 3: Mini-roundabout High-speed right eliminated Right-turn lane eliminated Long term

54 Preferred Intersection Concepts Vote for your preferred concept Ethan Allen Shopping Center Concept Config. Timeline Final Score Concept 1: Pedestrian crossing times long enough for seniors No right on red 3 Lanes Medium term Lanes Short term 2.6 Concept 2: Pedestrian crossing times long enough for seniors No right on red Farrington s Mobile Home Park private drive reconstruction Bamboo Hut sidewalk and curb reconstruction 3 Lanes Long term Lanes Long term

55 Preferred Intersection Concepts Vote for your preferred concept Ethan Allen Parkway Concept Config. Timeline Final Score Concept 1: Little Eagle Bay included in signal High-speed NB right turn lane eliminated Relocate park entrance and add curb extension to further slow right turns Concept 2: Roundabout with dual SB approach lanes and NB rightturn lane, no flare on approaches Relocate park entrance 3 Lanes 4 Lanes Medium term 3.0 Medium term Lanes Long term Lanes Long term

56 Preferred Intersection Concepts Vote for your preferred concept VT 127 Ramps Concept Config. Timeline Final Score Concept 1: Remove high-speed NB and WB right turn lanes 3 Lanes Medium term Lanes Short term 3.5 Concept 2: Remove high-speed NB and WB right-turn lanes Dual SB left-turn lanes Concept 2: Remove high-speed NB rightturn lane Roundabout with dual SB approach lanes, a WB rightturn bypass lane, and no flare on approaches 3 Lanes Long term Lanes Long term Lanes Long term Lanes Long term

57 Preferred Intersection Concepts Vote for your preferred concept Institute Rd Concept Timeline Final Score Concept 1: No right on red Reduce intersection footprint Relocate NB bus stop to far side Resolve bus driveway access Concept 2: Roundabout with SB right-turn bypass and no flare on approaches Resolve bus driveway access Short term 3.4 Long term

58 Preferred Pedestrian Crossing Locations Narrow list to 3 5 high priority pedestrian crossings (see map handout for locations): Gosse Ct Green Acres Dr / Cayuga Ct Loaldo Dr Saratoga Ave Killarney Dr / Village Green Dr Lakewood Pkwy Poirier Pl Burlington College Ward St 58

59 Next Steps Draft implementation plan Advisory Committee Review ( ) Draft report TEUC Meeting (July) City council meeting acceptance of the plan (July/August) Final report (September) 59

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project. Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation

More information

Florida Avenue Multimodal Transportation Study. June 19, 2013

Florida Avenue Multimodal Transportation Study. June 19, 2013 Florida Avenue Multimodal Transportation Study June 19, 2013 Today s Agenda Team & project introduction Project Timeline What you said Tools we use Mapped data and what clues it can provide Highlights

More information

Measuring the Street:

Measuring the Street: Measuring the Street: New Metrics for 21st Century Streets 1 Measuring the Street: New Metrics for 21st Century Streets New York City s streets are constantly called on to the meet new and varied needs

More information

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all

More information

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High Multi-Modal Corridor Degree of Complexity: Cost/Benefit: Maintain the same level of service for Ensures continuous flow through the Might impact other transportation Consider road diet and/or different

More information

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013 Near Westside Neighborhood and University Avenue Corridor Transportation Study Public Workshop #2 September 12 and 23, 2013 Presentation Outline: Brief Review of Study Scope, Background, and Current Conditions

More information

Topic 2 11/28/2012 Blocks & Street Network

Topic 2 11/28/2012 Blocks & Street Network TOPIC 2 Blocks & Street Network Implementation Note: 1. Some recommendations are summarized in the tables herein. For complete recommendation language, please see the. 2. Recommendations referenced in

More information

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

Light Rail Transit in Phoenix

Light Rail Transit in Phoenix 4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February

More information

Harlem River Bridges Access Plan

Harlem River Bridges Access Plan Harlem River Bridges Access Plan Workshop Round 2 September 10, 2015 Harlem River Bridges Access Plan: Overview Agenda Presentation: Background + overview of concepts for review (15 20 min) Participation:

More information

Improving Access in Florida International University Biscayne Bay Campus Executive Summary

Improving Access in Florida International University Biscayne Bay Campus Executive Summary EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared

More information

Developing Street Standards That Allow Flexibility

Developing Street Standards That Allow Flexibility Developing Street Standards That Allow Flexibility ABSTRACT GWEN OWENS City of Sacramento 927 10th Street Sacramento, CA 95814 gowens@sacto.org The City of Sacramento, California, recently updated its

More information

Downtown Tampa Transportation Vision

Downtown Tampa Transportation Vision Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

Lincoln Downtown Master Plan Update

Lincoln Downtown Master Plan Update Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating

More information

BENNINGTON LOCAL ROADWAY NETWORK TRAFFIC ANALYSIS

BENNINGTON LOCAL ROADWAY NETWORK TRAFFIC ANALYSIS Documentation for: BENNINGTON LOCAL ROADWAY NETWORK TRAFFIC ANALYSIS Bennington, VT Prepared for: Bennington County Regional Commission & Town of Bennington August 2003 TABLE OF CONTENTS 1.0 INTRODUCTION...1

More information

RESOLUTION NO. 1539 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BONNEY LAKE, PIERCE COUNTY, WASHINGTON, APPROVING THE 192 ND CORRIDOR STUDY AND DIRECTING THE MAYOR TO PROCEED WITH PARTIAL DESIGN AND

More information

SECTION 6: TRANSPORTATION

SECTION 6: TRANSPORTATION 6.0 INTRODUCTION SECTION 6: TRANSPORTATION This section covers the design of the transportation system including but not limited to roadways, lanes, sidewalks and pathways located within road right of

More information

Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street

Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street City of Seattle Department of Transportation Stone Way N Rechannelization: Before and After Study N 34th Street to N 50th Street May, 2010 INTRODUCTION Population density in Seattle is increasing within

More information

IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY

IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY The term " Complete Streets" describes a comprehensive, integrated transportation network with

More information

Presentation to Community Task Force July 9, 2007

Presentation to Community Task Force July 9, 2007 Alternative Evaluation Results Presentation to Community Task Force July 9, 2007 Outline of Presentation Overview of alternative evaluation Alternative evaluation methodology Process and assumptions General

More information

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Prepared for TranSystems Corporation for the City of Evanston Submitted by Regina Webster & Associates, Inc. Date: 08/15/2008

More information

Tier 1 Strategies. WV Route 14 Corridor Management Plan

Tier 1 Strategies. WV Route 14 Corridor Management Plan 1.1 1.2 1.3 1.4 Signal timing optimization system improvements. Improve geometry traffic control at high crash intersections. Construct intersection capacity improvement projects. Widen longer sections

More information

BIKEWAY TYPOLOGIES COMPLETE STREETS WORKSHOP JULY 2014. John Cock, Principal/Planner Alta Planning + Design

BIKEWAY TYPOLOGIES COMPLETE STREETS WORKSHOP JULY 2014. John Cock, Principal/Planner Alta Planning + Design BIKEWAY TYPOLOGIES COMPLETE STREETS WORKSHOP JULY 2014 John Cock, Principal/Planner Alta Planning + Design Alta Planning + Design Creating active communities where bicycling and walking are safe, healthy,

More information

LAKE SHORE DRIVE CTA RED LINE BROADWAY SHERIDAN FOSTER ARGYLE. Pedestrian Access Advisory Committee. April 25, 2014

LAKE SHORE DRIVE CTA RED LINE BROADWAY SHERIDAN FOSTER ARGYLE. Pedestrian Access Advisory Committee. April 25, 2014 FOSTER LAKE SHORE DRIVE CTA RED LINE BROADWAY SHERIDAN ARGYLE ARGYLE STREET STREETSCAPE - S-1-323 Pedestrian Access Advisory Committee BROADWAY ARGYLE CTA RED LINE WINTHROP KENMORE SHERIDAN Broadway -

More information

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Transportation & Mobility projects that meet the following criteria: enhances regional mobility; supports public transit;

More information

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included

More information

OVERVIEW PROJECT SUMMARY

OVERVIEW PROJECT SUMMARY OVERVIEW Cesar Chavez showcases how to successfully redesign a primary arterial route into a neighborhood destination, improving modal share, water sensitive design, biodiversity and safety whilst maintaining

More information

N Street Protected Bikeway

N Street Protected Bikeway N Street Protected Bikeway The N Street Protected Bikeway project was identified in the 2005 City of Lincoln Downtown Master Plan and the 2012 Downtown Master Plan Update as the completion of the last

More information

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality

More information

BETTER STREETS PLAN SAN FRANCISCO POLICIES AND GUIDELINES FOR THE PEDESTRIAN REALM DRAFT PLAN RELEASE PACKET JUNE 2008. inside:

BETTER STREETS PLAN SAN FRANCISCO POLICIES AND GUIDELINES FOR THE PEDESTRIAN REALM DRAFT PLAN RELEASE PACKET JUNE 2008. inside: SAN FRANCISCO BETTER STREETS PLAN POLICIES AND GUIDELINES FOR THE PEDESTRIAN REALM DRAFT PLAN RELEASE PACKET JUNE 2008 inside: LETTER FROM MAYOR GAVIN NEWSOM EXECUTIVE SUMMARY SAN FRANCISCO PLANNING DEPARTMENT

More information

APPENDIX F:TRIPLE BOTTOM LINE ANALYSIS

APPENDIX F:TRIPLE BOTTOM LINE ANALYSIS APPENDIX F:TRIPLE BOTTOM LINE ANALYSIS Triple Bottom Line Analysis Map (TBLAM) Project or Decision: College Ave Corridor for FC Moves long range transportation plan for College Ave., for redevelopment

More information

How To Improve Safety

How To Improve Safety Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,

More information

Revised January 2015. Bicycle Policy & Design Guidelines Maryland State Highway Administration

Revised January 2015. Bicycle Policy & Design Guidelines Maryland State Highway Administration Revised January 2015 Bicycle Policy & Design Guidelines Maryland State Highway Administration RECORD OF CHANGES TO THE MAY 2013 BICYCLE POLICY & DESIGN GUIDELINES Introduction The 2013 Bicycle Policy &

More information

Alternatives Evaluation Overview

Alternatives Evaluation Overview Alternatives Evaluation Overview 124 Alternatives were analyzed against the evaluation criteria Criteria and criteria weighting were set by the Community Task Force Ratings were quantitative and qualitative

More information

Executive Summary. Transportation Needs CHAPTER. Existing Conditions

Executive Summary. Transportation Needs CHAPTER. Existing Conditions CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in

More information

EPA Technical Assistance for Sustainable Communities Building Blocks

EPA Technical Assistance for Sustainable Communities Building Blocks EPA Technical Assistance for Sustainable Communities Technical Assistance Tool: Complete Streets Deerfield Beach, Florida February 16, 2012 To: CC: Amanda Martinez, City of Deerfield Beach Roger Millar,

More information

Context Sensitive Design for Urban Transportation in West Philadelphia

Context Sensitive Design for Urban Transportation in West Philadelphia Context Sensitive Design for Urban Transportation in West Philadelphia Transportation Research Board 85 th Annual Meeting 24 January 2006 Jeffrey M. Casello University of Waterloo Robert Wright City of

More information

8+ %!0"% 8+1!%"'$%,$"$

8+ %!0% 8+1!%'$%,$$ 8+ 8+ %!0"% The next step in developing recommendations for improvements to Grand Avenue was to identify, develop and evaluate alternatives to address the issues and needs identified in the previous chapter.

More information

Measuring Success: Transportation Improvements along Sandy Boulevard between NE 13 th and NE 47 th Avenues

Measuring Success: Transportation Improvements along Sandy Boulevard between NE 13 th and NE 47 th Avenues Measuring Success: Transportation Improvements along Sandy Boulevard between NE 13 th and NE 47 th Avenues FINAL REPORT pared by Dan Bower and Scott Cohen City of Portland, Office of Transportation January

More information

AN ALTERNATIVE PROPOSAL FOR THE RECONSTRUCTION OF ELMWOOD AVENUE

AN ALTERNATIVE PROPOSAL FOR THE RECONSTRUCTION OF ELMWOOD AVENUE AN ALTERNATIVE PROPOSAL FOR THE RECONSTRUCTION OF ELMWOOD AVENUE logos here e City s plan for the reconstruction of Elmwood Avenue basically rebuilds the road from the Scajaquada Expressway to Forest Avenue,

More information

SAFE Streets for CHICAGO

SAFE Streets for CHICAGO Overview Each day, hundreds of thousands of Chicagoans walk or drive in the city. Ensuring their safety is the City s top priority. Over the past several years, Chicago has developed many successful strategies

More information

These "rules of the road" are based on Texas Transportation Code statutes. Find the complete bicycle code at the bottom of the page

These rules of the road are based on Texas Transportation Code statutes. Find the complete bicycle code at the bottom of the page Texas Bicycle Laws These "rules of the road" are based on Texas Transportation Code statutes. Find the complete bicycle code at the bottom of the page Bicyclists have the rights and duties of other vehicle

More information

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015

HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 HARRIS TEETER AT LADY S ISLAND CITY OF BEAUFORT DRB CONCEPTUAL PROJECT NARRATIVE Submittal Date: September 2, 2015 Meeting Date: September 10, 2015 PROPOSED REDEVELOPMENT The project consists of demolishing

More information

Greg Stuart, Executive Director, Broward MPO

Greg Stuart, Executive Director, Broward MPO Diana Alarcon, Director, Transportation & Mobility Dept. Darlene Pfeiffer, CAPP, Business Manager Renee Cross, AICP, LEED AP, Principal Planner Kevin Walford, Transportation Planner Greg Stuart, Executive

More information

Protected Bicycle Lanes in NYC

Protected Bicycle Lanes in NYC Protected Bicycle Lanes in NYC New York City Department of Transportation Polly Trottenberg, Commissioner September 2014 NEW YORK CITY DEPARTMENT OF TRANSPORTATION 1 Overview Since 2007, the New York City

More information

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,

More information

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

ADA POST INSPECTION CHECKLIST. Job No. Route County Location ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks

More information

Schenk-Atwood Neighborhood Business District Master Plan

Schenk-Atwood Neighborhood Business District Master Plan Schenk-Atwood Neighborhood Business District Master Plan Prepared for the Schenk-Atwood Revitalization Association (SARA) and the City of Madison SCHREIBER/ANDERSON ASSOCIATES, INC. BEST Real Estate Group,

More information

Implementation Strategy

Implementation Strategy Implementation Strategy 6 The following implementation strategy defines strategic points of intervention for complete streets programming, including visioning, goal-setting, local agency plans, coordination

More information

Aerial View E Looking West

Aerial View E Looking West Figure 3-9 Aerial View E Looking West 3-19 Urban Design Figure 3-10 Aerial View F Looking North West 3-20 Urban Design Figure 3-11 Skyline and Massachusetts Avenue Gateway 3-21 Urban Design 4.0 TRANSPORTATION

More information

Capacity Deficiency Project Application Jackson MPO Surface Transportation Program

Capacity Deficiency Project Application Jackson MPO Surface Transportation Program Capacity Deficiency Project Application Jackson MPO Surface Transportation Program The following information must be completed for all Capacity Deficiency proposed Jackson MPO STP projects. MPO staff will

More information

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850

More information

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for

More information

DE 8 Concept Plan and Operations Study. Dover Safety Advisory and Transportation Committee October 23, 2007

DE 8 Concept Plan and Operations Study. Dover Safety Advisory and Transportation Committee October 23, 2007 DE 8 Concept Plan and Operations Study Dover Safety Advisory and Transportation Committee October 23, 2007 Purpose Develop a concept plan describing the aesthetic qualities of the corridor as a gateway

More information

Indiana Multimodal Project Indiana County, PA Mackin Engineering Company, Project No#5063 Date- January 22, 2015 FINAL REPORT.

Indiana Multimodal Project Indiana County, PA Mackin Engineering Company, Project No#5063 Date- January 22, 2015 FINAL REPORT. Indiana Multimodal Project Indiana County, PA, Project No#5063 Date- January 22, 2015 Cover Page FINAL REPORT Table of Contents Executive Summary Report Summary of Study Indiana University of Pennsylvania

More information

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.

Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s. Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library

More information

Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay

Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay Peter Hsu, P.E. FDOT District Seven Safety Office Presentation Overview FDOT Traffic Safety Focus Areas

More information

DESIGN ASSISTANCE APPLICATION

DESIGN ASSISTANCE APPLICATION DESIGN ASSISTANCE APPLICATION for FY 2016 NEW RIVER MULTI USE PATH: PINNACLE PEAK ROAD TO HAPPY VALLEY ROAD CITY OF PEORIA APPLICATIONS ARE DUE VIA ONLINE SUBMITTAL BY 10:00 AM ON MONDAY, JUNE 29, 2015

More information

MEMORANDUM. Robert Nichols, Acting Corridor Design Manager Northgate Link Extension

MEMORANDUM. Robert Nichols, Acting Corridor Design Manager Northgate Link Extension MEMORANDUM DATE: September 23, 2014 TO: Robert Nichols, Acting Corridor Design Manager Northgate Link Extension FROM: SUBJECT: COPIES: Katherine Casseday, PE, PTOE, Casseday Consulting Tony Lo, PE, Parsons

More information

- FREE! - The Official San Francisco BIKE GUIDE. 1st Edition

- FREE! - The Official San Francisco BIKE GUIDE. 1st Edition - FREE! - The Official San Francisco BIKE GUIDE 1st Edition SF BIKE LAWS SAN FRANCISCO BICYCLISTS MUST: Yield to People Walking Whether they re in a crosswalk or not, ALWAYS yield to people walking. Stop

More information

Pedestrian & Bicycle Plan

Pedestrian & Bicycle Plan RAMSEY COMMUNITIES COUNTYWIDE Pedestrian & Bicycle Plan PRIMER: LEGAL FRAMEWORK PRIMER: LEGAL FRAMEWORK Walking and Biking for All e 2 CHAPTER 2: Walking and Biking for All This page intentionally left

More information

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City Mayors Welcome Strong Surrey Votes Yes Coalition Support Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City February 11, 2015 Vancouver, BC The Mayors Council on Regional Transportation

More information

Corridor Goals and Objectives

Corridor Goals and Objectives Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty

More information

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM

FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM CITYOFOBERLIN OHIO CITY OF OBERLIN, OHIO FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM Background In October, 2011, the City of Oberlin Planning

More information

Review Public Input Report Jenn Toothaker. Approval of Meeting Summaries: May 21, May 23, May 30, & June 20, 2013 Meetings

Review Public Input Report Jenn Toothaker. Approval of Meeting Summaries: May 21, May 23, May 30, & June 20, 2013 Meetings Call to the Audience Guidelines 2 Call to the Audience opportunities Must fill out participant card Participants called in the order cards are received 3 minutes allowed per participant CTF Facilitator

More information

Pavement Management Program

Pavement Management Program Pavement Management Program 2014 Street Maintenance Program Executive Summary 01/21/2014 Presented by Mark Thiel Assistant Director of Public Works Program Overview Start of current program 2005 825.1

More information

Citizen Advisory Group Meeting #1 December 8, 2011 6:00 p.m.

Citizen Advisory Group Meeting #1 December 8, 2011 6:00 p.m. Citizen Advisory Group Meeting #1 December 8, 2011 6:00 p.m. Meeting Agenda 1. Background Information 2. Policy Framework 3. Plan Development Process 4. Public Input Results 5. Vision Statement 6. Group

More information

Downtown Louisville Two-Way Street Study

Downtown Louisville Two-Way Street Study Final Draft Report Downtown Louisville Two-Way Street Study Submitted to Downtown Development Corporation Submitted by ENTRAN, PLC Submitted October 2009 Table of Contents Introduction Study Purpose...1

More information

Bicycle riding is a great way to get into shape

Bicycle riding is a great way to get into shape Bicycle riding is a great way to get into shape and have fun. To remain safe on Illinois roads, it is important to follow the same traffic safety laws that govern vehicle drivers. No amount of bicycle

More information

NORTH RED AND PURPLE MODERNIZATION PROJECT

NORTH RED AND PURPLE MODERNIZATION PROJECT RED AD PURPLE MDERIZATI PRJECT Environmental Impact Statement Scoping Information January 2011 ITRDUCTI The Chicago Transit Authority (CTA) is proposing to make improvements, subject to the availability

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

a rider s manual your comprehensive guide to the new viva rapidway service

a rider s manual your comprehensive guide to the new viva rapidway service a rider s manual your comprehensive guide to the new viva rapidway service 1 1 contents Section 1: welcome...3 Section 2: changes to the street...4 Section 3: how to viva...7 Section 4: new stations...13

More information

Smart Cycling IN SANTA MONICA SANTA MONICA POLICE DEPARTMENT BE SMART. BE VISIBLE. BE ATTENTIVE. HAVE FUN!

Smart Cycling IN SANTA MONICA SANTA MONICA POLICE DEPARTMENT BE SMART. BE VISIBLE. BE ATTENTIVE. HAVE FUN! Smart Cycling IN SANTA MONICA BE SMART. BE VISIBLE. BE ATTENTIVE. HAVE FUN! Safety Tips and Rules of the Road for Cyclists SANTA MONICA POLICE DEPARTMENT Rules of the Road Drivers, bicyclists, and pedestrians

More information

KYTC, District 2 Chief District Engineer KYTC, District 2 Planning Supervisor & LPA Coordinator. KYTC, Central Office Planning

KYTC, District 2 Chief District Engineer KYTC, District 2 Planning Supervisor & LPA Coordinator. KYTC, Central Office Planning MINUTES Field Visit for Local Officials and Stakeholders Bluegrass Crossings Regional Business Centre Improved Access Road Study Ritatsu Manufacturing (Board Room) Beaver Dam, Kentucky June 11, 2014 1:30

More information

Bicycle Safety Quiz Answers Parental Responsibilities

Bicycle Safety Quiz Answers Parental Responsibilities Bicycle riding is a great way to get into shape and enjoy the outdoors. To remain safe on Illinois roads, it is important to follow the same traffic safety laws that govern vehicle drivers. No amount of

More information

SEPTEMBER 2015 SCOPE OF WORK. MONTGOMERY COUNTY PLANNING DEPARTMENT M-NCPPC MontgomeryPlanning.org

SEPTEMBER 2015 SCOPE OF WORK. MONTGOMERY COUNTY PLANNING DEPARTMENT M-NCPPC MontgomeryPlanning.org SEPTEMBER 2015 SCOPE OF WORK MONTGOMERY COUNTY PLANNING DEPARTMENT M-NCPPC MontgomeryPlanning.org table of contents table of contents... 1 introduction... 2 planning context... 2 purpose of master plan...

More information

TABLE OF CONTENTS. 1.0 Introduction... 1

TABLE OF CONTENTS. 1.0 Introduction... 1 TABLE OF CONTENTS Section Page 1.0 Introduction... 1 2.0 2007-2011 Countywide Crash Data... 1 Bicycle Crashes... 1 Pedestrian Crashes... 5 Bicycle and Pedestrian Parking Lot/Private Property Crashes...

More information

Is Encouraging More Bike Ridership On El Camino Real A Good Idea?

Is Encouraging More Bike Ridership On El Camino Real A Good Idea? Is Encouraging More Bike Ridership On El Camino Real A Good Idea? In the above illustration there is a shared right turn lane on southbound El Camino Real at the intersection with Santa Cruz Avenue. Turning

More information

UNEP recommendations to KURA on Improving Safety and Reducing Congestion on UN Avenue (7 October 2009; revised 23 November 2009)

UNEP recommendations to KURA on Improving Safety and Reducing Congestion on UN Avenue (7 October 2009; revised 23 November 2009) UNEP recommendations to KURA on Improving Safety and Reducing Congestion on UN Avenue (7 October 2009; revised 23 November 2009) UN Avenue extends for 2 km between Limuru Road and Ruaka Road (Runda Roundabout).

More information

Tennessee Traffic Laws Relating to Bicycles A HANDBOOK FOR MOTORISTS & BICYCLISTS

Tennessee Traffic Laws Relating to Bicycles A HANDBOOK FOR MOTORISTS & BICYCLISTS Tennessee Traffic Laws Relating to Bicycles A HANDBOOK FOR MOTORISTS & BICYCLISTS About the Knoxville Regional Bicycle Program The Knoxville Regional Transportation Planning Organization (TPO) coordinates

More information

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016 Rapid City Downtown Area Master Plan Draft Plan Concepts April 2016 CALL TO ACTION! A Thriving Downtown = Regional Economic Prosperity Rapid City is competing nationally for a limited supply of young skilled

More information

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois

More information

CHAPTERTWO. Alternatives 2.1 ALTERNATIVES DEVELOPMENT PROCESS

CHAPTERTWO. Alternatives 2.1 ALTERNATIVES DEVELOPMENT PROCESS 2. Section 2 TWO CHAPTERTWO 2.1 ALTERNATIVES DEVELOPMENT PROCESS This EIS has been prepared in compliance with the Council on Environmental Quality (CEQ) regulations for implementing NEPA (40 CFR 1500-1508).

More information

Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections

Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections Draft Non Transportation Performance Measures Including Related Qualitative Assessment of Example Sections Phil Erickson Community Design + Architecture Mike Johnson HDR Engineering CTF Charrette Approach

More information

Surface Transportation Program (STP)

Surface Transportation Program (STP) Project Name: Project Sponsor: FEDERAL FUNDS PROJECT APPLICATION TRANSPORTATION IMPROVEMENT PROGRAM 2008-2013 SALT LAKE and OGDEN/ LAYTON URBAN AREAS Surface Transportation Program (STP) Urban Surface

More information

Appendix 2.1.1 Performance Measure Memo

Appendix 2.1.1 Performance Measure Memo Appendix 2.1.1 Performance Measure Memo MEMORANDUM Date: To: From: Subject: Saravana Suthanthira, Alameda CTC Francisco Martin and Matthew Ridgway, Fehr & Peers Alameda Countywide Multimodal Arterial Plan

More information

CITY OF SUN PRAIRIE NEIGHBORHOOD TRAFFIC MANAGEMENT PROGRAM

CITY OF SUN PRAIRIE NEIGHBORHOOD TRAFFIC MANAGEMENT PROGRAM CITY OF SUN PRAIRIE NEIGHBORHOOD TRAFFIC MANAGEMENT PROGRAM Adopted: June 2011 City of Sun Prairie Neighborhood Traffic Management Program The objective of the Neighborhood Traffic Management Program (NTMP)

More information

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan. 3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation

More information

College of Southern Maryland. Hughesville Transportation Study

College of Southern Maryland. Hughesville Transportation Study College of Southern Maryland Project Overview Existing Conditions Transit Service Land Use CSM Student Demographics Recommendations Methodology Transit Recommendations Transportation Demand Management

More information

Needs Analysis. Long Beach Bicycle Master Plan. Bicycle Commuter Needs. LONG BEACH BICYCLE MASTER PLAN Needs Analysis

Needs Analysis. Long Beach Bicycle Master Plan. Bicycle Commuter Needs. LONG BEACH BICYCLE MASTER PLAN Needs Analysis Long Beach Bicycle Master Plan Needs Analysis The purpose of reviewing the needs of commuter and recreational bicyclists is twofold: (1) it is instrumental when planning a system which must serve both

More information

The Transect Zones

The Transect Zones T1 TABLE 1. TRANSECT ZONE DESCRIPTIONS TABLE 1: Transect Zone Descriptions. The following are general descriptions of the character of each Transect Zone. They may be interpreted as a constituent part

More information

REGIONAL NON-MOTORIZED TRANSPORTATION NETWORK

REGIONAL NON-MOTORIZED TRANSPORTATION NETWORK Chapter 10 Bicycle and Pedestrian SAFETEA-LU legislation requires that non-motorized users be considered in the LRTP. The legislation allows for bicycle and pedestrian safety to be incorporated into the

More information

Engagement with the community will be in accordance with Council s Community Participation Policy.

Engagement with the community will be in accordance with Council s Community Participation Policy. CLARENCE CITY COUNCIL ASSET MANAGEMENT 7 DEC 2015 86 11.5 ASSET MANAGEMENT 11.5.1 CLARENCE STREET SAFETY ASSESSMENT PROJECT (File No 04-03-01) EXECUTIVE SUMMARY PURPOSE The purpose of this report is to

More information

6: LANE POSITIONS, TURNING, & PASSING

6: LANE POSITIONS, TURNING, & PASSING 6: LANE POSITIONS, TURNING, & PASSING BASIC LANE POSITIONS Traffic law says that slower vehicles should stay to the right. But where exactly should bicycles ride? Here are some basics. Never Ride Against

More information

TEST ON Driving Safely Among Bicyclists and Pedestrians

TEST ON Driving Safely Among Bicyclists and Pedestrians TEST ON Driving Safely Among Bicyclists and Pedestrians Next you will take a 16 question test about driving safely among bicyclists and pedestrians. Please take out a sheet of paper to mark down and score

More information

San Francisco Complete Streets Strategy

San Francisco Complete Streets Strategy San Francisco Complete Streets Strategy Timothy Papandreou Deputy Director Sustainable Streets 2013 Sacramento 2 million San Francisco Bay Area 8 million Central Valley 4 million Los Angeles 19 million

More information

Route Development Plan

Route Development Plan WSDOT Northwest Washington Division, Planning and Policy Office Route Development Plan State Route 99 North/Aurora Avenue North From the North end of the Battery Street Tunnel (Mile Post 32.44) to N. 145th

More information

City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address

City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address July 005 Prepared by DMCG Disability Management Consulting Group L.L.C. 801 Jonquil Place Columbia, MO 650 In

More information