1 US 281 AT PREMONT PUBLIC HEARING
2 Hearing Purpose The purpose of tonight s Public Hearing is for the public to: Learn about the status of the proposed project Review the purpose and need for the project Learn about alternatives studied Review the Preferred Alternative Provide comments and input 2
3 Hearing Agenda Introductions Meeting Format Technical & Environmental Presentation Public Comments 3
4 Meeting Format Options for Commenting 1. Make a verbal comment (3 minutes per speaker) 2. Place comment card in the comment box 3. Provide comments to onsite court reporter 4. comments to: [email protected] 5. Mail comments to: TxDOT Corpus Christi District Office Attn: Victor Vourcos 1701 South Padre Island Drive Corpus Christi, Texas Deadline for comments : January 7,
5 ENGINEERING AND ENVIRONMENTAL PRESENTATION US 281 at Premont
6 Project History N N 6
7 Need and Purpose Improve safety for the traveling public Develop statewide significant interstate corridor (I-69C segment) along existing US 281 INTERSTATE TEXAS 69C 7
8 Alternatives Considered Relief route through Premont on a bridge Relief route through Premont at street level Relief route east of Premont Two relief routes west of Premont As shown at the September 2008 Public Open House 8
9 Community Impact Assessment Alternatives and Results As shown at the October 2012 Public Open House 9
10 Alternative Advanced for Detailed Study Plan View 418 3D View N
11 Alternative Advanced for Detailed Study Plan View 3D View 422 N
12 Alternative Advanced for Detailed Study Plan View N Cemetery 3D View Cemetery SE 1st Street 12
13 Alternative Advanced for Detailed Study Plan View 422 SE 1 st Street Donald Street NE 8 th Street N Cemetery 3D View 13
14 Right-of Way/Utility Adjustments Right-of-way acres of new right-of-way 79 acres of existing right-of-way ROW width varies from 270 to 500 feet Utilities water lines sewer lines gas lines telephone cables electrical lines other underground and overhead utilities 14
15 Estimated Cost Total project cost estimate: $58.14 million Funding breakdown $50.56 million for construction $7.58 million in contingencies/indirect costs 15
16 National Environmental Policy Act (NEPA) Clean Water Act Endangered Species Act Environmental Justice (Executive Order 12898) National Historic Preservation Act Section 4(f) of the Department of Transportation Act Clean Air Act Title VI of the Civil Rights Act Uniform Relocation Assistance and Migratory Bird Treaty Act Floodplain Management (Executive Order 11988) Comprehensive Environmental Response, Compensation and Liability Act Resource Conservation and Recovery Act Farmland Protection Policy Act Land and Water Conservation Fund Real Property Acquisition Policies Act Act Americans with Disabilities Act Highway Noise Standards Endangered Species Act Public Involvement Requirements AND MORE, including state and local requirements 16
17 NEPA Studies Draft Environmental Assessment (EA) includes: Purpose and Need statement Evaluation of alternatives considered Evaluation of the affected environment Assessment of environmental consequences Public involvement Recommendation of the preferred alternative FHWA declared the US 281 EA Satisfactory for further processing on November 3,
18 NEPA Studies Traffic Land Use and Zoning Population Characteristics Economics Community Cohesion Aesthetics and Visual Quality Right-of-Way Acquisitions Utility Infrastructure Soils - Prime Farmland Soils Vegetation Wildlife/Wildlife Habitat Threatened and Endangered Species Non-archeological Historic Resources Archeological Resources Wetlands and Waters of the U.S. Water Quality Floodplains Air Quality Hazardous Materials Indirect and Cumulative Impacts 18
19 US 281 at Premont Project Impacts Proposed project includes construction in 100-year floodplain area Proposed design will adhere to federal and state hydraulic design policies and procedures Proposed project will not increase the current base flood plain level Proposed project is designed to accommodate large floods without substantial damage to project or property 19
20 NEPA Conclusion 20
21 Provide Your Comments Options for Commenting 1. Make a verbal comment 2. Place comment card in the comment box 3. Provide comments to onsite court reporter 4. comments to: [email protected] 5. Mail comments to: TxDOT Corpus Christi District Office Attn: Victor Vourcos 1701 South Padre Island Drive Corpus Christi, Texas Deadline for comments : January 7, 2015 Public Hearing Report will be posted at when analysis is complete 21
22 VERBAL COMMENTS US 281 at Premont
23 3:00 Minutes For Each Speaker
24 Closing Remarks Thank You for Your Participation! 24
25 Provide Your Comments Options for Commenting 1. Place comment card in the comment box 2. Provide comments to onsite court reporter 3. comments to: 4. Mail comments to: TxDOT Corpus Christi District Office Attn: Victor Vourcos 1701 South Padre Island Drive Corpus Christi, Texas Deadline for comments : January 7,
Environmental Impact Assessment
Environmental Impact Assessment E. Beimborn, University of Wisconsin-Milwaukee NEPA: the National Environmental Policy Act Enacted in 1969 Provides a general statement of federal policy towards the environment:
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Elba Liquefaction Company, L.L.C. Southern LNG Company, L.L.C. Elba Express Company, L.L.C. Docket No. PF13-3-000 NOTICE OF INTENT TO PREPARE
Proposed General Plan Update Goals, Policies, and Implementation Actions
Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental
AGENCY COORDINATION AND PUBLIC INVOLVEMENT
5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included
STATE HIGHWAY 360. PUBLIC HEARING Thursday, October 17, 2013 FROM: E. SUBLETT ROAD/ W. CAMP WISDOM ROAD TO: US 287
STATE HIGHWAY 360 PUBLIC HEARING Thursday, October 17, 2013 FROM: E. SUBLETT ROAD/ W. CAMP WISDOM ROAD TO: US 287 TIMBERVIEW HIGH SCHOOL, ARLINGTON, TEXAS Project Vicinity Proposed Project Length: Approximately
COASTAL APPLICATION FOR A MAJOR SITING PERMIT
Frank M. Rabauliman Administrator Commonwealth of the Northern Mariana Islands OFFICE OF THE GOVERNOR Bureau of Environmental and Coastal Quality Division of Coastal Resources Management Gualo Rai Center
RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION
RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION CX Log #: DOI-BLM-OR-V060-2015-032-CX CE Exemption category: 516 DM 11.9, E.12: Grants of right-of-way wholly within the boundaries
March 17, 2015. Dear Mr. Sullins:
Tony Sullins Endangered Species Chief, Midwest Regional Office Public Comment Process Attn: FWS-R5-ES-2011-0024 Division of Policy and Directives Management U.S. Fish and Wildlife Service 4401 N. Fairfax
Environmental Law Primer. Adapted from Vermont Law School s Environmental Law Primer for Journalists
Environmental Law Primer Adapted from Vermont Law School s Environmental Law Primer for Journalists General Categories Command and Control Liability Disclosure Ecosystem and Place-based Programs Marketable
DEPARTMENT OF TRANSPORTATION. Notice of Limitation on Claims against a Proposed Transportation Project
This document is scheduled to be published in the Federal Register on 12/10/2015 and available online at http://federalregister.gov/a/2015-31111, and on FDsys.gov DEPARTMENT OF TRANSPORTATION [4910-RY-P]
APPLICATION FOR STATE REVOLVING FUND LOAN
APPLICATION FOR STATE REVOLVING FUND LOAN for the Construction of Wastewater Treatment Facilities (Revised 02/2015) A completed application must be submitted for each proposed project. If any information
COMMUNITY CERTIFICATIONS
National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS Public reporting burden for this form is estimated to average 4 hours for annual recertification, per response. The burden
Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters.
Plan Framework for Coastal Management The purpose of this element is to provide for the protection of residents and property in within the coastal area of the host community, and to limit expenditures,
U.S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT GRANTS PASS FIELD OFFICE 2164 NE Spalding Ave Grants Pass, OR 97526
A. Background U.S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT GRANTS PASS FIELD OFFICE 2164 NE Spalding Ave Grants Pass, OR 97526 Categorical Exclusion Determination and Decision
List of Preparers AKRF, INC. Robert F. Conway, P.E. EIS Project Manager; Construction Impacts
List of Preparers AKRF, INC. Robert F. Conway, P.E. EIS Project Manager; Construction Impacts Masters, Civil Engineering. More than 30 years of experience in modeling pollutant fate for transportation
Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants
OMB Approval No.: 0648-0538 Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants Instructions The National Environmental Policy
PUBLIC NOTICE Application for Permit
PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested
Gold Ray Dam Interagency Technical Team Meeting
Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,
NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014
NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 APPLICANT Skyline Restoration Inc. CGI Northeast, Inc. Spring Scaffolding LLC Metropolitan Northeast LLC 11-20 37 th Avenue Long Island City, NY 11101
Foreign Affairs Security Training Center (FASTC) U.S. General Services Administration U.S. Department of State
Foreign Affairs Security Training Center (FASTC) U.S. General Services Administration U.S. Department of State Supplemental Draft Environmental Impact Statement for U.S. Department of State Foreign Affairs
J. Template Environmental Checklist for FEMA/HUD Using the Template Environmental Checklist for FEMA and HUD Responsible Entities EHP Reviews
J. Template Environmental Checklist for FEMA/HUD Using the Template Environmental Checklist for FEMA and HUD Responsible Entities EHP Reviews As discussed in the Unified Federal Review Guidance for EHP
Conservation Tax Credit Regulations Chapter 391-1-6 A-1 RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES CHAPTER 391-1-6
Conservation Tax Credit Regulations Chapter 391-1-6 A-1 RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES CHAPTER 391-1-6 GEORGIA CONSERVATION TAX CREDIT PROGRAM TABLE OF CONTENTS 391-1-6-.01 Purpose and
30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN COHASSET HARBOR COHASSET AND SCITUATE, MASSACHUSETTS
.-ro:'j - I US Army Corps of Engineers r& New England District 696 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Mr. Craig Martin [email protected] Programs/Project Management
Performance Goals and Objectives:
Online Briefing Winter 2011 2012 Purpose: The purpose of the Project is to examine and recommend ways of introducing higher passenger train speeds on the Empire Corridor and ways to improve reliability,
Veterans Memorial Bridge (Orange Avenue) PD&E Study
Veterans Memorial Bridge (Orange Avenue) PD&E Study From City Island Parkway to South Peninsula Drive FDOT FPID# 242172-128-01 Volusia County Project# P-5351-1 Project Limits End Project City Island Veterans
NASA Stennis Space Center Environmental Resources Document
16.0 Major Environmental Considerations for Proposed Actions All construction, rocket testing, and operations that may potentially impact environmental media, such as air, water, land, aquatic and biotic
Public Information & Public Scoping Meeting
Public Information & Public Scoping Meeting William F. Cribari Memorial Bridge Route 136 over the Saugatuck River Review of Rehabilitation Study Report Public Scoping for the gathering and analysis of
NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project
NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION Vallecitos Water District Rock Springs Sewer Replacement Project Vallecitos Water District has prepared a Draft Mitigated Negative Declaration
DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment
DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment Water Protection Bureau Name of Project: Applicant: Ueland Land Development LLC Type of Project: Proposed discharge of treated domestic wastewater
Eldorado-Ivanpah Transmission Project WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE
WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE 1 1 Welcome to The Eldorado-Ivanpah Transmission Project Open House How is the open house organized? This
Land Protection Planning for the National Wildlife Refuge System
March 2012 Planning Information Brochure 1 Land Protection Planning for the National Wildlife Refuge System The following questions are often asked when the U.S. Fish and Wildlife Service (Service) begins
North Face. South Face. Figure 1.1-2 Science Park Station Exteriors. Pg 1-3 MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
North Face South Face MASSACHUSETTS BAY TRANSPORTATION AUTHORITY Pg 1-3 Figure 1.1-2 Science Park Station Exteriors MASSACHUSETTS BAY TRANSPORTATION AUTHORITY Pg 1-4 Figure 1.1-3 Science Park Station Platform
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
Pipeline Regulatory and Environmental Permits
Chapter 3 Pipeline Regulatory and Environmental Permits William E. Bauer Chapter Outline Introduction 57 3.1 Regulation of Interstate Pipelines 58 3.1.1 FERC-Regulated Natural Gas Pipelines 58 3.1.2 FERC-Regulated
Floodplain Development Land Use Review
COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review
Sec. 22a-1a page 1 (4-97)
Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination
SR-18 Corridor Improvements in Wood County
Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park
CHAPTER 9 List of Preparers
CHAPTER 9 List of Preparers CHAPTER 9 LIST OF PREPARERS This document was prepared by FHWA, TxDOT, and GPA, with assistance from HNTB Corporation. FEDERAL HIGHWAY ADMINISTRATION (FHWA) Mr. Mike Leary,
Urban Stream Restoration Defining the Full Benefits of a Project. Warren C. High MACTEC Engineering and Consulting
Urban Stream Restoration Defining the Full Benefits of a Project Warren C. High MACTEC Engineering and Consulting Economics in the Decision Process Return on Investment Willingness to Pay Municipal Growth
OTHER FUNDS AND ACCOUNTS
OTHER FUNDS AND ACCOUNTS CAPITAL PROJECTS FUNDS, SPECIAL REVENUE FUNDS OTHER FUNDS AND ACCOUNTS CAPITAL PROJECTS FUNDS Fund No. 530 Correctional Facilities Construction Fund 541 Correctional Facilities
Chapter 5 Financial Plan
The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA_LU) requires that the MTP incorporate a financial plan for the planning period. The MTP is required to
AIR TRAFFIC INITIAL ENVIRONMENTAL REVIEW
AIR TRAFFIC INITIAL ENVIRONMENTAL REVIEW Operational Test Period #2 to Evaluate the Feasibility of Changing Runway Configurations at Two Times during the Day at Boston-Logan Airport FAA Order 7400.2 Appendix
U.S. Department of Transportation Federal Highway Administration. Western Federal Lands Highway Division Vancouver, Washington
U.S. Department of Transportation Federal Highway Administration Western Federal Lands Highway Division Vancouver, Washington Juniper Dunes Access Road WA Franklin 2013(1) Finding of No Significant Impact
Northern Middlesex Council of Governments
Northern Middlesex Council of Governments The Federal Energy Commission (FERC) is the agency charged with evaluating whether the proposed route should be approved Cooperating agencies generally include
Trouble with the Feds: An Overview of Federal Constitutional and Statutory Issues in Local Urban Planning and Zoning Law
Trouble with the Feds: An Overview of Federal Constitutional and Statutory Issues in Local Urban Planning and Zoning Law Trouble with the Feds: An Overview of Federal Constitutional and Statutory Issues
GAO PIPELINE PERMITTING. Interstate and Intrastate Natural Gas Permitting Processes Include Multiple Steps, and Time Frames Vary
GAO United States Government Accountability Office Report to Congressional Committees February 2013 PIPELINE PERMITTING Interstate and Intrastate Natural Gas Permitting Processes Include Multiple Steps,
THE LOCAL ROLE IN PERMITTING INTERSTATE NATURAL GAS PIPELINES MASSACHUSETTS ASSOCIATION OF CONSERVATION COMMISSIONS
THE LOCAL ROLE IN PERMITTING INTERSTATE NATURAL GAS PIPELINES PRESENTATION AT CITIZEN PLANNER TRAINING COLLABORATIVE CONFERENC E BY EUGENE B. BENSON, EXECUTIVE DIRECTOR, MACC MARCH 21, 2015 Massachusetts
Environmental Guidance for
Environmental Guidance for Alabama_AL / Caribbean_PR / Florida_FL/ Georgia_GA / Kentucky_KY / Mississippi_MS / North Carolina_NC / South Carolina_SC / Tennessee_TN This Environmental Guidance page is designed
Prepared by Kory Menken & Andrew Finzen 10/26/14. North Sioux City Economic Development Corporation Flynn Business Park
North Sioux City Economic Development Corporation Flynn Business Park South Dakota Certified Ready Sites Application Prepared by Kory Menken & Andrew Finzen 10/26/14 Table of Contents 1.0 Ownership Information...
CHAPTER 4 ALTERNATIVES COMPARISON
CHAPTER 4 ALTERNATIVES COMPARISON 4.1 INTRODUCTION This chapter provides a comparison of the and its alternatives as described in EIS/EIR Section 1.8.3 (s Evaluated in this EIS/EIR) and analyzed in Sections
Executive Director s Recommendation Commission Meeting: March 5, 2015
Executive Director s Recommendation Commission Meeting: March 5, 2015 PROJECT Curseen-Morris Processing and Distribution Center Parking Lot 900 Brentwood Avenue NE Washington, DC SUBMITTED BY United States
ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project
ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower
Corridor Goals and Objectives
Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty
Virginia Department of Transportation Rural Rustic Road Program Manual
Virginia Department of Transportation Rural Rustic Road Program Manual Prepared by Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219 Jennifer
March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633
ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER
Addendum D. Nomination of Moody Wash ACEC
Addendum D Nomination of Moody Wash ACEC Moody Wash ACEC is hereby nominated by Citizens for Dixie s Future to: BLM St. George Field Office 345 East Riverside Drive St. George, UT 84790 Moody Wash is a
Categorical Exclusion Determination Bonneville Power Administration Department of Energy
Categorical Exclusion Determination Bonneville Power Administration Department of Energy Proposed Action: Removal and Relocation of Equipment from Leased Area in Titan Data Center Project Manager: Molly
Procedures for Applying for Financial Assistance
EMERGENCY OPERATIONS PLAN May, 2009 Procedures for Applying for Financial Assistance GENERAL INFORMATION Financial assistance may come from the state alone or both the state and federal governments. For
Section 8.1 ADVANCE ACQUISITION
Section 8.1 ADVANCE ACQUISITION PURPOSE... 8-1-1 AUTHORITY... 8-1-1 SCOPE... 8-1-1 REFERENCES... 8-1-1 TRAINING... 8-1-1 FORMS... 8-1-1 DEFINITIONS... 8-1-2 8.1.1 Advance Acquisition Procedures... 8-1-2
Timberland Property Tax in Texas. Yanshu Li Texas Forest Service
Timberland Property Tax in Texas Yanshu Li Texas Forest Service 1 Outline Timberland property tax State tax incentives for timberland Wildlife management valuation on timberland Landowners rights and remedies
St. Clair College Planning Area Introduction
Introduction What is the Study Area? St. Clair College Planning Area is bounded by Highway 3 to the west, Cabana Road to the north, the residential community of South Windsor to the east and Cousineau
The Cadmus Group, Inc. U.S. General Services Administration Schedule Contract Federal Supply Service Authorized Federal Supply Schedule Price List
U.S. General Services Administration Schedule Contract Federal Supply Service Authorized Federal Supply Schedule Price List FSC 899 Environmental Services Special Item Numbers: 899-1: Environmental Planning
ENVIRONMENTAL REVIEW SCREENING QUESTIONS
ENVIRONMENTAL REVIEW SCREENING QUESTIONS All applications to WHEDA are required to meet the Department of Housing and Urban Development s environmental compliance standards listed in 24 CFR Part 58. Your
Disaster Recovery Managing and Leveraging Multiple Funding Sources
Disaster Recovery Managing and Leveraging Multiple Funding Sources Jordan Williams, CFM June 3, 2015 Overview Programs FEMA Public Assistance (PA) and Hazard Mitigation Grant Program HUD s Community Development
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
DEVELOPMENT DUE DILIGENCE CHECKLIST
DEVELOPMENT DUE DILIGENCE CHECKLIST A. Title Condition. 1. Preliminary Title Reports. A current preliminary title report ( PTR ) for the Real Property. 2. Copies of Exceptions to Title. Copies of all documents
CLASSIFICATION AND SALARY RANGES RIGHT-OF-WAY PERSONNEL
CLASSIFICATION AND SALARY RANGES RIGHT-OF-WAY PERSONNEL THE WEST VIRGINIA DEPARTMENT OF TRANSPORTATION REQUESTED A POLL OF THE OTHER STATES REGARDING CLASSIFICATION AND SALARY RANGES FOR RIGHT-OF-WAY PERSONNEL
NEPA Environmental Assessment. Broadband Technology Opportunities Program. Statewide Fiber Optic Network. Prepared For: On Behalf Of: Prepared By:
NEPA Environmental Assessment Broadband Technology Opportunities Program Statewide Fiber Optic Network April 2011 Prepared For: Frank Monteferrante, Ph.D. Environmental Compliance Specialist National Telecommunications
URBAN DRAINAGE CRITERIA
URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities
Improving Access in Florida International University Biscayne Bay Campus Executive Summary
EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared
Project Manager & Key Staff Standards for Technical Proposals Projects using Level A and/or Level B prequalification disciplines
Projects using Level A and/or Level B prequalification disciplines Project Manager PROJECT MANAGER Key Staff/ ROADWAY DESIGN (TP Section 5) (TP Section 6) BACHELORS DEGREE 4 TO 8 YEARS (TP Sections 6 &
PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015
PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015 AT ACTON TOWN HALL FAULKNER ROOM 472 MAIN STREET ACTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED ASSABET RIVER RAIL TRAIL (ARRT) IN THE TOWNS OF ACTON
Harris County Flood Control District. Policy, Criteria, and Procedure Manual
Harris County Flood Control District Policy, Criteria, and Procedure Manual For Approval and Acceptance of Infrastructure General Review October 10, 2003 Draft Please Provide Written Comments to the HCFCD
HARDWICK TOWNSHIP WARREN COUNTY, NEW JERSEY
HARDWICK TOWNSHIP WARREN COUNTY, NEW JERSEY AN ORDINANCE TO AMEND CHAPTER XIII OF THE REVISED GENERAL ORDINANCES BEING THE LAND DEVELOPMENT ORDINANCE OF THE TOWNSHIP OF HARDWICK TOWNSHIP IN ORDER TO ADOPT
agrees to replace at no charge any tree that dies and subsequent inspection shows that the wire basket was not properly removed.
Adopted 12/5/00; revised as of 1/2/07 Marietta Tree Commission Rules and Regulations I. Tree Planting A. Planting Specifications 1. Trees must be: A) of a minimum 1¼ inches caliper; B) single stem, straight,