Executive Director s Recommendation Commission Meeting: July 11, 2013
|
|
|
- Marshall Warner
- 9 years ago
- Views:
Transcription
1 Executive Director s Recommendation Commission Meeting: July 11, 2013 PROJECT Russell Road Widening Phase 2 United States Marine Corps Base Quantico Prince William County, Virginia SUBMITTED BY United States Department of Defense Department of the Navy REVIEW AUTHORITY Advisory per 40 U.S.C. 8722(b)(1) NCPC FILE NUMBER 7467 NCPC MAP FILE NUMBER (41.22)43790 APPLICANT S REQUEST Final approval of site development plans PROPOSED ACTION Approve as requested ACTION ITEM TYPE Consent Calendar PROJECT SUMMARY The United States Department of Defense proposes to widen Russell Road from two to four lanes, for a distance of approximately 2,600 linear feet, between the existing Marine Corps Federal Credit Union building (Building # 3000) and the Davis Building (Building # 3300). The project will help mitigate existing traffic congestion; improve driver and pedestrian safety; and lessen traffic queues along I-95. Other project elements include: two new curbside transit pull off areas, 26 new customer parking spaces in the Navy Exchange lot, new crosswalks, new traffic/pedestrian signaling devices, new retaining walls and culverts, new turn-only lanes, new hiker/recreational street-side trails, and new lane markings as required. KEY INFORMATION The proposed project is included in the current 2002 Marine Corps Base Quantico Master Plan, a part of a potential three-phase widening plan, and the Commission previously approved the Phase 1 widening of Russell Road in The project will require the removal of trees within the project area, and the Commission requested additional information regarding the project s proposed tree removal, mitigation, and MCBQ s re-forestation policies at its May 2, 2013 meeting. The Applicant has successfully provided the additional information as requested by the Commission.
2 Executive Director s Recommendation Page 2 RECOMMENDATION The Commission: Approve the final site development plans for the Phase 2 widening of Russell Road, located at Marine Corps Base Quantico in Quantico, Virginia. PROJECT REVIEW TIMELINE Previous actions Remaining actions (anticipated) May, Approval of preliminary site development plans with comments. None. Prepared by Michael Weil July 3, 2013
3 Executive Director s Recommendation Page 3 I. PROJECT DESCRIPTION Site The United States Marine Corp Base Quantico (MCBQ) installation is located approximately 35 miles southwest of Washington, DC as the primary base for the U.S. Marine Corps in the Metropolitan Washington Region. The installation is approximately 87 square miles in area and bi-furcated by Interstate Route 95 (I-95), occupying portions of three Virginia counties: Prince William, Stafford, and Fauquier. MCBQ, west of I-95, is known as Westside, and the area to the east of I-95 is known as Mainside. Figure 1 shows the location of the project area within MCBQ Mainside, as well as some surrounding geographic context. As shown in the figure, the project is along Russell Road, near Chopawamsic Creek, which is a significant and biologicallydiverse wetlands area on the installation. Figure 1: Map of MCBQ Mainside and Project Context Russell Road is one of two east-west roads that connect the downtown Mainside commercial area to the I-95/Route 1 Corridor. The other east-west road, Fuller Road, is currently 2-lanes wide and located to the north of Russell Road, adjacent to residential neighborhoods and a golf course.
4 Executive Director s Recommendation Page 4 Background The current project proposal was granted Preliminary approval by the Commission at its May 2, 2013 meeting, in conjunction with several Commission comments related to the project s tree removal, project s consistency with the MCBQ Master Plan, and the planned Potomac Heritage Nation Scenic Trail. Figure 2 shows the geographic context for two previously-approved projects, the current Phase 2 widening proposal, and future planned Phase 3 Russell Road widening, which is currently unfunded. Figure 2: Project Background The multi-phased widening of Russell Road and re-location of the Russell Road/Purvis Road intersection are designed to reduce existing traffic congestion along Russell Road, between downtown Mainside and the I-95/Route 1 Corridor; to accommodate expected future population growth at MCBQ; to improve driver and pedestrian safety along Russell Road; and to mitigate dangerous traffic queuing along I-95.
5 Executive Director s Recommendation Page 5 Proposal The project will widen a 2,600 foot long section of Russell Road from two to four-lanes, between the existing merge area (just east of the Marine Corps Federal Credit Union Building) to just east of the access drive to the Davis Building, which houses the Marine Corps Combat Development Command headquarters, as shown in Figure 3. The widened Phase 2 segment will provide additional roadway capacity for traffic between the MCBQ ACP and Davis Building, which houses over 600 workers. Figure 3: Proposed Russell Road Widening Project Area The project will make the following specific improvements along the widened Russell Road segment: The old Purvis Road alignment will be disconnected from Russell Road and redeveloped into a new 26-space customer parking lot 1 for use by Navy Exchange (NEX) customers and other nearby commercial uses such as McDonald s; Two new pull-off areas will be constructed at existing transit stop locations; Three new crosswalks will be striped in two different intersection locations; Two new eight-foot wide sidewalk trail segments will be constructed along the south-side and north-side of widened Russell Road; Retaining walls and culverts will be constructed along various segments of the widened roadway (along both north and side sides); 1 The project submission indicates that the additional parking will off-set a future proposed expansion of the Navy Exchange to the east of the existing building, which could remove approximately 45 customer spaces, resulting in a net local area parking reduction of 19 spaces.
6 Executive Director s Recommendation Page 6 One right-turn only and two left-turn only lanes will be created through re-striping and re-location of the through traffic lanes; Several new traffic and pedestrian signals will be installed at two intersection locations; and All existing utilities (including street lighting) will be re-located as needed. Overall, the project will remove trees and increase impervious surface from 3.13 (35% of the project area) to 4.88 (55% of the project area) acres within the project area. The proposed widening will be along the north-side of Russell Road to the maximum extent feasible to minimize impacts to the sensitive wetlands, Riparian Buffer Areas (RPAs), and Resource Management Areas (RMAs) associated with Chopawamsic Creek, directly to the south of the existing roadway. MCBQ will not plant any new trees/vegetation within the project area due to clear zone/driver visibility requirements. PROJECT ANALYSIS/CONFORMANCE Analysis Based on review of additional project information provided by the Applicant, which includes final site development plans (dated April 12, 2013), NCPC staff recommends that the Commission approve the final site development plans for the Phase 2 widening of Russell Road, located at Marine Corps Base Quantico in Quantico, Virginia. Staff believes that MCBQ has submitted adequate follow-up information regarding the project s proposed tree removal, mitigation, and MCBQ s re-forestation policies in response to the Commission s request during its May 2, 2013 preliminary approval action. The follow-up information, which was submitted by MCBQ in two separate documents, is summarized in the following sections. Tree Removal Estimate MCBQ has submitted a more refined tree removal estimate of based on the final site development plans and area of woodland disturbance as stated in their submission letter dated June 6, The letter is included in Appendix A. Tree Removal Areas Figure 4 shows the total area of tree removal as 2.28 acres within the project area, with defined boundaries for the tree clear areas along both sides of Russell Road, indicated with cross-hatched shading. Tree Removal Mitigation MCBQ will mitigate the widening project s tree removal by planting new trees adjacent to an existing residential development on MCBQ to create a new nature preserve area and to ensure no net tree loss. The proposed nature preserve area is shown in Figure 5.
7 Executive Director s Recommendation Page 7 Figure 4: Proposed Tree Clear Areas Figure 5: Proposed Future Nature Preserve Area
8 Executive Director s Recommendation Page 8 MCBQ Reforestation Plan MCBQ submitted MCB Order B, which governs their woodland tree and shrub management. The submission letter explains that the heavily forested lands on MCBQ serve a unique and integral component of the military training environment. As stated in the letter, The diverse forest structure affords a variety of vegetative covers and landscapes, which provide vast flexibility for the development of assorted military training scenarios and exercises. To ensure that this valuable training resource remains functional, an aggressive forest management program directed at the improvement and maintenance of forest health and diversity through the application of silvicultural practices is in place. Since 1988, this program has averaged 44,700 tree plantings each year. The full management policy is contained in Appendix B. Comprehensive Plan for the National Capital The Comprehensive Plan for the National Capital provides goals and policies that guide the Commission in evaluating and acting on plans and projects in the National Capital Region. Staff has determined that the proposed project is consistent with the following policies from the Transportation, Parks and Open Space, and Federal Environment Elements of the Comprehensive Plan for the National Capital. 1. Provide sidewalks among buildings on federal campuses as well as between federal buildings and transit stations. 2. Avoid destruction of or damage to wetlands. 3. Coordinate wetland activities with federal, state, and local government programs and regulations, and with special programs such as the Chesapeake Bay 2000 Agreement. 4. Protect the scenic and ecological values of waterways and stream valleys. 5. Minimize tree cutting and other vegetation removal to reduce soil disturbance and erosion, particularly in the vicinity of waterways. When tree removal is necessary, trees should be replaced to prevent a net tree loss. 6. Incorporate new trees and vegetation to moderate temperatures, minimize energy consumption, and mitigate stormwater runoff. 7. Restore forested buffers along waterways and stream valleys Marine Corps Base Quantico Master Plan The phased widening of Russell Road, including the Phase 2 widening project, is contained within the current 2002 MCBQ Master Plan. National Environmental Policy Act (NEPA) The MCBQ studied the Phase 2 project s impact to the natural environment through an Environmental Assessment (EA), which concluded with a Finding of No Significant Impact
9 Executive Director s Recommendation Page 9 (FONSI) on March 2, 2012 to complete their NEPA review responsibility. For federal projects in the environs, NCPC does not have independent NEPA responsibility. National Historic Preservation Act (NHPA) The EA summarizes the project s Section 106 process follows: Past the eastern terminus of this project Russell Road passes through locations that were conducive to Native American and Early Colonial settlement. Between Buildings 3300 and 3280 two sites have been identified, 44PW946 and 44PW945 dating to the Late Archaic through Late Woodland Periods (3000 BCE 1607 CE), with an early 18th century Colonial component included in the latter. After a series of Phase II archaeological investigations, these sites were determined ineligible for the National Register of Historic Places (NRHP). In both cases conditions of the sites had been degraded by the effects of erosion, plowing, and the construction of the existing roadway. No further coordination with the State Historic Preservation Officer under the National Historic Preservation Act is required. For federal projects in the environs, NCPC does not have independent Section 106 responsibility. II. CONSULTATION Coordination with local agencies In accordance with the Commission s Procedures for Intergovernmental Cooperation in Federal Planning in the National Capital Region, the project was referred by NCPC to the Virginia Department of Transportation (VDOT), the Virginia Department of Environmental Quality (DEQ), Prince William County Office of Planning, Prince William County Department of Planning, the Northern Virginia Regional Commission (NVRC), and Northern Virginia Transportation Commission on February 11, Comments received back from two of the referral agencies indicate that the project will have no significant impacts on their jurisdictions. In addition, as part of the EA process, the project s preliminary design was referred out to multiple Virginia State agencies, which all generally concurred that the project is consistent with all applicable federal and State policies and laws, assuming that proper construction methods and Best Management Practices are used for the project.
10 Executive Director s Recommendation Page 10 APPENDIX A MCBQ FINAL PROJECT SUBMISSION LETTER
11 Executive Director s Recommendation Page 11 APPENDIX A (CON T.)
12 Executive Director s Recommendation Page 12 APPENDIX B WOODLAND TREE AND SHRUB MANAGEMENT B
13 Executive Director s Recommendation Page 13 APPENDIX B (CON T.)
14 Executive Director s Recommendation Page 14 APPENDIX B (CON T.)
15 Executive Director s Recommendation Page 15 APPENDIX B (CON T.)
16 Executive Director s Recommendation Page 16 APPENDIX B (CON T.)
17 Executive Director s Recommendation Page 17 APPENDIX B (CON T.)
Executive Director s Recommendation Commission Meeting: March 5, 2015
Executive Director s Recommendation Commission Meeting: March 5, 2015 PROJECT Curseen-Morris Processing and Distribution Center Parking Lot 900 Brentwood Avenue NE Washington, DC SUBMITTED BY United States
AGENCY COORDINATION AND PUBLIC INVOLVEMENT
5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included
Corridor Goals and Objectives
Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty
Lincoln Downtown Master Plan Update
Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating
APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES
Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan
March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633
ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER
SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA
SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA A. LAND USE ELEMENT INTERPRETIVE GUIDELINES B. COMMUNITY BENEFITS C. COUNTY ACTION ITEMS Adopted by the Board of Supervisors November 9, 1999 A. Santa
Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations?
Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview Purpose of Subdivision/ Land Development Ordinances (SALDO) Municipalities Planning Code Process Design
1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile
Improving Access in Florida International University Biscayne Bay Campus Executive Summary
EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared
3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
FINDING OF NO SIGNIFICANT IMPACT FOR ROCK CREEK PARK MULTI-USE TRAIL REHABILITATION WASHINGTON, DC
FOR ROCK CREEK PARK MULTI-USE TRAIL REHABILITATION WASHINGTON, DC The District Department of Transportation (DDOT), in conjunction with the Federal Highway Administration (FHWA), the National Park Service
TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES
TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES Background One of the most critical public services provided by a community is the community s transportation system. An effective
SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing
SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing This report is prepared by the James City County Planning Division
Executive Summary. Transportation Needs CHAPTER. Existing Conditions
CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
Accident Analysis of Sheridan Road between Isabella Street and South Boulevard
Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Prepared for TranSystems Corporation for the City of Evanston Submitted by Regina Webster & Associates, Inc. Date: 08/15/2008
Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS
Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter
TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL
TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL INTRODUCTION The Town of Harrisburg is committed to establishing an interconnected, multimodal transportation system that increases mobility, safety, connectivity,
LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN
1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially
CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT
CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT MEETING DATE: SEPTEMBER 8, 2015 ITEM NUMBER: 1 SUBJECT: PROPOSED GENERAL PLAN LAND USE ALTERNATIVE FOR THE YEAR 2015-2025 GENERAL PLAN
Maryland Invests $845 Million in New Highway and Bridge Projects
Maryland Invests $845 Million in New Highway and Bridge Projects Completing Widening of MD 404 Talbot And Caroline Counties Top Regional Priority Queen Anne s, Talbot, and Caroline Counties Widening MD
D3 April 8, 2015 Public Hearing
D3 April 8, 2015 Public Hearing APPLICANT AND PROPERTY OWNER: ASSEMBLY OF YAH, INC. STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (Religious Facility - church) ADDRESS / DESCRIPTION: 5151 Locke
CPED STAFF REPORT Prepared for the City Planning Commission
CPED STAFF REPORT Prepared for the City Planning Commission CPC Agenda Item #1 June 23, 2014 RLS-72 LAND USE APPLICATION SUMMARY Property Location: 222 Hennepin Avenue Project Name: 222 Prepared By: Becca
PLANNING FOR NEW DEVELOPMENT AT THE COTTONWOOD MALL SITE
APPENDIX F PLANNING FOR NEW DEVELOPMENT AT THE COTTONWOOD MALL SITE Table of Contents The Setting Background Planning Objectives Neighborhood Protection The Concept Plan Exhibits Cottonwood Mall Site 1
MEMORANDUM OF AGREEMENT Between THE CITY OF BALTIMORE And THE MID-ATLANTIC FEDERAL PARTNERSHIP FOR THE ENVIRONMENT
MEMORANDUM OF AGREEMENT Between THE CITY OF BALTIMORE And THE MID-ATLANTIC FEDERAL PARTNERSHIP FOR THE ENVIRONMENT The Mid-Atlantic Federal Partnership for the Environment ( MAFPE ) and the City of Baltimore
SR-18 Corridor Improvements in Wood County
Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park
FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005
FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 Background: It is in the national interest to maintain the Interstate System to provide the highest level of
Chapter 7 ZONING PLAN
Chapter 7 ZONING PLAN Introduction This Chapter opens with a general description of a zoning plan. It is followed by a brief explanation of the relationship between this Growth Management Plan and the
Planning Level Cost Estimation Tool. User s Manual
Planning Level Cost Estimation Tool User s Manual Atlanta Regional Commission Submitted By: User s Manual Table of Contents 1. INTRODUCTION... 1 2. OBJECTIVE... 1 3. FRAMEWORK OF THE TOOL... 2 4. HOW TO
BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY
BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY In the Matter of the Application of ) NO. SSDP 000748 ) Kevin Robinson ) FINDINGS, CONCLUSIONS ) AND DECISION For a Shoreline Substantial Development ) Permit
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Rutgers Cooperative Extension Water Resources Program Christopher C. Obropta, Ph.D., P.E. Email: [email protected]
ELEMENT 4 - FUTURE LAND USE ELEMENT
ELEMENT 4 - FUTURE LAND USE ELEMENT Goal 1 To create a long-range development pattern which directs growth into developable areas and away from environmentally sensitive areas, in a manner that is compatible
Environmental Impact Statement for the Washington Union Station Expansion Project
This document is scheduled to be published in the Federal Register on 11/04/2015 and available online at http://federalregister.gov/a/2015-28079, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION
Florida Avenue Multimodal Transportation Study. June 19, 2013
Florida Avenue Multimodal Transportation Study June 19, 2013 Today s Agenda Team & project introduction Project Timeline What you said Tools we use Mapped data and what clues it can provide Highlights
Village of Spring Valley Comprehensive Plan 2009-2029
Chapter 8: Intergovernmental Cooperation Introduction Intergovernmental communication, coordination, and cooperation can make a significant difference in the implementation and administration of a comprehensive
BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE
BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE February 23, 2006 PROJECT INTRODUCTION Project Area 230 acres $50 million estimated market value (approximately) 50 acres parkland 100 residences (estimated)
BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.
Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation
Gold Ray Dam Interagency Technical Team Meeting
Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,
Haynes Recreation Center, Laredo, TX. Data Matrix and Sustainability Benchmarks
Haynes Recreation Center, Laredo, TX Data Matrix and Sustainability Benchmarks (Updated Spring 2010) 1 Standard Benchmarks BENCHMARKS UNITS PRE PROJECT GOAL Property value (pre/post) Assessed or redevelopment
2010 Salida Community Priorities Survey Summary Results
SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive
Virginia Department of Transportation Rural Rustic Road Program Manual
Virginia Department of Transportation Rural Rustic Road Program Manual Prepared by Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219 Jennifer
Mount Royal College Transit Service Plan
Mount Royal College Transit Service Plan Background In 2007 November response to Council Report C2007-78 West LRT Alignment, Budget and Project Delivery, Council directed the Administration to report back
Downtown Community Planning Council Meeting offebruary 18, 2015
- san diego Item #12 DATE ISSUED: ATTENTION: SUBJECT: February 13, 2015 Downtown Community Planning Council Meeting offebruary 18, 2015 Consideration of Support for Grant Applications for the San Diego
THE RUSKIN COMMUNITY PLAN
THE RUSKIN COMMUNITY PLAN Introduction Ruskin is a historic community situated on the shores of Tampa Bay, the Little Manatee River and the Ruskin Inlet, approximately 16 miles southeast of Tampa. The
Goals & Objectives. Chapter 9. Transportation
Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system
KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs
KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality
Request for Proposal. Request for Proposal for GreenLink Bellingham Technical Analysis and Community Engagement, Bellingham, WA
Request for Proposal Request for Proposal for GreenLink Bellingham Technical Analysis and Community Engagement, Bellingham, WA 1 Table of Contents: Section A: Project Scope... 3 Section B: Background...
Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts. Design and Development Guidelines. Part Two.
Revere Beach Transit-Oriented Development Parcels Revere, Massachusetts Design and Development Guidelines Request for Qualifications and Expressions of Interest with Preliminary Development Plans Part
How To Plan A Buffer Zone
Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other
Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1
Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 The Montgomery County Dept. of Environmental Protection, in cooperation with the Dept. of Permitting Services and the Washington
9.0 Alta Vista/Faircrest Heights/Riverview Park (Key Principles)
9.0 Alta Vista/Faircrest Heights/Riverview Park (Key Principles) Official Plan Consolidation for the City of Ottawa 1 9.1 Location This Chapter applies to Alta Vista/Faircrest/Riverview Park, which corresponds
COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY. Staff: Claudette Grant
COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY Project Name: ZMA 2013-00004 Hollymead Town Center Block VI Planning Commission Public Hearing: July 29, 2014 Staff: Claudette Grant Board of Supervisors
Chapter 22A Forest Conservation Law
Chapter 22A Forest Conservation Law 2014 1 Table of Contents Table of Contents Article I - General... 4 Sec. 22A-1. Short title... 4 Sec. 22A-2. Findings and purpose... 4 Sec. 22A-3. Definitions... 4 Sec.
720 Contour Grading. General. References. Resources. Definitions
720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable
A Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
CHAPTERTWO. Alternatives 2.1 ALTERNATIVES DEVELOPMENT PROCESS
2. Section 2 TWO CHAPTERTWO 2.1 ALTERNATIVES DEVELOPMENT PROCESS This EIS has been prepared in compliance with the Council on Environmental Quality (CEQ) regulations for implementing NEPA (40 CFR 1500-1508).
PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015
PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015 AT ACTON TOWN HALL FAULKNER ROOM 472 MAIN STREET ACTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED ASSABET RIVER RAIL TRAIL (ARRT) IN THE TOWNS OF ACTON
Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County
Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing
Is Encouraging More Bike Ridership On El Camino Real A Good Idea?
Is Encouraging More Bike Ridership On El Camino Real A Good Idea? In the above illustration there is a shared right turn lane on southbound El Camino Real at the intersection with Santa Cruz Avenue. Turning
North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014
North Avenue Corridor Study Advisory Committee Meeting #5 June 11, 2014 Agenda Welcome and introductions Concept refinement and evaluation: Public meeting and web survey General cross-section concepts
Woodlands Management Plan. (Draft June 2011) A. Definition of Woodlands Areas vs. Landscaped Areas of Parkfairfax
Woodlands Management Plan (Draft June 2011) I. Background A. Definition of Woodlands Areas vs. Landscaped Areas of Parkfairfax The woodlands are defined as those wooded areas of Parkfairfax which are left
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities This document summarizes and provides explanation for the purpose and intent of major recommended
MAPPING MINNEAPOLIS URBAN TREE CANOPY. Why is Tree Canopy Important? Project Background. Mapping Minneapolis Urban Tree Canopy.
MAPPING MINNEAPOLIS URBAN TREE CANOPY Why is Tree Canopy Important? Trees are an important component of urban environments. In addition to their aesthetic value, trees have significant economic and environmental
PROFFER STATEMENT REZONING TLZM 2013-0001 LEEGATE November 1, 2013
PROFFER STATEMENT REZONING TLZM 2013-0001 LEEGATE November 1, 2013 Leegate LLC and Stanley Martin Companies, LLC, owner and applicant, (the Applicant ) of certain property described as Loudoun County Tax
Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High
Multi-Modal Corridor Degree of Complexity: Cost/Benefit: Maintain the same level of service for Ensures continuous flow through the Might impact other transportation Consider road diet and/or different
ROUTE 178 CORRIDOR STUDY. Prepared For: KERN COG, CALTRANS, CITY OF BAKERSFIELD
ROUTE 178 CORRIDOR STUDY Prepared For: KERN COG, CALTRANS, CITY OF BAKERSFIELD Prepared By: Barton-Aschman Associates, Inc. December 1986 TABLE OF CONTENTS 1. INTRODUCTION 1 Study Background 1 Study Purpose
Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:
CHATTAHOOCHEE CORRIDOR PLAN Adopted 9/23/98 PART 1: GOALS. POLICY. COVERAGE. A. Goals The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are: 1. Preservation and protection
How To Design A Crash Investigation Site
CHAPTER 7 CRASH INVESTIGATION SITES December, 2000 7. Crash Investigation Sites (CIS) 7.1. Introduction and Usage The idea of "crash investigation sites" or areas outside of the freeway mainline where
Appendix A: Affordable Housing Site Inventory
Appendix A: Affordable Housing Site Inventory Following is a brief summary of the various sites considered for the Affordable Housing Project. Each site is provided with a photo when available and a concise
Town of Beaufort, NC US Highway 70 Commercial Project
Town of Beaufort, NC US Highway 70 Commercial Project Context The North Carolina Department of Transportation is proposing a new bridge and highway alignment that will relocate U.S. Highway 70 from its
Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota. Land Use Goals:
Draft Goals and Objectives Wadena Comprehensive Plan City of Wadena, Minnesota Land Use Goals: 1. Growth in Wadena will be undertaken in such a manner as to create a full range of living, working, shopping,
FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST
FHWA Minnesota Division Guidance for the Preparation of a FHWA INTERSTATE ACCESS REQUEST August 2003 Background: The Federal Highway Administration (FHWA) has retained all approval rights to the control
Provincial Policy Statement
2014 Provincial Policy Statement Under the Planning Act Ontario.ca/PPS For more copies of this document, in either English or French, please contact: Ministry of Municipal Affairs and Housing Provincial
Development proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
Development Update 2015
Development Update 2015 About Rosenberg Total Land Area: 37.2 square miles Land in ETJ: 70.8 square miles 53 percent undeveloped 2014 Population: 35,491 5.8 miles of undeveloped land on I-69 in Rosenberg
How To Amend A Stormwater Ordinance
Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental
GENERAL. This manual addresses five local programs that are funded under the current Highway Act:
OVERVIEW The Local Public Agency Manual published by the Missouri Department of Transportation (MoDOT) is intended to be used as a guide for cities and counties that sponsor projects utilizing federal
Appendix C. Municipal Planning and Site Restoration Considerations
Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning
Downtown Tampa Transportation Vision
Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org
