PUBLIC WORKS DEPARTMENT

Similar documents
Roadway Cost Per Centerline Mile Revised June 2014

Bexar County Public Works Department Flood Control Program

Pavement Management Program

Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL

Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33

Surface Transportation Program (STP)

General Obligation Bond Projects FYE

CONSTRUCTION COST ESTIMATES

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

Monitoring Highway Assets with Remote Technology

LBJ Express Project (LBJ Managed Lanes Project)

Dallas-Fort Worth Area Major Transportation Projects

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

H-GAC 2015 Call for Projects - Selected Projects

DESCRIPTION OF WORK:

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

Exhibit A Scope of Work

Definitions. For the purposes of this rule chapter the following definitions shall apply unless the context clearly shows otherwise:

SUMMARY OF CATEGORIES 2007 STATEWIDE PRESERVATION PROGRAM (SPP) _MAINTAIN IT_

Pavement Management Program

Planning Level Cost Estimation Tool. User s Manual

TECHNIQUES FOR MANUALLY ESTIMATING ROAD USER COSTS ASSOCIATED WITH CONSTRUCTION PROJECTS

Florida Class E Knowledge Exam Road Rules Practice Questions

Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES

EXHIBIT A Accessible Truck Routes Map

Improving Access in Florida International University Biscayne Bay Campus Executive Summary

Transportation Funding Overview SAMCo. Victor Boyer, Executive Director San Antonio Mobility Coalition (SAMCo) January 10, 2006

SR-18 Corridor Improvements in Wood County

5 ALTERNATIVE SOLUTIONS AND EVALUATION

Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION:

REQUEST FOR PROPOSAL. Consulting Services for a Thomas Street Corridor Master Plan

VERTICAL SPEED CONTROL DEVICES

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010)

Infrastructure assets are distinguished from other capital assets because they normally:

Wilmington to Newark Commuter Rail Improvement Project

Maryland Invests $845 Million in New Highway and Bridge Projects

CONSTRUCTION COST MODELS

Sunday, January 7, 2001 Neil R. Gross

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

Road Repaving and Street Safety Bond Quarterly Status Report presented to the Citizens General Obligation Bond Oversight Committee As of March 2016

100 Design Controls and Exceptions

SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES

Narrative Response/Attachment 1 (WisDOT TAP- Second Round Application ID-SWBP22)

REAL ESTATE ACQUISITION

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

RESOLUTIONS FOR APPROVAL OF AMENDMENTS TO THE TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP)

Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program

GOALS, OBJECTIVES, AND EVALUATION MEASURES

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

Chapter 22. Lump Sum Project Guidelines

Marshall V. Davidson Jr. Richard N. Gill

VDOT Project Advertisements from 4/1/13-6/30/14 (by advertisement)

FIBER-OPTIC CABLE PLAN CHECK

PRIORITIZATION PROCESSES

VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS

Presentation to NYSAMPO, June 2015 Steve Wilcox, P.E., Director, Maintenance Program Planning Bureau NYSDOT

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

The Colony Community Development Corporation Strategic Plan

For more information, visit: rethinkingstreets.com

NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, SPP-24 & 1512-ODP-24

Transition from SAFETEA-LU to the new MAP-21 Federal Transportation Act

Surface Transportation Program (STP) Projects

FY Highway Improvement Program 61ST REP. DIST. Sheri L. Jesiel. State Highways. MYP Years. Route/Street P.E. (PHASE II)

Road Signs Recognition Quiz

Guidelines for Fiber Optic Cable Permits

CHAPTER 2 TRAFFIC SIGNS AND HIGHWAY MARKINGS

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

EDUCATION AND PROFESSIONAL DEVELOPMENT PROFESSIONAL EXPERIENCE

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013

Transcription:

Babcock Phase V From Camp Bullis to Heuermann (Kyle Seale Pkwy to Camp Bullis Rd). Reconstruction of Babcock Rd to include two travel lanes and fourfoot shoulders. Roadway reconstruction will provide unflooded access to this segment of roadway and will include the construction of four bridges and a bridge class culvert. Status: Construction (75 %) Consultant: TEDSI Bid Opening: July 1, 2013 Contractor: J3 Companies LLC Construction Start: Nov. 19, 2013 Construction Cost: $ 8,566,353.95 Construction End Date: 1 Q 2016 Joint Bid: CPS & SAWS With Flood Control Component

Blanco Rd at Slumber Pass Traffic Signals Blanco Rd (FM 2696) at Slumber Pass. Project involves the study, design and construction of traffic signals. Status: Construction Consultant: Dannenbaum Bid Opening: July 7, 2015 Contractor: The Levy Company, L.P. Construction Start Date: 4 Q 2015 Construction Cost : $ 144,458.20 Construction End Date: 1 Q 2016 Joint Bid: N/A

Boerne Stage Road From Cross Mountain Trail to Intersection of IH 10.. The project consists of 1.1 miles of roadway reconstruction to 2-12 ft. lanes and a 14 ft. continuous center turn lane with a 6 ft. shoulder in most sections. It also consists of channel improvements to Leon Creek and drainage structure. Status: Complete. Consultants: AECOM Bid Opening: August 9, 2013 Contractor: Texas Sterling Construction Start : Dec 2, 2013 Construction Cost: $ 8,211,064 Construction End Date: 4 Q 2015 Joint Bid: SAWS, CPS-Gas With Flood Control Component

Borgfeld Dr Phase I From Timberline Dr to Hwy 281. Reconstruction approximately 14,300 linear feet of Borgfeld Road to a Secondary Arterial Type A street and reconstruct drainage culverts. Streets section will consist of a 56 foot wide pavement, including four 12 foot lanes and 4 foot wide shoulders, with roadside ditches. Status: Construction ( 99 %) Consultant: Jacobs Bid Opening : April 5, 2013 Contractor: SMC Contractors Construction Start: July 15, 2013 Construction Cost: $ 9,039,312 Construction End Date: 1 Q 2016 Joint Bid: SAWS, CPS Gas Bond 2003

Borgfeld Dr Phase II From Timberline Dr to FM 2696 (Blanco Rd) including Old Blanco Rd south of Borgfeld Drive. The project consists of 2 miles of roadway reconstruction to two-12 ft. travel lanes in each direction designated turn lanes at intersections, two 4-foot shoulders and necessary drainage. Status: Waiting utilities companies to complete relocation. Consultant: CDS Muery Services Advertise Date: 2 Q 2016 Contractor: TBD Construction Start Date: 3 Q 2016 Construction Cost: $ 9,500,000 Construction End Date: 3 Q 2018 Joint Bid: TBD

Bulverde Rd Phase IV Expansion of Bulverde Rd from Marshall Road to approximately 6,300 ft. north. Project will expand the existing two lane rural roadway section to an urban roadway section consisting of two 12 foot travel lanes in each direction with a 14 foot center median/turn lane within an 86 ROW (Typical). Status: Final Design Consultant: LAN Inc. Advertise Date: 4 Q 2016 Contractor: TBD Construction Start Date: 2 Q 2017 Construction Cost: $ 8,100,000 Construction End Date: 3 Q 2018 Joint Bid: SAWS, CPS Gas MPO Project

Bulverde Road Phase V From the end of Bulverde Road Phase IV (approx. 6,300 ft. north of Marshall Rd) to Smithson Valley Rd. Project will expand the existing two-lane rural roadway section to an urban roadway section consisting of two 12-foot travel lanes in each direction and 2 ft. to 4 ft. shoulders within an 86 ROW (typical). Status: Complete Consultants: HALFF Associates Bid Opening: Aug. 16, 2013 Contractor: Capital Excavation Construction Start: Nov. 19, 2013 Construction Cost: $ 8,291,819 Construction End Date: 4 Q 2015 Joint Bid: SAWS, CPS-Gas With Flood Control Component

Bulverde Rd Pedestrian Amenities Bulverde Rd from Evans Rd to TPC Pkwy. The proposed project will involve the installment of pedestrian amenities within the existing 86 foot Bulverde Road right-of-way for the benefit of area bicyclists and pedestrians stretching 6,864 linear feet. Status: Awarding Contractor. Consultant: KLOTZ Associates Advertise Date: 1 Q 2016 Contractor: TBD Construction Start Date: 2 Q 2016 Construction Cost: $ 970,000 Construction End Date: 4 Q 2016 Joint Bid: N/A

Marshall Rd From US 281 to Bulverde Rd. Roadway reconstruction and expansion from a 2 lanes to a 3 lane urban configuration with drainage improvements and pedestrian amenities within a 80 ROW (typical). 4,800 L.F. Status: Negotiations Consultant: TBD Advertise Date: TBD Contractor: TBD Construction Start Date: TBD Construction Cost: $ 3,000,000 Construction End Date: TBD Joint Bid: TBD January 8, 2016