1 CONSTRUCTION COST MODELS Prepared by: The New England Environmental Finance Center For the Maine Department of Transportation Office of Environmental Planning November 1, 2010 The following are a series of cost estimate models similar in format to a typical engineer s estimate that were developed in support of our financial impact assessment report for LD The models us current material costs, labor costs, and equipment costs for the region to provide a comparative cost analysis of seven culvert replacement scenarios. The models provide information about what the cost impact of LD 1725 would be for typical culvert replacements in Maine. However, due to the inherent restrictions of the cost modeling framework we were not able to include the abundance of variables that would be present in a real world culvert replacement project. As such, the models are representative of very basic culvert replacement projects and may not reflect the tremendous variety and scale of variable could be present in an actual culvert replacement project. For example, construction costs for culvert replacement in a rural setting versus an urban setting can vary by as much as 50% due to site specific variables such as lane width, paving depth, traffic count and the presence of potentially conflicting underground utilities. COST TABLE KEY: Description = description of item QTY = quantity of units Unit = unit of measurement for item Unit $ = unit cost for item Total $ = total cost for item [unit cost multiplied by quantity of units] $/LF = total cost per lineal foot
2 Scenario #1: Replacement of 48" CMP in 10 foot channel. Under LD 1725 the 1.2X bankfull measurement would be 12 feet. Depth measured from stream bottom to top of pavement of road = 8.0 feet. Site specific assumptions: 2 lane paved non arterial feeder road (rural or suburban) with low daily traffic volumes and several possible detour routes. In kind replacement of 48" CMP culvert in 10 foot channel ( bankfull) 1 Traffic Control 1 LS $1, $1, Erosion Control 1 LS $ $ RipRap 20 SY $40.00 $ Remove & Reset Guardrail 80 LF $30.00 $2, Remove Pavement 75 SY $5.00 $ Dam/Diversion of Stream 1 LS $ $ Excavation/Removal of Existing Pipe 125 CY $15.00 $1, Pipe Bedding 45 CY $20.00 $ Stuctural Backfill/Gravel Base 100 TN $18.00 $1, " CMP Culvert Galvanized Metal 50 LF $75.00 $3, Hot Mix Asphalt Pavement 20 TN $ $3, Mobilization & Miscellaneous Cleanup 1 LS $1, $1, Notes: Material used: CMP culvert $18, $/LF $ Replacement of 48" CMP with ADS culvert in 10 foot channel ( bankfull) Item Description QTY Unit Unit it$ Total l$ 1 Traffic Control 1 LS $1, $1, Erosion Control 1 LS $ $ RipRap 20 SY $40.00 $ Remove & Reset Guardrail 80 LF $30.00 $2, Remove Pavement 75 SY $5.00 $ Dam/Diversion of Stream 1 LS $ $ Excavation/Removal of Existing Pipe 125 CY $15.00 $1, Pipe Bedding 45 CY $30.00 $1, Stuctural Backfill/Gravel Base 100 TN $18.00 $1, " ADS/HDPE Culvert (smooth bore) 50 LF $70.00 $3, Hot Mix Asphalt Pavement 18 TN $ $3, Mobilization & Miscellaneous Cleanup 1 LS $1, $1, Notes: Material used: HDPE culvert (corrugated on outside with smooth bore). $18, Note: smoothbore HDPE culvert may not be allowed pending changes to LD $/LF $370.00
3 Installation of 12'W x 6'H CMP arch culvert in 10 foot channel ( bankfull) 1 Traffic Control 1 LS $2, $2, RipRap 30 SY $40.00 $1, Remove & Reset Guardrail 80 LF $30.00 $2, Remove Pavement 80 SY $5.00 $ Excavation/Removal of Existing Pipe 275 CY $15.00 $4, Stuctural Backfill/Gravel Base 195 TN $18.00 $3, ' W x 6' H CMP Arch Culvert 50 LF $ $12, Hot Mix Asphalt Pavement 25 TN $ $4, Labor & Equipment to Assemble Plates 1 LS $2, $2, Mobilization & Miscellaneous Cleanup 1 LS $ $ Notes: Material used: structural plate bottomless metal culvert. Traffic $47, Control increases due to longer closure of the road $/LF $ Installation of 12'W x 8'H 3 Sided concrete box culvert in 10 foot channel ( bankfull) 1 Traffic Control 1 LS $3, $3, RipRap 30 SY $40.00 $1, Remove & Reset Guardrail 80 LF $30.00 $2, Remove Pavement 80 SY $5.00 $ Excavation/Removal of Existing Pipe 300 CY $15.00 $4, Stuctural Backfill/Gravel Base 195 TN $18.00 $3, ' W x 8' H Open Bottomed Concrete Box Culvert 50 LF $ $35, Hot Mix Asphalt Pavement 25 TN $ $4, Mobilization & Miscellaneous Cleanup 1 LS $1, $1, Crane Rental 1 LS $3, $3, Notes: Material used: 3 sided (bottomless) precast concrete box culvert. $73, Traffic Control increases due to longer closure of the road $/LF $1,472.70
4 Scenario #2: Replacement of 48" CMP in 10 foot channel. Under LD 1725 the 1.2X bankfull measurement would be 12 feet. Depth measured from stream bottom to top of pavement of road = 14.0 feet. Note: this scenario is identical to scenario #1 with the exception of deeper fill. Site specific assumptions: 2 lane paved non arterial feeder road (rural or suburban) with low daily traffic volumes and several possible detour routes. In kind replacement of 48" CMP culvert in 10 foot channel ( bankfull) Item Description Unit Unit $ Total $ 1 Traffic Control 1 LS $4, $4, Erosion Control 1 LS $ $ RipRap 20 SY $40.00 $ Remove & Reset Guardrail 150 LF $30.00 $4, Remove Pavement 135 SY $5.00 $ Dam/Diversion of Stream 1 LS $ $ Excavation/Removal of Existing Pipe 375 CY $15.00 $5, Pipe Bedding 35 CY $30.00 $1, Stuctural Backfill/Gravel Base 450 TN $18.00 $8, " CMP Culvert Galvanized Metal 60 LF $ $9, Hot Mix Asphalt Pavement 50 TN $ $8, Mobilization & Miscellaneous Cleanup 1 LS $ $ Note: Will require shoring (trench boxes, etc.) to allow for safe excavation $44, at this depth which will significantly slow the rate of production. $/LF $ Installation of 12'W x 6H 6'H CMP arch culvert in 10 foot channel ( bankfull) 1 Traffic Control 1 LS $4, $4, RipRap 30 SY $40.00 $1, Remove & Reset Guardrail 150 LF $30.00 $4, Remove Pavement 165 SY $5.00 $ Excavation/Removal of Existing Pipe 925 CY $15.00 $13, Stuctural Backfill/Gravel Base 1120 TN $18.00 $20, ' W x 6' H CMP Structural Plate Arch Culvert 60 LF $ $15, Hot Mix Asphalt Pavement 55 TN $ $9, Labor & Equipment to Assemble Plates 1 LS $2, $2, Mobilization & Miscellaneous Cleanup 1 LS $1, $1, Notes: Trench box type shoring will not work in this case due to width of excavation. $86, Contractor will likely open cut the excavation as structural shoring would $/LF $1, be cost prohibitive in this application.
5 Installation of 12'W x 8'H 3 Sided concrete box culvert in 10 foot channel ( bankfull) 1 Traffic Control 1 LS $4, $4, RipRap 30 SY $40.00 $1, Remove & Reset Guardrail 150 LF $30.00 $4, Remove Pavement 165 SY $5.00 $ Excavation/Removal of Existing Pipe 925 CY $15.00 $13, Stuctural Backfill/Gravel Base 1100 TN $18.00 $19, ' W x 8' H Open Bottomed Concrete Box Culvert 60 LF $ $42, Hot Mix Asphalt Pavement 55 TN $ $9, Mobilization & Miscellaneous Cleanup 1 LS $1, $1, Crane Rental 1 LS $3, $3, Notes: Trench box type shoring will not work in this case due to width of excavation. Contractor will $115, likely open cut the excavation as structural shoring would be cost prohibitive in this $/LF $2, application. Sliplining of 48" CMP culvert in 10 foot channel ( bankfull) 1 Traffic Control 1 LS $ $ Erosion Control 1 LS $ $ RipRap 0 SY $40.00 $ Remove & Reset Guardrail 0 LF $30.00 $ Remove Pavement 0 SY $5.00 $ Dam/Diversion of Stream 1 LS $ $ Excavation/Removal of Existing Pipe 0 CY $15.00 $ Pipe Bedding 0 CY $20.00 $ Stuctural Backfill/Gravel Base 0 TN $15.00 $ " HDPE Snap Tite Pipe with Annular Grout 60 LF $ $18, Hot Mix Asphalt Pavement 0 TN $ $ stuctural Backfill/Gravel Base 1 LS $ $ Notes: Slipling can offer a significant savings over in kind replacement in settings where access to the $20, pipe is limited or difficult such as: high traffic locations, underground utiltity conflicts or $/LF $ excessive depth of fill. Note: sliplining would be disallowed under LD 1725.
6 Scenario #3: Replacement of 48" CMP in 7.5 foot channel. Under LD 1725 the 1.2X bankfull measurement would be 9 feet. Depth measured from stream bottom to top of pavement of road = 9.0 feet. Site specific assumptions: 2 lane paved non arterial feeder road (rural or suburban) with low daily traffic volumes and several possible detour routes. Replacement construction at this depth may require safety shoring. In kind replacement of 48" CMP culvert in 7.5 foot channel (9 1.2 bankfull) 1 Traffic Control 1 LS $1, $1, Erosion Control 1 LS $ $ RipRap 20 SY $40.00 $ Remove & Reset Guardrail 80 LF $30.00 $2, Remove Pavement 75 SY $5.00 $ Dam/Diversion of Stream 1 LS $ $ Excavation/Removal of Existing Pipe 125 CY $15.00 $1, Pipe Bedding 45 CY $20.00 $ Stuctural Backfill/Gravel Base 100 TN $18.00 $1, " CMP Culvert Galvanized Metal 50 LF $75.00 $3, Hot Mix Asphalt Pavement 20 TN $ $3, Mobilization & Miscellaneous Cleanup 1 LS $1, $1, Note: Material used: CMP culvert $18, $/LF $ Replacement of 48" CMP with 112" x 75" CMP Galvanized Arch Pipe in 75foot 7.5 channel (9 12BF) Traffic Control 1 LS $1, $1, Erosion Control 1 LS $ $ RipRap 30 SY $40.00 $1, Remove Pavement 110 SY $5.00 $ Excavation/Removal of Existing Pipe 275 CY $15.00 $4, Pipe Bedding 45 CY $30.00 $1, Stuctural Backfill/Gravel Base 220 TN $18.00 $3, " x 75" CMP Galvanized Arch (Elliptical) culvert 50 LF $ $7, Hot Mix Asphalt Pavement 75 TN $ $13, Mobilization & Miscellaneous Cleanup 1 LS $1, $1, Notes: Material used: CMP elliptical arch culvert $39, $/LF $781.20
7 Installation of 10'W x 5' 3"H CMP arch culvert in 7.5 foot channel (9 1.2 bankfull) 1 Traffic Control 1 LS $2, $2, RipRap 30 SY $40.00 $1, Remove Pavement 110 SY $5.00 $ Excavation/Removal of Existing Pipe 275 CY $15.00 $4, Stuctural Backfill/Gravel Base 195 TN $18.00 $3, ' W x 5'3" H CMP Structural Plate Arch Culvert 50 LF $ $11, Stream Bottom Gravel 40 TN $25.00 $1, Hot Mix Asphalt Pavement 75 TN $ $13, Labor & Equipment to Assemble Plates 1 LS $2, $2, Mobilization & Miscellaneous Cleanup 1 LS $1, $1, Notes: Material used: structural plate bottomless metal culvert. Traffic Control increases due to $58, longer closure of the road. $/LF $1, Installation of 10'W x 6'H 3 Sided concrete box culvert in 7 foot channel (9 1.2 bankfull) 1 Traffic Control 1 LS $3, $3, Erosion Control 1 LS $ $ RipRap 30 SY $40.00 $1, Remove Pavement 110 SY $5.00 $ Dam/Diversion of Stream 1 LS $1, $1, Excavation/Removal of Existing Pipe 300 CY $15.00 $4, Stuctural Backfill/Gravel Base 195 TN $15.00 $2, ' W x 6' H Open Bottomed Concrete Box Culvert 50 LF $ $25, Stream Bottom Gravel 40 TN $25.00 $1, Hot Mix Asphalt Pavement 75 TN $ $13, Mobilization & Miscellaneous Cleanup 1 LS $1, $1, Crane Rental 1 LS $3, $3, Notes: Traffic Control increases due to longer closure of the road $73, $/LF $1,461.00
8 Scenario #4: Replacement of 30" CMP in 6.75 foot channel. Under LD 1725 the 1.2X bankfull measurement would be 8 feet. Depth measured from stream bottom to top of pavement of road = 6.0 feet. Note: cost evaluation of a 3 side concrete box culvert was not performed for this scenario. Site specific assumptions: 2 lane paved non arterial feeder road (rural or suburban) with low daily traffic volumes and several possible detour routes. In kind replacement of 30" CMP culvert in 6.75 foot channel (8 1.2 bankfull) 1 Traffic Control 1 LS $ $ Erosion Control 1 LS $ $ RipRap 20 SY $40.00 $ Remove Pavement 45 SY $5.00 $ Dam/Diversion of Stream 1 LS $ $ Excavation/Removal of Existing Pipe 95 CY $15.00 $1, Pipe Bedding 20 CY $20.00 $ Stuctural Backfill/Gravel Base 70 TN $18.00 $1, " CMP Culvert Galvanized Metal 50 LF $35.00 $1, Hot Mix Asphalt Pavement 15 TN $ $2, Mobilization & Miscellaneous Cleanup 1 LS $ $ Note: Towns would likely not use guardrail in this situation due to shallow fill. MaineDOT may be required to use guardrail so it has been included for $13, comparison. $/LF $ Installation of 95" x 67" CMP Galvanized Arch Pipe in 6.75 foot channel (8 1.2 BF) 1 Traffic Control 1 LS $1, $1, Erosion Control 1 LS $ $ RipRap 30 SY $40.00 $1, Remove Pavement 575 SY $5.00 $2, Excavation/Removal of Existing Pipe 135 CY $15.00 $2, Pipe Bedding 35 CY $30.00 $1, Stuctural Backfill/Gravel Base 250 TN $18.00 $4, " x 67" CMP Galvanized Arch (Elliptical) culvert 60 LF $ $7, Hot Mix Asphalt Pavement 125 TN $ $21, Mobilization & Miscellaneous Cleanup 1 LS $1, $1, Notes: Pipe will be imbedded by 20% so actual height will be reduced from 67" to 54" however, the $48, depth of cover will need to be increased thus lengthening pipe and resulting in substantial reconstruction of road including:increasing fill and pavement. $/LF $969.50
9 Installation of 8'W x 4' 2"H CMP arch culvert in 6.75 foot channel (8 1.2 bankfull) 1 Traffic Control 1 LS $2, $2, Erosion Control 1 LS $ $ RipRap 40 SY $40.00 $1, Remove Pavement 75 SY $5.00 $ Excavation/Removal of Existing Pipe 175 CY $15.00 $2, Stuctural Backfill/Gravel Base 105 TN $18.00 $1, Structural Plate Arch CulvertArch Culvert 50 LF $ $9, Stream Bottom Gravel 25 TN $25.00 $ Hot Mix Asphalt Pavement 20 TN $ $3, Labor & Equipment to Assemble Plates 1 LS $1, $1, Mobilization & Miscellaneous Cleanup 1 LS $1, $1, Notes: Material used: structural plate bottomless metal culvert. Traffic Control $42, increses due to longer closure of the road. $/LF $857.30
10 Scenario #5: Replacement of 72" CMP in 14 foot channel. Under LD 1725 the 1.2X bankfull measurement would be 16 feet. Depth measured from stream bottom to top of pavement of road = 10.0 feet. Site specific assumptions: 2 lane paved non arterial feeder road (rural or suburban) with low daily traffic volumes and several possible detour routes. Replacement construction at this depth may require safety shoring. In kind replacement of 72" CMP culvert in 14 foot channel (+/ bankfull) 1 Traffic Control 1 LS $2, $2, RipRap 25 SY $40.00 $1, Remove & Reset Guardrail 90 LF $30.00 $2, Remove Pavement 115 SY $5.00 $ Dam/Diversion of Stream 1 LS $1, $1, Excavation/Removal of Existing Pipe 400 CY $15.00 $6, Pipe Bedding 45 CY $30.00 $1, Stuctural Backfill/Gravel Base 450 TN $18.00 $8, " CMP Culvert Galvanized Metal 50 LF $ $5, Hot Mix Asphalt Pavement 35 TN $ $6, Mobilization & Miscellaneous Cleanup 1 LS $ $ Note: A 72" culvert will require a minimum 10 foot wide trench to safely construct. $35, $/LF $ Replacement of 72" CMP culvert with twin HDPE pipes in 14 foot channel ( bankfull) 1 Traffic Control 1 LS $1, $1, Erosion Control 1 LS $ $ RipRap 20 SY $40.00 $ Remove & Reset Guardrail 90 LF $30.00 $2, Remove Pavement 115 SY $5.00 $ Dam/Diversion of Stream 1 LS $1, $1, Excavation/Removal of Existing Pipe 400 CY $15.00 $6, Pipe Bedding 45 CY $30.00 $1, Stuctural Backfill/Gravel Base 475 TN $18.00 $8, " ADS/HDPE Culvert (smooth bore) multiple 100 LF $45.00 $4, Hot Mix Asphalt Pavement 35 TN $ $6, Mobilization & Miscellaneous Cleanup 1 LS $ $ Notes: Installation of twin 36 inch HDPE culverts. Note: although the installation of multiple culverts $33, is currently a fairly common practice it would not be allowed under LD 1725 and is shown here for comparison purposes only. $/LF $677.00
11 Installation of 16'W x 6'H CMP arch culvert in 14 foot channel ( bankfull) 1 Traffic Control 1 LS $3, $3, RipRap 50 SY $40.00 $2, Remove Pavement 125 SY $5.00 $ Excavation/Removal of Existing Pipe 250 CY $15.00 $3, Stuctural Backfill/Gravel Base 350 TN $18.00 $6, W x6' H CMP Structural Plate Arch Culvert 50 LF $ $20, Hot Mix Asphalt Pavement 40 TN $ $7, Labor & Equipment to Assemble Culvert 1 LS $2, $2, Mobilization & Miscellaneous Cleanup 1 LS $1, $1, Notes: Traffic Control increases due to longer closure of the road $63, $/LF $1, Installation of 16'W x 6'H 3 Sided concrete box culvert in 14 foot channel ( bankfull) Item Description Quantity Unit Unit $ Total $ 1 Traffic Control 1 LS $3, $3, RipRap 50 SY $40.00 $2, Remove Pavement 95 SY $5.00 $ Excavation/Removal of Existing Pipe 350 CY $15.00 $5, Stuctural Backfill/Gravel Base 275 TN $18.00 $4, ' W x 6' H Open Bottomed Concrete Box Culvert 50 LF $ $38, Stream Bottom Gravel 70 TN $25.00 $1, Hot Mix Asphalt Pavement 38 TN $ $6, Mobilization & Miscellaneous Cleanup 1 LS $1, $1, Crane Rental 1 LS $3, $3, Notes: $85, $/LF $1,711.50
12 Scenario #6: Replacement of 96" CMP in 15 foot channel. Under LD 1725 the 1.2X bankfull measurement would be 18 feet. Depth measured from stream bottom to top of pavement of road = 10.0 feet. Site specific assumptions: 2 lane paved non arterial feeder road (rural or suburban) with low daily traffic volumes and several possible detour routes. Replacement construction at this depth may require safety shoring. In kind replacement of 96" CMP culvert in 15 foot channel (+/ bankfull) 1 Traffic Control 1 LS $1, $1, RipRap 35 SY $40.00 $1, Remove Pavement 140 SY $5.00 $ Dam/Diversion of Stream 1 LS $2, $2, Excavation/Removal of Existing Pipe 535 CY $15.00 $8, Pipe Bedding 45 CY $30.00 $1, Stuctural Backfill/Gravel Base 575 TN $18.00 $10, " CMP Culvert Galvanized Metal 50 LF $ $6, Hot Mix Asphalt Pavement 50 TN $ $8, Mobilization & Miscellaneous Cleanup 1 LS $ $ Note: A 96" culvert will require a minimum 12 foot wide trench to safely construct. $44, $/LF $ Replacement of 96" CMP culvert with twin 48" ADS/HDPE pipes in 15 foot channel ( bankfull) 1 Traffic Control 1 LS $1, $1, RipRap 35 SY $40.00 $1, Remove Pavement 140 SY $5.00 $ Dam/Diversion of Stream 1 LS $2, $2, Excavation/Removal of Existing Pipe 550 CY $15.00 $8, Pipe Bedding 45 CY $30.00 $1, Stuctural Backfill/Gravel Base 625 TN $18.00 $11, " ADS/HDPE Culvert (smooth bore) multiple 100 LF $70.00 $7, Hot Mix Asphalt Pavement 50 TN $ $8, Mobilization & Miscellaneous Cleanup 1 LS $ $ Notes: Installation of twin 48 inch HDPE culverts. Note: although the installation of multiple culverts $46, is currently a fairly common practice it would not be allowed under LD 1725 and is shown here for comparison purposes only. $/LF $934.00
13 Installation of 18''W x 8'H CMP arch culvert in 15 foot channel ( bankfull) 1 Traffic Control 1 LS $3, $3, Erosion Control 1 LS $1, $1, RipRap 65 SY $40.00 $2, Remove Pavement 195 SY $5.00 $ Dam/Diversion of Stream 1 LS $3, $3, Excavation/Removal of Existing Pipe 725 CY $15.00 $10, Stuctural Backfill/Gravel Base 700 TN $18.00 $12, 'W x8' H CMP Structural Plate Arch Culvert 50 LF $ $22, Stream Bottom Gravel 85 TN $25.00 $2, Hot Mix Asphalt Pavement 65 TN $ $11, Labor & Equipment to Assemble Plates 1 LS $2, $2, Mobilization & Miscellaneous Cleanup 1 LS $1, $1, Notes: Material used: structural plate bottomless metal culvert. Traffic Control increases due to $89, longer closure of the road. $/LF $1, Installation of 18'W x 8'H 3 Sided concrete box culvert in 15 foot channel ( bankfull) 1 Traffic Control 1 LS $3, $3, Erosion Control 1 LS $1, $1, RipRap 50 SY $40.00 $2, Remove Pavement 195 SY $5.00 $ Dam/Diversion of Stream 1 LS $3, $3, Excavation/Removal of Existing Pipe 725 CY $15.00 $10, Stuctural Backfill/Gravel Base 575 TN $18.00 $10, ' W x 8' H Open Bottomed Concrete Box Culvert 50 LF $1, $52, Stream Bottom Gravel 85 TN $30.00 $2, Hot Mix Asphalt Pavement 65 TN $ $11, Mobilization & Miscellaneous Cleanup 1 LS $1, $1, Crane Rental 1 LS $3, $3, Notes: $118, $/LF $2,372.50
14 Scenario #7: Replacement of 120" CMP in 17 foot channel. Under LD 1725 the 1.2X bankfull measurement would be 20 feet. Depth measured from stream bottom to top of pavement of road = 13.0 feet. Culverts with spans/diameters greater than 96" present construction challenges that prevent many municipalities from self performing replacement. Site specific assumptions: 2 lane paved non arterial feeder road (rural or suburban) with low daily traffic volumes and several possible detour routes. Replacement construction at this depth may require safety shoring. In kind replacement of 120" CMP culvert in 17 foot channel (+/ bankfull) 1 Traffic Control 1 LS $2, $2, RipRap 50 SY $40.00 $2, Remove Pavement 150 SY $5.00 $ Dam/Diversion of Stream 1 LS $2, $2, Excavation/Removal of Existing Pipe 550 CY $15.00 $8, Pipe Bedding 45 CY $30.00 $1, Stuctural Backfill/Gravel Base 700 TN $18.00 $12, " CMP Culvert Galvanized Metal 50 LF $ $10, Hot Mix Asphalt Pavement 50 TN $ $8, Mobilization & Miscellaneous Cleanup 1 LS $1, $1, Note: A 120" culvert will require a minimum 14 foot wide trench to safely construct. $53, $/LF $1, Replacement of 120" CMP with twin 60" HDPE culvert in 17 foot channel ( bankfull) 1 Traffic Control 1 LS $2, $2, RipRap 50 SY $40.00 $2, Remove Pavement 150 SY $5.00 $ Dam/Diversion of Stream 1 LS $2, $2, Excavation/Removal of Existing Pipe 550 CY $15.00 $8, Pipe Bedding 45 CY $30.00 $1, Stuctural Backfill/Gravel Base 750 TN $18.00 $13, " ADS/HDPE Culvert (smooth bore) multiple 120 LF $90.00 $10, Hot Mix Asphalt Pavement 50 TN $ $8, Mobilization & Miscellaneous Cleanup 1 LS $ $ Notes: Installation of twin 48 inch HDPE culverts. Note: although the installation of multiple culverts $53, is currently a fairly common practice it would not be allowed under LD 1725 and is shown $/LF $1, here for comparison purposes only.
15 Installation of 20'W x 6'H CMP arch culvert to meet the 1.2BF of a 17'W channel. 1 Traffic Control 1 LS $3, $3, Erosion Control 1 LS $1, $1, RipRap 75 SY $40.00 $3, Remove Pavement 185 SY $5.00 $ Dam/Diversion of Stream 1 LS $3, $3, Excavation/Removal of Existing Pipe 850 CY $15.00 $12, Stuctural Backfill/Gravel Base 800 TN $18.00 $14, 'W x6' H CMP Structural Plate Arch Culvert 50 LF $ $28, Stream Bottom Gravel 85 TN $25.00 $2, Hot Mix Asphalt Pavement 65 TN $ $11, Labor & Equipment to Assemble Plates 1 LS $2, $2, Mobilization & Miscellaneous Cleanup 1 LS $1, $1, Notes: Material used: structural plate bottomless metal culvert. Traffic Control increases due to $99, longer closure of the road $/LF $1, Installation of 20'W x 10'H 3 Sided concrete box culvert to meet the 1.2BF of a 17'W channel. Item Description Quantity Unit Unit $ Total $ 1 Traffic Control 1 LS $3, $3, Erosion Control 1 LS $1, $1, RipRap 50 SY $40.00 $2, Remove Pavement 185 SY $5.00 $ Dam/Diversion of Stream 1 LS $3, $3, Excavation/Removal of Existing Pipe 850 CY $15.00 $12, Stuctural Backfill/Gravel Base 650 TN $18.00 $11, ' W x 10' H Open Bottomed Concrete Box Culvert 50 LF $1, $60, Hot Mix Asphalt Pavement 65 TN $ $11, Stream Bottom Gravel 85 TN $30.00 $2, Mobilization & Miscellaneous Cleanup 1 LS $1, $1, Crane Rental 1 LS $3, $3, Notes: $128, $/LF $2,576.00
16 Sources Contech Construction Products, Inc Material Prices: CMP Culverts and Structural Metal Plate Culverts WH Shurtleff & Co Material Prices: CMP Culverts, Structural Metal Plate Culverts and HDPE Culverts Broadcove Associates Material and Labor Prices: HDPE Sliplining American Concrete Industries Material Prices: Precast Concrete Box Culvert Maine Department of Transportation Bid Tabulations: Labor Rates, Equipment Rates, Material Prices RS Means Reed Construction Data Maine Archives: Labor Rates, Equipment Rates, Material Prices
FY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS
2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the
Storm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)
BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset
Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006
Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 1.0 Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM)
FDOT Specifications List
FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...
Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY
Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm
PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
Repair or Replacement - Band-Aids vs. Surgery
Repair or Replacement - Band-Aids vs. Surgery Using RCP for the Replacement of Failed or Undersized Culverts www.concrete-pipe.org Introduction and Background Our Nation s infrastructure owners are facing
Developing Critical Path Method Scheduling (CPM)
Developing Critical Path Method Scheduling (CPM) Pretest 1. An activity which is on critical path has a planned duration of 5 days. What is the total float for the activity? a. 0 b. 1 c. 2 d. 3 Pretest
TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth
TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
Local Road Assessment and Improvement Drainage Manual
Local Road Assessment and Improvement Drainage Manual Donald Walker, T.I.C. Director, author Lynn Entine, Entine & Associates, editor Susan Kummer, Artifax, design Transportation Information Center University
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
NOTICE TO CONTRACTORS. CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW
NOTICE TO CONTRACTORS CALL ORDER 700 FEDERAL PROJECT NO. STPD-6-2(122) LOCATION: US-34/US-6,CULBERTSON-McCOOK COUNTIES: HITCHCOCK RED WILLOW The Nebraska Department of Roads will receive sealed bids in
Special Specification 7021 Water Main and Sewer Line Replacements
Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,
FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR
FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
UNIT PRICE LIST (09/30/2012) DIVISION I -EARTHWORK
LIST (09/30/2012) DIVISION I -EARTHWORK 100.1 MOBILIZATION L.S. - 11% 100.2 INSURANCE & BOND L.S. - 3% 101.1 PREPARING RIGHT OF WAY L.S. - 4% 102.1 OBLITERATING ABANDONED STREET ( < 25,000 S.Y.) S.Y. 6
Section 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
Unit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS
SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS 701.01 DESCRIPTION. Furnish and install culvert pipe, entrance pipe, and storm sewer pipe. Use units conforming to the dimensions,
Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
CHAPTER 850 PHYSICAL STANDARDS
HIGHWAY DESIGN MANUAL 850-1 CHAPTER 850 PHYSICAL STANDARDS Topic 851 - General Index 851.1 - Introduction This chapter deals with the selection of drainage facility material type and sizes including pipes,
DIVISION 4300 STORM DRAINAGE
DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES
San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS
San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these
SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.
SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION
Section 600 Incidental Construction
Table of Contents 1. Pipe Culverts... 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes... 600-5 2. Grade Adjustment of Existing Miscellaneous Structures... 600-8 3. Rebuilt Miscellaneous Structures...
1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP
5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'
SECTION III DRAINAGE
SECTION III DRAINAGE TOC-III.1 of 5 TABLE OF CONTENTS DRAINAGE FACILITIES No. Title D-1 Standard Underdrains D-2 Longitudinal Underdrain for Flexible Paving D-3 Spring Control Method & Detail D-4 Trench
X Planning X Quality X Maintenance & Operations
Delaware Department of Transportation Division of Transportation Solutions Design Guidance Memorandum Memorandum Number 1-20 Revised 1. Road Design Manual 2. Bridge Design Manual 3. Utilities Design Manual
Porous Pavement Alternatives Cost Analysis
Porous Pavement Alternatives Cost Analysis Prepared by Century West Engineering for Metro This cost analysis compares the construction costs of six different types of pavement for three different scenarios.
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
CHAPTER 5. Storm Sewer
CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water
Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
PAVER JOB INFORMATION SHEET
PAVER JOB INFORMATION SHEET JOB SITE ADDRESS: Phone # Scheduled Date Directions JOB # OWNERS NAME (S): Phone # (h) (w) GENERAL CONTRACTOR: Contact Phone ARCHITECT: Contact Phone PLANS: Specs Date Pages
SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
Part 9 SUBDRAIN DESIGN AND LAYOUT
Part 9 SUBDRAIN DESIGN AND LAYOUT Early subdrainage often consisted of placing free-draining material, mostly gravel and rock, in the axis of filled swales, as sketched above. These began to be employed
City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014
City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014 Section Subsection Name Date Modification Division 1 All subsections General Provisions
550 PIPE CULVERTS, SEWERS AND DRAINS
551.01 550 PIPE CULVERTS, SEWERS AND DRAINS 551 GENERAL 551.01 Description 551.02 Materials 551.03 Excavation 551.04 Protection of Excavation 551.05(a) Bedding for Rigid Pipe 551.05(b) Bedding for Non-Rigid
SECTION 108 - INLETS 108.1 INLET LOCATIONS
Greene County Design Standards -Adopted April 5, 1999 SECTION 108 - INLETS SECTION 108 - INLETS 108.1 INLET LOCATIONS 108.2 INLET INTERCEPTION CAPACITIES 108.2.1 Clogging Factors 108.3 INTERCEPTION AND
CULVERT AND STORM SEWER PIPE MATERIAL POLICY ON FEDERALLY FUNDED LOCAL AGENCY PROJECTS UPDATED March 2013
CULVERT AND STORM SEWER PIPE MATERIAL POLICY ON FEDERALLY FUNDED LOCAL AGENCY PROJECTS UPDATED March 2013 Background Section 5514, a final rule for SAFETEA-LU was issued on November 15, 2006 and became
Guidelines for Fiber Optic Cable Permits
Guidelines for Fiber Optic Cable Permits NOVA District (Fairfax/Arlington) Permits www.virginiadot.org/business/fairfax-permits-main.asp Email: [email protected] 14685 Avion Parkway
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection
ITD Pipe Materials Selection & Specification Procedures. July 2011
ITD Pipe Materials Selection & Specification Procedures July 2011 INTRODUCTION: This technical memorandum is written as a guide to the selection of compliant pipe materials and the elimination of non-compliant
CONSTRUCTION PERMIT REQUIREMENTS
CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department
CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices
For Asset Management
For Asset Management By: Larry Weiss SDLTAP It Begins with Accurate Inventory Inventory of existing system: The Local Roads Needs Study conducted in Aug/Sept of 08 indicated by it s results and from LTAP
A. Structures Quantity Item Price Cost @ $3,500 EA
PRINCE WILLIAM COUNTY Department of Development Services Land Development Division UNIT PRICE LIST (Performance Bonds, Landscaping Escrows, and Siltation & Erosion Control Escrows) Revised: November 17,
ADVERTISEMENT FOR BIDDERS
ADVERTISEMENT FOR BIDDERS Sealed Bids will be received by the City of Lookout Mountain, Georgia, 1214 Lulu Lake Road, Lookout Mountain, Georgia 30103, Attention: Brad Haven, City Manager until: for the
Monitoring Highway Assets with Remote Technology
Monitoring Highway Assets with Remote Technology For the Michigan Department of Transportation July 2013 DYE MANAGEMENT GROUP, INC. Project Scope Summary of Technologies Aerial Imagery with LiDAR Mobile
The unit costs are based on the trend line of the 3 low bids for the average quantity.
Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally
SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS
1 SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS TABLE OF CONTENTS I. Introduction II. General Information and Requirements A. Applying for Sewer connection B. Excavation C. Cutting Concrete and Asphalt
Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts
SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required
Riverside County Transportation Department Summary of Bids
Bids Open: 2 pm Date: Wednesday, March 4, 2015 BASE BID SCHEDULE 1 - Rudell Road Reconstruction Project NO. CODE CONTRACT PROJECT No. B3-0470 and C4-0069 COUNTY'S ESTIMATE 1 All American Asphalt Corona,
SPR PE Steel Reinforced Liner
ENGINEERED SOLUTIONS SPR PE Steel Reinforced Liner Reline Done Right Contech is your single source for rehabilitation of sanitary & storm sewers, culverts and bridges. Contech Engineered Solutions has
SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D
SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS Appendix D RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Rumbi Grill -
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
DRAINAGE HANDBOOK OPTIONAL PIPE MATERIALS
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DRAINAGE HANDBOOK OPTIONAL PIPE MATERIALS OFFICE OF DESIGN, DRAINAGE SECTION AUGUST 2014 TALLAHASSEE, FLORIDA Table of Contents Chapter 1 - Purpose... 3 1.1
SECTION 7- STORM SEWER
SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...
Township of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA
MONETARY GUARANTY PROCEDURE PACKAGE FREDERICK COUNTY, VIRGINIA Department of Planning and Development 107 North Kent Street, Suite 202 Winchester, Virginia 22601 Phone: (540) 665-5651 Fax: (540) 665-6395
Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets
Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST
FIBER-OPTIC CABLE PLAN CHECK
Engineering Division 201 North Broadway, Escondido, CA 92025 (760) 839-4651, FAX (760) 839-4597 FIBER-OPTIC CABLE PLAN CHECK To: Date: Project: Project No. Address: Check No. Attn: Via: The attached plans
817 - PIPE CULVERTS, EROSION PIPE, STORM SEWERS, SANITARY SEWERS & END SECTIONS SECTION 817
SECTION 817 PIPE CULVERTS, EROSION PIPE, STORM SEWERS, SANITARY SEWERS AND END SECTIONS 817.1 DESCRIPTION Install the size and type of pipe culvert, erosion pipe, storm sewer, sanitary sewer, end section
8.01 STORM SEWERS, CATCH BASIN LEADS, AND EXTENSIONS
8.01 STORM SEWERS, CATCH BASIN LEADS, AND EXTENSIONS 8.01.01 Description This work shall consist of installing lines of storm sewer pipe of the required inside diameter, and the necessary appurtenances,
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial
BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS
Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development
700 Life-Cycle Cost Analysis... 700-1
Table of Contents 700 Life-Cycle Cost Analysis... 700-1 701 Introduction... 700-1 701.1 Discount Rate... 700-1 702 Initial Construction... 700-1 703 Future Rehabilitation... 700-1 703.1 Introduction...
SETTLEMENT INSTRUMENTATION & MONITORING
SECTION 02445 SETTLEMENT INSTRUMENTATION & MONITORING PART 1 - GENERAL 1.01 SUMMARY A. The Work specified in this Section includes furnishing, installing, and monitoring settlement instrumentation to monitor
Estimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach
October 5 2011 Estimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach 2011 SESWA Annual Conference 2011 Southeast Stormwater Associated Annual Conference Presentation Overview
CHAPTER 9 CULVERTS 2005
CHAPTER 9 CULVERTS 2005 Culverts 9-1 Chapter Table of Contents 9.1 - Introduction 9-5 9.2 - Policy and Practice 9-5 9.3 - Large, Medium and Small Culverts 9-8 9.4 - Sources of Information 9-8 9.5 - Culvert
Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness
3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component
STORM DRAINS CHAPTER 7
CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect
VDOT 2001 Road and Bridge Standards Section 100 - Drainage Items
VDOT 2001 Road and Bridge s Page Title EW-1 EW-1A 101.01 Endwall for Pipe Culverts 12" - 36" Circular and 23" X 14" - 53" X 34" Elliptical Pipes EW-1PC EW-1APC 101.02 Precast Endwall for Pipe Culverts
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
INDEX STORM DRAINAGE PRE-APPROVED NOTES, DESIGN CRITERIA, & PLANS
INDEX STORM DRAINAGE POLICIES D-1 NOT USED D-2 Small Project Drainage Review Requirements D-3 Targeted and Full Drainage Review Requirements D-4 Prohibited and Allowed Discharges to the Storm Drainage
The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES
Approved 6/26/01 HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES All new, modified and/or changed use access(es) onto county roads shall be subject to the access and corridor protection guidelines
SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.
Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to
SECTION 33 41 00 REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:
SECTION 33 41 00 REINFORCED CONCRETE PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including
ALBEMARLE COUNTY SERVICE AUTHORITY
ALBEMARLE COUNTY SERVICE AUTHORITY AGENDA ITEM EXECUTIVE SUMMARY AGENDA TITLE: All Saints Anglican Church Request Turn Lane Project STAFF CONTACT(S)/PREPARER: Gary O Connell, Executive Director Jeremy