Bexar County Public Works Department Flood Control Program
|
|
|
- Daniella Madeline West
- 9 years ago
- Views:
Transcription
1 Bexar County Public Works Department Flood Control Program SC 4 Knoll Creek Drainage Improvements February 18, 2015
2 Meeting Agenda Introductions Bexar County Precinct 4 Chief of Staff Office of the County Manager Bexar County Flood Control (Engineering and PR) Design Consultant (San Antonio Design Group) City of San Antonio Bexar County Flood Control (Construction Team) Program Background Project Details and Construction Schedule Q&A 2
3 Knoll Creek: Project Construction Team BCFC Senior Construction Manager Ted Nelson (210) BCFC Project Construction Manager Robert (Bert) Williams (210) (Bert is BCFC contact person) BCFC Onsite Project Inspector Foster CM Group Construction Contractor J3 Company, LLC 3
4 Bexar County Flood Control Program 10 year, $500 Million Capital Improvement Program In year 8 of 10, with numerous projects heading into construction phase. The Hill Country is known as flash flood alley, with 1,000 ft. elevation drop across Bexar County. Flood Control program works with local municipalities and agencies to deliver projects that alleviate flooding across the region. Half of all flood deaths occur in vehicles. Turn around, don t drown!
5 Project Overview Construction cost: $4.45M Design Consultant: San Antonio Design Group, Inc. (SADG) Eliminating low water crossing on Jung Rd, near Stahl Rd. Eliminating low water crossing on Classen Rd., between Briarcrest St. and Stahl Rd. Enhancing drainage off of Briarcrest St., between Jung Rd. and Classen Rd. Drainage channel improvements at new culvert crossings and along Briarcrest St. Bexar County Flood Control working with City of San Antonio Transportation and Capital Improvements (TCI) department.
6 Project Benefits Allows for unflooded vehicular travel across Salado Creek Tributary during storm events up to the 100 year (1% annual chance) storm event. Allows emergency responders to safely travel across the Tributary during storm events, improving response times. Eliminates the need for barricades and lengthy detour routes during storm events. Alleviates water ponding on Briarcrest St. In conjunction with the City, the project adds dedicated left turn lane for northbound traffic on Classen Rd. to turn left onto Briarcrest St., improving safety and traffic flow at the intersection.
7 Existing low water crossing at Jung Rd. regularly experiences flooding during storm events. New culvert bridge will allow 100 year (1% annual chance) storm event to cross under roadway. Flood study shows that 4.4 ft. of water will top the existing roadway during the 100 year (1%) storm. Less than 6 of water can sweep people off their feet and wash cars downstream. Photos from May 25, 2013 which was a 5 year (25%) to 25 year (4%) storm.
8 Existing low water crossing at Classen Rd regularly experiences flooding during storm events. New culvert bridge will allow 100 year (1% annual chance) storm event to cross under roadway. Flood study shows that 4.1 ft. of water will top the existing roadway during the 100 year storm. Photo from May 25, 2013 which was a 5 to 25 year storm.
9 Typical view along Briarcrest St., between Jung Rd. and Classen Rd, where water accumulates along roadway. Drainage channel on the north side of Briarcrest St., near Briarledge St., drains directly onto the street.
10 Construction Phasing Phase 1 SC 4 Knoll Creek Construct Jung Rd. drainage improvements Road closure: Detour Knollcreek Dr. to Classen Rd to Stahl Rd Construction duration is approximately 6 months Phase 1 anticipated to run Feb 2015 to Aug 2015 Phase 2 Construct Classen Rd. drainage improvements Classen Road Closure: Detour through Knollcreek Dr. to Jung Rd to Stahl Rd Construction duration is approximately 6 months Construct drainage improvements along Briarcrest St. Briarcrest St. remain open during construction activities Phase 2 anticipated to run Aug 2015 through Feb 2016
11 Jung Road Detour Plan SC 4 Knoll Creek
12 Classen Road Detour Plan
13 COSA Higgens Project SC 4 Knoll Creek
14 Contact Info Bexar County Flood Control CIP City of San Antonio 233 N. Pecos, Suite 480 TCI Department San Antonio, TX Joey Doctor Website Presentation will be posted on the website 14
Draft Transportation Management Plan for Via Verdi Repair Project
for Via Verdi Repair Project prepared for City of Richmond This report was prepared by: This report was reviewed by: Ryan McClain, P.E. Fehr & Peers TABLE OF CONTENTS 1.0 INTRODUCTION & PROJECT DESCRIPTION...
SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS
UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line
Informational Workshop Public Meeting Kanawha Falls Bridge Project
Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal
1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.
SECTION 6: REQUIREMENTS FOR A DRIVEWAY CONNECTION A. Required information. The application shall be accompanied by a sketch of the proposed driveway which at a minimum shall indicate: 1. Geometric information
VERTICAL SPEED CONTROL DEVICES
H-3.8 VERTICAL SPEED CONTROL DEVICES GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Vertical Speed Control Devices in the design and construction of elements
Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County
Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing
Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program
Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program Field Inspection Notes 27 29 September 2012 Introduction The U.S. Army Corps of Engineers (Corps), in
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
URBAN DRAINAGE CRITERIA
URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities
General Obligation Bond Projects FYE 2013-2018
General Obligation Bond Projects FYE 2013-2018 2009 City of Norman Community Survey Final Report 2011 CTP Survey Results Storm Drainage and Street Widening Projects Combined Storm Water/Transportation
TENNESSEE GAS PIPELINE COMPANY, L.L.C.
TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,
South Carolina Department of Transportation Engineering Directive Memorandum
South Carolina Department of Transportation Engineering Directive Memorandum Number: 36 Primary Department: Preconstruction Referrals: None Subject: Public Notification of Bridge Replacement Projects On
ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS
ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE
Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M.
Fort Dodge Stormwater Master Planning Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Project Location Project Background Flooding History Localized flooding and storm sewer
Town of Amherst Flood Plan Annex
Town of Amherst Flood Plan Annex The following document is an annex to the Town of Amherst Disaster Plan and is specifically used as a guideline for Flooding events Flood Plans can enable a flexible response
FOR IMMEDIATE RELEASE September 17, 2013 Contact:
NEWS RELEASE FOR IMMEDIATE RELEASE September 17, 2013 Contact: Diana L. Klink 757.514.4104 757.359.1845 Tim Kelley 757.514.4103 757.871.3039 UPDATE (Bridge Road/Mills Godwin Bridge) The work scheduled
Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements
Moving Ruston Forward City of Ruston Infrastructure Maintenance and Improvements MLK Extension Project will be done in conjunction with proposed water and sewer improvements Connect Martin Luther King
Texas. DeVry Impact. Summary Statistics. Earnings by Education Level. Total Wage Growth Over Studied Period. 65% Growth $44,262. 42% Growth $39,478
Texas DeVry Inc. s eight Texas locations 1 produced $82.7 million in economic impact in FY2010. As part of this economic impact, DeVry Inc. schools supported 809 jobs. Wage Impact annually, while the degree
Flood Protection in Garland Past, Present, and Future. Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas
Flood Protection in Garland Past, Present, and Future Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas A few facts about Garland: Originally incorporated in 1891 Population 226,876 (2010
Floods are too much water on normally dry land. Rivers can flood after heavy rain has fallen over a long period of time. River flooding can last
Floods are too much water on normally dry land. Rivers can flood after heavy rain has fallen over a long period of time. River flooding can last weeks or longer. River floods usually occur slowly enough
HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES
Approved 6/26/01 HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES All new, modified and/or changed use access(es) onto county roads shall be subject to the access and corridor protection guidelines
Flagger Training & Certification
Flagger Training & Certification Flagger Training & Certification TMI has a staff of qualified professionals whose knowledge and skills are invaluable to our classroom and online training programs. TRAFFIC
5.14 Floodplains and Drainage/Hydrology
I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important
10.1. UNALLOCATED COST DISTRIBUTION Chapter 10 UNALLOCATED COST DISTRIBUTION NARRATIVE
Chapter 10 UNALLOCATED COST DISTRIBUTION 10.1 NARRATIVE Costs that cannot be directly related to a specific road, construction/engineering project, or unit of equipment are considered unallocated costs.
TOWN OF HARRISBURG FIRE DEPARTMENT 6450 Morehead Road, Harrisburg North Carolina 28075 Phone: 704 455 3574 Fax 704 455 6391 www.harrisburgfd.
FLOOD FACTS AND SAFETY TIPS Floods are one of the most common hazards in the United States. Flood effects can be local, impacting a neighborhood or community, or very large, affecting entire river basins
Small Dam Hazard Assessment Inventory
Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible
2012 Program Report. Agricultural Group Drainage Program
2012 Program Report Agricultural Group Drainage Program Accomplishments: It was a successful year for the drainage program. We were able to complete two new projects and seven maintenance projects throughout
General Insurance - Domestic Insurance - Home Contents Storm water damage policy exclusion flood damage
Determination Case number: 227307 General Insurance - Domestic Insurance - Home Contents Storm water damage policy exclusion flood damage 4 April 2011 Background 1. The Applicants insured their home contents
Walking Route the assigned or authorized route a pupil walks to arrive at school or at the designated bus stop.
BUSINESS NON-INSTRUCTION OPERATION 3541 TRANSPORTATION I. GENERAL It is the goal of the Board of Education to establish for the public schools an appropriate transportation system one which will enable
Greater Los Angeles County Region
Attachment 6 Greater Los Angeles County Region IRWM Implementation Grant Proposal Monitoring, Assessment, and Attachment 6 consists of the following items: Monitoring, Assessment, and. The purpose of this
Action plans for hotspot locations - Ash Study
Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side
Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE
Frequently-Asked Questions about Floodplains and Flood Insurance What is a floodplain? The floodplain is any area covered by water during normal water flows, and which could be inundated as a result of
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
Town of Bellingham DEPARTMENT OF PUBLIC WORKS. Snow and Ice Control FAQs. Q. Can I push snow from my property onto the sidewalk or street?
Frequently Asked Questions Town of Bellingham DEPARTMENT OF PUBLIC WORKS Snow and Ice Control FAQs Q. Can I push snow from my property onto the sidewalk or street? Bylaw 15.02 restricts this act and you
Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS
Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro
BRIDGES ARE relatively expensive but often are
Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
Wilmington to Newark Commuter Rail Improvement Project
Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion
Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
CHAPTER 4 EXISTING STORMWATER MANAGEMENT SYSTEM
CHAPTER 4 EXISTING STORMWATER MANAGEMENT SYSTEM INTRODUCTION The analysis of stormwater management system performance requires knowledge of the system components. This chapter presents a description of
City Council Agenda Item Report October 13, 2015
City Council Agenda Item Report October 13, 2015 Contact Chance Sparks, AICP, CNU-A, Director of Planning 512-312-0084 / [email protected] SUBJECT: APPROVAL OF A PRELIMINARY PLAN FOR THE BUDA BUSINESS
Pennsylvania Flood Safety Awareness Week March 6-10th, 2015
Pennsylvania Flood Safety Awareness Week March 6-10th, 2015 David J. Nicosia Warning Coordination Meteorologist National Weather Service Binghamton, NY Flooding is a coast to coast threat to the United
Homeowner s Guide to Drainage
Homeowner s Guide to Drainage a scottsdale homeowner s guide to drainage produced by the city of scottsdale s stormwater management division Transportation Department TABLE OF CONTENTS Introduction 2 Drainage
Evaluation of the Shared-Use Arrow
Evaluation of the Shared-Use Arrow Table of Contents Page Evaluation of the Shared-Use ARROW Background... 1 ARROW Design... 1 ARROW Placement... 2 Wayne E. Pein William W. Hunter J. Richard Stewart Report
Roadway Closures / Limited Access Air Force Association Cycling Classic Sunday, June 12 th. STREET CLOSURES 4:00 AM to 10:00 AM
Roadway Closures / Limited Access Air Force Association Cycling Classic Sunday, June 12 th lease be aware that numerous roads will be closed Sunday, June 12 th, 2016 between the hours of 4:00 AM and 3:00
Swannanoa River Flood Risk Management Study
Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River
Subject: Presentation - TTC/Transportation Services Joint Surface Transit Initiatives
INFORMATION Subject: Presentation - TTC/Transportation Services Joint Surface Transit Initiatives Date: May 27, 2015 Stephen Buckley, General Manager, Transportation Services has been invited by the Chair
5 ALTERNATIVE SOLUTIONS AND EVALUATION
Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable
9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015
9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,
OURIMBAH FLOOD RESPONSE PLAN
OURIMBAH FLOOD RESPONSE PLAN February 2014 2 EMERGENCY CONTACT DETAILS Security Services for all Emergencies (24 Hours) Ourimbah 4348 4222 If not able to be reached please call Newcastle on Newcastle 4921
STANDARD ELEMENTS OF A CONSTRUCTION MANAGEMENT PLAN
STANDARD ELEMENTS OF A CONSTRUCTION MANAGEMENT PLAN JULY 2015 Standard Elements of a Construction Management Plan (CMP) This guidance tool was developed through partnership between the Department of Planning
Guelph Driving School. 246 WOOLWICH ST. Unit C Guelph, Ontario N1H 3V9. Office: 519-829-8801 Cell: 519-362-5664. Email: info@guelphdrivingschool.
246 WOOLWICH ST. Unit C Guelph, Ontario N1H 3V9 Office: 519-829-8801 Cell: 519-362-5664 Email: [email protected] Dear Student, We would like to take this opportunity to thank you for choosing
Appendix I: BMP Inspection Form CASQA SWPPP Template 91 January2011 BMP INSPECTION REPORT Date and Time of Inspection: Date Report Written: Inspection Type: (Circle one) Weekly Complete Parts I,II,III
HCP Team Meeting. November 18, 2015. icfi.com
HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next
Standard Site Drainage and Erosion Control Details (August 15, 2006)
City of St. Petersburg Construction Services and Permitting Standard Site Drainage and Erosion Control Details (August 15, 2006) Attached are the City Engineer s approved City standards dated September
LIMITED SCOPE CONCEPT DEVELOPMENT REPORT
LIMITED SCOPE CONCEPT DEVELOPMENT REPORT Route 33 Resurfacing Project Eastbound: Milepost 24.2 to Milepost 28.9 Westbound: Milepost 24.3 to Milepost 28.9 Manalapan & Freehold Townships, Monmouth County
Innovative Approaches in Flood Damage Reduction
Innovative Approaches in Flood Damage Reduction Solutions for the Stormwater Management High Level Results 3D geospatial model of storm water management pond (GRCA, 2013) Enhanced understanding of storm
Transportation Management Plan Template
DATE: TO: FROM: SUBJECT: Date Name Position Transportation Service Center Name Position Transportation Service Center Transportation Management Plan Job Number(s) Control Section(s) Route Details County
TOWN OF NEW HAVEN ROAD PLAN
1 TOWN OF NEW HAVEN ROAD PLAN BACKGROUND The Town of New Haven, Vermont consists of 42 square miles of land and a population of approximately 1400 people. At the start of the 21 st century, it is served
PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015
PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015 AT ACTON TOWN HALL FAULKNER ROOM 472 MAIN STREET ACTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED ASSABET RIVER RAIL TRAIL (ARRT) IN THE TOWNS OF ACTON
FULFORD HEATH GOLF CLUB - Ride on Buggy Policy
FULFORD HEATH GOLF CLUB - Ride on Buggy Policy 1. Introduction 1.1 Use is regulated by Fulford Heath Golf Club s policy with due regard to section 6 of The Equality Act 2010 1.2 During normal conditions
DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS
DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS The City of DeSoto s Department of Development Services is the point of contact for storm drainage related issues. The following are some frequently
11 p.m. to. Tuesday, June. will remain open. 14. closed
June 3, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 [email protected] Important Lane Closures June 5 11 Include Northbound Beltway Lanes, Eastbound Dulles Airport Access
Spill Prevention, Control & Cleanup SC-11
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Spills and leaks, if not properly controlled, can adversely impact the storm drain system and receiving waters. Due to
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
Belmont Street Bridge Rehabilitation Project
Belmont Street Bridge Rehabilitation Project Christian Gospel Church Worcester 43 Belmont Street Worcester MA February 20, 2015 7:00PM Agenda Introductions Project site and overview Project history Construction
SITE PLAN REVIEW RESOLUTION BERGEN COUNTY, NEW JERSEY
SP SITE PLAN REVIEW RESOLUTION BERGEN COUNTY, NEW JERSEY Document available on line at www.co.bergen.nj.us/planning TABLE OF CONTENTS I. DEFINITIONS FOR SITE PLAN RESOLUTION II. PROCEDURES: A. General
Modelling of Urban Flooding in Dhaka City
Modelling of Urban Flooding in Dhaka City Chusit Apirumanekul*, Ole Mark* *Water Engineering & Management, Asian Inst. of Technology, PO Box 4, Klong Luang, Pathumthani 12120, Thailand Abstract Flooding
Lisgar District Basement Water Infiltration Investigation Answers to Residents Written Questions Received by Councillors Ward 10 Office
Lisgar District Basement Water Infiltration Investigation Part A Answers to Technical Questions 1. There has been a tremendous amount of work done everywhere along the creek. If there was nothing wrong
DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST
State of California Business, Transportation and Housing Agency DISTRICT 3 TRAFFIC MANAGEMENT PLAN CHECKLIST District / EA: District 3/ EA 03-3E380 Date Prepared: 1/10/2013 Prepared By: Robert Himes Stage
Section 6 Traffic Analysis
Section 6 Traffic Analysis Traffic Operations of the Preferred Network Alternative After the Preferred Network was identified and confirmed by local policy makers and area residents, detailed traffic analysis
I-25/ARAPAHOE INTERCHANGE RECONSTRUCTION PROJECT
MANDATORY PRE-BID SIGN IN CDOT Carrie DeJiacomo, Program Engineer John Hall, Resident Engineer Telecia McCline, Project Manager Tammy Maurer, Assistant Project Manager David Evans/Hartwig Design Consultant
FLOOD PROTECTION BENEFITS
IV. (340 points) Flood Protection Benefits A. Existing and potential urban development in the floodplain (50) 1. Describe the existing and potential urban development at the site and the nature of the
Chaudière Crossing Bridge Rehabilitation
Chaudière Crossing Bridge Rehabilitation Douglas K. Lowry P. Eng., Armtec Infrastructure Incorporated David Delicate, P.Eng. Public Works and Government Services Canada (Retired) Prepared for presentation
Vehicle Tracking Pad
Stormwater Quality Best Management Practices Construction Sites s When to use: Where construction vehicles leave active construction areas onto surfaces where runoff is not checked by sediment controls
Storm Drain System Operation and Maintenance
Santa Clara Valley Urban Runoff Pollution Prevention Program PUBLIC AGENCY ACTIVITIES Performance Standard and Supporting Documents for Storm Drain System Operation and Maintenance December 19, 1996 March
Alternatives Presentation Meeting Middlebury WCRS(23)
Alternatives Presentation Meeting Middlebury WCRS(23) Main Street (VT 30/TH 2 Bridge 102) and Merchants Row (TH 8 Bridge 2) over Vermont Railway June 4, 2013 Twilight Hall Auditorium, Middlebury College
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water