1 Narrative Response/Attachment 1 (WisDOT TAP- Second Round Application ID-SWBP22) 2. For Bicycle and Pedestrian Projects: Clearly indicate the location, length, width, surface materials, and any connections to existing or planned facilities. The proposed VIP Trail Expansion project is located on the south end of the Gundersen Health System La Crosse Campus,starting east of 7th St. South and continuing East along Swift Creek before heading North, ending on South Ave. adjacent to the Gund Brewery Lofts. The easternmost section of the trail will branch off and connect to Maple Street and a large expanse of the southern part of the City to this trail netowrk. The trail will be approximately 0.80 miles in length, paved in asphalt, and widened from 8 to 10 in width with a 2ft wide gravel shoulder and a 5 screenings running so that is meets (AASHTO) standard. This trail connects to the existing Isle La Plume multi-modal trail. It willl also connect to existing & proposed dedicated on-street bike lanes which connect to a large retail center. How many new or replacement trips are expected and from which modes i.e. biking or walking? Much of the Powell-Poage Neighborhood (2,500+ residents) to the north has expressed their desire for a connection to the VIP Trail in order to access the waterfront and the off-street trail network to parks and La Crosse s Historic Commercial Downtown. Also, the residential neighborhoods to the east & south (8,000+ residents) will have safe access to the trail network, which they have not had before, and it is anticipated that a large percent of this neighborhood will utilize this new facility. There are also approximately 170 residents living in the Gund Brewery Lofts and 100+ residents and staff in the new senior living facility that will soon have direct access to the trail network. It is estimated that biking trips will be greater than 100 per day and walking trips will be greater than 50 per day. How much of the new or replacement use is for work or other utilitarian trips? In a recent survey, Gundersen Health System employees cited a lack of a connection to the VIP Trail and traffic on Hwy 16/41 impacted their ability to commute on a regular basis in a multi-modal manner. Also, this project will connect thousands of residents to many of the employment centers and retail establishments in La Crosse. How many auto trips will be eliminated? It is anticipated that hundreds of auto trips will be eliminated on a weekly basis.

2 What is the average trip distance of auto trips that will be eliminated? An average distance is difficult to determine. An expected average range is anywhere from 1-5 miles. 3. For all projects, to the extent not already addressed in answers to the questions above, describe project benefits by answering the following questions: Timeline How will the project sponsor ensure that the project is implemented on time, in accordance with the Project Costs and Dates section of the pre-scoping application? If awarded, the design of this project would be included in the City Engineering Department s 2015 work plan as stated in the pre-scoping application. The project sponsor would begin developing maintenance and access easements with Gundersen Health System and Gorman and Company, Inc., and ensure that funding is allocated in the Capital Improvement Budget and a State Municipal Agreement is executed so construction can commence in What obstacles or problems must be overcome to implement this project? No obstacles or problems are anticipated. Gundersen Health System has stated to the City that they are ready to begin developing the necessary easements to complete this project and the Common Council is expected to pass the required Resolution of Support in mid-april In light of project obstacles, describe how the project sponsor will comply with state law and policy requiring project commencement within four years, and project completion within approximately six years. All state laws and policies will be complied with and the project will be completed within the required timeframe. Connectivity How, if at all, does the proposed project add connectivity to the state s multi-modal transportation network, including bicycle, pedestrian and transit facilities? This project will connect a 144 unit Senior Living Facility, an 85 unit mixed income apartment building, three residential neighborhoods, and a health care facility with 4,000+ employees to a trail network that connects to the Great River State Trail System via off-street trails and dedicated on-street bicycle and pedestrian facilities. Transit stops are located within a ¼ mile of the trail and all buses are equipped with bike racks. Describe whether the proposed project is within ½ mile of any of the listed facilities; and describe how,

3 if at all, the proposed project would connect to these existing land uses: public park, school, library, public transit, employment and/or retail centers, residential areas, other. This project is within a ½ mile of Gundersen Health System, the largest employer in La Crosse County. It is also within a ½ mile of public waterfront, parks and the Green Island Park & Ice Area and connects large residential areas in south La Crosse to the off-street trail network. This project also connects to other bicycle and pedestrian facilities that are within ½ mile of more parks, schools, and retail centers. Safety Describe how the proposed project makes transportation facilities safer and less intimidating for nonmotorists. With the connection to Maple Street and the residential neighborhood to the southeast, this project will allow those residents to access the off-street trail system safely without having to travel along a 6 sidewalk section of U.S. Highways 14/61 that has an ADT count of 18,500 and along streets that bring 4,000+ employees and 2,000 visitors a day to the Gundersen Health System La Crosse Campus. If the proposed project location has undergone a walk or bike audit, provide any pertinent information regarding safety concerns revealed in that audit. Surveys that were conducted in this area indicated that residents did not feel safe riding on this section of U.S. Highways 14/61 or through Gundersen s La Crosse Campus and desired a safer connection to the trail system. Miscellaneous What will make this project a success, especially as compared to other proposed projects of the same or similar type? This project will be successful due to the strong partnership between the City of La Crosse, Gundersen Health System, the Powell-Poage-Hamilton Neighborhood, major residential developments, and the bicycle and pedestrian community. This project was identified in the City Of La Crosse s Bicycle and Pedestrian Master Plan that was adopted in 2012 and in the Joint Neighborhood Campus Plan developed between Gundersen, the City the Powell-Poage-Hamilton Neighborhood in 2013 and is a critical component to completing our trail network. In addition, Gundersen intends to use this trail as part of their annual Steppin Out in Pink event, a benefit walk for breast cancer research, which annually attracts more than 5,000 participants..

4 REDFIELD ST 10TH ST S 9TH ST S City of La Crosse Gundersen Health System Campus GREEN BAY ST HIGH ST _ ^ Gund Brewery Lofts SO SIMS PL WOLLAN PL AV E WESTON ST 7TH ST S COOK ST UT H MAPLE ST BENORA LEE CT Isle La Plume Trail Future Bethany Lutheran Senior Housing City of La Crosse WisDOT TAP Application VIP Trail Expansion/Extension Location Map Existing VIP Trail to be reconstructed by Bethany Lutheran Senior Housing Development to a 20' wide reinforced path to serve bicycles and pedestrians and as an emergency fire lane Existing VIP Trail will be widened from 8' to 10' with a 2' wide gravel shoulder and 5' adjacent running path Extensions of VIP Trail that will be 10' wide with a 2' wide gravel shoulder and 5' adjacent running path Feet Date: 12/10/2013

5 CONFIDENTIAL INFORMATION Project Costs and Dates NOTE: do not include pages A 7 and A 8 in the Concept Definition Report (CDR) for approved TAP projects. Project Costs Complete the table below for the appropriate fiscal years of the application/project cycle ( ). If a sponsor proposes to construct a project in phases throughout multiple years, schedule the project costs as appropriate and provide further details in the project description. You must attach a detailed breakdown of project costs (line item expenses; expenses per year, etc.) as part of responding to this Project Costs & Dates section. Project Dates In addition to providing fiscal year in the table below, within the attached breakdown of project costs please provide estimated month and year the project will begin for each project phase. Design work is typically completed in six months unless environmental impacts exist, real estate transactions and railroad crossing approvals take at least a year to complete, and projects should be built within one construction season unless the project is very large. Submit a separate application and budget for each project or stand alone project segment for which you are willing to accept funding, or for a bike trail section that could function as a separate facility. Project requests are not considered for partial funding. Applicants should reference the WisDOT 2012 Cost Estimate Table prior to completing this section of the application: NOTES: Requesting design and construction projects in the same fiscal year is not allowed. Please refer to the corresponding WisDOT TAP Guidelines for a chart that clarifies the timeframe included in each state fiscal year. Tied Projects? Please indicate which projects will be tied (if applicable): (See instructions, I 5) TOTAL PROPOSED PROJECT COST $665, Total Proposed Project Costs include the federal AND local share of all project phases. Please provide additional project cost detail utilizing the fields below. Construction: Basis for Construction Estimate: Itemized Per Square Foot Past Projects WisDOT 2012 Cost Estimate Table (see hyperlink above) 10/31/2013 A 7 Other, please specify: Project Prioritization If a sponsor is submitting more than one project in an urbanized area within an MPO, the sponsor must rank each project in priority order, e.g., 1 (highest priority) to 5 (lowest), for the local priority among five projects. MPO staff will use the local ranking as a guide during application review and prioritization. Local sponsor prioritization for projects outside of MPO areas is also required.

6 Project Priority: 2 Construction (minimum infrastructure project cost (including design and construction) is $300,000): Federal Share of the Participating Construction Cost (80%) $440, Local Share of the Participating Construction Cost (20%) $110, Non Participating Construction Cost (100% Local) $0 A. Subtotal Construction Costs $550, CONFIDENTIAL INFORMATION (continued) Project Costs and Dates NOTE: do not include pages A 7 and A 8 in the Concept Definition Report (CDR) for approved TAP projects. B. State Review for Construction (see instructions, page I 7, Table 1) Percentage: 9 % $49, Construction with State Review Cost Estimate (sum lines A and B) $599, Design: 100% Locally Funded (state review is required to be included as 100% locally funded) OR 80% Federally Funded ( state review only projects are not allowed) Project Priority: 2 A. Plan Development (see instructions page I 7, Table 1) Percentage: 10 % $55, B. State Review for Design (see instructions, page I 7, Table 1) Percentage: 2 % $11, Design with State Review Cost Estimate (sum lines A and B) $66, Real Estate: (Recommend funding with local funds.) Project Priority: Total Real Estate Cost (minimum $100,000) $ Non Infrastructure/Other: (Planning, Administration, non infrastructure SRTS projects): Project Priority: Total Non Infrastructure Cost (minimum $50,000): $ Utility: (Compensable utility costs must be $50,000 minimum per utility. Recommend funding with local funds.) Project Priority: Total Utility Cost (round to next $1,000) $ 10/31/2013 A 8

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR

CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile

More information

DESIGN ASSISTANCE APPLICATION

DESIGN ASSISTANCE APPLICATION DESIGN ASSISTANCE APPLICATION for FY 2016 NEW RIVER MULTI USE PATH: PINNACLE PEAK ROAD TO HAPPY VALLEY ROAD CITY OF PEORIA APPLICATIONS ARE DUE VIA ONLINE SUBMITTAL BY 10:00 AM ON MONDAY, JUNE 29, 2015

More information

Pedestrian & Bicycle Plan

Pedestrian & Bicycle Plan RAMSEY COMMUNITIES COUNTYWIDE Pedestrian & Bicycle Plan PRIMER: LEGAL FRAMEWORK PRIMER: LEGAL FRAMEWORK Walking and Biking for All e 2 CHAPTER 2: Walking and Biking for All This page intentionally left

More information

Wilmington Urban Area Metropolitan Planning Organization Surface Transportation Program Direct Attributable Project Submittal Guide Fiscal Year 2016

Wilmington Urban Area Metropolitan Planning Organization Surface Transportation Program Direct Attributable Project Submittal Guide Fiscal Year 2016 Wilmington Urban Area Metropolitan Planning Organization Surface Transportation Program Direct Attributable Project Submittal Guide Fiscal Year 2016 Date of Release: September 14, 2015 Pre application

More information

New Jersey SRTS Travel Plan Guide

New Jersey SRTS Travel Plan Guide New Jersey SRTS Travel Plan Guide Prepared For: Funded By: Prepared By: New Jersey Department of Transportation Federal Highway Administration Alan M. Voorhees Transportation Center Edward J. Bloustein

More information

Capacity Deficiency Project Application Jackson MPO Surface Transportation Program

Capacity Deficiency Project Application Jackson MPO Surface Transportation Program Capacity Deficiency Project Application Jackson MPO Surface Transportation Program The following information must be completed for all Capacity Deficiency proposed Jackson MPO STP projects. MPO staff will

More information

REGIONAL NON-MOTORIZED TRANSPORTATION NETWORK

REGIONAL NON-MOTORIZED TRANSPORTATION NETWORK Chapter 10 Bicycle and Pedestrian SAFETEA-LU legislation requires that non-motorized users be considered in the LRTP. The legislation allows for bicycle and pedestrian safety to be incorporated into the

More information

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan

More information

Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street

Stone Way N Rechannelization: Before and After Study. N 34th Street to N 50th Street City of Seattle Department of Transportation Stone Way N Rechannelization: Before and After Study N 34th Street to N 50th Street May, 2010 INTRODUCTION Population density in Seattle is increasing within

More information

Lincoln Downtown Master Plan Update

Lincoln Downtown Master Plan Update Lincoln Downtown Master Plan Update Table of Contents Executive Summary........................................... 1 Complete Streets Framework.................................... 3 Promenade Creating

More information

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality

More information

PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015

PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015 PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015 AT ACTON TOWN HALL FAULKNER ROOM 472 MAIN STREET ACTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED ASSABET RIVER RAIL TRAIL (ARRT) IN THE TOWNS OF ACTON

More information

Needs Analysis. Long Beach Bicycle Master Plan. Bicycle Commuter Needs. LONG BEACH BICYCLE MASTER PLAN Needs Analysis

Needs Analysis. Long Beach Bicycle Master Plan. Bicycle Commuter Needs. LONG BEACH BICYCLE MASTER PLAN Needs Analysis Long Beach Bicycle Master Plan Needs Analysis The purpose of reviewing the needs of commuter and recreational bicyclists is twofold: (1) it is instrumental when planning a system which must serve both

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

Koser Field. 7th St SE 2.25

Koser Field. 7th St SE 2.25 Submited on: 1/31/2014 Managing Entity: Contact Information: Watford City Park District PO Box 13 Watford City, ND 58854 Robin Arndt PO Box 13 Watford City, ND 58854 PHONE : Email: sarndt@ruggedwest.com

More information

Oregon City Clackamas County Red Soils Campus

Oregon City Clackamas County Red Soils Campus Oregon City Clackamas County Red Soils Campus Clackamas County Red Soils Campus Oregon City The Clackamas County Red Soils Campus focus area is located in the City of Oregon City. It is situated approximately

More information

For more information, visit: rethinkingstreets.com

For more information, visit: rethinkingstreets.com For more information, visit: rethinkingstreets.com 37 Arterial Rehab Busy, multi-lane streets, often referred to as arterials, crisscross the landscape of our cities and suburbs. Alongside these wide thoroughfares,

More information

EPA Technical Assistance for Sustainable Communities Building Blocks

EPA Technical Assistance for Sustainable Communities Building Blocks EPA Technical Assistance for Sustainable Communities Technical Assistance Tool: Complete Streets Deerfield Beach, Florida February 16, 2012 To: CC: Amanda Martinez, City of Deerfield Beach Roger Millar,

More information

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High Multi-Modal Corridor Degree of Complexity: Cost/Benefit: Maintain the same level of service for Ensures continuous flow through the Might impact other transportation Consider road diet and/or different

More information

AREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF

AREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF FILE NO.: Z-9020 NAME: Hometown Tax Service Short-form PD-O LOCATION: Located at 3008 West 12 th Street DEVELOPER: Mark Green 65 Westfield Loop Little Rock, AR 72210 SURVEYOR: Kittler-Roberts Group, LLP

More information

Motorcycle & Pedestrian Master Plans in Indianapolis, Indiana

Motorcycle & Pedestrian Master Plans in Indianapolis, Indiana PROJECT PURPOSE The Warsaw + Winona Lake Bicycle and Pedestrian Master Plan establishes a comprehensive framework for a connected bicycle and pedestrian system that will be used for both recreation and

More information

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Transportation & Mobility projects that meet the following criteria: enhances regional mobility; supports public transit;

More information

Topic 2 11/28/2012 Blocks & Street Network

Topic 2 11/28/2012 Blocks & Street Network TOPIC 2 Blocks & Street Network Implementation Note: 1. Some recommendations are summarized in the tables herein. For complete recommendation language, please see the. 2. Recommendations referenced in

More information

ARC Bike/Ped Plan Equity Discussion. Presented to ARC Bike/Ped Plan Equity Advisory Group July 29 th, 2015

ARC Bike/Ped Plan Equity Discussion. Presented to ARC Bike/Ped Plan Equity Advisory Group July 29 th, 2015 ARC Bike/Ped Plan Equity Discussion Presented to ARC Bike/Ped Plan Equity Advisory Group July 29 th, 2015 The Bicycle 1973 ARC A Plan & Program for Its Use as a Mode of Transportation & Recreation The

More information

Florida Avenue Multimodal Transportation Study. June 19, 2013

Florida Avenue Multimodal Transportation Study. June 19, 2013 Florida Avenue Multimodal Transportation Study June 19, 2013 Today s Agenda Team & project introduction Project Timeline What you said Tools we use Mapped data and what clues it can provide Highlights

More information

Surface Transportation Program (STP) Projects

Surface Transportation Program (STP) Projects Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE

More information

30 Years of Smart Growth

30 Years of Smart Growth 30 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor A Presentation by the Arlington County Department of Community Planning,

More information

Downtown Tampa Transportation Vision

Downtown Tampa Transportation Vision Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org

More information

APPENDIX B: THE PORTLAND METROPOLITAN REGION S CASE FOR ACTIVE TRANSPORTATION

APPENDIX B: THE PORTLAND METROPOLITAN REGION S CASE FOR ACTIVE TRANSPORTATION APPENDIX B: THE PORTLAND METROPOLITAN REGION S CASE FOR ACTIVE TRANSPORTATION Prepared by Alta Planning & Design May 2009 Call for Active transportation demonstration projects Metro invites partners to

More information

Bikeway Inventory System. October 2015

Bikeway Inventory System. October 2015 Bikeway Inventory System October 2015 SOLES & SPOKES WALKING AND BICYCLING FOR TRANSPORTATION TABLE OF CONTENTS Contents Bikeway Inventory System Introduction... 1 Database Structure... 1 BIS Datasets...

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

OVERVIEW PROJECT SUMMARY

OVERVIEW PROJECT SUMMARY OVERVIEW Cesar Chavez showcases how to successfully redesign a primary arterial route into a neighborhood destination, improving modal share, water sensitive design, biodiversity and safety whilst maintaining

More information

STREETS -- BICYCLES -- PATHS

STREETS -- BICYCLES -- PATHS STREETS -- BICYCLES -- PATHS RCW 35.75.050 Bicycle road fund -- Sources -- Use. The city or town council shall by ordinance provide that the whole amount or any amount not less than seventy-five percent

More information

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,

More information

Examples of Transportation Plan Goals, Objectives and Performance Measures

Examples of Transportation Plan Goals, Objectives and Performance Measures Examples of Transportation Plan Goals, Objectives and Performance Measures The next step in the Long Range Transportation Plan (LRTP) process is to develop goals, objectives, and performance measures.

More information

IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY

IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY IN THE CITY COUNCIL OF THE CITY OF LIVERMORE, CALIFORNIA A RESOLUTION TO APPROVE A COMPLETE STREETS POLICY The term " Complete Streets" describes a comprehensive, integrated transportation network with

More information

Alewife Working Group June 14, 2016

Alewife Working Group June 14, 2016 Alewife Working Group June 14, 2016 cambridgema.gov/citywideplan 1 Agenda What we ve heard Past plans and studies for Alewife Alewife Revitalization Plan (1979) Citywide Plan (1997-2000) Concord-Alewife

More information

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

Bicycle and Pedestrian Subcommittee (BPS) Recommendation FY 2015 Transportation Alternatives Program (TAP) Allocation

Bicycle and Pedestrian Subcommittee (BPS) Recommendation FY 2015 Transportation Alternatives Program (TAP) Allocation Bicycle and Pedestrian Subcommittee (BPS) Recommendation FY 2015 Transportation Alternatives Program (TAP) Allocation The Montgomery Metropolitan Planning Organization (MPO) receives a direct annual allocation

More information

Joint Development and Real Estate Committee. Board Item I-A. March 25, 2010

Joint Development and Real Estate Committee. Board Item I-A. March 25, 2010 Joint Development and Real Estate Committee Board Item I-A March 25, 2010 Negotiate and Execute an Easement Agreement with the District of Columbia for the Metropolitan Branch Trail Bridge at Rhode Island

More information

Comprehensive Plan Policies that support Infill and Mixed Use

Comprehensive Plan Policies that support Infill and Mixed Use Comprehensive Plan Policies that support Infill and Mixed Use Introduction A comprehensive plan provides a broad vision for the future growth of a community. It is often formulated using community visioning

More information

Healthy, Equitable Transportation Performance Measures and Creative Place-making

Healthy, Equitable Transportation Performance Measures and Creative Place-making THE HONORABLE Mayor KEN WILBER, Karl Dean, CHAIRMAN Chairman Healthy, Equitable Transportation Performance Measures and Creative Place-making Rochelle Carpenter PSRC Bicycle/Pedestrian Advisory Committee

More information

Light Rail Transit in Phoenix

Light Rail Transit in Phoenix 4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February

More information

Implementing the Transportation Alternatives Program for the National Capital Region

Implementing the Transportation Alternatives Program for the National Capital Region Implementing the Transportation Alternatives Program for the National Capital Region Safe Routes to School Regional Meeting October 29, 2013 Sarah Crawford National Capital Region Transportation Planning

More information

RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS

RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS RPA 14/ATURA Surface Transportation Program (STP) APPLICATION FOR FUNDS Please provide the following information when applying to RPA 14/ATURA for Surface Transportation Program (STP) funding for projects

More information

CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND)

CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND) Regional Transportation Plan 2035 28 CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND) The Cache Transportation Vision Plan shows roadway, bicycle, transit and pedestrian projects that attempt

More information

GOALS, OBJECTIVES, AND EVALUATION MEASURES

GOALS, OBJECTIVES, AND EVALUATION MEASURES GOALS, OBJECTIVES, AND EVALUATION MEASURES The Tallahassee-Leon County MPO is developing its first Bicycle and Pedestrian Master Plan, a 20- year plan that provides guidance for the development of facilities

More information

Executive Summary. Transportation Needs CHAPTER. Existing Conditions

Executive Summary. Transportation Needs CHAPTER. Existing Conditions CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

Harlem River Bridges Access Plan

Harlem River Bridges Access Plan Harlem River Bridges Access Plan Workshop Round 2 September 10, 2015 Harlem River Bridges Access Plan: Overview Agenda Presentation: Background + overview of concepts for review (15 20 min) Participation:

More information

South Waterfront Area Dave Unsworth

South Waterfront Area Dave Unsworth South Waterfront Area Dave Unsworth TriMet Capital Projects September 14, 2011 Presentation outline Background Partnering Agreements Project descriptions OHSU Portland Aerial Tram New Campus Portland Streetcar

More information

RESOLUTION NO. WHEREAS, the 2016-2017 City Budget Forecast estimates that housing

RESOLUTION NO. WHEREAS, the 2016-2017 City Budget Forecast estimates that housing RESOLUTION NO. WHEREAS, the 2016-2017 City Budget Forecast estimates that housing (21.6 percent) and transportation (14.9 percent) are the two largest expense categories for the typical Austin family;

More information

SEPTEMBER 2015 SCOPE OF WORK. MONTGOMERY COUNTY PLANNING DEPARTMENT M-NCPPC MontgomeryPlanning.org

SEPTEMBER 2015 SCOPE OF WORK. MONTGOMERY COUNTY PLANNING DEPARTMENT M-NCPPC MontgomeryPlanning.org SEPTEMBER 2015 SCOPE OF WORK MONTGOMERY COUNTY PLANNING DEPARTMENT M-NCPPC MontgomeryPlanning.org table of contents table of contents... 1 introduction... 2 planning context... 2 purpose of master plan...

More information

Safety Evidence for Bicycling

Safety Evidence for Bicycling Photo: Boegh (Flickr) Cycling in Cities Research Program School of Population & Public Health The University of British Columbia Faculty of Health Sciences Simon Fraser University Driving near bicyclists

More information

MID-HUDSON SOUTH TRANSPORTATION COORDINATING COMMITTEE APRIL 6, 2011. TIP Public Review Meeting

MID-HUDSON SOUTH TRANSPORTATION COORDINATING COMMITTEE APRIL 6, 2011. TIP Public Review Meeting MID-HUDSON SOUTH TRANSPORTATION COORDINATING COMMITTEE APRIL 6, 2011 TIP Public Review Meeting Meeting Agenda New York Metropolitan Transportation Council Major Products Transportation Improvement Program

More information

Schenk-Atwood Neighborhood Business District Master Plan

Schenk-Atwood Neighborhood Business District Master Plan Schenk-Atwood Neighborhood Business District Master Plan Prepared for the Schenk-Atwood Revitalization Association (SARA) and the City of Madison SCHREIBER/ANDERSON ASSOCIATES, INC. BEST Real Estate Group,

More information

28 CHAPTER 4 TRANSPORTATION. Chapter 4 Transportation

28 CHAPTER 4 TRANSPORTATION. Chapter 4 Transportation 28 CHAPTER 4 TRANSPORTATION Chapter 4 Transportation Introduction An efficient, safe, and connected transportation system is a key component to a vibrant, healthy city. Convenient access to jobs, schools,

More information

Indiana Multimodal Project Indiana County, PA Mackin Engineering Company, Project No#5063 Date- January 22, 2015 FINAL REPORT.

Indiana Multimodal Project Indiana County, PA Mackin Engineering Company, Project No#5063 Date- January 22, 2015 FINAL REPORT. Indiana Multimodal Project Indiana County, PA, Project No#5063 Date- January 22, 2015 Cover Page FINAL REPORT Table of Contents Executive Summary Report Summary of Study Indiana University of Pennsylvania

More information

Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects

Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects C2012-0684 ATTACHMENT 2 The RouteAhead draft 30-year rapid transit plan was developed in coordination with the Investing in

More information

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must

More information

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013 Red Wing Bridge Project PAC #5/TAC #8 Meeting July 18, 2013 Alternatives Analysis Agenda Overview of Past Progress Progress Since April PAC Bridge 9103 Rehabilitation Study Bridge 9040 Rehab vs. Replacement

More information

A Presentation by the Project Managers: Rick Canizales Prince William County. Jana Lynott, AICP Northern Virginia Transportation Commission

A Presentation by the Project Managers: Rick Canizales Prince William County. Jana Lynott, AICP Northern Virginia Transportation Commission A Presentation by the Project Managers: Rick Canizales Prince William County & Jana Lynott, AICP Northern Virginia Transportation Commission for the: Public Open House and Hearing December 6, 2005 George

More information

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates SANTA MONICA TRAVEL DEMAND FORECASTING MODEL TRIP GENERATION RATES SUBMITTED BY: 201 Santa Monica Blvd., Suite 500 Santa Monica,

More information

Fiscal impact analysis of three development scenarios in Nashville-Davidson County, TN

Fiscal impact analysis of three development scenarios in Nashville-Davidson County, TN Fiscal impact analysis of three development scenarios in Nashville-Davidson County, TN April 2013 Prepared by 1 SUMMARY BY SMART GROWTH AMERICA Summary This study examines the relative fiscal costs and

More information

BIKE AND PEDESTRIAN CRASH SURVERY

BIKE AND PEDESTRIAN CRASH SURVERY This survey includes questions regarding biking activity, accidents, and injuries, as well as the answer options provided by the Nashville MPO. Introduction 1. Have you ridden a bicycle within the past

More information

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.

BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project. Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation

More information

Pavement Management Program

Pavement Management Program Pavement Management Program 2014 Street Maintenance Program Executive Summary 01/21/2014 Presented by Mark Thiel Assistant Director of Public Works Program Overview Start of current program 2005 825.1

More information

College of Southern Maryland. Hughesville Transportation Study

College of Southern Maryland. Hughesville Transportation Study College of Southern Maryland Project Overview Existing Conditions Transit Service Land Use CSM Student Demographics Recommendations Methodology Transit Recommendations Transportation Demand Management

More information

How To Plan A City Of Mason

How To Plan A City Of Mason Transportation Master Plan (TMP) for the City of Madison: Draft Scope of Work Briefing for Madison Area TPB/MPO June 6, 2012 TMP: Overview/Purpose Help Create Walkable, Bikeable, Livable City - Strengthen

More information

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all

More information

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard

Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Prepared for TranSystems Corporation for the City of Evanston Submitted by Regina Webster & Associates, Inc. Date: 08/15/2008

More information

2010 Salida Community Priorities Survey Summary Results

2010 Salida Community Priorities Survey Summary Results SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive

More information

University of South Florida Area Multimodal Transportation District

University of South Florida Area Multimodal Transportation District University of South Florida Area Multimodal Transportation District Study Area Evaluation & Transportation Needs Prepared for Hillsborough County By Jacobs Engineering Group May 25, 2010 EXECUTIVE SUMMARY...

More information

A Bicycle Accident Study Using GIS Mapping and Analysis

A Bicycle Accident Study Using GIS Mapping and Analysis A Bicycle Accident Study Using GIS Mapping and Analysis Petra Staats, Graduate Assistant, Transportation Policy Institute, Rutgers University, New Brunswick, NJ, USA pstaats@eden.rutgers.edu Summary Surveys

More information

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to

More information

Claret Consulting 18 December 2015

Claret Consulting 18 December 2015 The Denver-based Regional Transport District (RTD) 2004 FasTracks program is a multi-billion dollar regional transportation expansion plan that was designed to meet the Denver metro area s infrastructural

More information

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016 Rapid City Downtown Area Master Plan Draft Plan Concepts April 2016 CALL TO ACTION! A Thriving Downtown = Regional Economic Prosperity Rapid City is competing nationally for a limited supply of young skilled

More information

Downtown Community Planning Council Meeting offebruary 18, 2015

Downtown Community Planning Council Meeting offebruary 18, 2015 - san diego Item #12 DATE ISSUED: ATTENTION: SUBJECT: February 13, 2015 Downtown Community Planning Council Meeting offebruary 18, 2015 Consideration of Support for Grant Applications for the San Diego

More information

Performance measures for active transportation

Performance measures for active transportation Performance measures for active transportation 1 Transportation performance measures: why? MAP-21 requirements Accountability to goals and policies Transparency of decisions Guidance making tradeoffs Biggest

More information

SMALL BUSINESS COMMISSION AND OFFICE OF SMALL BUSINESS

SMALL BUSINESS COMMISSION AND OFFICE OF SMALL BUSINESS CITY AND COUNTY OF SAN FRANCISCO SMALL BUSINESS COMMISSION AND OFFICE OF SMALL BUSINESS 1 Dr. C a r lto n B. G o o d let t P lace, S u ite 1 10 Te l: 415-554-6134 Fa x : 41 5-558-7844 w w w. s fgov.o r

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014

North Avenue Corridor Study. Advisory Committee Meeting #5 June 11, 2014 North Avenue Corridor Study Advisory Committee Meeting #5 June 11, 2014 Agenda Welcome and introductions Concept refinement and evaluation: Public meeting and web survey General cross-section concepts

More information

N Street Protected Bikeway

N Street Protected Bikeway N Street Protected Bikeway The N Street Protected Bikeway project was identified in the 2005 City of Lincoln Downtown Master Plan and the 2012 Downtown Master Plan Update as the completion of the last

More information

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY 3 VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY The overall planning strategy for the Bank Street CDP is to ensure that future development is undertaken in a coordinated and planned approach, supported

More information

HOW WILL PROGRESS BE MONITORED? POLICY AREA. 1. Implement the 2040 Growth Concept and local adopted land use and transportation plans

HOW WILL PROGRESS BE MONITORED? POLICY AREA. 1. Implement the 2040 Growth Concept and local adopted land use and transportation plans PERFORMANCE MONITORING APPROACH OAR 660-044-0040(3)(e) directs Metro to identify performance measures and targets to monitor and guide implementation of the Climate Smart Strategy. The purpose of performance

More information

Bicycle Safety Webinar December 1 st 2010

Bicycle Safety Webinar December 1 st 2010 Bicycle Safety Webinar December 1 st 2010 Kay Teschke Kay Teschke is Professor in the Schools of Population and Public Health and of Environmental Health at the University of British Columbia. She is principal

More information

Request for Information

Request for Information Request for Information Date of Issue: February 13, 2015 Responses Due: May 29, 2015 Overview Forest West Properties Inc. (FWP) is soliciting qualifications from qualified developers for the development

More information

Residential Market. Downtown Houston

Residential Market. Downtown Houston Downtown Houston The Houston Market Houston s residential market represents one of the best values in the United States. The city ranks third in the 2010 Forbes list of best housing markets, and second

More information

Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay

Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay Peter Hsu, P.E. FDOT District Seven Safety Office Presentation Overview FDOT Traffic Safety Focus Areas

More information

Advantages and Disadvantages of One Way Streets October 30, 2007

Advantages and Disadvantages of One Way Streets October 30, 2007 Advantages and Disadvantages of One Way Streets October 30, 2007 0 P age Background As the revitalization of the Central Waterfront area moves forward, one issue that might need closer analysis is the

More information

Attachment B Policy Audit Template

Attachment B Policy Audit Template Attachment B Policy Audit Template 5 6 7 8 9 0 Provide A Variety of Transportation Choices Provide A Variety of Transportation Choices Provide A Variety of Transportation Choices Encourage transit-oriented

More information

LOUISIANA LOCAL ROAD SAFETY PROGRAM. Local Road Safety Improvement Projects

LOUISIANA LOCAL ROAD SAFETY PROGRAM. Local Road Safety Improvement Projects LOUISIANA LOCAL ROAD SAFETY PROGRAM Local Road Safety Improvement Projects Louisiana Local Road Safety Program Project Application 2015 Louisiana Department of Transportation and Development 2015 APPLICATION

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

General Obligation Bond Projects FYE 2013-2018

General Obligation Bond Projects FYE 2013-2018 General Obligation Bond Projects FYE 2013-2018 2009 City of Norman Community Survey Final Report 2011 CTP Survey Results Storm Drainage and Street Widening Projects Combined Storm Water/Transportation

More information

Task 1 Project Management and Project Organization Work Plan

Task 1 Project Management and Project Organization Work Plan City of Palmdale Active Transportation Program Plan Scope of Work At their January 22, 2015 meeting, the California Transportation Commission (CTC) allocated funding for the above-referenced project as

More information

Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program

Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program Eric Loucks, P.E., D.WRE Kumar Gali, P.E. June 4, 2015 Outline MMSD Service Area Problem and Challenges Solution

More information

RESOLUTION NO. 74443

RESOLUTION NO. 74443 RD:AGN:ERD RES. NO. 74443 5/27/08 RESOLUTION NO. 74443 A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN JOSE APPROVING A REVISED COUNCIL POLICY 5-6 ENTITLED TRAFFIC CALMING POLICY FOR RESIDENTIAL NEIGHBORHOODS

More information

Summary. Run By the Sea 226 Jeter Street Santa Cruz, CA 95060 Phone: 831 272 4627 Email: whatisron@gmail.com Web: www.runbythesea.

Summary. Run By the Sea 226 Jeter Street Santa Cruz, CA 95060 Phone: 831 272 4627 Email: whatisron@gmail.com Web: www.runbythesea. Run By the Sea 226 Jeter Street Santa Cruz, CA 95060 Phone: 831 272 4627 Email: whatisron@gmail.com Web: www.runbythesea.org Ohlone Rail Trail Proposal We propose opening a section of north coast farm

More information

RESIDENTIAL DRIVEWAYS

RESIDENTIAL DRIVEWAYS RESIDENTIAL DRIVEWAYS If you have specific questions or want to confirm your plans, our staff is available to assist in person, by telephone, or by e-mail. City of St. Petersburg Division of Development

More information

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013 Near Westside Neighborhood and University Avenue Corridor Transportation Study Public Workshop #2 September 12 and 23, 2013 Presentation Outline: Brief Review of Study Scope, Background, and Current Conditions