Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements
|
|
|
- Derek Palmer
- 9 years ago
- Views:
Transcription
1 Moving Ruston Forward City of Ruston Infrastructure Maintenance and Improvements
2 MLK Extension Project will be done in conjunction with proposed water and sewer improvements Connect Martin Luther King Drive to Hwy 167 Increase accessibility to the area from Hwy 167 Provide heavy commercial traffic with alternate route around Ruston s Core Districts to industrial areas Total Estimated Costs: $2,000,000
3 Kentucky: Hwy 167-Hwy 33 Expand the existing road surface to three lanes with curb and gutter, install bike lanes, and add sidewalks Project will include the replacement of the Colvin Creek Bridge Relocation and upgrade of existing utilities Will promote the inclusive community feel with multi-modal transportation and sidewalks Estimated Cost of $15,000,000
4 Monroe St.: Line Ave to Service Rd Expand the existing road surface to accommodate bike lanes with curb and gutter and sidewalks Project may include extensive drainage work Possible relocation and upgrade of existing utilities Estimated Cost of $4,000,000
5 Bonner St.: Mills to Maryland Expand the existing road surface to accommodate bike lanes with curb/ gutter and add sidewalks Possible relocation and upgrade of existing utilities Estimated Cost of $3,000,000
6 Monroe and Line St. Intersection Rebuild intersection for better traffic flow Create a safer driving environment Create 4 way stop for Monroe St., Jones St., and Line Ave Angle the end of Monroe St. towards Jones St. Model the intersection after Farmerville St. and E. Mississippi Ave. intersection. Total estimated Cost: $800,000
7 Shepard Creek Improvements Increase flow capacity of the creek and road crossings Rebuild all road crossings and water flow conduits Will help reduce current flooding from West Alabama to the city limits This will help the sewer system in the area by reducing water infiltration into the sewer system. Total Estimated Cost: $6,500,000
8 Street Overlays: 35 miles Currently working with engineering firm to develop plan, evaluate, and grade all road surfaces in the city The information generated by the street survey will determine the scope and schedule of work per street block 120 miles of road ways inside the city limits Funding would cover resurfacing 35 miles of road Total distance may vary if more substantial road improvements are necessary Total Estimated Cost $5,000,000 or $135,000/mile of overlay
9 Corrugated Metal Pipe Replacement Replace all existing Corrugated metal pipe culverts, drains and bridges system wide Corrugated metal piping is known to hold water which causes the pipe to rust and ultimately the structure will fail Most of the corrugated pipe will be replaced with a smooth PVC pipe that has a much longer life span. Approximately 107 corrugated metal pipe culverts that cross roadways Total Estimated Cost: $700,000
10 Reynolds Dr.: Hwy 167 to Goodwin Rd. Need to address multiple issues along the roadway Establish sidewalks down the roadway Address drainage issues along the right of way Reevaluate any parking that backs into the street and speed limits along the right of way Evaluate the road surface and determine if any improvements are necessary Estimated total Costs: $2,000,000
11 AMI Meter Change Out Program Will increase the city s water meter reading and billing efficiency. Projected two year time line Total Project cost of $2,100,000
12 Water Well Rehab Rehab and bring online existing Well 8 Well 8 is currently not in use Estimated cost $300,000 Project may be done in the 2016 budget year Drill new water well Drill new well in the North East quarter of the city Estimated cost- $1,000,000 Rehab other existing online wells Estimated $40,000 each Estimated Total cost: $3,000,000
13 Kirkland St. Currently no water main on Kirkland St. Improve water quality on existing services Added fire protection in area Installation of 6 water main 1,100 down Kirkland St. from Arizona Ave to E. Line Ave. Estimated Total Costs: $400,000
14 Arizona to Trenton Main Rehab Replace 1700 of 4 water main with 6 water main Tie into existing 6 water line on Dan Reneau Dr. Increase capacity of water lines Increase fire protection Estimated cost $1,000,000
15 MLK, Jonesboro and Vernon St. Tie Install new 12 main down Jonesboro St to MLK Dr. Abandon existing 2 line and install 8 line at the eastern end of MLK Dr., down Cornell Ave., and south along Dark St. Connect existing 6 lines on Vernon St. to 6 lines on MLK Dr. 12 main main main 1052 Estimated cost: $800,000
16 North Plant Rehabilitation North Treatment Plants necessary 5 year enhancement costs $4,000,000 Main issues that need to be addressed Filtration system Clarifier system ph Diversion system This will increase the capacity and effectiveness of the waste water treatment plant
17 MLK Dr. Sewer Extension This project will be done in conjunction with the road and water line extension Tie existing gravity sewer line from Famerville St. to Mills St. Install approximately 1000 of sewer line Estimated total cost: $500,000
18 Hundred Oaks Lift Station Rebuild the Hundred Oaks Lift station Estimated Cost: $600,000 Rebuild portions of the gravity sewer line and reduce inflow and infiltration $140/ft Total Estimated Cost: $1,000,000
19 Street Overlay Prep Project will be done in conjunction with the road overlay project Any section of road surface that is chosen to be rebuilt will have the existing sewer line evaluated and replaced as needed Will help decrease inflow and infiltration and decrease the amount of storm water relocated by lift stations and treated at the treatment plant This initiative will further decrease any future cost if the sewer is replaced while the road is actively under construction Estimated Total Cost: $5,000,000
20 South Plant Lift Station Need to rehab the south plant lift station Top priority project, could be done in conjunction with the South Plant flow basin rehabilitation Will improve the sewer main issues in the area Projected cost $1,000,000
21 South Plant Flow Basin Replace gravity sewer lines that feed the South Plant lift station Replacement of lines will improve efficiency of South Plant lift station by reducing amount of storm water that enters into our waste water system Approximate distance 16,430 Estimated Cost: $2,000,000
22 Force Main Rehab Need to rebuild the existing force main from Lift Station 39 to Gains St. Need to rebuild the existing force main from Honeysuckle Ln. to the Treatment plant Total approximate distance: 13,000 Estimated Total Cost: $3,000,000
23 Bike and Running Trails Developing bike and running trails throughout the city Estimated cost: $1,000,000
24 New Animal Control Facility New facility will include New Kennel Facility New Office Building New Exam, Surgery, Lab, and Isolation rooms Large Animal Facilities Fencing New Location Dog Park Estimated total cost for all improvements: $1,200,000
25 New Sports Complex 6 Adult softball fields 8 Dixie fields 8 Girls softball fields 3 T-ball fields 1 Buddy ball field 6 Soccer areas 3 Football areas Walking track Estimated Total Cost: $15,000,000
26 Moving Ruston Forward Available Funds ¾ cent Tax at today s levels: $4,200,000 (annually) Bondable Amount 20 years: $40,000,000 Excess Tax Above Payments ($1.2 Million per year): $24,000,000 Savings on Capital Projects ($2 Million per year): $40,000,000 Grants and State Capital Outlay: $15,000,000 Total: $119,000,000
27
in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works
Planned Public Works Projects in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Projects in Marina Del Rey Waterline Projects Phase II Phase III Roadway Projects Admiralty
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water
Water and Sewer Utilities
Water and Sewer Utilities Capital Improvement Program Utilities Water and Sewer Requested - $98,295,000 - $97,792,600 Funded - $32,951,600 Sewer 53.3% Sewer 54% Water 27% Water Water 46% 46.7% Sewer 73%
Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted
Engineering Agency Number: 53 Budget Function: Public Works and Transportation The Engineering Division is responsible for the design, supervision and inspection of all street, highway, sidewalk and bike
City of Auburn Summary of Capital Outlay by Fund and Department
General Fund ~ MidBiennium Budget Review ~ FY 04 City Council (none) $ Office of the City Manager $ 25,000 Judicial (none) Information Technology Information Technology Division Upgrade for intrusion detection
MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements
MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements Presentation July 23, 2014 A. Morton Thomas and Associates, Inc. 800 King Farm Boulevard, 4 th Floor Rockville, Maryland 20850
Home Drainage & Causes of Basement Flooding. Water
Home Drainage & Causes of Basement Flooding Understanding Drainage There are two separate sewer systems Eavestroughs & Downspout Road Property Line Floor Drain Catch basin Access Cover Weeping Tile House
City of Santa Ana. FY 2014/2015 Capital Improvement Program. Broadway/Anahurst to 1 st Improvements. First Street Bridge Replacement
Broadway/Anahurst to 1 st Improvements First Street Bridge Replacement MacArthur Rehabilitation/Bristol to Flower Fisher Park Butterfly Garden Improvements 1 Finance, PRCSA, CDA and PWA Data Gathering
UNIT PRICE LIST January 2009
UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only
Chapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24
Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge
CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
Kansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater
ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010)
Bikeways and Enhancements Report for Lucas County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #
PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
Roadway Cost Per Centerline Mile Revised June 2014
Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743
CHAPTER 8 CIVIL DESIGN
CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical
Proposed Program of High Capacity Transit Improvements City of Atlanta DRAFT
I 20 West Heavy Rail Northside Drive Bus Rapid Contingent Multi Jurisdicitional Projects Atlanta Light Rail Clifton Light Rail * I 20 East Bus Rapid * Atlanta BeltLine Central Loop Irwin AUC Line Downtown
Koser Field. 7th St SE 2.25
Submited on: 1/31/2014 Managing Entity: Contact Information: Watford City Park District PO Box 13 Watford City, ND 58854 Robin Arndt PO Box 13 Watford City, ND 58854 PHONE : Email: [email protected]
FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM
CITYOFOBERLIN OHIO CITY OF OBERLIN, OHIO FY 2011 OHIO SMALL CITIES COMMUNITY DEVELOPMENT BLOCK GRANT COMPREHENSIVE DOWNTOWN REVITALIZATION PROGRAM Background In October, 2011, the City of Oberlin Planning
PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
CHAPTER 4 EXISTING STORMWATER MANAGEMENT SYSTEM
CHAPTER 4 EXISTING STORMWATER MANAGEMENT SYSTEM INTRODUCTION The analysis of stormwater management system performance requires knowledge of the system components. This chapter presents a description of
Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City
Mayors Welcome Strong Surrey Votes Yes Coalition Support Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City February 11, 2015 Vancouver, BC The Mayors Council on Regional Transportation
AGENCY COORDINATION AND PUBLIC INVOLVEMENT
5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included
SOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33,100. 3 Mile: Population: 80,200 Median HH Income: $34,900
Walmart Outparcels For Sale College Station, TX Store # 1150 1815 Brothers Blvd FM 2818 W SOLD Texas Ave S/ Hwy 6 Longmire Dr Brothers Blvd Lot 1 For more information about this site, contact: Lot 1: ±2.41
SECTION 5 DRAFTING STANDARDS
SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
SANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
City of Cape Coral, Florida FY 2015-2017 Proposed Operating Budgets
FUNDED CAPITAL IMPROVEMENT PROGRAM FY 2015-2020 SUMMARY OF REQUIRED REVENUES FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TOTAL All Hazards $ 100,000 $ - $ - $ - $ - $ - $ 100,000 Capital Facility Expansion
Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33
Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33 This page intentionally left blank. PAGE 34 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT PLAN ASSET INVENTORY
EPA Technical Assistance for Sustainable Communities Building Blocks
EPA Technical Assistance for Sustainable Communities Technical Assistance Tool: Complete Streets Deerfield Beach, Florida February 16, 2012 To: CC: Amanda Martinez, City of Deerfield Beach Roger Millar,
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile
Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets
Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST
DESCRIPTION OF ACCOUNTING AND FINANCIAL REPORTING SYSTEM
DESCRIPTION OF ACCOUNTING AND FINANCIAL REPORTING SYSTEM Livingston s accounting system is organized on the basis of Accounting Funds, each of which is considered a separate government activity with its
Bond Release Process for New Subdivision Developments in Fairfax County
Bond Release Process for New Subdivision Developments in Fairfax County An Overview for Homeowners Associations A Fairfax County, Va., publication April 2009 For more information or to request this document
Township of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
Storm Drainage Systems 11.9-1
Storm Drainage Systems 11.9-1 11.9 Gutter Flow Calculations 11.9.1 Introduction Gutter flow calculations are necessary in order to relate the quantity of flow (Q) in the curbed channel to the spread of
Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate
Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5
Atlanta 2015 Infrastructure Bond
Investing in a commitment today to meet the infrastructure challenges of the future. Richard Mendoza, Public Works James Shelby, Planning & Community Development July 2014 Key Events June 2014: Public
APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations
ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS
ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE
Pavement Management Program
Pavement Management Program 2014 Street Maintenance Program Executive Summary 01/21/2014 Presented by Mark Thiel Assistant Director of Public Works Program Overview Start of current program 2005 825.1
REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING FLOOD REMEDIATION PROGRAM
J Wokking foh y or REPORT Meeting Date: November 28,2013 Regional Council DATE: October 22,201 3 REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING
SECTION 108 - INLETS 108.1 INLET LOCATIONS
Greene County Design Standards -Adopted April 5, 1999 SECTION 108 - INLETS SECTION 108 - INLETS 108.1 INLET LOCATIONS 108.2 INLET INTERCEPTION CAPACITIES 108.2.1 Clogging Factors 108.3 INTERCEPTION AND
For more information, visit: rethinkingstreets.com
For more information, visit: rethinkingstreets.com 37 Arterial Rehab Busy, multi-lane streets, often referred to as arterials, crisscross the landscape of our cities and suburbs. Alongside these wide thoroughfares,
Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000
Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 SEMCOG 2000 Prepared
SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS
UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line
Based on the above, it is recommended that Lift Stations #1 and #3 be abandoned and their flows be diverted to the regional Lift Station #8.
Lakeside; Clairmont Heights; Portion of Clairmont currently serviced to Pump Station #2; Crossroads North and Crossroads South portion of flows that are diverted to Lakeside Trunk. It is understood that
TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African
TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African Regional Office 01 CHAPTER ONE Checklist Page 2 of 8
Infrastructure assets are distinguished from other capital assets because they normally:
4. REPORTING 4.2 Government-Wide Financial Statements 4.2.6 Infrastructure Reporting 4.2.6.10 Governments are required to report all of their capital assets in the statement of net position. Infrastructure
013-0809 Rocky View County. Background Report
013-0809 Rocky View County Background Report Conrich Area Structure Plan Background Report Produced By Melissa Ayers for Rocky View County - July 2013 Table of Contents Introduction 1 Policy Context 1
EXHIBIT A Accessible Truck Routes Map
EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT
PUBLIC WORKS DEPARTMENT STRATEGIC PLAN 2015 2020
PUBLIC WORKS DEPARTMENT STRATEGIC PLAN 2015 2020 1 Purpose of Strategic Plan This document serves as the road map for the Public Works Department. It identifies where we are going and how we are going
CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)
CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW) January, 2013 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS DRAINAGE STRUCTURES DRN-01 Corrugated metal pipe drop inlet DNR-02 Storm Drain
SECTION 6A STORM DRAIN DESIGN Mar. 2002 S E C T I O N 6A STORM DRAIN - DESIGN
S E C T I O N 6A STORM DRAIN - DESIGN 6A.l Scope 6A.2 Storm Water Quantity 6A.3 Storm Drain Hydraulics 6A.4 Depths 6A.5 Locations 6A.6 Curved Storm Drains 6A.7 Manholes 6A.8 Catch basins 6A.9 Storm Drain
EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection
EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED
Town of Medway Capital Improvements Planning Committee
Town of Medway Capital Improvements Planning Committee 5-Year Plan FY 2013 FY 2017 6/3/12 1 Contents Page Summary................................................................... 3 I. Projects Approved
FIBER-OPTIC CABLE PLAN CHECK
Engineering Division 201 North Broadway, Escondido, CA 92025 (760) 839-4651, FAX (760) 839-4597 FIBER-OPTIC CABLE PLAN CHECK To: Date: Project: Project No. Address: Check No. Attn: Via: The attached plans
City of Hilshire Village Pine Creek Ln Reconstruction
City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22)
Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22) 2. For Bicycle and Pedestrian Projects: Clearly indicate the location, length, width, surface materials, and any
Mandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding
Mandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding May 26, 2011 Kyle Chambers, P.Eng. Environmental and Engineering Services Department City of London [email protected] 519-661-2500
The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08
The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES
FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN WASTEWATER TREATMENT FACILITIES 1 FISCAL YEAR 2014-2018 CAPITAL IMPROVEMENT PLAN Wastewater Treatment Facilities The Wastewater Treatment System (System)
2014 CONSTRUCTION PLAN
2014 CONSTRUCTION PLAN Local CSAH 24 CSAH 10 to CSAH 5 440 1987 $575,000 $575,000 Shoulder Widening (3.0 Miles) CSAH 24 CSAH 10 to CSAH 5 440 1987 $1,115,000 $144,045 $1,259,045 Bituminous Reclamation
Using GIS to Track and Prioritize Your Assets
Using GIS to Track and Prioritize Your Assets What is GIS?? Geographic Information System Geographic Location of an asset Information Characteristics of an asset System Software that allows connection
Upper Polo Field Turf Project Information Session
Upper Polo Field Turf Project Information Session 25 October 2012 Presented by: Bernardsville Recreation Department 1 Agenda Project Background Turf Field Rationale Project costs Project Funding Options
Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D
Road Rehabilitation and Reconstruction Using AutoCAD Civil 3D Contents Introduction... 3 Introduction to Corridor Targets... 3 Surface Targets... 4 Width and Offset Targets... 5 Elevation or Slope Targets...
Bridges & Culverts Condition by Quantity
3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to
Downspout Disconnection Program FAQs
Why is the Village making downspout disconnection mandatory? A mandatory downspout disconnection has been the law for several years in La Grange Park. All gutter downspouts must be disconnected from the
VDOT Project Advertisements from 4/1/13-6/30/14 (by advertisement)
VDOT Project s from 4/1/13-6/30/14 (by advertisement) Description UPC Project Manager Phone RTE 85 - BRIDGE SYSTEM PRESERVATION (Richmond District-wide) BOYD ST - RECONSTR BETWEEN 2ND & 3RD ST & IMPR DRAINAGE
EXPENDITURES SUMMARY 2015 2016 INCREASE BUDGET BUDGET (DECREASE) Over 2015 $ $ $
EXPENDITURES SUMMARY 2015 2016 INCREASE Mayor and Council 900,000 900,000 - Office of Chief Administrative Officer 598,500 598,500 - Clerks 1,635,000 1,659,500 24,500 Legal Services 2,686,000 2,777,000
CHAPTER 4 STORM DRAINAGE SYSTEMS
CHAPTER 4 STORM DRAINAGE SYSTEMS 4.1 Overview... 4-1 4.1.1 Introduction... 4-1 4.1.2 Inlet Definition... 4-1 4.1.3 Criteria... 4-1 4.2 Pavement Drainage... 4-2 4.2.1 Introduction... 4-2 4.2.2 Storm Drain
NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES
NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It
Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods
Extreme Wet Weather in Brookfield How to Keep Your Basement Dry During Heavy Rains and Floods Relating Stormwater Drainage to Sewer Backups Brookfield has two separate sewer systems Storm sewer system
Doing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+
Doing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+ Erin Mills Parkway Intersections at Dundas Street and Burnhamthorpe Road Index
CD i -STREETS- Detail #
-STREETS- Detail # 3000 Vertical Curb, Gutter and Sidewalk 3010 Low-Profile Curb, Gutter and Sidewalk 3020 Rolled Curb, Gutter and Sidewalk 3030 Separated Sidewalk, Curb & Gutter 3040 Sidewalk Staged Construction
How To Improve Safety
Collision Diagrams Collision diagrams are used to display and identify similar accident patterns. They provide information on the type and number of accidents; including conditions such as time of day,