Pavement Management Program
|
|
|
- Allan Morgan
- 10 years ago
- Views:
Transcription
1 Pavement Management Program 2013 Street Maintenance Program Executive Summary 1/15/2013 Presented by Mark Thiel Assistant Director Public Works
2 Program Overview Start of current program Lane miles of City streets Up 1.5 lane miles from 2011 Cycle 1 complete Oct center-line miles Cycle 2 complete Oct center-line miles Cycle 3, Phase 3 complete (80%) or 261 Center-line miles PCI Pavement Condition Index Is a numerical value (0 to 100) assigned based on the visual street condition and ride. 100 represents a pavement with no visible distresses
3 Pothole Reduction Pothole numbers over the past several years have been greatly reduced Pavement Management Program success - balanced use of rehabilitation & preventative maintenance methods Continued use of patching methods (injection patching & mill/patch) Fewer freeze thaw cycles
4 Pothole comparison 2012 / 2011 Potholes 2012 Potholes 2011 Potholes reported on Hotline & phone 210 Potholes reported on Wufoo (on-line reporting) 110 Total Reported 320 Number of holes patched 6, Tons of Hot mix used Tons of cold mix used Yards of Durapatch used Pounds of Crack Sealer used 92, Potholes reported on Hotline & phone 468 Potholes reported on Wufoo (on-line reporting) 207 Total Reported 675 Number of holes patched 12,575 Tons of Hot mix used Tons of cold mix used Yards of Durapatch used Pounds of Crack Sealer used 63,273.00
5 PCI Goals Prevent / slow down further deterioration Establish a maintenance plan Critical points (preventative to rehabilitation work) Arterial 65 Collector 60 Residential 55 Cycle % in fair to poor range Cycle % in fair to poor range Cycle % in fair to poor range fair to poor suggests not a good candidate for preventative maintenance should consider rehabilitation / possible reconstruction in some cases
6 Average PCI The overall PCI Cycle 1 = 69.0 Cycle 2 = Cycle 3, Phase 1,2,&3 = Positive movement of PCI average Curb and Gutter condition does not impact street PCI; however, steady increase from fair/poor to good condition (+2.5% change in Cycle 2 to 3, +10.6% change Cycle 1 to 3)
7
8 Brick Streets We have 23 lane miles of brick streets Various condition. (exposed brick, overlayed) In the past four years have completed 4 blocks of restoration (Ohio & New York) 2013 plan 800 block of Pennsylvania 2014 Plan 2100 block of Vermont
9 Brick Street Maintenance Planning We are developing a plan to add more maintenace During 2013 will begin meeting with stakeholders Residents, Historical review, NA s, others Basic premise Restore brick streets where residential homes face the street Convert others to Asphalt or Concrete While waiting for restoration perform basic maintenance, such as overlay or patching There will be exceptions to any final plan
10 Maintenance Programs Contracted Concrete Rehab Microsurfacing Curb & Gutter Mill & Overlay
11 Maintenance Programs In- House Concrete Rehab Injection Microsurfacing Patching Concrete Rehab Mill & Crack Overlay Sealing Polymer Patching Curb & Gutter Crack Sealing Asphalt Mill & Overlay Patching
12
13
14 2012 Summary As-Built Map & Number Summary Work Type Contracted Maintenance Mill & Overlay Microsurfacing/ Patching 22.0 lane-miles 32.6 lane-miles Concrete Rehab Patching 6,533 Square Yards (As of Nov. 2012) Curb & Gutter 19,354 Linear Feet (As of Nov. 2012) ADA Ramps 45 Ramps Work Type Internal Street Maintenance Crack Sealing Potholes Patched Concrete Patching Curb & Gutter ADA Ramps 92,390 lbs 6,041 potholes (536 tons SY Durapatch) 1352 Cubic Yards (~ 7,000 Square Yards) 6,145 Linear Feet 29 Ramps
15
16
17 Summary of Program Average PCI increased by 7.37% from Cycle 2 through Cycle 3 Indicates program is moving in a positive direction toward sustainability Good decisions are being made Deterioration rates are slowing/ stabilizing, overall average of (incline) of comparable street segments from Cycle 2 to Cycle 3 to date. The overall percentage of fair to poor streets has continued to decline
18 2013 Program In August 2012 commission approved $4.38 million Verified by Budget Manager Projects selected using Pavement management database (PCI s) Constituent concerns Known problem areas Coordination with other projects / agencies Utilities, development, new construction (coordination/ phasing with other projects) Bicycle advisory committee review of plan (based on BAC recommendations - planned inclusion of shared use paths, bicycle lanes on BBPW & Wakarusa Dr) Incorporation of Complete Street Elements (ADA ramps, crosswalks, bicycle lanes) Selection of diverse locations throughout the city
19 $200, $140, Bonded Debt $1,500, Infrastructure / CIP Sales Tax Reserve Fund General Fund Motor Fuels Tax Fund $1,740, Storm Water Fund $800, Contracted Street Maintenance Budget by Fund
20 Complete Street Elements Bicycle Advisory Committee Recommendations Bob Billings Pkwy Shared use path construction Wakarusa Dr Bike lanes included in plan ADA Ramps Remove/replace & new installation with various reconstruction and maintenance projects Imprinted Concrete Crosswalks 19 th & Barker and Harvard & Monterey Way
21 Complete Street Elements CIP Iowa St Reconstruction/ 6 th & Iowa Intersection - Widening, Additional turn lanes throughout, Additional sidewalk Bob Billings Pkwy - Shared use path Wakarusa - Bike Lanes, 6 Sidewalks both sides 9 th & Tennessee - Additional turn lanes, Bike lanes 23 rd & O Connell - Additional turn lanes
22 2013 Program Projects Crack Sealing (In-House), Wide Joint Sealing, Polymer Patching Microsurfacing/ Patching Concrete Rehabilitation (In-House and Contracted) Mill, Overlay, Curb & Gutter one phase KLINK - Iowa St, 29 th to south City Limit Reconstruction Iowa St, Harvard to Irving Hill Overpass Bob Billings Pkwy, Iowa to Crestline & Kasold to Crestline Wakarusa Dr, north & south of Bob Billings Pkwy Brick Restoration/ Concrete Reconstruct 8 th /9 th Pennsylvania Intersections Geometric/ Signalization/ Turn Lanes 23 rd & O Connell 9 th & Tennessee 6 th & George Williams Way 6 th & Iowa Other projects Imprinted Crosswalks In-house projects $96,000 incentive for early completion of the intersection of 15 th & Iowa. ($6k / day prior to Aug 15 th )
23
24 $250, $500, $50, $350, Microsurfacing Ph 1 M&O 2013 KLINK $800, Pennsylvania & 9th $900, th & Iowa 2013 Crack Seal 2013 Concrete Rehab Inspection & Testing $600, $700, Street Maintenance Budget Allocation by Project
25 2013 Major Capital Projects Pennsylvania (8 th to 9 th ) Brick 9 th (Delaware to Pennsylvania) Concrete 9 th & Tennessee Turn Lane Iowa (29 th south to city limits) mill and overlay Wakarusa & BBP Concrete BBP (Crestline to Kasold) Iowa (Harvard to Irving Hill Rd) Concrete 23 rd & O Connell Signalized intersection
26 2013 Major Capital Projects Farmland Road additions 31 st St. extension (Haskell to O Connell) 6 th & Iowa Turn Lane 9 th & Michigan Geometric improvements 9 th & Kentucky Signal Cross Walk striping Road striping 2013 Street Maintenance Program
27
28 Public Communication Public Meetings Mass mailings Open houses Next one February 13 th at City Hall 4:30 pm to 5:30 PM Water Billing insert Message boards Project advance notice signs
29 Message boards and Signs
30 Water bill insert 32,000 mailings
31
32 Questions?
Pavement Management Program
Pavement Management Program 2014 Street Maintenance Program Executive Summary 01/21/2014 Presented by Mark Thiel Assistant Director of Public Works Program Overview Start of current program 2005 825.1
DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job
MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION Using the Full Range of Tools for a Challenging Job Report To: TTI Committee May 13, 2014 1 Pavement Management - Suggested Treatments
Decision Matrix for Pavement Preservation. Mike Mamlouk Arizona State University
Decision Matrix for Pavement Preservation Mike Mamlouk Arizona State University Outline 1. Concept of preventive maintenance 2. Effectiveness of treatments 3. Treatment selection 2 Pavement Pavement Preservation
CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON
Council Meeting Date: August 11, 2014 Agenda Item: 7(c) CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON AGENDA TITLE: Motion Authorizing the City Manager to Execute a Contract with Transmap Corporation
CID STREET INFRASTRUCTURE ASSESSMENT
ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for
SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.
Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to
Roadway Cost Per Centerline Mile Revised June 2014
Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743
Transportation Infrastructure Asset Management
2015 NW Region TTAP& BIA Symposium Transportation Infrastructure Asset Management March, 2015 Happy Longfellow, PE [email protected] (206) 394-3649 ASSET MANAGEMENT OVERVIEW What? Why? How? Inventory
Cost Considerations of In-Place Recycling as a Pavement Rehabilitation Alternative Brian Diefenderfer, PhD, PE Alex Apeagyei, PhD, PE
Cost Considerations of In-Place Recycling as a Pavement Rehabilitation Alternative Brian Diefenderfer, PhD, PE Alex Apeagyei, PhD, PE A partnership of the Virginia Department of Transportation and the
OHIO ASPHALT PAVING CONFERENCE
OHIO ASPHALT PAVING CONFERENCE 38 th Annual Conference Wednesday, 2/6/2013 Fawcett Center Campus of The Ohio State University 2400 Olentangy River Road Columbus, Ohio 43210 REHAB STRATEGIES FOR LOCAL
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must
Pavement Management Implementation: Success Stories for Maryland Counties
Pavement Management Implementation: Success Stories for Maryland Counties September 25, 2015 Aaron D. Gerber, P.E. How Does Your Organization Manage Pavement Assets? By Experience/Past Practice? By Customer
The Roads to Recovery. Facts About Transportation Funding and Spending
The Roads to Recovery Facts About Transportation Funding and Spending How Pima County spends transportation money (F.Y. 2014-15 Transportation Budget) 1 Debt Service (1997 bonds): $19.1 million In 1997,
Chapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
Presentation to NYSAMPO, June 2015 Steve Wilcox, P.E., Director, Maintenance Program Planning Bureau NYSDOT
Presentation to NYSAMPO, June 2015 Steve Wilcox, P.E., Director, Maintenance Program Planning Bureau NYSDOT Comprehensive Asset Management Planning What Is Your Asset Management Organization? What Do You
EXHIBIT A Accessible Truck Routes Map
EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT
CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM
CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM 2.1. INTRODUCTION TO PAVEMENT MANAGEMENT The ability of a pavement system to serve a society is largely a function of planning. Planning is the intersection between
Case Studies - Concrete Overlays
Case Studies - Concrete Overlays Lessons Learned - Concrete Overlays Purdue Road School March 6, 2013 Today s Topic 1. Overlays 2. New Full-depth 3. Pervious 4. Roller Compacted 5. Full Depth Patching
Rehabilitation for Concrete Pavements
Rehabilitation for Concrete Pavements www.asphaltalliance.com Overview Effective rehab for PCC Break PCC into small segments Overlay with Hot Mix Asphalt Road-userfriendly Rubblize and pave in off-peak
Street Audit Tool: Web 2.0 Tools
Name: Email: Instructions: Auditor Information (1) Use all three tools for your assessment (2) If the tool can not determine the criteria, check (3) Indicate the tools used (4) Rate the effectiveness of
Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications.
Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications. Author: Gary L. Mitchell, P.E. Director Airports, American Concrete Pavement Association
Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33
Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33 This page intentionally left blank. PAGE 34 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT PLAN ASSET INVENTORY
KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS
KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS I. GENERAL The following policy shall apply when the intent of the project is to
ADA POST INSPECTION CHECKLIST. Job No. Route County Location
ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks
6: LANE POSITIONS, TURNING, & PASSING
6: LANE POSITIONS, TURNING, & PASSING BASIC LANE POSITIONS Traffic law says that slower vehicles should stay to the right. But where exactly should bicycles ride? Here are some basics. Never Ride Against
CHAPTER 2 LCCA APPROACHES
2.1 LCCA Basis CHAPTER 2 LCCA APPROACHES When making decisions about pavement design, LCCA: Compares pavement alternatives; and Identifies the best strategy based on current information as well as meeting
LIMITED SCOPE CONCEPT DEVELOPMENT REPORT
LIMITED SCOPE CONCEPT DEVELOPMENT REPORT Route 33 Resurfacing Project Eastbound: Milepost 24.2 to Milepost 28.9 Westbound: Milepost 24.3 to Milepost 28.9 Manalapan & Freehold Townships, Monmouth County
Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -
Project Information Existing Conditions Cracked and settled pavement. Structural failure within the asphalt pavement section. Anticipated Project Elements Reconstruction of all asphalt pavement on US Route
APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations
Planning Level Cost Estimation Tool. User s Manual
Planning Level Cost Estimation Tool User s Manual Atlanta Regional Commission Submitted By: User s Manual Table of Contents 1. INTRODUCTION... 1 2. OBJECTIVE... 1 3. FRAMEWORK OF THE TOOL... 2 4. HOW TO
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water
AGENCY COORDINATION AND PUBLIC INVOLVEMENT
5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included
Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling
7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished
Catch Basin Rehabilitation Road Commission for Oakland County, Michigan
Date: Location: September 14, 2011, 9:45a.m. start East side of street in front of 4656 Maura Lane, West Bloomfield Participants: Oakland County Michelle Belanger, Rick Hall, Matt Mountain, Gary Flounory,
ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES
How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all
Grinding equipment that causes raveling, aggregate fractures or disturbance to the joints shall not be permitted.
Guide Specification: Diamond Grinding for City Streets Publication Date: May 24, 2010 SCOPE City streets are defined as roadways with a closed drainage system along with numerous structures such as manholes,
RoadMatrix V3.1 has incorporated many engineering enhancements including the following:
What s New in V3.1? RoadMatrix V3.1 has incorporated many engineering enhancements including the following: 1. Extended Programming Period The analysis programming period has increased from 10 to 100 years.
RANDOM/GRID BLOCK CRACKING EXTREME SEVERITY. Transverse Cracking- Extreme Severity. Alligator Cracking- High. Severity
RANDOM/GRID BLOCK CRACKING EXTREME SEVERITY Transverse Cracking- Extreme Severity Slab Cracking Class II Regular Joint- High Severity Pattern Cracking-High Severity Alligator Cracking- High Severity Shoulder
The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.
3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation
BEST PRACTICES. Smart Transportation is a key concept for the Paoli Roadway Improvement Project.
Smart Transportation Smart Transportation is a key concept for the Paoli Roadway Improvement Project. PennDOT s Smart Transportation Guidebook (2008) outlines a comprehensive approach to transportation
ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS
ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE
Northwest Light Rail Extension Pre-Construction/Final Design. Public Meeting November 27 & 29, 2012
Northwest Light Rail Extension Pre-Construction/Final Design Public Meeting November 27 & 29, 2012 6:00 6:30 p.m. Open House 6:30 7:00 p.m. Presentation 7:00 8:00 p.m. Open House 2 Project Overview Carla
Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps
Pavement Patching Repair for AC and PCC Pavement Surfaces. Vern Thompson www.crafco.com
Pavement Patching Repair for AC and PCC Pavement Surfaces Vern Thompson www.crafco.com Overview and Objective New Methods For Pavement Patching-Overview What are they How they are applied New Methods Secti
Paving Capitalization Work Categories and Treatments
Statement of ODOT Infrastructure Capitalization Policy Government Accounting Standards Board (GASB) 34 requires public agencies to capitalize infrastructure assets on their financial statements for periods
In 2005, the City of Pasadena, CA, USA, with the support of consultants,
Creating a Citywide Safe Routes to School Program: Pasadena, CA, USA s Step-by-Step Approach In 2005, the City of Pasadena, CA, USA, initiated development of a comprehensive Safe Routes to School Program.
I-66 Pavement Rehabilitation
I-66 Pavement Rehabilitation Fall Asphalt Conference Richmond, VA David Shiells, P.E. Virginia Department of Transportation David White Superior Paving Corporation October 2, 2012 Project Location 2 Goal
Riverside County Transportation Department Summary of Bids
Bids Open: 2 pm Date: Wednesday, March 4, 2015 BASE BID SCHEDULE 1 - Rudell Road Reconstruction Project NO. CODE CONTRACT PROJECT No. B3-0470 and C4-0069 COUNTY'S ESTIMATE 1 All American Asphalt Corona,
Topic 2 11/28/2012 Blocks & Street Network
TOPIC 2 Blocks & Street Network Implementation Note: 1. Some recommendations are summarized in the tables herein. For complete recommendation language, please see the. 2. Recommendations referenced in
Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005
Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Purpose The purpose of this review is to capture for technical deployment the most advanced
Implementing a Work Order and. Asset Management System? Learning Objectives. What We Have. The City of Colleyville
A Small City s Story of Implementing a Work Order and Asset Management System American Public Works Association 2013 Congress August 28, 2013 Introductions Public Works Department City of Colleyville,
ASPHALT PAVEMENT RECYCLING
HOT IN-PLACE RECYCLING THE ENERGY SAVING METHOD ASPHALT PAVEMENT RECYCLING Hot In-Place alt ec cl n The Energy Saving Method! HIGHWAY REHAB CORP Highway Rehab Corp 2258 Route 22 Brewster, NY 10509 Tel
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection
CONCRETE REPAIR GUIDELINES. Concrete repairs can be broken down into four basic types, plus special repairs and planing.
CONCRETE REPAIR GUIDELINES Concrete repairs can be broken down into four basic types, plus special repairs and planing. Note: It is recommended that investigation into soundness of pavement be performed
Asset Management for MAP-21. Gary Lasham, P.E. Jonathan Pollack
Asset Management for MAP-21 Gary Lasham, P.E. Jonathan Pollack Replaced Intermodal Surface Transportation Efficiency Act (ISTEA) MAP-21 is transforming the policy and programmatic framework for investments
Transportation Asset Management Program 2009 Federal Aid PASER Road Survey. August 2009
Transportation Asset Management Program 2009 Federal Aid PASER Road Survey August 2009 WEST MICHIGAN SHORELINE REGIONAL DEVELOPMENT COMMISSION (WMSRDC) The WMSRDC is a regional council of governments representing
The State of Michigan Transportation Asset Management Council 2005 PASER Survey Of Genesee County
The State of Michigan Transportation Asset Management Council 2005 PASER Survey Of Genesee County Prepared by the Genesee County Metropolitan Planning Commission Staff The State of Michigan Transportation
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile
Light Rail Transit in Phoenix
4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial
Forensic Engineering Determination of the Angle of Lean of a Cycle-Rider System Negotiating a Turn
NAFE 193F/401F ANALYSIS OF BICYCLE STABILITY PAGE 1 Forensic Engineering Determination of the Angle of Lean of a Cycle-Rider System Negotiating a Turn by James M. Green, P.E., D.E.E. (NAFE 193F) Jon O.
Pavement Management Office
Department of Transportation and Public Works Puerto Rico Pavement Management Office PAVEMENT PRESERVATION SEPPP 1 GOALS AND OBJECTIVES PRHTA has been collecting data for more than twenty (20) years with
KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs
KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality
Public Works Transportation County Fleet
Public Works Transportation County Fleet Public Works Public Works Department Overview Debra Brisk, Assistant County Administrator Public Works Public Works Public Works Organization 2014 Hennepin County
Metropolitan Builders Association Masonry & Concrete Standard
Metropolitan Builders Association Masonry & Concrete Standard Background Masonry and concrete work in residential construction often provides the base structure upon which the house is built or as a veneer.
Township of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
Surface Transportation Program (STP) Projects
Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE
C. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
Final Report Evaluation of I-Pave Low Volume Road Design Software
Final Report Evaluation of I-Pave Low Volume Road Design Software May 2015 Michael I Darter, William R. Vavrik, Dinesh Ayyala 2015 2014 Applied Research Associates, Inc. 1 Objectives 1. Obtain all documentation
CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)
CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW) January, 2013 THIS SHEET INTENTIONALLY LEFT BLANK TABLE OF CONTENTS DRAINAGE STRUCTURES DRN-01 Corrugated metal pipe drop inlet DNR-02 Storm Drain
USE OF HIGHLY POLYMER MODIFIED HMA (HiMA) Ohio Asphalt Paving Conference Columbus, Ohio February 4, 2015 Bob Kluttz, Kraton Polymers
USE OF HIGHLY POLYMER MODIFIED HMA (HiMA) Ohio Asphalt Paving Conference Columbus, Ohio February 4, 2015 Bob Kluttz, Kraton Polymers Outline Introduction SBS and Highly Modified Asphalt Material Properties
A Comprehensive Approach to Storm Water Asset Management Planning. City of Virginia Beach Public Works Operations
A Comprehensive Approach to Storm Water Asset Management Planning City of Virginia Beach Public Works Operations Steve McLaughlin, PE April 2016 Agenda City of Virginia Beach, VA Population: 450,000 250
For Asset Management
For Asset Management By: Larry Weiss SDLTAP It Begins with Accurate Inventory Inventory of existing system: The Local Roads Needs Study conducted in Aug/Sept of 08 indicated by it s results and from LTAP
Figure 3 Pipe Cracking
The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.
FY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
CAPPELEN MEMORIAL BRIDGE REHABILITATION
CAPPELEN MEMORIAL BRIDGE REHABILITATION Owner: Hennepin County Engineering: HNTB with Olson-Nesvold Engineering (ONE) and others Section 106 Historical Committee: Hennepin County, MnDOT Cultural Resources
Clean, Green, Fun! Cady Way. Trail
Clean, Green, Fun! Cady Way Trail Seminole County Burkett Osceola 426 Mizell Sylvan 426 Ward Memorial Cady Way 436 426 551 Nan Waunatta Martha Mira Pearl George Virginia Berry Irma Winter Pines Golf Course
CITY COUNCIL WORKSHOP MAY 24, 2016
1 CITY COUNCIL WORKSHOP MAY 24, 2016 Capital Budget FY 2016-2017 & 2017-2018 Robert Ovadia, PE, City Engineer 2 Overview FY 2015-16 Accomplishments Projects Completed during FY 2015-16 Projects Under Construction
Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate
Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5