38 25 00 N, 27 04 30 E.



Similar documents
TANZANIA HARBOURS AUTHORITY PO Box 9184 DAR-ES-SALAAM TANZANIA

REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO

Portsmouth. Port. Dues, Rates and Charges. Pilotage Arrangements I N T E R N A T I O N A L

Tariff General Cargo. Tariff DB Port Szczecin Sp. z o.o. Bytomska14_Str Szczecin, Poland. This Tariff includes: rates for services,

GOVERNMENT OF PAKISTAN MINISTRY OF PORTS AND SHIPPING


SINGAPORE. A PREMIER GLOBAL HUB PORT THE WORLD S BUSIEST PORT

BULGARIAN RIVER SHIPPING JSC RUSE, BULGARIA. PROJECT : LOGMOS 29 February 2012 Brussels

KRISHNAPATNAM PORT COMPANY LIMITED

PRICING TARIFF Effective 01 July 2014 to 30 June 2015

Welcome to the Port of Larvik. the gateway to Europe

PORTS OF. sh i p to no r way

PORT TARIFF SZCZECIN AND ŚWINOUJŚCIE SEAPORTS AUTHORITY 2010

Maritime Trade and Transportation by the Numbers

Republic of Turkey - Ministry of Economy,

FREMANTLE PORTS. A Guide to Our Business

STAVANGERREGIONEN HAVN IKS STAVANGERREGIONEN HAVNEDRIFT AS. Prices

TOGETHER! Let s sea more

Congo (D. R.) Ports description

THE PORTS ACT Regulations made by the Mauritius Ports Authority under Section 65 of the Ports Act 1998

TRANSPORT MODES AND THE CONSOLIDATION OF TRANSPORT LOTS

Trade Statistics for Queensland Ports

THE LIVORNO PLATFORM

Table 5 Core Port and Transport Logistic Measures: Definitions, priorities, and sources of data

Fee tariff for services of Port of Gdansk Authority SA

We provide international road haulage services all throughout Europe. Our dispatchers have many years of experience and are ready to meet the

2011 REPORT ON CARGO HANDLING IN KLAIPöDA STATE SEAPORT

INTERNATIONAL MARINE UNDERWRITERS COMMERCIAL MARINE PACKAGE POLICY APPLICATION

ING FORWARDING & SHIP'S AGEI

Inland intermodal terminals and freight logistics hubs

Hellesylt. PORT Contact on arrival (detail name): VHF channel: 13/16 PFSO on duty Telephone: Notice required:

Ports and Ocean Freight

APRIL 2014 PORT OF ITAQUI

PORT OF NEWCASTLE 2014 ANNUAL TRADE REPORT

Hellesylt. PORT Contact on arrival (detail name): VHF channel: 13/16 PFSO on duty Telephone: Notice required:

Founded in 1961, OYAK is Turkey s first and biggest privately-owned pension fund. OYAK is the second biggest industrial groups in Turkey.

GUIDELINES FOR VOLUNTARY USE OF THE SHIP ENERGY EFFICIENCY OPERATIONAL INDICATOR (EEOI)

A SOLUTION FOR THE NEW YORK HARBOR TODAY. A LEADER FOR THE SHIPPING WORLD TOMORROW.

Vessels reporting duties on the NSR

J.J. Keller Safety Materials

Prepared and Submitted by

Port of Esbjerg Hulvejen 1 Postboks 2 DK-6701 Esbjerg

PORT of TAMPA. Presentation to: Tampa Bay Applications Group May 2, 2013

The Port of Oslo. A cleaner way to Norway s capital. 3,350 mobile phones arrive in Oslo by sea every day. photo: bård ek

MLD: Domestic Maritime Transport Project

BERMUDA MARITIME SECURITY (HARBOUR AREAS) (RESTRICTED ZONES) ORDER 2010 BR 79 / 2010

TARIFF September 2010

3 Remuneration for Use of Infrastructure. 3.3 Remuneration for Use/Hire of Land/Land Tenure Hawse Remuneration / Rope Handling

PORT TARIFF. for THE PORT AUTHORITY OF GRENLAND. Effective from 1 January 2016.

Port of Farsund. The exotic choice. Your first and foremost port in Norway

Ship Fleet Management System Market Outlook FMS Adoption in Ships Likely to Accelerate by 2018 with New-generation Ships Creating Opportunities

ISLAND TOURISM AND YACHTING IN GREECE

THE LOGISTIC PLATFORM ITALIAN - TURKISH

FOR RENT PRODUCTION AND COMMERCIAL FACILITIES ALONG WITH A SOCIAL AND OFFICE SURFACE MARR BUSINESS PARK 10 NAD DRWINĄ STREET IN KRAKÓW

Riga Facts & Figures. Riga Facts &

PORT INFORMATION GUIDE PRIMORSK JUNE 2010

Port of Esbjerg Hulvejen 1 DK-6700 Esbjerg

World Fuel Services Corporation Overview

MINING ACTIVITIES IN TURKEY DURING 1959

Discharge of Water & Waste from Marine Vessels Standards & Regulations (MARPOL Convention)

PORT TARIFF BOOK Version 11.0 ABRIL, 2014

SOLAS. Verified Gross Mass Shipper Guide. nagel.com

PT. TRI MARINA GLOBALNUSA - BROCHURE

Hurricane Hotwash. Presented by: David W. Mock, P.E. Director S.E. Region, Ports and Maritime Group CH2M HILL. AAPA Cruise Committee

MARINE LIABILITY PRODUCTS

Intermodal Handling TOP PERFORMANCE WITH SMART SOLUTIONS

Container design and types

Japanese Shipping and Challenges for the Shipping Industry

to the General Terms and Conditions ( AGB ) Applicable to Civil-Law Agreements on the General Use of the Port of Hamburg

Crowley 60 Years in Alaska. February 2014

Logistics and Infrastructure

RAS AL KHAIMAH PORT RAS AL KHAIMAH PORT TARIFF. Doc. No. RAKP PT 001 Rev.03 PAPER COPY UNCONTROLLED Issue date: 12/01/2015

How To Answer A Cargo Handling Questionnaire

2016 MAY. The brochure.

Railway network. [and you drive??] PhD CE Jarosław Zwolski. 1. Railway network in Poland and in Europe. 2. Safety and traffic control

A greener route to the capital

Cuyahoga County s Clean Ohio Revitalization Fund Round 5 Application Great Lakes Shipyard Expansion Project Attachment A1 Application Summary Document

Compliance Noise Monitoring

CPCS Supply Chain Review. Eastern Canada Logistics Study By CPSC November 2012

Think global, act local.

CHARGES, TERMS AND CONDITIONS FOR STRANDA PORT AUTHORITY 2016 Adopted: Stranda Port Authority, 27 November 2015

Cruise Liners. Prices and terms Port of Stockholm and Nynäshamn. Version

PORT TARIFFS applicable to the ports of Region Gotland

AUTOMATED MARINE TECHNOLOGIES. ALL RIGHTS RESERVED.

AGILITY TRANSPORT OVERVIEW. May 2014

Formal Interpretation NFPA 30. Flammable and Combustible Liquids Code Edition

Port of Beira. 22/06/12, Pretoria. Félix Machado Sales & Marketing Manager

Agricultural & Farm Development - The Planning Issues

CUXPORT - IN POLE POSITION

NORTHWEST VERMONT SOLID WASTE MANAGEMENT DISTRICT GEORGIA, VERMONT

DEVELOPING A CNG INFRASTRUCTURE LINING WITH THE FUTURE NEEDS MIDDLE EAST, NGV SUMMIT, 8 10 SEPTEMBER 2014, ABU DHABI, UAE

SHOREHAM PORT AUTHORITY

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA

Part 0 - Classification and Surveys Classification and Surveys I

Scope of EN Clarification Document

Abu Dhabi Ports Operating Company Abu Dhabi Terminals PJSC

Crowley LNG. Puget Sound Harbor Safety Committee June 3 rd, Matthew Sievert Director Business Development LNG

Recent evolutions in the tank storage sector in the Port of Antwerp. Rose-Marie Pype March 19th, 2013

CHANGES IN RO-RO TRANSPORT TENDENCIES IN SANTANDER PORT

Why infrastructure is so important

Transcription:

Invest in SEAS OF İZMİR İzmir has a significant potential regarding national and international maritime transportation. Alsancak, Aliağa-Nemrut, Dikili and Çeşme seaports are important points in maritime transport. Çandarlı Seaport which is under construction that will be one of the ten biggest seaports of the world will also be one of the connection points that will significantly increase the potential of Izmir. Alsancak Seaport Alsancak Seaport is the biggest seaport of Aegean Region in regards to its annual ship acceptance capacity of 3,588 ships. In addition to being the import portal of Central Anatolia Region and Aegean Region, it is also an important trading port between European, Middle Eastern and Asian countries with its railway and highway connections. In year 2011, approximately 70% of loadings and 77% of container traffic realised at seaports operated by TCDD was made by Alsancak Seaport. Coordinates: The seaport operated by T.R. General Directorate of State Railways (Devlet Demiryolları İsletmesi Genel Müdürlüğü TCDD) is located at the coordinates of 38 25 00 N, 27 04 30 E.

549 S ALSANCAK SEA 3.400 11 2.086 G, D 348 L 200 A Area size : 635.000 m2 Location : Considered together with its highway and railway access routes, the hinterland of Izmir Seaport covers the southern part of Marmara Region, entire of Aegean and Central Aegean Regions, western part of Central Anatolia, western and north western parts of Mediterranean Region. Number of wharfs : 25 Potential capacity : 1,000,000 TEU container, 10,000,000 tonnes load handling State : Investments underway. As the foremost export seaport of Turkey in container handling, İzmir Seaport is an important trade port between, European, Middle East and Asian countries with its railroad and highway connections, along with being the import gate of Central Anatolia and Aegean Regions of Turkey. Considering its location allowing easy access to all touristic assets of Aegean Region and close proximity of 25 km to Adnan Menderes Airport, the importance of the port for passenger services may also be emphasised. The seaport has a wide agricultural and industrial hinterland. Aside from being the agriculture and industry port of Aegean Region, Izmir also plays a crucial role regarding the export activities of the country. All types of cargo are serviced in the port and port expansion works are underway. The seaport is connected to the railway and highway networks. Dominantly services for cargo and cruise passenger ships are provided in Alsancak Seaport. Annually, 500,000 passengers, 1 million TEU container and 10 million tonnes cargo are handled. Providing employment for 800 people, the Seaport annual average turnover has been indicated to be 100 million US dollars. Pilotage/Towage: It is mandatory for ships to get pilotage while entering and exiting the port. Pilotage and Towage services are provided 24 hours a day by TDI (Türkiye Denizcilik İşletmeleri A.Ş.). Marine Vehicles: A 90-tonnes capacity floating crane and 1 mooring (warp) boat exist in the port. Handling Equipments: Container handling operations in the terminal are realised by 5 40-tonnes gantry cranes, 19 rubber-wheeled transtainers with 40-tonnes capacity, 20 full container forklifts with 25-42-tonnes capacity and 20 empty container forklifts with 8-10-tonnes capacity. In addition to these, there are 7 dock cranes with 3-25-tonnes capacity, 12 mobile cranes with 5-25-tonnes capacity, and 20 short-mast forklifts. Also the terminal has suitable reefer panels for reefer containers. The daily capacity of the container washing plant is 20 TEU. Third Person Handling Equipments: 2 MHC with 100-tonnes capacity. Bulk Cargo Facility: In the port that has two concrete silos with a total capacity of 70,000 tonnes belonging to TMO, there is also a conveyor system connected to the dock. Passenger Services: Due to the close proximity of Izmir to the historical and touristic sites in Aegean Region, the port passenger terminal also has a significant traffic. New Investments and Privatisation Practices: A total investment amount of 650 million US dollars is estimated to be made for Alsancak Seaport regarding expansion of both the cruise port and the container port. Privatisation practices for the seaport are also in progress. 2

Aliağa-Nemrut Seaports The industry district of İzmir, Aliağa, is surrounded by Manisa at the east, Bergama at the north, Menemen at the south and Foça at the southwest. İzmir- Çanakkale motorway passes through the city, and it takes 45 minutes from the district to İzmir Centrum with this double two-way highway. Ege Gübre, BATICIM, İzmir Demir Çelik, Ege Çelik, HABAS, TCE EGE, Nemport, Petkim, Tüpraş, Petrol Ofisi, Ege Gaz, Total Gaz ports and docks in Nemrut and Aliağa have a significant contribution to economy. The export made via these ports and docks occurred to be approximately 7 billion dollars in year 2010, and 10 billion dollars in year 2011. The construction of the North Aegean Çandarli Port increases the importance of the region even further. There are a total of 61 companies functioning in the Ege Gübre Seaport Port including Tüpraş with over 8 billion TL sales volume and Petkim with over 2 billion sales volume. Annually commercial transaction at a total value of approximately 15 billion dollars is realised in the docks and ports in Aliağa. As of year 2011, an approximate ship traffic of 5000 was achieved in the area where 39 million tonnes handling was made. The only ship dismantling facility of Turkey is located in Aliağa. 21 enterprises with ship dismantling licence are situated on 1300 metres coastline and 600,000 m2 area. When the sector reaches full capacity 900,000 tonnes/year production, 1800 workers get employment and together with the subindustry this value reaches 8000 workers. Recycling amount estimated as of end of year 2012 is around 750,000-800,000 tonnes, while it is estimated that 1,000,000 tonnes of ship recycling is going to occur as of year 2015. Location: Latitude 38º 45 65 N, Longitude 26º 55 68 E 3

680 S Ege Gübre 1,648 27 6.000 G, L 1150 D Area size : 513. 000 m 2 Location : Located at southeast of the Nemrut bay interior port. Nemrut Industrial Zone - ALİAĞA / İZMİR (distance to İZMİR city centre is 60 km) at 1,700 metres distance to İZMİR - ÇANAKKALE highway and State Railways. At 70 km distance to Adnan Menderes Airport. İZBAN light railway system functions between Aliağa and İzmir city centre. All import and export processes of third parties registered in Aliağa Customs Directorate may be realised here. Number of wharfs : 2 Potential capacity : No tonnage restriction for berthing ships. Seaport Features (North-South) Seaport ship berthing north section length is 124 m Seaport ship berthing north section depth is 13 m Maximum 50,000 DWT ships may berth at north section of the port. Seaport ship berthing south section length is 103,50 m Seaport ship berthing south section depth is 10 m Maximum 7,000 DWT ships may berth at south section of the port. Seaside ship berthing section (apron) width of seaport is 15,60 m Seaport Features (East-West) Seaport ship berthing west section length is 360 m Seaport ship berthing west section depth is 11-23 m Maximum 100,000 DWT ships may berth at west section of the port. Seaport ship berthing east section length is 410 m Seaport ship berthing east section depth is 7-23 m Maximum 80,000 DWT ships may berth at east section of the port. Seaside ship berthing section (apron) width of seaport is 30 m Equipments Seaport houses 3 cranes in total, consisting of 1 rail-operated crane with 10-tonnes lifting capacity and 2 mobile-operated cranes with 36-tonnes lifting capacity. There is a mobile pneumatic discharge system. There are phosphoric acid, sulphuric acid, liquefied ammonia and solvent and fuel oil discharge systems at the seaport wharf. Port Support Services Storage Height (m) Area (m²) Shelter 6 20,000 Closed Warehouse 11 2,446 Open Concrete Site - 10,000 Storehouses 7.90 9.95 22,300 Closed Warehouse 2 9 10,125 Steel Silo 4 5,000 tonnes There are 3 electronic weighbridges of 80-tonnes capacity inside factory site. There is a car park area of 1,100 m². All import and export processes of third parties may be realised here under jurisdiction of Aliaga Customs Directorate. There are 23 separate tanks of various characteristics and capacities between 100 m³ and 2,650 m³ in Ege Gubre Terminal. Tank filling capacity is 23,000 m³, usable for various liquid chemical substances. Specially outfitted tank group with 1,500 m³ filling capacity has heating system. Loading and Unloading Capacity General Cargo: 2,000 4,000 tonnes/day Bulk Solid: 1,000 15.000 tonnes/day Bulk Liquid: 150 400 tonnes/hour 4

IDC SEA Location : 38 46 N - 26 56 E X 1,000 IDC 374 26 5.000 G, D Area size Location : 191.000 m2 : Built on the coast of Nemrut Bay at northwest of Izmir, the port is at 60 km distance to İzmir and 70 km. distance to Adnan Menderes Airport İZBAN light railway system functions between Aliağa and Izmir city centre. Service type is bulk dry cargo and general cargo. Number of wharfs : 2 Capacity : Ships up to 80,000 DWT may berth Stocking site : 4,000 m² closed warehouse, 6,275 m² penthouse Storage area : 50.000 open air, total area 60.000 m² Capacity : Ship berthing capacity up to 80,000 DWT. All ships may berth at the wharf with max. m draft. Weighbridge : 2 x 80-tonnes electronic weighbridge. Crane : 2 x wharf coast cranes with 12.5 tonnes lifting capacity www.idcliman.com.tr Cargo Handled at Port Scrap Iron (5-9,000m. t/day) Product Iron (7-9,000m. t/day) Pig Iron (5-9,000m. t/day) Coal (15,000 t/day) Iron Ingot Petroleum Coke (15,000m t/ day) Round timber Lumber MDF Particle board Cement Clinker Fertiliser Lignite coal Anthracite coal Copper Lead Zinc Mineral Plaster board Marble Fishmeal Clay Roll sheet Sheet metal Cottonseed Corn Wheat Soy bean Feldspar Demounted part Ammonium nitrate Brick Pier Information Pier No Length (m) Width (m) Depth (m) Note 1 110 22 7 Coaster / River type 2 175 22 11,5 Large bulk cargo ships 3 175 22 12,5 Large bulk cargo ships 4 110 22 9 Coaster / River type 5

TÜPRAŞ SEA TÜPRAŞ 1.458 19 25.000 L Location : Built on the coast of Nemrut Bay at northwest of Izmir, the port is at 60 km distance to Izmir and 70 km. distance to Adnan Menderes Airport İZBAN light railway system functions between Aliağa and İzmir city centre. Service type is liquid bulk cargo. Number of wharfs : 8 Other : http://goo.gl/1sluoy PETKİM SEA Location: 38 46 70 N 26 54 90 E PETKİM 1.176 12 5.500 G 1.765 S 6

Area size Location : 9.206 m2 : Built on the coast of Nemrut Bay at northwest of İzmir, the port is at 60 km distance to İzmir. Number of wharfs: 8 İZBAN light railway system functions between Aliağa and İzmir city centre. Service type is liquid bulk cargo. Mooring : Ships may moor at the outer seaport region of Nemrut Cove. Petkim Seaport has been providing services to PETKİM since year 1985 with its total area of 456,000 m², Temporary Storage Yard and Port Operations Building, and to third parties since year 2004 with its Type A closed and open air General Warehouse and two weighbridges of 60-tonnes capacity. Built over a total area of 456,000 m², the port functions for the storage and handling processes of various load types with its general warehouse consisting of approximately 30,000 m² open air /5,000 m² concrete Type A storage site, 40,000 m² temporary storage yard and 3,024 m² closed area Type A warehouse. PIER SHIP LENGTH (m) SHIP DRAFT (m) DWT HANDLED PRODUCT DRY CARGO-1 DRY CARGO-2 175 125 9,2 6,5 25000 10000 BULK DRY CARGO, GENERAL CARGO, PROJECT LOADS, DRY CARGO-3 125 6,5 10000 CONTAINER, RO-RO TANKER-2 100-155 9,2 25000 ETHYLENE, C4, ACN, NAFTA, PX, OX, BENZENE, C3, LPG, PYGAS, C5/TO TANKER-3/1 100-120 5,5 10000 C5/TO, BENZENE, PX, OX, A.ACID, HEG- HEP, NAFTA, VCM-EDC, PENTANE, ACN, MEG, DEG TANKER-3/2 (Salt Pier) 70-100 5 10000 SALT TANKER-5 110-180 11,2 40000 DIESEL FUEL, AROMATIC OILS, NAFTA, C4, LPG, AMMONIA, PYGAS, VCM, BENZENE, PX, PROPYLENE, CAUSTIC EGEÇELİK SEA Location: 38 46 Latitude 26 55 Longitude EGEÇELİK 1.125 35 7.500 G, D 7

Area size Location : No storage or support services. : Built on the coast of Nemrut Bay at northwest of İzmir, the port is at 60 km distance to Izmir Number of wharfs : 7 İZBAN light railway system functions between Aliağa and İzmir city centre. Service type is general cargo and dry bulk cargo. Other : Average ship acceptance capacity is 1,500 ships/year. Elevation of Pier Surface Above Water Level: 3.40 m. Ship Acceptance Capacity: Average 1,500 ships/year Cargo Handling Capacity: 7,500,000 tonnes/year Wharf Length Drafts 1 # 110 m. 7,5 m. 2 # 186 m. 9,0 m. 25,0 m. 3 # 200 m. 25,0 m. 35,0 m. 4 # 185 m. 25,0 m. 35,0 m. 5 # 214 m. 11,5 m. 25,0 m. 6 # 120 m. 5,5 m. 13,0 m. 7 # 100 m. 4,5 m. 6,0 m. Services Provided at the Port: Loading Unloading Closed and open air storage yards Solid waste, liquid waste, waste collection, water, fuel oil and provision services Cranes and Equipments Serving at Seaport: Liebherr LHM 150 40 MT Handling Kobelco 35 MT Handling P & H 518 35 MT Handling Liebherr 954 Excavator 15 MT Liebherr 954 Excavator 15 MT NEM SEA NEM 820 22 300 S 8

Area size Location : 100.000 m2 : Built on the coast of Nemrut Bay at northwest of İzmir, the port is at 60 km distance to İzmir. Number of wharfs: 2 İZBAN light railway system functions between Aliağa and İzmir city centre. Service type is dry bulk cargo. Dock Features 820 metres long dock for accepting ships South Dock (dock no 2 & 3) 410 m North Dock (dock no 4 & 5) 410 m Dock Width 40 m 96 x Bridgestone M1 type fender (at 9.40 distances) 4 x Bridgestone corner fender 5 x quickrelease hooks (4 x 80 m. + 1 x 40 m. capacity) 52 x Anchor ring 5 x fire hydrants and water supply cocks 3 x 40-100 lux lighting equipments on poles Yards 28 x fire hydrants and water supply cocks 1 x foam fire extinguisher 0,500 TEU container and 120 reefer storage areas on 100,000 m² C30 type 30 cm thick concrete fields over double steel mesh. Equipment Park 3 x MHC Gottwald (Capacity: 2x100 tonnes + 1x140 tonnes) 5 x Electrical RTG Konecranes (Capacity: 50 tonnes 6 + 1 story 7 yan) 4 x CRS Kalmar (Capacity: 45 tonnes 5 story) 1 x CRS Kalmar (Capacity: 10 tonnes 6 story) 2 x EHC Kalmar (Capacity: 16 tonnes 8 + 1 story) 8 x hauler Terberg 22 x Trailers (Capacity: 60 tonnes) 1 x Scale (Capacity: 100 tonnes) 4 x Forklift (Capacity: 45 tonnes. 25 tonnes, 16 tonnes, 5 tonnes) 15 x Forklift (Capacity: 3 tonnes) 2 x Mini Loader (Capacity: 2.5 tonnes) Paper Roll Clamp (Capacity: 5 tonnes) Bale Clamp (Capacity: 2.5 tonnes) 4 x Barrel Clamps 6 metres Bar Iron Loading Clamp Warehouse Nemport Type-A Customs General Warehouse that is established on 3300 m² land compliant to international standards has been providing services to importers and exporters since October 2010. Nemport Type-A Customs General Warehouse: In addition to the forklift fleet with 1 x 45 tonnes, 1 x 25 tonnes, 1 x 16 tonnes, 1 x 5 tonnes, 9 x 3 tonnes capacity, it has a fully-equipped machinery park with bale and paper roll clamps. Due to 11 x EP (Euro Palet) shelves on 700 m² warehouse land, a storage capacity of 1485 EP exists. High storage standards suitable to food and all types of sensitive cargo. The opportunity to handle the containers, which were unloaded at other container ports, in Nemport port and store the cargo at the warehouse. Close proximity to Aliaga Directorate of Customs. Due to legislation, foreign cargo shipped to clients may be stored free of time limit and exempt from customs tax. The demurrage cost formed when cargo is stored inside the containers is eliminated during warehouse utilisation. For Nemport Port is located inside the container terminal, intermediary transportation cost for containers unloaded to Nemport is eliminated. 9

HABAŞ SEA Location: 38 47 68 N 26 54,7 E HABAŞ 1.550 41 5.500 G,D Area size : 100.000 m2 Location Number of wharfs : 2 : Built on the coast of Nemrut Bay at northwest of İzmir, the port is at 60 km distance to İzmir. İZBAN light railway system functions between Aliaga and İzmir city centre. Service type is general cargo and dry bulk cargo. Pier length: 490 m. Pier width: 30 m. Dock length: 450 m. Maximum draft: 41 m. Habaş Seaport a member organisation under Habaş Group, operates the seaport located at the south of Nemrut Bay entrance. Located at 7 km distance to Habaş Iron Steel Plants, the seaport generally functions for the discharge of scrap steel and loading of finished steel products, while providing services also to other organisations willing to benefit from the port. BATIÇİM SEA 10

Included in BATI ANADOLU GROUP structure as of year 2006, BATILİMAN facility is located at Çakmaklı Village, Nemrut Bay - Aliağa, at 59 km distance to İzmir city centre, Latitude: 38 45 00 North Longitude: 26 53 50 East coordinates. BATILİMAN facility is significantly suitable for berthing and departure of incoming ships. BATILİMAN port rear service area consists of the 100,000 m² site adjacent to the port and the 70,000 m² site at 2 km distance to the port. These rear service areas are suitable for warehousing and temporary stockpiling, and provide advantage to cargo owners regarding transport organisation of incoming/outgoing shipments. BATILİMAN has a strategic location with its highway connection and railroad line reaching the port area. And this feature provides an important advantage to clients for all import and export processes. BATILIMAN HIGHWAY AND RAILWAY DISTANCES Highway Batıliman - Balıkesir 196 234 Batıliman Manisa 59 59 Batıliman İzmir 59 57 Batıliman Denizli 281 320 Railway General cargo, bulk cargo, scrap iron and all types of mixed cargo handling and storing services are provided at the port by a specialist staff utilising modern port equipments 7 days a week and 24 hours a day. ISPS International ship and port facilities safety code is implemented in the seaport, and high standard security and control is provided 24 hours a day within the context of seaports approved for security by the Undersecretariat of Maritime Affairs. Entire terminal site is monitored through 8 security cameras. TECHNICAL FEATURES OF THE Handling capacity General Cargo: 3,000,000 tonnes/year Bulk Cargo: 6,000,000 tonnes/year Total seaport area 149,000 m² Storage area Customs area Automobile and truck park area Facility equipments 100,000 m² - Open Air 40,000 m² - Open Air 20,000 m² - Open Air Machinery and equipments required for loading and unloading exists at the facility site TABLE OF FEATURES FOR BATILIMAN PIERS Pier No 1 205 m. Ship Berthing Section Lengths Pier No 2 186 m. Pier No 3 196 m. Pier No 4 164 m. Pier No 1 10 12 m. Ship Berthing Section Depths Pier No 2 17-36 m. Pier No 3 17 36 m. Pier Water Level Height 4 4,5 m. Pier Width 22 m. Pier No 4 5 6 m. Pier Latitude and Longitude Values Fuel and Water Supply to Ships Operation Period Under Suitable Weather Rib Status 38 45 00 Latitude - 26 53 50 Longitude Realised by agencies and petroleum companies. Operates for 7 days a week and 24 hours a day. Adequate rib provided depending on Loading Unloading state 11

ÇEŞME SEA ÇEŞME 1.276 12 - F,R,Y Location : Located in the touristic Çeşme Peninsula at half an hour distance west of Izmir. Service type is ferry boat, Ro-ro and passenger transportation. Number of wharfs : 2 Sitting on a total 26,931 m² area, the port was completed in year 1991 along with its facilities and put in service by Turkey Maritime Organisation A.S. Çeşme Seaport is located at 85 km distance to Izmir, 110 km distance to Adnan Menderes Airport and 1 km distance to Cesme district centre. PHYSICAL ASPECTS OF THE SEA Dock: Total dock length is 480 metres. Throughout the dock length, water depth is 7 to 10 metres at ship mooring points. Piers a) Ferry Boat / Cruise Ship Pier Pier length is 150 m, and depth is 8 to 12 metres along the pier. Works on extending this pier from 150 metre length to 322 metre length are underway. As of September 2012, cruise ships up to 330 metre length will be able to berth at this pier. b) Ro-Ro Pier The pier was built with a length of 213 metres in order to prevent Ro - Ro traffic and cruise ship passenger traffic from being affected by each other. c) Small Ferry Boat Pier (Low Elevation Ramp Pier) The low elevation ramp pier put into service in year 2004 has a length of 50 m and width of 5 m. Small tonnage ferry boats travelling to/from Chios Island are capable of berthing at both sides of the pier and the pier may serve up to 5 ships with maximum 500 GRT at the same time. SERVICES PROVIDED In general the following ships are served at Çeşme Seaport; Ro-Ro ships sailing on Çeşme-Trieste (Italy) maritime line (3 Ro-Ro ships sail on this line as of year 2012 with a total capacity of 435 TRUCKS) Cruise ships sailing to Greek Islands (2 cruise ships sail to Greek Islands as of year 2012), and Low tonnage ships on the line between Cesme Chios Island (Greece) (1 Greece registered and 4 Turkey registered ships to a total of 5 ships cruise on this line, every day of week during summer season and 3 days of week during winter) 1. Pilotage Services Pilotage Services in the port are provided on a 24 hour - 7 day basis by experienced Maritime Pilots within the coordinates defined under Çeşme Seaport Guidelines. 2. Towage Services Towage Services in the port are provided by SARKOY Towboat with 11 tonnes towing capacity and ÇEŞME-1 Towboat with 30 tonnes towing capacity. 12

3. Utility Water Supply Service to Ships Utility water demands of ships visiting the port can be met 24 hours a day with a total capacity of 35 tonnes/hour. 4. Solid/Liquid Waste Collection Service for Ships Solid and liquid wastes forming due to normal activities of ships visiting the port are collected as per relevant regulation, stored in our Waste Acceptance Facility and sent to Disposal Facilities to be disposed of. 5. Security Services (ISPS) As with the effectuation of International Ship and Port Facility Security Code (ISPS) on the 1st of July 2004, the seaport has realised all liabilities relevant to the code in question and received its ISPS certificate (Seaport Facility Security Certificate) and proved itself as a Secure Port within the sector of International Maritime and Seaport Operation. Towards this purpose, a security system comprising of 21 cameras (19 fixed, 2 moving) and 166 active barriers has been installed inside the port area and passenger hall. 6. Loading Unloading Services There are 3 Forklifts at the port with 3 tonnes lifting capacity each in the seaport. 7. Emergency Health Services There is an Infirmary at the port that is outfitted for all emergency health services to be provided to passengers for 24 hours a day during the activity season. 8. Duty Free Sales Store 9. PTT Office (Post Office) There is an exchange office at the seaport for passengers coming from abroad or going abroad to be able to exchange currencies and use mailing services. 10. Car Park Service There is a car park sitting on 3,750 m2 area for serving vehicles belonging to passengers going out to Chios Island of Greece from the port, passengers visiting Greek Islands via cruise ships, and for touring buses in the seaport. NORTH AEGEAN (ÇANDARLI) SEA Northern Aegean (Çandarli) Seaport is being initialised for the purposes of supporting İzmir Alsancak Seaport, meeting the future port demand of Turkey and Aegean Region, and serving transit cargo transportation and third generation ships. It has the potential features of becoming the centre of transit cargo transportation in Mediterranean Sea with its location, capacity and transportation opportunities. The aim is to accept berthing ships within year 2015. At full capacity operation, the seaport is estimated to have 1,100 ships berthing to an annual total of over 200,000 tonnes capacity. Çandarli Seaport: When completed, the port will be listed among 10 of the largest seaports throughout the world. Its tender shall cover construction through Build-Operate-Transfer (BOT) model and operation for 41 years. The port will be 4 times the size of Alsancak Seaport, enabling 6 ships to berth at the same time. The initial capacity of the Port shall be 4 million TEU, with a final capacity of 12 million TEU. Jetty length shall be 1,800 metres. The port will increase Turkey s cargo handling capacity by 70%. Rear service area shall cover 800,000 square meters of storage area. Şehit Fethi Bey Caddesi No:49/1 Birlik Plaza Kat:3 35210 Gümrük, İZMİR, TÜRKİYE T. +90 232 489 81 81 F. +90 232 489 85 05 info@izka.org.tr www.izka.org.tr /investinizmir /investinizmir /investinizmir