HP 16/18-Port Cable Management Kit Installation Guide Abstract This document describes how to attach the HP 16 Port or 18 Port Cable Management Kit to an HP rack. The cable management bracket is designed to align and support the cables that lead from an HP BladeSystem c-class enclosure's 16 port or 18 port InfiniBand switch mounted in the rear of the chassis to another c-class InfiniBand switch or an InfiniBand interconnect installed in an adjacent rack. The cable management bracket currently supports the HP BLc QLogic 4X QDR InfiniBand Switch (505958-B1) and the HP BLc 4X FDR InfiniBand Switch (64831-B1), but it can potentially be used for other configurations, as deemed necessary. HP Part Number: 5387-doc Published: April 01 Edition:.0
Copyright 009, 01 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. The only warranties for HP products and services are set forth in the express warranty statements accompanying such products and services. Nothing herein should be construed as constituting an additional warranty. HP shall not be liable for technical or editorial errors or omissions contained herein. InfiniBand is a trademark of the InfiniBand Trade Association.
Contents 1 Preparing for Installation...4 1.1 Audience...4 1. Documentation Resources...4 1.3 Kit Description...4 1.4 Kit Contents...4 1.5 Required Resources...5 1.6 Prerequisites...6 Aligning the Bracket...7 3 Installing the Cable Management Bracket...9 3.1 Installing the Cable Management Bracket...9 3. Installing the Releasable Cable Ties for the InfiniBand Cables...9 4 Removing InfiniBand Cables and Switches...1 4.1 Removing a Damaged Cable From the c-class Cable Management Bracket...1 4. InfiniBand Switch Removal...1 Contents 3
1 Preparing for Installation 1.1 Audience This guide is intended for HP service representatives and other persons trained to install hardware options in HP racks. Such persons are expected to understand the hazards of working in this environment and to take suitable precautions to minimize danger to themselves and others. 1. Documentation Resources You can download the documentation for components referenced in this installation guide from the following locations: HP Rack (Documentation option): http://h18004.www1.hp.com/products/servers/proliantstorage/racks HP Cluster Platform: 1.3 Kit Description http://docs.hp.com/en/highperfcomp.html The c-class enclosure cable management bracket described in this manual is designed to align and support the InfiniBand cables that lead from an HP c-class InfiniBand switch module. For example, the InfiniBand cables that run from a HP c-class switch module mounted in the rear of the HP BladeSystem c-class enclosure to another switch, or a similar interconnect device. The kit provides strain relief for the cables connected to the individual InfiniBand interconnect ports and ensures a good connection. It also ensures the correct bend radius for the cable and provides channels for cable routing and cable management. One cable management kit is required for each interconnect module bay system interconnect device. NOTE: The cable management bracket is designed to support 4 AWG (0.41 inch) diameter, 6 AWG (0.37 inch) diameter, and 8 AWG (0.33 inch) diameter QSFP InfiniBand cables. Consult the documentation supplied with your cluster before installing the brackets and routing the cables. 1.4 Kit Contents Verify that the cable management bracket kit contains the following components: Packaging and documentation. The bracket hardware shown in Figure 1. 4 Preparing for Installation
Figure 1 Bracket Hardware 1 3 4 5 6 The following list describes the callouts in Figure 1: 1. HP 16-Port or 18-Port Cable Management Bracket. Releasable cable tie 3. Holes used for the push-button mounts 4. Push-button mount 5. Rail-mount hook (one on each end of the bracket) 6. Mounting hole to fasten the bracket to the rack's rear rail (one on each end of the bracket) The fasteners that are specified in Table 1. Table 1 Fasteners (Supplied with Cabinet Mounting Hardware) Qty. Size Format Torque Description M6 cage nuts Square nut N/A Cage nut for M6 screw. M6 x 16mm pan head screws Posidrive 5-30 in/lb Machine screw. For use with M6 cage nut. To prevent screws from becoming loose because of vibration, HP recommends that you use an adjustable torque drive, set to the torque specifications given in the table above. Contact your HP sales representative if any parts are missing. 18 push-button mounts (see callout 4 in Figure 1) 18 releasable cable ties (see callout in Figure 1) Note: This cable management bracket might also be adaptable for other cable management solutions (consult your hardware installation documentation). 1.5 Required Resources To install the HP cable management kit, you require the following resources: Tools: Screwdriver, # (medium) Phillips Cage-nut insertion tool (shipped with the rack) or a flat-headed screwdriver 1.5 Required Resources 5
Marker pen or masking tape Diagonal cutting pliers Resources: Cables of the type used by the HP BladeSystem c-class InfiniBand switch. 1.6 Prerequisites Before you begin to mount the bracket: Follow the usual cable-handling precautions for InfiniBand cables, see the InfiniBand switch manual that came with your switch. Ensure you know how to plug in the InfiniBand cables, as described in the InfiniBand switch manual that came with your switch. Read the rack installation instructions for the c-class enclosure. Obtain the set of cabling tables required for your HP InfiniBand network. Important: Do not secure the enclosure into the rack before you begin the bracket installation. You must be able to access the rear (inward) face of the rack columns. 6 Preparing for Installation
Aligning the Bracket Figure shows the correct orientation of the cable management bracket which you must install before connecting the cables to the InfiniBand switch module. During the cabling procedure, the bracket provides strain relief for the InfiniBand ports, and maintains the correct minimum cable bend radius. Figure Bracket Orientation 1 The following list describes the callouts shown in Figure : 1. Mounting hook installed in one of the mounting holes in the rack's rear left column. Cable management bracket Callout 1 shows the bracket's mounting hook installed in one of the square holes in the left rear rack column. The actual mounting locations for a bracket are relevant to the location of the c-class enclosure in the rack, and must align with the InfiniBand switch installed in the c-class enclosure. Figure 3 shows the relative mounting locations. Figure 3 Three Bracket Mounting Locations U10 1 U9 U8 U7 U6 3 4 The following list describes the callouts shown in Figure 3: 7
1. The U location that aligns with the top of the HP BladeSystem c7000 enclosure. Each c7000 enclosure is 10U high.. Mounting hook location (black square) and fastener location (circled square) for an InfiniBand switch installed in Interconnect Module Bays (IMB) 3 and 4 3. Mounting hook location (black square) and fastener location (circled square) for an InfiniBand switch installed in IMB 5 and 6 4. Mounting hook location (black square) and fastener location (circled square) for an InfiniBand switch installed in IMB 7 and 8 Use the following procedure to determine the actual mounting locations for brackets: 1. Determine which of the interconnect module bays contain the InfiniBand switch. Note: There might be more than one InfiniBand switch module in some configurations.. Determine the rack U location that aligns with the top of the c-class enclosure. 3. Using a pen or masking tape, mark the mount locations defined in Table. Table Bracket Mounting Locations HP BladeSystem c7000 Enclosure Interconnect Module Bay Numbers Relative U Location Bracket Hook Cutout Fastener Cutout 3 and 4 Third U down from the top of the c-class (c7000) enclosure Bottom cutout Top cutout of the fourth U down from the top 5 and 6 Fourth U down from the top of the c-class (c7000) enclosure Center cutout Bottom cutout of the fourth U down from the top 7 and 8 Fifth U down from the top of the c-class (c7000) enclosure Top cutout Center cutout of the fifth U down from the top 8 Aligning the Bracket
3 Installing the Cable Management Bracket The location of the cable management bracket depends on the rack position occupied by the HP BladeSystem c-class enclosure. The InfiniBand switch might be installed in any or all of the interconnect module bays identified in Table. 3.1 Installing the Cable Management Bracket Use the following procedure to install the HP BladeSystem c-class enclosure cable management bracket: Caution: When performing the installation procedure, extend only one c-class enclosure no more than a few inches from the rack at any time. Ensure that the rack is stable before you begin the installation procedure. Note: One cable management kit is required for each InfiniBand switch installed in the rear of the c-class enclosure. 1. Starting from the lowest bracket location, and using the fastener locations that you identified and marked in Chapter, clip a cage nut into the back of each rear rack column.. Hook the bracket onto the square cutouts in the rack column. 3. Fasten the bracket to the rear rack columns by using two M6 pan-head screws and tighten them to the specified torque. 4. If more than one bracket is required, repeat Step 1. 5. Slide the c-class enclosure back into the rack and secure it at the front of the rack as specified in the installation instructions for the enclosure. 6. If necessary, attach the second bracket once the first switch (lowest switch in the c7000 enclosure) is cabled and tie-wrapped. Note: HP recommends that you only install the cable management bracket for the lowest InfiniBand switch in the c-class enclosure and complete the cable installation. Doing so makes it easier to install the releasable cable ties for each of the InfiniBand cables. Once the releasable cable ties are installed for the InfiniBand cables coming from the switch installed in the lowest interconnect module bay, you must install the next cable management bracket and releasable cable ties for the next InfiniBand switch. It is necessary to complete the installation for the lowest bracket first because there is not enough space between the two brackets to secure the releasable cable ties for the lower bracket when two or more brackets must be installed. 3. Installing the Releasable Cable Ties for the InfiniBand Cables Figure 4 shows the holes in the bracket that are used in the cable management bracket for an InfiniBand switch with 16 external uplink ports. 3.1 Installing the Cable Management Bracket 9
Figure 4 A Cable Management Bracket Holding 16 InfiniBand Uplink Cables 1 3 The following list describes the callouts shown in Figure 4: 1. Left rear rack column. 16 secured InfiniBand cables 3. One of the 16 releasable cable ties (completed assembly for 16-port switch shown) Important: You must install the HP BladeSystem c-class enclosure cable management bracket to provide proper strain relief for the InfiniBand cables. To install the InfiniBand cables and secure them with the releasable cable ties, follow these steps: 1. Install the push-button mounts by pressing them upward into each hole in the cable management bracket (see callout 4 in Figure 1).. Cable the lower InfiniBand switch first, as described in the hardware installation guide for the switch. 3. To secure an InfiniBand cable (callout 1 in Figure 5) to the cable management bracket, slide the releasable cable tie through the push button mount and around the InfiniBand cable (see callout in Figure 5) and through the releasable cable tie lock. 10 Installing the Cable Management Bracket
Figure 5 InfiniBand Cable Secured with a Releasable Cable Tie 1 Caution: The releasable cable tie should only be hand tight. Do not use a cable tie installation tool and do not over tighten the releasable cable tie or it might damage the InfiniBand cable. 4. Leaving approximately 1/4 inch to 3/8 inch coming out of the buckle, clip the excess from the releasable cable tie. Use one of the clipped-off pieces of cable tie as a tightness gauge (see callout 1 in Figure 6) to check that there is room to allow the InfiniBand cable (callout 4 in Figure 6) to move freely in the releasable cable tie loop (callout 3 in Figure 6) that is secured to the cable management bracket (callout in Figure 6) with a push button mount (not shown in Figure 6). Figure 6 Gauging the Tightness of the Releasable Cable Tie Loop 3 4 1 5. Repeat steps 4 and 5 to secure the remaining InfiniBand cables. 6. Route the InfiniBand cables to the side of the rack and secure them either upward or downward in the cable management plate. Be sure not to exceed the cable manufacturer s recommended bend radius for each InfiniBand cable as you route them in the rack. 3. Installing the Releasable Cable Ties for the InfiniBand Cables 11
4 Removing InfiniBand Cables and Switches This chapter describes the procedure to remove a damaged InfiniBand cable or InfiniBand switch for repair. 4.1 Removing a Damaged Cable From the c-class Cable Management Bracket To remove a damaged cable, follow these steps: 1. Bring the HP BladeSystem c-class enclosure to an appropriate state for service as described in the HP BladeSystem c7000 Enclosure Maintenance and Service Guide on the HP website: http://h0000.www.hp.com/bc/docs/support/supportmanual/c0071437/ c0071437.pdf. To release the InfiniBand cable from the releasable cable tie, use your finger or a small flat-headed screw driver to push down on the small tab inside the cable tie lock (see callout 1 in Figure 7). Figure 7 Cable Tie Release Tab 1 Note: The release tab is very small and might be difficult to reach with your finger. Use a small flat-headed screw driver to push the tab down to release the cable tie. Also, because there are several cables, removal of an InfiniBand cable in the middle portion of the switch might be difficult without the use of needle nose pliers and a small flat-headed screw driver. Be very careful not to damage other InfiniBand cables while using pliers or a screw driver. 3. Remove the InfiniBand cable from the switch. To remove the InfiniBand cable, pull the release tab on the QSFP connector while using your other hand to remove the connector from the switch. For more information on how to remove an InfiniBand cable from the switch, see the HP BLc QLogic 4X QDR InfiniBand Switch Installation Guide. 4. InfiniBand Switch Removal Put the rack cabinet into a safe and stable state for component removal. You must ensure that you can reach the component easily and handle it safely. To remove the InfiniBand switch, follow these steps: 1. Bring the HP BladeSystem c-class enclosure to an appropriate state for service as described in the HP BladeSystem c7000 Enclosure Maintenance and Service Guide on the HP web site: http://h0000.www.hp.com/bc/docs/support/supportmanual/c0071437/ c0071437.pdf. Remove all of the InfiniBand cables from the InfiniBand switch, but leave them secured in the cable management bracket. 3. Remove the cable management bracket from the rack's rear mounting rails. 1 Removing InfiniBand Cables and Switches
4. Leave the cables secured in the cable management bracket and carefully set the bracket aside. Caution: Do not bend the InfiniBand cables more than the minimum bend radius recommended by the cable manufacturer. 5. Push the blade handle release button to release the blade handle. 6. Open the blade handle and slide the switch all the way out of the HP BladeSystem c7000 enclosure. 4. InfiniBand Switch Removal 13
*5387-doc* Printed in the US