Fire Collars For Plastic Pipe Penetration
PROMASEAL Retrofit Collars FCS/FC FCS FC PROMASEAL fire collars are purpose made painted steel shells with integral mounting points, containing a specially formulated intumescent material. A fastening clip is fixed to the shell at the closed position. They prevent the passage of fire through gaps in compartment walls and floors caused by the collapse and/or melting of combustible services in the event of fire. The collars are used to maintain the fire resistance of walls and floors when they are penetrated by combustible pipework made from plastic e.g. Polyethylene PE, Polyvinylchloride PVC, and can also be used around groups of cables. They have been successfully tested and assessed to provide up to hours fire resistance by independent laboratories to meet the requirements of BS 76: Part 0: 987, AS 0: Part, AS 07: Part and pren 66: Part : 99. Insulation criteria will vary depending up on the pipe size and type and the building element. Check with Promat or your local supplier for approvals before installing collars. Up to hours fire rating, integrity and insulation in accordance with the criteria of BS 76: Part 0, AS 0: Part, AS 07: Part and pren 66: Part : 99. PROMASEAL Fire Collar Concrete, masonry or other fire rated wall elements Concrete floor or wall Attachment with suitable anchor i.e. Steel expanding fasteners or laminating screws Plastic piping e.g. Polyethylene PE, Polyvinylchloride PVC, Dimensions Guide of FCS PROMASEAL Retrofit Collar Detail Dimensions of FCS & FC PROMASEAL fi Retrofit Collars Detail FCS up to 0mm Detail FC up to 0mm & FC up to 00mm diameter diameter upvc HDPE ABS Body Flange Code pipe pipe pipe (mm) (mm) No. nom. nom. nom. (mm) (mm) (mm) H D D D FCS 0 0 0 0 8 6 FCS 0 0 6 0 98 70 FCS 6 6 7 8 6 FCS 80 80 80 8 98 86 FCS 00 00 00 00 67 7 FCS 0 0 0 70 7 9 NOTE: The above table measurements apply to floors only. Dimensions Guide of FC PROMASEAL Retrofit Collar Pipe size Body Flange Code nom. (mm) (mm) No. (mm) H D D L FC 0 0 77 FC 0 0 8 FC 6 6 0 7 8 FC 80 80 8 8 FC 00 00 0 8 FC 6 6 7 97 FC 0 0 7 00 6 FC 00 00 00 6 0 0 Ø FC 00 8 6 Ø FC 0 0 0 6 80 Ø FC 00 00 60 0 8 66 Ø NOTE: FC 00 to FC 00 have circular bases.
PROMASEAL Retrofit Collars FCS/FC 6 Detail FCS up to 0mm & FC up to 00mm diameter 6 Up to hours fire rating, integrity and insulation in accordance with the criteria of BS 76: Part 0, AS 0: Part, AS 07: Part and pren 66: Part : 99. PROMASEAL Fire Collar Concrete, masonry or other fire rated wall elements Concrete floor Attachment with suitable anchor i.e. Steel expanding fasteners or laminating screws Plastic piping e.g. Polyethylene PE, Polyvinylchloride PVC, 6 PROMASEAL Mortar 7 Fire Rated board ceilings 8 PROMASEAL Acrylic Sealant 9 Stud at screw position NOTE: Insulation criteria will vary depending up on the pipe size and type and the building element. Detail FC PROMASEAL Retrofit Collars can be cast in to floor slabs for pipes up to 0mm. The collar should be installed to the soffit side of the floor. See FCC, Green and Hi-Blu collars for general cast in applications. Detail Detail FC up to 0mm diameter FC and FCS PROMASEAL Retrofit Collars for floor slabs. The collars are to be fixed to the under side of the floor slabs. Ensure all fixing points are used. FC for up to mm and FCS for up to 0mm diameter. 9 8 7 Detail If there is a gap greater than mm between the pipe and cored hole, backfill with PROMASEAL Mortar. For gaps less than mm, seal with PROMASEAL Acrylic Sealant. Use FC PROMASEAL Retrofit Collar for pipes up to mm, or FCS PROMASEAL Retrofit Collar for pipes up to 0mm. Detail 6 FC to 0mm diameter for ceilings up to hours Detail FC PROMASEAL Retrofit Collar can also be installed in to a core hole with PROMASEAL Mortar backfilled for a flush fit. For pipes up to 0mm. Detail 6 FC PROMASEAL Retroft Collars can be installed to pipes in or -hours fire rated ceilings. Used PROMASEAL Acrylic Sealant to seal edges and additional framing to support. For pipes up to 0mm. Detail 7 FC PROMASEAL Retrofit Collar can be fixed to both sides of wall for pipes up to mm. For pipes greater than 0mm, please contact Promat. Detail 7 FC up to 00mm diameter NOTE: FCS PROMASEAL Retrofit Collars can be used on walls and floor slabs around combustible drink supply lines. Pipes with outside diameters greater than 0mm can achieve an -hour fire rating (FRL -/0/0) for floors and -hour (FRL -/80/80) for walls, and are for use on unvented parts.
PROMASEAL Cast-In Collar / Hi-Blu Collar FCC/FCCHB FCC Up to hours fire rating for FCC and up to hours fire rating for FCCHB, integrity and insulation in accordance with the criteria of BS 76: Part 0, AS 0: Part, AS 070: Part and pren 66: Part : 99 respectively. PROMASEAL Fire Collar Concrete floor Plastic piping e.g. Polyethylene PE, Polyvinylchloride PVC, Detail Floor penetration Cast in as part of slab. Dimensions Guide of FCC PROMASEAL Cast-In Collar Detail Dimensions Detail Floor penetration FCCHB Pipe size Body Flange Code nom. (mm) (mm) No. (mm) H D D D FCC 0 0 60 + * 8 9 FCC 0 0 60 + * 98 6 FCC 6 6 60 + * 69 6 FCC 80 80 70 + * 8 8 86 FCC 00 00 70 + * 67 0 09 *Additional height of upright pipe grip Dimensions Guide of FCCHB PROMASEAL Hi-Blu Collar Body Flange Steel plate Grafi- Code (mm) plate (mm) (mm) tex No. H H H D D D D S S (mm) FCCHB 6 0 0 97 9 9 0 8 FCCHB 00 0 7 9 78 0 98 0 7 * FCCHB 0 0 7 9 97 79 9 0 *Recycled FCCHB PROMASEAL Hi-Blu Collars are fitted with smoke and water seals. Detail A Dimensions Detail B Floor penetration
PROMASEAL Wall / Drop-In Collar FCW/FCD FCW Up to hours fire rating for FCW and up to hours fire rating for FCD, integrity and insulation in accordance with the criteria of BS 76: Part 0, AS 0: Part, AS 07: Part and pren 66: Part : 99 respectively. PROMASEAL Fire Collar Concrete, masonry or other fire rated wall elements Concrete floor Plastic piping e.g. Polyethylene PE, Polyvinylchloride PVC, PROMASEAL Acrylic Sealant 6 PROMASEAL Mortar 7 Steel straps Detail Wall penetration (Case ) Detail Dimensions Fill any gaps between the collar and the wall with PROMASEAL Acrylic Sealant to a depth of mm. This gap should not be more than mm wide. Detail Wall penetration (Case ) Collar can be positioned slanting at an angle in dry wall partition. For wider walls, collars may be used. Detail Wall penetration Detail Wall penetration (Case ) (Case ) 6 7 FCD Dimensions Guide of FCW PROMASEAL Wall Collar Pipe size Body Code nom. (mm) No. (mm) L D D FCW 0 0 0 80* 7 FCW 0 0 0 9* 60 FCW 6 6 0 07* 7 FCW 80 80 0 6* 89 FCW 00 00 0 * 6 FCW 0 0 0 0* 6 *Add mm to allow for clip Detail B Floor penetration Insertion into cored hole backfilled with PROMASEAL Mortar. Dimensions Guide of FCD PROMASEAL Drop-In Collar 6 7 Pipe size Body Code nom. (mm) No. (mm) H D D FCD 0 0 80* FCD 0 0 9* 8 FCD 6 6 06* 7 FCD 80 80 6* 8 FCD 00 00 * FCD 0 0 7 0* 6 *Add 7mm to allow for clip Detail A Dimensions Detail B Floor penetration
CFC/UC PROMASEAL Conduit Collar / PROMASTOP UniCollar CFC Up to hours fire rating, integrity and insulation in accordance with the criteria of BS 76: Part 0, AS 0: Part, AS 07: Part and pren 66: Part : 99. PROMASEAL Conduit Collar Concrete, masonry or other fire rated wall elements Conduit pipe with or without cables Attachment with suitable anchor i.e. Steel expanding fasteners or laminating screws NOTE: Insulation criteria will vary depending up on the pipe size and type and the building element. PROMASEAL Conduit Collar a) The collars are attached to both sides of the wall. b) Used for conduits up to mm. One size collar does smaller pipes. c) Gap between pipe and wall no more than mm, sealed with a bead of PROMASEAL Acrylic Sealant. PROMASTOP UniCollar Detail Dimensions Detail A Detail Wall penetration Detail B UC PROMASTOP UniCollar is a unique, patented method of protecting plastic pipes which pass through fire rated walls and slab floors. The system is supplied in a boxed continuous strip, 0mm long, which is simply cut to length on site, and attached to the wall or floor using supplied clips, and suitable screws, bolts and anchors. The collar has been tested to many inernational standards (including BS 76: Part 0: 987 and AS 0: Part : 997 and UL Certification) and has achieved FRL s up to hours. The collar is used to maintain the fire resistance of walls or slab floors when they are penetrated by combustible pipework made from upvc, HDPE, P/P and many other materials. Detail C Detail D Detail A Open box at contents lid. Pull out accessories. Pull out only enough UniCollar fi strip to do pipe in question. Detail B Lay the supplied measured tape on the Grafitex side of the collar and cut it at marked measurement of the tape according to the pipe size. The length required can also be determined using the chart provided and counting the segments or holding the strip around the pipe. Detail C Bend the Grafitex side of the collar by 80 O or time until it snaps. Detail E Detail F Detail D Shape the collar to fit the pipe and bevel the Grafitex edge for close fit. Detail E Wrap the collar around the pipe and clip the first bracket into slots on both ends. Detail F Complete other brackets and fix the collar onto floor/wall. See next opposite for installation method details. 6
UC PROMASTOP UniCollar Up to hours fire rating, integrity and insulation in accordance with the criteria of BS 76: Part 0, AS 0: Part, AS 07: Part and pren 66: Part : 99. PROMASTOP UniCollar Concrete wall or floor Plastic piping e.g. Polyethylene PE, Polyvinylchloride PVC, Wall penetration. Attachment with suitable anchor i.e. Steel expanding fasteners or laminating screws NOTE: Insulation criteria will vary depending up on the pipe size and type and the building element. The chart below shows the suggested length of strip required for each size pipe and how many brackets to use. At the time of publication test data is available for pipe sizes up to 00mm to some standards. Please contact your local Promat distributor for further details or visit www.firecollar.com. Floor penetration. Nominal pipe size (mm) 0 6 69 7 8 (inches).. Casing segments 7 8 9 0 Approx. collars per box 0 8. 8 7. 7. 7 6. 6 Nominal pipe size (mm) 0 0 60 00 (inches) 6 Casing segments 9 0 6 0 9 Approx. collars per box 6..7. Detail Dimension Detail Wall penetration Detail Wall or floor penetration 7
PROMASEAL Green Cast-In Collar FCG PROMASEAL Green Cast-In Collar Concrete floor, with fire resistance equal or higher than the collar Plastic piping Floor waste grille PROMASEAL Green Cast-In Collar size ranges from pipe OD mm to 0mm for fire ratings up to hours with upvc HDPE pipe. Different collars designs for various applications have FRL s ranging up to hours. Installation Place the collar onto the formwork. Secure the collar into position with 0mm x mm flat head clouts, nailed through the notches provided. DO NOT SKEW NAIL. Detail Dimensions Detail Cast in as part of slab Insert a pipe section through the collar so that the end of the pipe sits flat of the formwork, ensuring the top of the pipe is higher than the finished slab depth. Ensure the pipe section remains in place and plumb during the concrete pour and immediately afterwards. After the formwork is stripped, the casting pipe may be knocked out of the collar and replaced with the required pipe section if required to do so. Dimensions Guide Pipe Body Flange Code nom. (mm) plate No. size (mm) H D D D Green 0 0 9 + 0* 60 Green 0 0 9 + 0* 6 60 Green 6 6 9 + 0* 69 60 Green 80 80 60 + 0* 6 8 0 Green 00 00 60 + 0* 6 0 0 *Additional height of upright pipe grip Detail Floor waste insulated system PROMASEAL Green Cast-In Collars have been successfully tested in floor constructions for up to hours. Tests were carried out using the procedures and criteria of AS 0: Part and AS 07: Part. The results are reported by various approved testing laboratories including Warrington Fire Research and CSIRO. PROMASEAL Green Cast-In Collars help prevent the passage of smoke, water, toxic gases and fire through gaps in compartment floors caused by the collapse and melting of combustible services in the event of a fire. For installation of collars in permanent form work and thin floor slabs (<0mm) applications always contact Promat. Floor Waste Systems Collars used for floor waste are available in various models and the type used depends on the Certification required for the building. All floor waste systems have been tested in accordance with AS 0: Part and the appropriate provisions of AS 07: Part. FWH and FWL Cast-in collars provide fully insulated systems. Integrity only systems and Alternate solutions are also available (all in accordance with the provisions of the BCA). Retrofit systems are available which provide fully insulated, Integrity only and Alternate solutions (all in accordance with the provisions of the BCA). 8
For latest information of the Promat Asia Pacific organisation contact details, please refer to www.promat-ap.com ASIA PACIFIC HEADQUARTERS Promat International (Asia Pacific) Ltd. 7E Jalan /7D, Off Jalan Segambut 00 Kuala Lumpur MALAYSIA Tel: +60 () 60 880 Fax: +60 () 60 9 Email: info@promat-ap.com AUSTRALIA Promat Australia Pty. Ltd. Scotland Road, Mile End South Adelaide, SA 0 Tel: + 800 0 0 0 Fax: +6 (8) 8 0 Email: mail@promat.com.au New South Wales Office Promat Australia Pty. Ltd. Unit, 7 Briens Road Northmead, NSW Tel: + 800 0 0 0 Fax: +6 () 960 08 Email: mail@promat.com.au Victoria Office Promat Australia Pty. Ltd. /7 Williamstown Road Port Melbourne, VIC 07 Tel: + 800 0 0 0 Fax: +6 () 96 8 Email: mail@promat.com.au CHINA Promat China Ltd. Room 0, Block B, Qi Lin Plaza - Pan Fu Road 080 Guangzhou Tel: +86 (0) 86 67 Fax: +86 (0) 86 7 Email: info@promat.com.cn Beijing Office Promat North China (Division of Promat China Ltd.) Room 00, Zhongji New Oriental Tower No. Dongsanhuan North Road 0008 Beijing Tel: +86 (0) 68 60 Fax: +86 (0) 68 67 Email: info@promat.com.cn HONG KONG Promat International (Asia Pacific) Ltd. Room 00, C.C. Wu Building 0-08 Hennessy Road Wanchai Tel: +8 86 69 Fax: +8 8 Email: apromath@promat.com.hk INDIA Promat International (Asia Pacific) Ltd. (India Representative Office) S-, Second Floor B-87 Defence Colony 00 New Delhi Tel: +9 () 9 Fax: +9 () 9 Email: raman@promat-asia.com MALAYSIA Promat (Malaysia) Sdn. Bhd. 7E Jalan /7D, Off Jalan Segambut 00 Kuala Lumpur Tel: +60 () 60 880 Fax: +60 () 60 8 Email: info@promat.com.my SINGAPORE Promat Building System Pte. Ltd. 0 Science Park Road, #0- The Alpha, Singapore Science Park II Singapore 768 Tel: +6 6776 76 Fax: +6 6776 76 Email: info@promat.com.sg Your local Promat supplier For Promat International groups worldwide: www.promat-international.com Promat International (Asia Pacific) Ltd. 0/00. This document is formulated on the basis of information and experience available at the time of preparation. Promat is constantly reviewing and up dating all of it s test data and reserve the right to change specifications without notice.. Promat is not responsible if recipients of Fire test reports, assessments or literature incorrectly interpret their contents and use products based on those interpretations.