Hanson Building Products. precast basement solutions
|
|
|
- Franklin Abraham Cox
- 10 years ago
- Views:
Transcription
1 Hanson Building Products precast basement solutions
2 Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete with the engineered quality of offsite production and make your basement precast. Hanson offer precast concrete basement solutions to suit the individual requirements of each development. Installation in just one day Pre-cast concrete means: Fast installation Smooth moulded surface finish requiring minimal decoration High load-bearing capacity Inherent fire resistance Thermal insulation properties Robust, durable and secure structures Excellent sound insulation Full or partial below ground designs Just in time delivery, saving expensive site time Greatly reduced weather dependency Complete bespoke solutions with staircase and all ancillary structural requirements
3 Box Basements Traditional masonry structures can be built straight off the top Box clever and take it all in pre-formed units. Ideal in basic form for below ground garage, store room, wine cellar etc. Up-grade to habitable room standard and provide a play room, games room or gym etc. Maximises the development potential of sloping sites by providing underfloor space without the need for constructing separate retaining walls. Units supplied in a wide variety of dimensions up to 6m wide by 3m high and to any length in maximum multiples of 2m. Structure comes complete with preformed end walls as required. Units can also be supplied complete with openings for windows, doors, ventilation shafts, services and stairways. The reinforced concrete units are designed to enable a traditional masonry structure above to be built straight off the top. Units can be installed without the need for major foundation works, (depending upon ground conditions and ultimate load to be applied). Ex mould finish to wall faces gives ideal base for minimal decoration. Maximises potential of sloping sites Installation can be complete in 1 day using mobile crane to place units on to a pre-prepared base. Installation is much less weather dependent than traditional methods.
4 Hanson Building Products Complete with floor, window and door openings Twin wall panels - two slabs connected by means of cast-in lattice girders Hanson precast staircase Installation rates of up to 100m 2 per hour
5 TwinWall Fully flexible walling system providing the speed and quality of pre-cast concrete with the structural and waterproof integrity of a continuously poured in situ concrete structure. No restriction on architectural layout Fast to build with installation rates of up to 100m 2 per hour Expensive formwork eliminated No waiting time for removal of formwork No edge shutter required for pouring of upper floor concrete Plastering to ceiling not necessary due to high quality finish Superior sound insulation Cable ducts and electrical boxes can be cast-in at factory Complete with floor, window, door and ventilation openings Cast in service ports can be provided Machine manufactured to exacting tolerances Less transport and crane costs due to less weight transported Full computer design with detailed installation drawing, calculations and method statement supplied.
6 Hanson Building Products Method Statement TwinWall When using Hanson ceiling panels, the outer-wall element will be increased in height by thickness of the ceiling panel. The inside wall element provides support. There is no requirement for shuttering to the ceiling edges. Wall and ceiling can be concreted in one work cycle. The delivery to the site is via flat bed trailers. A tower or mobile crane as well as a team of 3 people must be available on-site for unloading, positioning and installing. Perimeter Beam > 50mm Prior to installation Bars connecting wall to floor Omnidec floor panel Cover to suit exposure & fire requirements Cast-in fixing Starter bars Water bar Spacers Push-pull prop Basement slab 2 M12 fixings (typical) The slab must be as even as possible with an exactness of +/- 10mm and made of waterproof C25 concrete. If any connection reinforcement is necessary, it must be positioned 70mm to the outside edge of the wall. Any additional reinforcement for the wall installation must be connected at the lower end of the connection reinforcement. Any ground water build-up should be resolved with suitable drainage measures. Additional measures for sealing against water pressure must be taken. The layout of the walls is to be prepared on the slab by means of a levelling line. The length of each wall element should be marked and the required joint of 10mm considered in accordance with the installation drawing. The numbered positions should be marked to simplify the installation. During production of twin wall panels, a 30mm horizontal joint is taken into account. Packing shims levelled at the requested height further support the installation. 4 no shims per wall panel are to be prepared,approx. 500mm away from the ends. The shims must be flush with the outside of the wall panel after installation. Any necessary measures for sealing the joint between slab and wall panel are to be professionally executed (e.g. joint tape). Unloading A tower or mobile crane is necessary to unload the twin walls. Crane availability and all Health & Safety compliance are the responsibility of the client or his appointed site manager. Sufficient height must be available for the delivery vehicle. The unloading area for the delivery vehicle and crane must be adequate in area and load-bearing capacity. Acceptable unevenness of the floor is approx. 250mm on a length of 6,000mm. Unloading of the delivery vehicles and installation of wall panels needs to be executed by experienced site personnel. A team of 3 people is normally required. Twin wall elements are normally delivered in the upright position. Should this not be the case it is the contractors responsibility to safely and correctly turn the units. The crane chains must be of sufficient length to achieve an angle of at least 60 degrees when lifting the wall panel after fixing the hooks. Before lifting one element, the remaining panels on the lorry must be secured against tipping over. Additional protection is necessary for lattice girders reduced in size and for very high wall elements. Lifting into the vertical position must be executed without causing any sudden movement. Installation Hanson twin wall elements are marked with the position numbers shown on the installation drawing. They should be positioned in line according to the layout marking on the prepared shims. A vertical installation joint of 10mm should be allowed.
7 They require 2 no adjustable steel angled supports with spindles for fixing and positioning. Props should be screwed in the upper third of the inside wall element and to the slab by means of rawl plugs and pads. After positioning in line and fixing the crane chains can be removed. If necessary install additional reinforcement such as corner or joint connection reinforcement, wall and ceiling connection reinforcement as well as channels before the installation of further wall panels. Cut off any projecting installation bars at the ends of the wall panels before placing onto slab. For openings in joint areas, install reinforcement for the side, if required, before the neighbouring element is positioned. Openings, corners and T-shaped wall connections should be prepared with adequate measures. In case of unevenness in the floor, floor joint >30mm, a mould modification will be required. Vertical joints <10mm can be closed with installation foam. Attention: Please avoid any installation foam reaching the concrete core. Ceiling panel installation A detailed installation drawing will be prepared. When all wall panels and inside walls are installed, cross beams must be positioned as installation support for the ceiling panels in accordance with the installation drawing. After installing the ceiling panels, prepare shuttering for any ceiling openings and install pipework and conduit for the electrical installation as well as all supplementary and cross reinforcement. Pouring concrete Walls and ceilings can be concreted in one working cycle. (Please do not forget pre-watering.). A maximum 750mm wall pour height per hour is allowed. In order to prevent accumulation of aggregate and in order to achieve sufficient adhesion between in-situ concrete and wall panels, the concrete must be thoroughly vibrated. All reinforcement should be monitored during pouring of concrete. Any additional load or movement must be avoided before curing of the in-situ concrete in order to allow concrete and prefabricated panels to join together. Remove installation support. Sealing of basement outside walls Basement outside walls are to be sealed against moisture, seeping water and ground water. Ground water or flooding endangered areas Hanson twin wall elements are suitable for building in wet ground or in areas in danger of flooding. Please contact us for advice Once concreted a modular construction unit is achieved with excellent structural qualities. The installation of the wall and ceiling elements can be executed within one working day without any interruption. Concrete for wall elements and ceiling can be poured in one working cycle. Hanson offers a full installation service using experienced personnel together with a comprehensive range of additional structural components. For technical enquiries concerning basements please call our Somercotes office on
8 Floors and Precast Division Hanson Building Products Head Office Stewartby Bedford MK43 9L2 Tel: Website:
The minimum reinforcement for the stem wall is the placement of:
PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20
ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill
ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION
SikaProof A Technology
SikaProof A Technology The fully bonded waterproofing system Keep your basements durably and securely watertight What is SikaProof A? How does it work? Where can it be used? What are the advantages of
NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)
NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:
Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 [email protected]
CARDOK CARLIFT Fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built to measure, all dimensions can
Issue of the Guidelines on Prevention of Water Seepage in New Buildings
graphic: Buildings Department Your REF 來 函 檔 號 :. OUR REF 本 處 檔 號 :.BD GR/1-55/173 FAX 圖 文 傳 真 :..28400451 TEL 電 話 :..2626 1717 www.info.gov.hk/bd To : All Authorized Persons 7 March 2005 Registered Structural
Connex. Mortarless Masonry Block System
Connex Mortarless Masonry Block System Connex Mortarless block wall system from Boral The Boral Connex mortarless system comprises three modular components which key together eliminating the need for mortared
Built to Last. Built for Beauty. Good. Solid. Logix. TM
Built to Last. Built for Beauty. Good. Solid. Logix. TM Quality, Value and Service Introducing LOGIX Insulated Concrete Forms. Based on the simple concept of interlocking blocks, LOGIX ICF gives you a
Chapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
Simplifying design and construction. Alan Tovey, Director The Basement Information Centre
Simplifying design and construction Alan Tovey, Director The Basement Information Centre Simplifying design and construction Grades of construction Construction options Design and waterproofing issues
Excerpts from the Canadian National Building Code (NBC)
Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more
Building Control Guidance Note
Issued 01/01/13 Rev Page 1 of 5 If you intend to convert an existing loft space into additional rooms you will need to apply for Building Regulation Approval. You may also need Planning Permission if you
Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.
Section 5.0 Basements Wall insulated externally Product: Polyfoam ECO Ba01 Wall insulated internally Product: Polyfoam ECO Ba02 Basements Basements Basement design Waterproofing BS 8102: 2009 Code of practice
Construction. SikaProof A-08 Edge, A-12 Edge. Fully bonded FPO sheet membrane in L-shape for the SikaProof A waterproofing system. Product Description
Product Data Sheet Edition 15/10/2014 Identification no: 02 07 04 10 300 0 000002 SikaProof A Edge SikaProof A-08 Edge, A-12 Edge Fully bonded FPO sheet membrane in L-shape for the SikaProof A waterproofing
Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing
Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight
Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing
Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing Schluter -KERDI-BOARD The universal substrate for tiles Flat. Level. Plumb. Square. No matter the quality, cost, or extravagance of
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span
formwork formwork Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span has grown to become one of the major players in the scaffolding and
How To Build A Luxury Apartment Complex In London
Post Tensioning Awards 2009 Project Summary Type of structure Location Architects Structural Engineer Residential with leisure suites including Swimming pool, Cinema, Virtual Golf, Wine Cellars, and Parking
DE Frame with C Series Sidelight
TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder
6 RETROFITTING POST & PIER HOUSES
Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This
Current opportunities of sprayed waterproofing membrane. Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction
Current opportunities of sprayed waterproofing membrane Frank Clement Technical Manager Sprayable Membranes MEYCO Global Underground Construction 1 What would we like to achieve? 2 What is desired? 3 and
ModuSec. Secure and efficient IT room solutions Composite Panel Systems Compared. Panel Systems are not all the same!
Secure and efficient IT room solutions Composite Panel Systems Compared Panel Systems are not all the same! When it comes to accommodating critical IT systems, the first issue to look at is the environment
WATERPROOFING SikaProof -A TECHNOLOGY
SikaProof -A TECHNOLOGY content What is SikaProof -A? 6 How does it work? 8 Where can it be used? 0 What are the advantages of SikaProof -A? 2 How should it be installed? SikaProof -A system components
The WANZ Guide to Window Installation
The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 Ver. 1.1 Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening Preparation Page 7 Step P1 Preliminary Check
Extra. Technical. November 2014 Issue 16 NHBC STANDARDS GUIDANCE AND GOOD PRACTICE. In this issue:
Technical Extra November 2014 Issue 16 In this issue: NHBC STANDARDS Introducing Chapter 5.4 Waterproofing of basements and other below ground structures page 3 GUIDANCE AND GOOD PRACTICE The basement
Chapter 5.4. Waterproofing of basements and other below ground structures
Chapter Waterproofing of basements and other below ground structures Waterproofing of basements and other below ground structures CONTENTS SCOPE DESIGN Clause Page D1 Design standards D1 2 D2 Statutory
ACO Water Management: Civils + Infrastructure
ACO Water Management: Civils + Infrastructure Technical data Introduction to The unit provides an aesthetically pleasing solution when linking proprietary conveyance drainage systems to vegetated infiltration
If stepping is required, step at 180mm as seen in this picture.
Cast Foundations to standard building regulations requirements. Foundations must be cast completely level, 600mm wide by 230mm deep for single storey, double storey is not allowed by NHBRC. If stepping
Services Enclosures and Protected Shafts - Maintaining Compartmentation
Introduction When a fire resisting element is used to provide fire compartmentation, every opening that allows services to pass through the element must be adequately protected by sealing, or fire stopping
COMMONLY USED RESIDENTIAL BUILDING CODES
COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section
Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug.
P-5 The P-5 is hot forged from carbon steel. The formed head provis spherical seating that the Lifting Eye engages, while a disc-shaped foot is embedd in the concrete. Due to its being a forged part, the
Reticulation sewers in basements Technical guidelines
Reticulation sewers in basements Technical guidelines Overview What These guidelines explain our technical requirements for laying sewers in building basements. The scope of the guide is restricted to
necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the
Chapter 7 PLUMBING AND ELECTRICAL 7.1 Introduction to Plumbing and Electrical Consideration of support services such as plumbing and electrical systems from the preliminary schematics phase through final
Chapter 2 Basis of design and materials
Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural
What you need to know about concrete block basement construction.
Designing and planning your new residence is a vitally important process, which will have a great influence on the future enjoyment of your home. A successful process will ensure all areas of the home
LAYING BLOCK AND BRICK
LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct
Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.
CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,
STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM
Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally
Chimney systems ICOPAL WULKAN C/CI/C-eko/CI-eko
INSTALLATION MANUAL Chimney systems ICOPAL WULKAN C/CI/C-eko/CI-eko Ventilated Notified entity Building Technical and Research Institute Prague notification no. 1020 This instruction refers to double-layer
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced
INSTALLATION OF A BAY WINDOW
INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening
Rooflight INSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS Rooflight These instructions should be used for: Installing Permanent Trickle Ventilation: Constructing & Waterproofing a Timber Upstand Curb: Installing & Waterproofing Proprietary
What is QuickBase? Traditional foundations (left) compared with QuickBase (right)
QuickBase is an innovative new foundation and floor system for conservatories and lightweight structures which was launched in prototype form at last year s Interbuild exhibition, where it was hailed as
The Task. for. PERI Construction-Exercise 2003
The Task for PERI Construction-Exercise 2003 Entitled to participate all educational institutions for civil engineering and construction management. The work must be based on the outlined project and can
Composite Panel Firewall Systems
Composite Panel Firewall Systems part of the Protecting more than your business Insulated mineral fibre panels have excellent thermal and acoustic properties, ideal for factory and office partition walls.
8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS
8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS MARICA DELLA BELLA and DIEGO CIAN Precompressi Centro Nord S.p.A., Italy SUMMARY: Secondary roofing elements, complementary to the
7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME
7. Installation Window involves the fixing of window frame at an earlier construction stage and subsequent of the window sashes. This is a highly workmanship dependent process. Only trained and approved
Foundation. Foundation
Moisture Aside from structural concerns, the most important consideration for foundation design is moisture. No client wants a wet basement. No client wants a damp basement. No client wants mold in their
Confort 160. Sliding Systems. Sapa Building System
Confort 160 Sliding Systems Sapa Building System Confort 160 is a high performance thermally insulated sliding window system, with a user-friendly slide action. The system, which has an attractive aesthetic
Residential Inspection Guidelines
Residential Inspection Guidelines 201 Pre-Pour Foundation Dimensions Building Location Certificate - if required in the building consent Construction and Advice Notes Check the building dimensions against
first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel
first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel What is GigaCrete GigaCrete is a family of products based on low carbon footprint Green ceramic binders
- 5 - Table1. Maximum Compartment Volumes
- 5 - Part II - SPECIFIC REQUIREMENTS 5. Compartmentation 5.1 Every building should be divided into compartments by walls and floors to inhibit the spread of fire. 5.2 Compartment walls, compartment floors,
PRO. English COMPLETE PRECAST PLANT
PRO English COMPLETE PRECAST PLANT THE WORLD STANDARD FOR PRECAST PRODUCTION THE PRO PLANT Elematic s PRO production lines and machines are especially designed for precasters who need to produce different
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything
Rockwool Flexi Insulation Application Guide
Pitched roof Rafters InterMediate floors INTERNAL partitions external Framed walls separating floors Separating Walls Rockwool Flexi Insulation Application Guide Ground floor The perfect fit for any framed
THE FAST, EASY AND DURABLE PAVING SUPPORT SYSTEM WWW.RYNOSUPPORT.COM
THE FAST, EASY AND DURABLE PAVING SUPPORT SYSTEM WWW.RYNOSUPPORT.COM IDEAL FOR USE IN: Gardens Roof areas, terraces, balconies, greenroofs Structural podium decks Communal/public areas Walkways/wheelchair
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major
PERFORMANCE GUIDELINES
1. Foundation/Basement 17 PERFORMANCE GUIDELINES 1. FOUNDATION/BASEMENT 1.1 Efflorescence on concrete or masonry surfaces Efflorescence is the formation of a white crystalline or powdery deposit on the
Chapter 2: Foundations
Chapter 2: Foundations Crawlspace [V502.1.2] Vents. Vents in the crawlspace help keep floor insulation and floor framing dry. Crawlspace vents also reduce the potential for radon buildup under the floor.
12.1 Schlüter -KERDI-BOARD
I n n o v a t i v e p r o f i l e s 12.1 Schlüter -KERDI-BOARD S u b s t r a t e U N I V E R S A L S T R U C T U R A L P A N E L, B O N D E D W A T E R P R O O F I N G Application and Function Schlüter
SIKA AT WORK THE KAENG KRACHAN ELEPHANT HOUSE AT ZURICH ZOO
SIKA AT WORK THE KAENG KRACHAN ELEPHANT HOUSE AT ZURICH ZOO SIKA SYSTEMS FROM BASEMENT TO ROOF BASEMENT TO ROOF SOLUTIONS FOR ELEPHANT HOUSE AT ZURICH ZOO PROJECT DESCRIPTION The Kaeng Krachan Elephant
Elevating Your House. Introduction CHAPTER 5
CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,
BUILDING SAFETY UNIT
POLICY Page 1 of 5 SUBMITTAL REQUIREMENTS FOR ONE AND TWO FAMILY DWELLINGS, ADDITIONS AND RENOVATIONS All submittals shall be site specific and designed to the provisions of the 2012 International Residential
The Value of a Warehouse Floor Raising Flooring Standards around the Globe
The Value of a Warehouse Floor Raising Flooring Standards around the Globe An IKEA warehouse floor in Dortmund, Germany placed with the Somero SXP Laser Screed Referencing Technical Report No. 34, Third
Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors
Improving the flood resistance of your home Advice sheet 6: Flood-resilient This sheet provides guidance on identifying different types of floor, assessing the routes floodwater may enter, and describes
Flood Risk Considerations
CHECKLIST FOR MITIGATING OR AVOIDING FLOOD DAMAGE It may not seem the case, but individuals are not powerless in influencing their potential exposure to catastrophes, such as floods. Property owners have
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General
Interior Walls below and above ground OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM
P r o d u c t a p p l i c a t i o n s a n d t e c h n i c a l i n f o r m a t i o n 2 below and above ground V OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM V The flexible, fast and cost-effective answer
Concrete Waterproofing Systems. Integral Protection. www.tritonsystems.co.uk
Concrete Waterproofing Systems Integral Protection n Type B Integral Protection in accordance with BS 8102 (2009) n Unique chemical admix for waterproofing and protection of concrete n A complete and permanent
Analysis II Façade Redesign: Architectural Precast Panels
Analysis II Façade Redesign: Architectural Precast Panels Analysis II Façade Redesign: Architectural Precast Panels Overview: This analysis covers the comparison of the current EIFS façade and my proposed
Guidelines for Earthquake Bracing of Residential Water Heaters
Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)
Packaged Terminal Air Conditioner Wall Sleeve Installation
Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation
Sample Drawing Package for One and Two Family Dwelling Applications
Sample Drawing Package for One and Two Family Dwelling Applications For a full list of submission requirements, refer to the relevant checklist for your application found on our website: http://vancouver.ca/home-property-development/application-forms-and-checklists.aspx
Accessible planning and construction
Tiles for Architecture Design 01 01 DIN-certified PRO ARCHITECTURA SINUS trims programme for accessible designs Modular system Coordinated range of system components for flowing transitions without a visible
GYPSUM AREA SEPARATION FIREWALLS GA-620-2011
GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GA-620-2011 Copyright 2011 Gypsum Association All rights reserved. Printed in U.S.A. Characteristics, properties, or performance of materials or systems herein
HOUSE BUILDING DIGEST
HOUSE BUILDING DIGEST (Construction Specifications-Foundations) Creating Enabling Environment for Affordable Housing for All This is an attempt by BMTPC to provide useful but often ignored information
Safeguard Waterproofing Systems. Creating useable. living space. by making basements dry
Safeguard Waterproofing Systems living space Creating useable by making basements dry The SWS waterproof cement system The Safeguard SWS Structural Waterproofing System is designed to be both highly effective
When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:
When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial
bout your HOUSE before you start Renovating Your Basement Structural Issues And Soil conditions
A bout your HOUSE before you start Renovating Your Basement Structural Issues And Soil conditions CE 28 b Ground slopes towards window well No granular fill or connection to footing drain Ground floor
plumbing products guide
plumbing products guide radiator pipe guide & seals A significant development in the drive to reduce air leakage and heat loss. Installations such as that shown are all too common. The detail is poorly
Electrical Wiring Technical Bulletin
Electrical Wiring Technical Bulletin Overview In general, SIP construction is easier and more cost effective when things are planned and thought out before the panels are manufactured. This process will
The WANZ Guide to Window Installation
The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 2 of 60 Contents Overview 5 Objective 5 Scope 5 Opening Preparation 7 Step P1 Preliminary Check 8 Step P2 Cut the Underlay 9 Step
Schluter -KERDI-LINE Elegant, low-profile linear floor drain
Schluter -KERDI-LINE Elegant, low-profile linear floor drain Create an Oasis in the comfort of home Install at walls or intermediate locations Ensure a simple, waterproof drain connection Slope floor on
Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap
Tile Backing Will not deteriorate in water Easy to score and snap Resistant to mould and mildew Knauf Aquapanel Interior Cement board for wet areas Knauf Aquapanel Interior Cement Board Drywall for Wet
Truck Company Operations
Truck Company Operations Instructor Guide Session Reference: 1-1 Topic: Salvage Level of Instruction: Time Required: 2 Hours Materials: Various Items of Salvage Equipment Salvage Covers References: Ladder
DELTA Premium Moisture Management Systems for Foundations.
DELTA protects property. Saves energy. Creates comfort. DELTA Premium Moisture Management Systems for Foundations. DELTA Premium Moisture Management Systems provide the best protection for foundations.
After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE
86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is
NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS
NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry
The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................
How to build a Pizza Oven in 4 days
How to build a Pizza Oven in 4 days Preparation day (slab) 1. Foundation 1500 deep x 1300 wide x 75mm deep Required 20 bags cement pre mix. If you already have a concrete base, you save this prep day DAY
Guide Specifications for Maple Flooring Systems
Guide Specifications for Maple Flooring Systems MFMA Guide Specification for Resilient Pre-Engineered Fixed Panel System Purpose This Guide Specification is designed to assist in the production of actual
Manual lifting and handling
Manual lifting and handling When installing British Gypsum products and systems care should be taken to ensure that appropriate methods of handling and lifting are adopted. The following guidance details
Fire Collars For Plastic Pipe Penetration
Fire Collars For Plastic Pipe Penetration PROMASEAL Retrofit Collars FCS/FC FCS FC PROMASEAL fire collars are purpose made painted steel shells with integral mounting points, containing a specially formulated
IMPACT DAMAGE RESISTANT WALL SYSTEMS
IMPACT DAMAGE RESISTANT WALL SYSTEMS CONTENTS Introduction 2 Advantages 2 2 Material Specifications 2 Design Considerations 3 Framing 5 Plasterboard Installation 5 Health, Safety & Warranty 6 Contact Details
INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS. Multi-Layer Technology provides increased strength.
INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS Multi-Layer Technology provides increased strength. Specifically designed for interior applications. Compatible with most internal
Reference: BRM-00220488-A0 July 18 th, 2014. Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls
Reference: BRM-00220488-A0 July 18 th, 2014 Toronto Catholic District School Board 80 Sheppard Avenue East Toronto, Ontario M2N 6E8 Re: 1.0 Introduction Exp Services Inc. (exp) was retained by the Toronto