1 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL INFORMATION 4.0 PLANNING INFORMATION 5.0 CREW INFORMATION 6.0 CONTRACTOR INFORMATION 7.0 PRECASTED/ POURED-IN-PLACE TRENCH DRAWINGS 2.0 PURPOSE This standard provides information for construction of Cable Trench. This installation is for underground services from 2001 amps to 4000 amps. 3.0 GENERAL INFORMATION 3.1 Cable Trench is suitable for the following conditions: 2001 Amp to 4000 amp services. Trench length should be limited to 20 feet, with the service cable length limited to less than 50' from transformer to customer panel. 4.0 PLANNING INFORMATION JVV MB DA 7/05 Page 1 of 12
2 4.1 Location And Orientation Of Service Pad placement and switch board pull section should maximize trench window space. 4.2 Service Entrances The trench length must be determined, (see Section 6.8 for details). If the entrance is inside the building, then the wall must be cut or designed to allow the trough entry. The customer must meet NEC, Article requirements. JVV MB DA 7/05 Page 2 of 12
3 JVV MB DA 7/05 Page 3 of 12
4 NOTES: 1. NVE cable trench is not approved for installation inside a building to serve an internal / isolated Electrical Room. 2. If an internal / isolated Electrical Room is required, the customer must install a secondary splice can at the outer wall nearest the transformer. Refer to drawing below. 3. Outside splice can, and all facilities inside the building, will be customer owned and installed. Facilities must meet NEC requirements. 4.3 Trench Covers There are two types of trench covers available: H-20 Full Traffic Rated Non-Traffic / Pedestrian Only 4.4 Cable Selection Multiple runs of cable will be required to serve the load. The number of runs depends upon the main panel rating. Number of cables per phase is based on 80% rated panels. Add extra set(s) if 100% panel, noted by ( ) in table. MAIN PANEL RATING NUMBER OF CABLES PER PHASE Amps 5 (6) 3000 Amps 6 (7) 3500 Amps 6 (8) 4000 Amps 7 (9) See Table 8 of CB0003U, Vol. 17, Section 4, for cable ratings. JVV MB DA 7/05 Page 4 of 12
5 4.5 Required Service Materials (to be supplied by NVE) ITEM STOCK NUMBER QUANITY 750 kcmil 1/C 600 Volt Cable (Phase) See Section kcmil 1/C 600 Volt Cable (Neutral) See Section kcmil Flat-to-Crimp Connectors (bolt set). Stackable lug: ( ) 6 connectors per cable run * 350 kcmil Flat-to-Crimp Connectors (bolt set). Stackable lug: ( ) 2 connectors per cable run * Cable Ties pkg. per 10' trench length * Customer to furnish cable connectors at panel. NVE to furnish bolts. 5.0 CREW INFORMATION 5.1 Cable Orientation Cable Ties are to be set at +/- 15" intervals along the cable run. Each cable run contains 3 different phases and a neutral. JVV MB DA 7/05 Page 5 of 12
6 5.2 Support Arm and Tie-Down Spacing Support arms are to be set at 30 inch spacings. The cable is fastened to each arm. 5.3 Cable Lengths All X1 phase cables must be the same length, all X2 phase cables must be the same length, etc. However the length of the X1cables does not have to equal the X2 lengths or the X3 lengths. Example: 6.0 CONTRACTOR INFORMATION 6.1 Contractor Responsibility The contractor will provide trench, furnish and install materials as listed in section 6.7. Contractor will be responsible to submit to Jensen Precast (precasted trench) and/or NVE (poured in place trench) a preliminary drawing with the following items: Information as shown in 6.8 with pad size. Submit a preliminary design worksheet to Jensen Precast and/or NVE Inspection group for verification of measurements and final approval. Jensen will fax final design to NVE Inspection Group Reno or District Planner for final acceptance. 6.2 Trench Construction The cable trench may be precast (Preferred) or poured in place (Non Preferrred). Poured-in-place trench walls to be formed, do not cast against existing soil. Exposed edges to be finished with edging tool. No customer conductor, including bare ground/bonding conductors, is to be installed in the trench. JVV MB DA 7/05 Page 6 of 12
7 Unistrut or equivalent to be cast in wall. See details, Section 7.1. Unistrut shall be hot dip galvanized and have an "A" corrosion rating. 6.3 Backfill Composition Backfill material shall meet requirements of NVE Standard SUB01X, Trench Bedding and Backfill (see Volume 17, Section 3). 6.4 Service Entrance The contractor must check with local codes before running a service entrance. Service entrance into buildings must have 'fire proofing' per NEC # requirements. Firestopping - Building codes and standards provide strict requirements for sealing, or firestopping, penetrations through fire-rated walls, floors, and ceilings. Approved methods and materials must be used to reduce the chance of spreading fire, smoke, and toxic gases throughout the building(s). See Section 7.0, note 11. Firestop materials are available as: Blankets, Caulking compounds, Cementitious compounds, Collar devices and chokes, Composite sheets, Pillows, Putty, Wrap strips, Sprays, and Mechanical systems. All firestopping solutions are generally a combination of firestop materials, holding devices, packing materials, and other devices that make up a listed (approved) system. Always use an approved and engineered system to firestop a penetration. Contact an appropriate firestop manufacturer with any questions. 6.5 Trench Covers To be stamped as shown in Sections 7.0. Will be coated with red oxide primer and finished with epoxy sand paint. All covers will be constructed in 24" lengths. If additional length is needed at the start or end up to 6" may be added to the 24" section. Cover needing additional width above 6" will be made to fit. JVV MB DA 7/05 Page 7 of 12
8 6.6 Drains/Sump hole Precast and poured in place: Locate knockout for the drain hole and the sump hole as shown in sections 7.0 and List of Materials The materials listed below are for reference only; a detailed list of quantities should be generated by referencing the final drawing and the specifications shown in this standard. Materials to be Supplied by Contractor/Jensen Precast Poured-In-Place (Non-Traffic) Poured-In-Place (Traffic) Concrete, 3000 psi 28 days Diamond Plate Cover 1/4 Thickness Concrete, 3000 psi 28 days Diamond Plate Cover 1/2 Thickness PVC, 6 Dia. Structural Angle Iron 3-1/2 x 3 1/2 x 1/4 PVC, 6 Dia. Structural Tubing 3 x 3 x 1/4 Nelson Studs, 2 4 Long Unistruts For Holding 4 Long Unistruts For Holding Nelson Studs, 2 Covers In Place Covers In Place Rebar, 11 OC. Drain Rock, 3/4, 1 Cu. Ft. Rebar, 11 OC. Drain Rock, 3/4, 1 Cu. Ft. Rebar 12 OC. 12 Sump Rebar, OC. 12 Sump Unistrut P4000 or Equivalent Penta Head Bolts 1/2 x 3-1/2. Unistrut P4000 or Equivalent Penta Head Bolts 1/2 x 3-1/2. Angle Iron, 3 x 4 x 1/4 Cable Support Racks, Arms, & Cable Support Racks, Arms, & Angle Iron, 3 x 4 x 1/4 Hardware Hardware JVV MB DA 7/05 Page 8 of 12
9 JVV MB DA 7/05 Page 9 of 12
10 7.0 PRECASTED/POURED IN PLACE TRENCH DRAWINGS 1. Contractor is to furnish and install concrete trench (Precasted is Preferred Installation). 2. Contractor to furnish and install unistruts as shown on plan view. 3. Contractor to provide NVE and/or Jensen Precast with a preliminary layout to confirm transformer and trench layout. See section Trench walls to be formed, not cast against existing soil. 5. Concrete strength to be 3000 PSI at 28 days. Rebar yield strength shall be 60KSI. 6. Non traffic 1/4" diamond plate steel cover to be stamped "NON-TRAFFIC", "NVEO ELECTRIC" and painted with red oxide primer and sand epoxy painted. 7. H20 traffic rated 1/2" diamond plate steel cover to be stamped "H20 TRAFFIC", "NVEO ELECTRIC" and painted with red oxide primer and sand epoxy painted. 8. Finish exposed concrete trench edges with edging tool. 9. Backfill material shall be adjusted to ± 2% of optimum moisture content, placed and compacted in 8" lifts to 95% of maximum dry density per ASTM Unistrut or equivalent (1-5/8"X 13/16"shall be cast into wall sections with spacing locations (vertical/horizontal) and a length to fit wall sections as specified on NVE standard drawings. Unistrut shall be HDG unistrut P400 or equal and shall be "A" rated corrosion resistant. 11. The trench may not be extended into the building unless approved by local Inspection authority and adequate seal against water/fire is provided. (SEE NEC ) Drawn: Eng: Appr: Date: JVV MB DA 7/05 Revision: 8 Page 10 of 12
11 7.1 Trench Section Details (Pedestrian / H20 Traffic Rated) JVV MB DA 7/05 Page 11 of 12
12 7.2 Trench Section Details JVV MB DA 7/05 Page 12 of 12
MOBILE HOME SERVICE REQUIREMENTS GAS
ELECTRIC AND GAS 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL 4.0 REFERENCE MATERIAL 5.0 TYPICAL UNDERGROUND UTILITY LAYOUT 6.0 METER PAD DETAILS 7.0 GENERAL INSTALLATION PROCEDURES 8.0 PEDESTAL SPECIFICATIONS
CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements
16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications
UNDERGROUND ELECTRIC TEMPORARY SERVICE PANEL
S 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 CUSTOMER RESPONSIBILITY FOR TOTAL TEMPORARY SERVICE 4.0 CUSTOMER RESPONSIBILITY FOR TEMPORARY SERVICE IN PERMANENT LOCATION 5.0 NVE RESPONSIBILITIES 6.0 GROUNDING
The National Armored Cable Manufacturers Association Presents. Installation Standard for Types AC and MC Cables
The National Armored Cable Manufacturers Association Presents Installation Standard for Types AC and MC Cables An ANSI Standard Original document jointly produced by NECA and NACMA as Standard for Installing
Underground Service Requirements and Instructions
This packet includes all FKEC underground service requirements, instructions, procedures and drawings. If you are considering underground power service please review this document in its entirety (3 page
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT
SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING
REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING Revised October, 2013 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 REQUIRED DRAWINGS... 3 2.1 Site Plan... 3
The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................
ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:
ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: Chapter 12 of the Burlington Code of ordinances allows owner occupants of single family homes to do their own wiring if they choose. If you choose to
HOUSTON COMMUNITY COLLEGE HCC ALIEF CAMPUS MAIN BUILDING, FIRST, SECOND & FOURTH FLOORS RENOVATION ISSUE DATE: 10.17.12
SECTION 27 05 26 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes grounding and bonding products, design requirements and installation for communications
SECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General
SECTION 15 AIR RELEASE VALVE ASSEMBLIES 15-1.01 Scope 15-1 General This section describes the requirements for furnishing and installing Air Release Valve Assemblies of the size and type shown on the plans,
ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS
Prepared by: ABB1 ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS 052521 Asset Type: Electric Metering Function: Construction Issued by: Quoc Hoang (QxH1) Date: 07-01-16 Rev. #06: This document
AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding
AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding A Guide for California Developers of Com m ercial Property This guide consists of
SECTION 16402 UNDERGROUND ELECTRIC SERVICE
SECTION 16402 UNDERGROUND ELECTRIC SERVICE PART 1 GENERAL 1.1 SUMMARY A. Description of System 1. Furnish all labor, materials, and equipment for below grade work external to buildings as required, and
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
CONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall
Passive Fire Protection
Firestopping Passive Fire Protection FS20 Firestop Compound 6 hour fire rated penetration seals for electrical and mechanical services FS20 Firestop Compound FS20 Firestop Compound is a Fire-Rated Penetration
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
IRRIGATION PUMPING Table of Contents - Section 900
IRRIGATION PUMPING Table of Contents - Section 900 PARAGRAPH 900.1 GENERAL 1 900.2 METERING REQUIREMENTS 1 900.3 CUSTOMER S CONTROL EQUIPMENT 2 900.4 SERVICE CONDUCTOR REQUIREMENTS 2 900.5 RECOMMENDATIONS
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE Toll Free Telephone Numbers Residential Services 800.454.3853 Commercial Services 800.653.5307 Utility Locating Company N.C. 800.632.4949 S.C. 888.721.7877
CONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Vintage TM unit segmental retaining wall (SRW)
Fabricated Drainage Products
Fabricated Drainage Products Complete Drainage System Inline Drains are used At the beginning of a drain line Add a new water inlet to an existing drain line using a riser pipe and tee HARCO Surface Drainage
PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE
FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances
Uncovered Decks & Porches
Uncovered Decks & Porches Building Guides for Homeowners Why Do I need a Permit? D I D Y O U K N O W? As owner-builder you are the responsible party of record on such a permit. If your work is being performed
Value Engineering Considerations for Cast Iron Soil Pipe and PVC in Commercial Sanitary and Storm Drainage Applications
Value Engineering Considerations for Cast Iron Soil Pipe and PVC in Commercial Sanitary and Storm Drainage Applications BR-VEC (2-14-13) The Correct Material for the Correct Application Plumbing design
SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
Fire Barrier Duct Wrap 15A
3 Fire Barrier Duct Wrap 15A Commerical Kitchen Grease Duct Fire Protection System Product Data and Installation Instructions Compliance 1998 Edition Complies with International Mechanical Code Complies
TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING
TORONTO TRANSPORTATION January 2012 TS 813 GROUNDING AND BONDING TABLE OF CONTENTS 1. DRAWINGS TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET
CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION
CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION SPECIFICATION EO-5023 REVISION 3 MARCH 2003 REQUIREMENTS FOR
STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES
ROOFING APPLICATION STANDARD (RAS) No. 117 STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES Scope 1.1.
Least Cost Cable System. Strategies to Reduce Cable and Infrastructure Costs When Transitioning to an All Conduit Systems
Least Cost Cable System Strategies to Reduce Cable and Infrastructure Costs When Transitioning to an All Conduit Systems Cost Sharing of Cable Systems Underground Extensions The Company will construct
STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200
STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES PART 1 - GENERAL A. Description This section includes materials, testing, and installation of precast concrete
ROOF DRAINS TABLE OF CONTENTS
Pictorial Index Product Recommendations Roof Drain Selection Factors Sizing Placement Material & Characteristics Pipe Connection Commonly Specified Options Typical Installations TABLE OF CONTENTS ROOF
FIRESTOPPING & SMOKE SEALS
SPECIFICATION SECTION 07 84 00 FIRESTOPPING & SMOKE SEALS 1 GENERAL 1.1 SECTION INCLUDES 1.1.1 Comply with Division 1, General Requirements and Documents referred to therein. 1.1.2 It is the intent of
WHY CABLE TRAY? BECAUSE A CABLE TRAY WIRING SYSTEM PROVIDES SAFE AND DEPENDABLE WAYS TO SAVE NOW AND LATER
Large numbers of electrical engineers have limited detail knowledge concerning wiring systems. There is the tendency by engineers to avoid becoming involved in the details of wiring systems, leaving the
Cellar Tech Containment Well Cellar Systems www.cellartech.com
Sealed Well Cellars are protected by US patent 7637692, 7987904, 8127837, and 8256505. Additional US patents pending. Basic Containment Well Cellar Sealed Well Cellars are protected by US patent 7637692,
SECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
ELECTRIC METERING COMMERCIAL & INDUSTRIAL
ELECTRIC METERING COMMERCIAL & 1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 METER LOCATIONS 5.0 UNDERGROUND TERMINATIONS 6.0 METERING TRANSFORMER ENCLOSURES 7.0 SINGLE CUSTOMER METER INSTALLATIONS
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.
DIVISION 15 MECHANICAL SECTION 15100 - PLUMBING PART 1 - GENERAL SCOPE Plumbing work includes all domestic water, gas, and sanitary sewer systems as shown on plans. Also all fixtures and equipment which
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS
ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by
3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES
SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything
SECTION 18370 SIGNAL WIRE AND CABLE
SECTION 18370 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for all cable and wire required for signal and signal power system wiring to wayside shelters, junction boxes, and factory
Specification for Installation of Underground Conduit Systems
Specification for Installation of Underground Conduit Systems November 2008 Version 2.0 Specification For Installation of Underground Conduit Systems Revision Date: November, 2008 Version No.: 2.0 Table
POST AND FRAME STRUCTURES (Pole Barns)
POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:
800 Communications Circuits
ARTICLE 800 Communications Circuits INTRODUCTION TO ARTICLE 800 COMMUNICATIONS CIRCUITS This article has its roots in telephone technology. Consequently, it addresses telephone and related systems that
NATIONAL INSTITUTE OF BIOLOGICALS
Short Term Notice Inviting Quotations Quotations No. S.1-36/07/NIB/Engg. (Civil) Invitation to short term quotations for Repairing of damaged gypsum board false ceiling and painting with epoxy paint in
EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection
EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water
CT-02 CABLE TRAY SYSTEMS
CT-02 CABLE TRAY SYSTEMS SYSTEMS THAT MAKE SENSE Introduction B-Line Systems was formed in 96 and has over 30 years experience manufacturing cable tray systems in which it has grown to become the industry
SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes seismic restraints and other earthquake-damage-reduction measures for electrical
Specifications for Residential Property Owners Connection to New Public Sewer
Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the
SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks
The minimum reinforcement for the stem wall is the placement of:
PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20
FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.
Polk School District Specifications for the New Fire Alarm in the Existing Building Eastside Elementary School FIRE ALARM SYSTEM 1.01 SUBMITTALS A. Shop drawings shall be submitted as follows: 1. Manufacturer's
SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe hangers and supports. 2. Hanger rods. 3. Inserts. 4. Flashing. 5. Equipment
COATING & WRAPPING OF UNDERGROUND PIPING
CONSTRUCTION STANDARD SPECIFICATION DOCUMENT NO :SEC-PJ-000-SPC-PI-008 TOTAL PAGES : 8 Page 1 of 8 CONTENTS 1. SCOPE 2. DEFINITION 3. CODES AND STANDARDS 4. MATERIALS Page 2 of 8 1. SCOPE This specification
C. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec 03500 Master Spec. 03 49 00 Page 1
C. S. I. Spec 03500 Page 1 PART 1 - GENERAL 1.01 SUMMARY:.01 Provide special glassfiber reinforced cement (GRC) shapes in accordance with the requirements of the contract documents..02 The installing contractor
Packaged Terminal Air Conditioner Wall Sleeve Installation
Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation
SECTION 15140 - PIPE HANGERS AND SUPPORTS
Part I - GENERAL 1.01 SECTION INCLUDES A. The work covered under this section consists of the furnishing of all necessary labor, supervision, materials, equipment, and services to completely execute the
CTI TECHNICAL BULLETIN Number 9: A publication of the Cable Tray Institute
CTI TECHNICAL BULLETIN Number 9: A publication of the Cable Tray Institute Cable Tray Wiring Systems Have Many Cost Advantages Cost is usually a major consideration in the selection of a wiring system.
CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS
CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection
Preformed Metal Roofing and Siding
Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision
Flamesafe Firestopping Products. Firestopping Products. http://flamesafe.rectorseal.com
Flamesafe Firestopping Products Firestopping Products http://flamesafe.rectorseal.com Engineering Tested By Fire RectorSeal Firestopping Products Since the birth of the firestopping industry almost three
Catalog Number Pillow Type Pillow Size
FSA-1 3M Fire Barrier Self-Locking Pillows Extremely easy to install - saves time and labor Easy removal and fully reusable - with no blocking or fusing of materials No cutting required, no left over debris
March 14, 2007. Installation of Bay, Bow and Garden Windows
March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
TABLE OF CONTENTS. PUD SERVICE TERRITORY & CONTACTS... Page 1. NEW SERVICE QUESTIONNAIRE... Page 2. GENERAL... Page 3
UNDERGROUND TABLE OF CONTENTS PUD SERVICE TERRITORY & CONTACTS... Page 1 NEW SERVICE QUESTIONNAIRE... Page 2 GENERAL... Page 3 TRENCHING SECONDARY (120/240 volts)... Page 3 CONDUITS FOR PUD-INSTALLED CONDUCTORS...
Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants
Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants PG&E Office San Francisco January 18, 2007 Craig K. Meier Corrosion Control Incorporated Corrosion process for tanks
Tremco Fire Protection Systems Group Technical Bulletin
Compartmentalization products and design play a key role in protecting lives and property from fire. Understanding the tools and techniques available for firestopping is of utmost importance to designers,
PART 1 GENERAL 1.1 SECTION INCLUDES
J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
Sports and High Mast Lighting Poles Phone: (866) 474-7200 Fax: (817) 924-7049
Sports and High Mast Lighting Poles 4 High Mast Lighting Poles General American LitePole offers a raising and lowering system that allows for ease of maintaining the lighting system at ground level. Ideal
Cable Trays Technical Instructions & Specifications
Cable Trays Technical Instructions & Specifications Products Catalogue Objective and Structure The company s main objective is the supply of quality products, with respect to: practical design increased
CITY OF SELMA, TEXAS Inspection Checklist: Commercial
Rev Y71004 The Permits and Inspections Department welcomes you to the City of Selma. The following information is provided to you as guidance through the inspection process. The City of Selma provides
All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.
DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
1 Town of Lyons Electrical Distribution System Design Standards
Town of Lyons Electrical Distribution System Material and Design INDEX 6.1 Design Criteria 6.11 Submissions 6.1.2 Method 6.1.3 Criteria 6.2 Specifications 6.2.1 Scope 6.2.2 General Requirements 6.2.3 Materials
SECTION 15410 GROUND WATER STORAGE TANKS
SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design
Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections
Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built
HIGH TENSION CABLE BARRIER
Special Provision September 11, 2006 SECTION 02845 S HIGH TENSION CABLE BARRIER PART 1 GENERAL 1.1 SECTION INCLUDES A. Cable barrier materials and installation procedures. 1.2 RELATED SECTIONS A. Section
GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS
GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS 13.1 13.2 2006 Edition SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL
COLORADO MODEL. 35 x 65 SPECIFICATIONS
COLORADO MODEL 35 x 65 SPECIFICATIONS Dimensions: Roof Dimensions 35-0 x 65-0 Column Dimensions (center to center) 31-0 x 30-6 Minimum Clearance 14-0 Roof Height @ Peak ±18-8 Curved Roof ±42-6 radius Square
2012 Edition Redbook 11.0 GENERAL DRAWINGS AND STANDARDS
2012 Edition Redbook 11.0 GENERAL DRAWINGS AND STANDARDS Minimum Vertical Clearances Above Ground and Roofs D1 Minimum Pool Clearances D2 Minimum Clearances of Wires Adjacent to Buildings and Other Structures
SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...
SECTION 02845 GUARDRAILS
SECTION 02845 GUARDRAILS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals necessary and repair, replace or install all types of guardrails as specified herein
UNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-27 05 14.00 10 (April 2006) -------------------------------- Preparing Activity: USACE Superseding UFGS-27 05 14.00 10 (April 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS
Patio Covers / Carports
Patio Covers / Carports Building Guides for Homeowners Why Do I need a Permit? D I D Y O U K N O W? As owner-builder you are the responsible party of record on such a permit. If your work is being performed
NORTH ORANGE COUNTY COMMUNITY COLLEGE DISTRICT SECTION 27 05 26 GROUNDING AND BONDING FOR COMMUNICATION SYSTEMS
SECTION GROUNDING AND BONDING FOR COMMUNICATION SYSTEMS RELATED SECTIONS: Section 27 00 00 General Requirements Section 27 02 00 Communication General Requirements Section 27 05 28 Pathways for Communications
This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.
Basement Finishing Guide Community Development Department Building Inspections Division 5200 85 th Avenue North / Brooklyn Park, MN 55443 Phone: (763) 488-6379 / Fax: (763) 493-8171 6/15 www.brooklynpark.org
Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS
Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS 1 Proposal & Plans Received? 2 Review Proposal, highlight important facts. Know proposal well to be able to find answers quickly.
For the purposes of this Part, the following words shall have the following meanings:
LOUISIANA REVISED STATUTES TITLE 51. TRADE AND COMMERCE CHAPTER 2. PARTICULAR GOODS PART XIV-B. MINIMUM STANDARDS FOR INSTALLATION OF MANUFACTURED HOMES Current through all 2010 Regular Session Acts 912.21.