Vinyl Greenhouse Window Page 2 of 6 New Contruction Installation Instructions

Size: px
Start display at page:

Download "Vinyl Greenhouse Window Page 2 of 6 New Contruction Installation Instructions"

Transcription

1 New Construction Installation Instructions EPLACEMENT Installation Instructions

2 Page 2 of 6 New Contruction Installation Instructions 1. Frame rough opening equal to window call out size. ough opening should be plumb & square and the sill should be level. For custom size Simonton Windows Greenhouse Windows, the suggested rough opening size is: Width: 7 less Fin-to-Fin Dimension Height: 4-1/8 less Fin-to-Fin Dimension Note: (For existing construction) emove enough exterior wall ns must lay at against existing studs. Figure 1 2. ashing paper in the normal manner. First, apply to the ashing goes on after n (see Figure 2). Must be installed per AAMA Figure 2 3. Center the Simonton Windows Greenhouse Window in rough opening allowing equal clearance on both sides and top. Bottom pan should line up with the finished sill height, allowing for any inside additional material such as tile (see Figure 3). Attach window to jambs, sill and header with screws long enough to penetrate through any furring strips and at least 1-1/2 into framing, every 12. A ribbon of caulking between the frame and flashing is a must. Figure 3 Bottom Pan 16 Bracket 19 Finished Sill On 5-0 to 6-0 wide windows, support bracing is required on each end of the window (Warranty will be void without proper support). These supports can be constructed as part of the wall framing or metal support brackets may be fabricated to adequately support the window. Fasteners to be supplied by installer (1/4 x 3 lag screws are suggested for wall mounting). Brackets must attach to the vertical studs below the window (see Figure 3). 5. Fastening the bracket to the bottom pan is not necessary. If fasteners are desired, the MAXIMUM screw length will be 3/4 as shown in Figure 3. Use caution when attaching as not to penetrate the inside pan surface. Figure 4 Header Patent No D Patent No 6,588,146B1 ev: 08/20/09 Tel: SIMONTON ( )

3 ev: 08/20/09 IMPOTANT: EVIEW ALL INSTUCTIONS THOOUGHLY BEFOE STATING STEP 1 Page 1 of 6 Tools & Materials TOOLS & materials required equired Tape Measure Drill Motor & 3/16 Drill Bit Caulking Gun Countersink Level Stud Finder Flat Head Screws Framing Square Caulk Parts Included parts included 1/4 x 3 Lag Bolts Hack or Chop Saw KV2061 KV2060 K series Window J1010 Bracket (2) Step 1 Verify Verify the Window the Window Dimensions Dimensions 1 The window width should be 1/8 smaller than the opening width. The window height should be 1/8 less than the opening height. (Figures 1 and 2) OPENING WIDTH OPENING HEIGHT OPENING WIDTH - 1/8" OPENING HEIGHT - 1/8" FIGUE 1 FIGUE 2

4 Prepare the Opening Vinyl eplacement Greenhouse Window Installation Instructions Page 2 of 6 Step 2 Prepare the Opening emove the existing sash and meeting rail. Insure the opening is clear of any obstructions. Clean the exterior sur- Step 2 2 face Prepare where the the radial Opening flange will touch. The radial flange will extend approximately 2 1/2 beyond the opening. (Figure emove 3) the existing sash and meeting rail. Insure the opening is clear of any obstructions. Clean the exterior surface where the radial flange will touch. The radial flange will extend approximately 2 1/2 beyond the opening. (Figure 3) Page 2 of 6 FIGUE 3 Determine screw location FIGUE and 3 size Step 3 Determine Screw Location and Size 3 Step 3 Measure Determine from the Screw face of Location the opening and to a Size point you are sure your screws will engage the Measure framing around in from the existing face of the window. opening It to a may point be necessary you are sure to go your through screws the will existing engage frame. the framing It is recommended around the that existing you select window. It screws may at be least necessary #10 in to diameter go through and the long existing enough frame. to It penetrate is recommended the framing that by you at select least one screws inch. (Figure at least 4) #10 in diameter and long enough to penetrate the framing by at least one inch. (Figure 4) Face of opening to screw center Face of opening to screw center Face of opening to screw center Face of opening to screw center FIGUE 4 FIGUE 4

5 Step 4 Predrill the Flange 4 Step 4 Vinyl Greenhouse eplacement Window Installation Instructions Predrill the Flange Using the dimension obtained in Step 3, on 12 inch centers, drill clearance holes for your Predrill screws the the Flange complete perimeter of the horizontal Using the dimension flange. Countersink obtained in the Step holes 3, so on that 12 inch the screw centers, heads drill are clearance flush with holes the for surface your of screws the horizontal the complete flange. perimeter (Figure of 5) the horizontal flange. Countersink the holes so that the screw heads are flush with the surface of the horizontal flange. (Figure 5) Your Dimension Page 3 of 6 Page 3 of 6 Your Dimension Your Dimension Your Dimension FIGUE 5 Step 5caulk Caulk the Flange the Flange Liberally apply caulking in at least 3/16" diameter bead to the radial flange, paying Step 5 Caulk particular the attention Flange to the corners where the flanges Liberally come apply together. caulking Make in at sure least all 3/16" the joints are diameter covered. bead (Figure to the radial 6) flange, paying NOTE: particular The attention weatherability to corners of the where installation flanges is the come responsibility together. Make of the sure installer. the joints the Simonton are covered. Windows (Figure 6) will NOT be liable for damages NOTE: The related weatherability to a poor or of incorrect the installation is the responsibility of the installer. installation. Simonton Windows will NOT be liable for damages related to a poor or incorrect installation. FIGUE 5 FIGUE 6 FIGUE 6

6 Step 6 Install the Window in the Opening Note: This operation will require at least three people. Two people lift the window into the opening, and the third screws the window into place, insuring the window is plumb, level, and square. It is important to tighten the screws only enough to hold the window in place. Do not tighten so much the flange is distorted. (Figure 7) Vinyl Greenhouse eplacement Window Installation Instructions Install the window in the opening 6 Page 4 of 6 FIGUE 7 Step 7 Install the support brackets 7 Install the Support Brackets Using the stud finder or other method, locate studs as close to the outside edges of the window as possible. Butt the horizontal leg of the bracket against the underside of the window, and mark the locations of the mounting holes. Drill pilot holes at these locations, and install the support brackets using the 1/4 x 3 lag bolts. (Figure 8) Note: Interior and exterior walls removed for clarity FIGUE 8

7 Optional. Install the Trim Strips. Note: The Trim Step 8 Optional. Strips are Install provided the Trim for your convenience. You may wish to finish Strips. out the interior Note: opening The Trim in another Strips are provided for your convenience. You manner. may wish to finish out the interior opening in another manner. 8.a Locate the KV2060. Note which of the KV2061 pieces is the same length as the KV2060. (Figures 9 and 10) This is the head trim. Cut the sill and head trim to the same width as the interior opening. (Figure 11) Measure the opening at both head and sill before cutting the trim. Notch the trim to fit inside the vertical flanges. (Figures 12 and 13) Vinyl eplacement Greenhouse Window Installation Instructions FIGUE 9 FIGUE 10 KV2061 Head and Jambs KV2060 Sill Page 5 of 6 INTEIO OPENING WIDTH FIGUE 11 Step 8 8.b FIGUE 12 Continued. Install the Trim Strips. Determine the height of the trim flange and cut to size. (Figure 14) Install the horizontal trim, and cut the vertical trim to fit. Determine the height of the vertical trim flange, cut and install. Your installation is complete. FIGUE 13 Vertical trim dimension Cut here Cut here FIGUE 14

8 Vinyl Greenhouse eplacement Window Installation Instructions Page 6 of 6 DO NOT USE Petroleum, Aromatic, Aliphatic, Acetone, or Ammonia based cleaners or solvents on any surface of the Simonton Windows. The use of these cleaners on any surface will void the warranty on the window and materials. The factory recommends the use of warm soapy water to clean vinyl surfaces. This window is covered under one or more of the following U.S. Patents: D320,952 6,588,146. The retro-fin system is patent pending.

9

10 SIM2233 / 0809 Publication No

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

Basement Window Installation Guide Hopper and Sliding

Basement Window Installation Guide Hopper and Sliding Basement Window Installation Guide Hopper and Sliding americancraftsmanwindows.com Project Requirements: Installation must comply with all applicable building codes. Existing window frame, wall and weatherresistant

More information

Clad Direct Glaze Window Installation Instructions

Clad Direct Glaze Window Installation Instructions Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully

More information

Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows

Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows Viewed from the exterior. IMPORTANT: Please read before you begin installation. TABLE OF CONTENTS AND TOOL / MATERIAL

More information

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin americancraftsmanwindows.com Project Requirements: Failure to follow these instructions may void product

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit. Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden

More information

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit. Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden

More information

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

WHI 90-Minute Rated Veneered Door Frame Installation Instructions No. 940-03-10 INSTALLATION INSTRUCTIONS 90 MINUTE RATED VENEERED DOOR FRAME DOOR REQUIREMENTS: Consult the door manufacturer to make sure that the doors are qualified for the hardware to be installed,

More information

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read

More information

Brick Veneer Construction

Brick Veneer Construction Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power

More information

Tundra Series Windows January 2016

Tundra Series Windows January 2016 Tundra Series Windows January 2016 New Construction Installation Instructions Nail Fin, J-Fin and Brickmold Aplications product. ATTENTION! Read and understand all installation instructions before installing

More information

4 5/16 Subframe Installation

4 5/16 Subframe Installation 4 5/16 Subframe Installation The subframe system is a great installation tool for installing windows in masonry conditions. Typically subframes are used in masonry openings so that windows can be anchored

More information

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW Vinyl Windows and Doors Manufactured by Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW Lea las instrucciones en español en el reverso.

More information

Important Information for Installer & Homeowner

Important Information for Installer & Homeowner Important Information for Installer & Homeowner Homeowner: Please keep this information for your records, do not discard! Installation Instructions for Wood Frame Construction Replacement (See other side

More information

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES

REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES Tools Required Tape Measure Hammer Slotted Screw Driver #2 & #3 Philips Screw Driver 3-4 Foot Level 12 Pry Bar Cold Chisel

More information

INSTALLATION INSTRUCTIONS for Premium Pocket Windows (JII022) IMPoRtaNt INFoRMatIoN & glossary. safety & HaNdlINg

INSTALLATION INSTRUCTIONS for Premium Pocket Windows (JII022) IMPoRtaNt INFoRMatIoN & glossary. safety & HaNdlINg Thank you for selecting JeLd-weN products. Attached are JeLd-weN s recommended installation instructions for pocket (replacement) double-hung, casement, awning, picture or transom windows, designed to

More information

WINDOW PANNING AND TRIMS

WINDOW PANNING AND TRIMS OCTOBER, 2010 PANNING AND TRIMS GENERAL INFORMATION 1 EXTERIOR PANNING Panning is primarily used to cover the perimeters of existing building openings prior to the installation of replacement windows.

More information

All-Season Sunroom Sliding Glass Door Installation Instructions

All-Season Sunroom Sliding Glass Door Installation Instructions ASRESGD-08 All-Season Sunroom Sliding Glass Door Installation Instructions Panel Frame Door Frame Left Side Foam Insulator IE241 H Bar Assembly Door Frame Top Track Panel Frame Door Frame Right Side Stationary

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions

More information

PANELIZED HOME INSTALLATION GUIDELINE

PANELIZED HOME INSTALLATION GUIDELINE PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.

More information

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements

More information

March 14, 2007. Installation of Bay, Bow and Garden Windows

March 14, 2007. Installation of Bay, Bow and Garden Windows March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows without Nailing Fin (JII011) ImPOrTANT INFOrmATION & GlOssAry. rough OPeNINGs

INSTALLATION INSTRUCTIONS for Vinyl Windows without Nailing Fin (JII011) ImPOrTANT INFOrmATION & GlOssAry. rough OPeNINGs Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for vinyl windows without a nailing fin (including finless, flush fin and flange). Read these instructions

More information

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS IMPORTANT DreamLine TM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical

More information

HOW TO INSTALL A BEAUTIFUL NEW KITCHEN

HOW TO INSTALL A BEAUTIFUL NEW KITCHEN HOW TO INSTALL A BEAUTIFUL NEW KITCHEN Easy to follow step-by-step kitchen cabinet installation TOOL AND MATERIAL LIST Hammer Pry bar Screwdriver Phillips Flathead Level Tape measure Pencil Straight edge

More information

Premier & Deluxe 3-Season Room Sliding Glass Door

Premier & Deluxe 3-Season Room Sliding Glass Door DTSSGD-11 Premier & Deluxe 3-Season Room Sliding Glass Door Installation Instructions Screen Door Seal Left Side Track Top Track Assembly Right Side Track Right Side Trim Sliding Glass Door Sliding Screen

More information

DE Frame with C Series Sidelight

DE Frame with C Series Sidelight TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder

More information

How To Install Your Frameless Shower Enclosure

How To Install Your Frameless Shower Enclosure How To Install Your Frameless Shower Enclosure a) Installing Single Frameless Door Side Mounted Wall Hinges b) Installing Frameless Door with In-Line Panel c) Installing Frameless Door Between In-Line

More information

WINDOW INSTALLATION GUIDE

WINDOW INSTALLATION GUIDE WINDOW INSTALLATION GUIDE is not responsible for or liable for any use or misuse of the information contained in this window installation guide. Window Installation Guide This guide provides basic information

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS door frames Engineered product systems INSTALLATION INSTRUCTIONS door frames MINIMALIST DOOR FRAME Fry Reglet Flush Door frames are designed for use with 3 5/8 studs with ½ drywall both sides (4 5/8 throat

More information

InsulView Window Installation Instructions

InsulView Window Installation Instructions InsulView Window Installation Instructions 1. The entire building is normally sheeted with the 2" 2 ½ OR 3 wall panel and the windows installed at a later time. A window retrofit of an existing building

More information

DECKING INSTALLATION, CARE & MAINTENANCE INSTRUCTIONS. 866.729.2378 MOISTURESHIELD.COM limited lifetime warranty 866.729.2378 WWW.MOISTURESHIELD.

DECKING INSTALLATION, CARE & MAINTENANCE INSTRUCTIONS. 866.729.2378 MOISTURESHIELD.COM limited lifetime warranty 866.729.2378 WWW.MOISTURESHIELD. DECKING INSTALLATION, CARE & MAINTENANCE INSTRUCTIONS 866.729.2378 MOISTURESHIELD.COM limited lifetime warranty Welcome To The Even Greater Outdoors. Congratulations on choosing MoistureShield for your

More information

Installation Guide for Andersen Architectural Wood Inswing Entry Doors

Installation Guide for Andersen Architectural Wood Inswing Entry Doors Installation Guide for Andersen Architectural Wood Inswing Entry Doors Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance are

More information

INSTALLATION OF A BAY WINDOW

INSTALLATION OF A BAY WINDOW INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening

More information

2.9 WINDOW & DOOR BUCKS

2.9 WINDOW & DOOR BUCKS 2.9 WINDOW & DOOR BUCKS Bucks provide attachment surfaces for windows and doors while holding back concrete from these openings during concrete placement. Mark the center and edges of openings as you place

More information

www.cornholesupplies.com

www.cornholesupplies.com www.cornholesupplies.com How To Build Regulation Cornhole Boards Home of the Original Cornhole Bags and Boards Supply List: 1-4' X 8' Piece of Plywood (pre sanded) 4-2" X 4" X 8' Studs (2 by 4s make sure

More information

Customer Service 800.780.8889 or visit us online at smithnoble.com. Wood Shutters. Step by Step Installation. Troubleshooting Tips

Customer Service 800.780.8889 or visit us online at smithnoble.com. Wood Shutters. Step by Step Installation. Troubleshooting Tips reflect your style TM Customer Service 800.780.8889 or visit us online at smithnoble.com Wood Shutters Step by Step Installation Troubleshooting Tips Easy Care Instructions STEP 1 Your New Shutter Thank

More information

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,

More information

SLIDING PATIO DOOR INSTALLATION INSTRUCTIONS USING FRAME SCREWS

SLIDING PATIO DOOR INSTALLATION INSTRUCTIONS USING FRAME SCREWS Vinyl Windows and Doors Manufactured by Pella Corporation Part Number: V984528 2012 Pella Corporation SLIDING PATIO DOOR INSTALLATION INSTRUCTIONS USING FRAME SCREWS Installation Instructions for Typical

More information

GreenGuard Housewrap Installation Guide

GreenGuard Housewrap Installation Guide 000768PACBPHW_Flashing Bro 5/23/03 2:52 PM Page 1 For the most current product information, go to www.green-guard.com. Pactiv Building Products believes the information and recommendations herein to be

More information

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS 2009 Pella Corporation INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS Part Number: 80WH0100 Installation Instructions for Typical Wood Frame Construction.

More information

Installing Window and Door Mouldings

Installing Window and Door Mouldings Installing Window and Door Mouldings About Window and Door Mouldings The trim around windows and doors greatly influences the look and style of your interior. They also bridge the gaps and cover spaces

More information

Installation Instructions For Slider Casement Air Conditioners

Installation Instructions For Slider Casement Air Conditioners Installation Instructions For Slider Casement Air Conditioners NOTE: These instructions describe installation in a typical wood framed window with a wood SLIDE-BY sash, or installation in a metal CASEMENT

More information

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER SEALANT REQUIRED TO COMPLETE THIS INSTALLATION: (Not supplied) Sika Sikasil NG (Arctic White) To seal the WHITE shower door and returns to the shower tray.

More information

Barewood Octagon and Elongated Windows Installation Instructions

Barewood Octagon and Elongated Windows Installation Instructions Step-by-step instructions to a beautiful window. Measuring and Installation of your new window from Century Specialty Windows couldn't be easier with our step-by-step instructions. Quality, function and

More information

Black Wolf POCKET BILLIARD TABLE INSTALLATION MANUAL. SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104

Black Wolf POCKET BILLIARD TABLE INSTALLATION MANUAL.  SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104 Black Wolf TM POCKET BILLIARD TABLE INSTALLATION MANUAL www.brunswickbilliards.com SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104 51-905710-000 SEPTEMBER 2010 NOTE: Please use the instructions in this

More information

Information Technology Solutions

Information Technology Solutions Information Technology Solutions Aluminum Sliding Door Assembly Instructions Shield Doors & Windows Bi-fold Door Assembly Instructions For Support Please Call 03 8339 2252 Aluminum Sliding Door Assembly

More information

Sash Replacement Guide

Sash Replacement Guide for Andersen 200/400 Series Awning Windows Read all instructions carefully before attempting this procedure. If you have any questions about your ability to complete this procedure, call Andersen at 1-888-888-7020

More information

AZEK Rail Install Guide

AZEK Rail Install Guide TRIM MOULDING DECK PORCH RAIL PAVERS AZEK Rail Install Guide Installing AZEK Rail with Glass Infill... 2 Installing AZEk Rail Stairs with Glass Infill... 9 Notes...14 Please read all instructions completely

More information

Installation Instructions

Installation Instructions Installation Instructions READ BEFORE INSTALLING UNIT For Low Profile Window Air Conditioner INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step

More information

Guidelines for Earthquake Bracing of Residential Water Heaters

Guidelines for Earthquake Bracing of Residential Water Heaters Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)

More information

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL Please read these instructions carefully and completely before attempting to install Hale Pet Doors; they will guide you through the steps

More information

New Construction Stud Frame Vinyl Window Installation Guide

New Construction Stud Frame Vinyl Window Installation Guide New Construction Stud Frame Vinyl Window Installation Guide This manual contains procedures based on ASTM E2112 and Installation Masters Installer Training & Certification Program Manual RLC-1 The procedures

More information

Installation Guide for Andersen Architectural Clad Outswing Commercial Doors

Installation Guide for Andersen Architectural Clad Outswing Commercial Doors Installation Guide for Andersen Architectural Clad Outswing Commercial Doors Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance

More information

MGB Chrome Bumper Conversion

MGB Chrome Bumper Conversion MGB Chrome Bumper Conversion Installation Instructions For 1974 1/2-1980 MGB This kit requires cutting, welding, and painting. Professional installation recommended. Note: Every MGB body is slightly different

More information

glass & Glazing Products

glass & Glazing Products glass & Glazing Products WallMaker Create an unlimited variety of bright, beautiful and secure interior environments with the easy-to-install Stylmark WallMaker glass wall system. This versatile system

More information

Cable Support System Guide for Andersen Bow, Bay, and Box Projecting Window Units

Cable Support System Guide for Andersen Bow, Bay, and Box Projecting Window Units for Andersen Bow, Bay, and Box Projecting Window Units Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance are essential if the

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 8 DOORS AND WINDOWS 08 50 00 WINDOWS

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 8 DOORS AND WINDOWS 08 50 00 WINDOWS SECTION INCLUDES Metal Windows Vinyl/Aluminum Clad Wood Windows Solid Fiberglass and Vinyl Windows Wood Windows (Historic Preservation only) RELATED SECTIONS 02 83 00 Lead Paint Remediation 06 10 00 Rough

More information

Heavy Glass Frameless Shower Door With Return Panel

Heavy Glass Frameless Shower Door With Return Panel 202 Anderson Ave., elvue, KS 66407 Phone: 800-669-9867 Fax: 800-393-6699 www.onyxcollection.com Heavy Glass Frameless Shower Door With Return Panel Full Showers with Return ench Seat with Return FRLSDRPL-0116

More information

INSTALLATION INSTRUCTIONS for Vinyl Patio Doors with Integral Nailing Fin (JII006)

INSTALLATION INSTRUCTIONS for Vinyl Patio Doors with Integral Nailing Fin (JII006) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl Patio Doors with nailing fin. Any local building code requirements supersede the recommended

More information

Garden Window. Montecito Series Vinyl Garden Window Architectural Manual

Garden Window. Montecito Series Vinyl Garden Window Architectural Manual Montecito Series Vinyl The offers the outstanding insulating properties, low maintenance, and contemporary aesthetic appeal only vinyl can provide. Available in White and Tan homogenous window frames,

More information

300mm. 2mm MIN GAP. PLACE 100mm X 100mm. SO THAT IT IS 38mm INTO

300mm. 2mm MIN GAP. PLACE 100mm X 100mm. SO THAT IT IS 38mm INTO INSTALL PEEL & STICK (P&S) GUSSETS WITH PRIMER AS PER MANUFACTURERS INSTRUCTIONS 2mm MIN GAP IN SHEATHING STEP 1 PLACE 100mm X 100mm PIECE OF P&S IN CORNER SO THAT IT IS 38mm INTO THE OPENING EACH WAY

More information

BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS

BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,

More information

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work. Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. Warning Do not install defective material.

More information

By SP Partners, LLC. www.rainbowatticstair.com INSTALLATION GUIDE. Prestige

By SP Partners, LLC. www.rainbowatticstair.com INSTALLATION GUIDE. Prestige By SP Partners, LLC www.rainbowatticstair.com INSTALLATION GUIDE Prestige IMPORTANT READ THIS FIRST Inspect stair for any damage prior to installation. Stair is NOT to be installed while home is under

More information

450 SERIES SLIDING GLASS DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

450 SERIES SLIDING GLASS DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS 450 SERIES SLIDING GLASS DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS Effective 2/12/11 Revised 7/7/15 TACOMA, WA (253) 922-6030 PORTLAND, OR (503) 682-3270 MARYSVILLE, WA (360) 659-0836 SACRAMENTO, CA

More information

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11 K. D. FRAME ASSEMBLY FOR MASONRY WALLS...........................Ins 2 FRAME INSTALLATION DETAILS FOR MASONRY WALLS......................Ins 3 INSTALLING EXISTING MASONRY WALL ANCHORS IN FRAME..................Ins

More information

Installer Training and Certification Overview

Installer Training and Certification Overview Installer Training and Certification Overview Outline of This Presentation The Need for a Training Program The History of the Program Details of the Training Program The Certification Process The Need

More information

SERIES 238 WINDOWS. NOTE: Read instructions completely before attempting any installation.

SERIES 238 WINDOWS. NOTE: Read instructions completely before attempting any installation. 1 Installation Instructions SERIES 238 WINDOWS Page 2: Page 3-4: Page 5: Page 6: Page 7: Opening Preparation and Wood Buck Installation Installation Instructions for Series 238 WINDOWS Figure 1: Buck preparation

More information

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for premium composite, hollow and solid core molded Bifold Doors. Bifolds are designed for fast

More information

IMPORTANT! READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION. Step 1:

IMPORTANT! READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION. Step 1: IMPORTANT! READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION. Thank you for purchasing your new replacement windows from Great Lakes Window. The following instructions will help remove the old windows

More information

CRASH RAIL INSTALLATION HEIGHT

CRASH RAIL INSTALLATION HEIGHT PLEASE READ PLEASE READ THESE INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING THE INSTALLATION! THIS INSTRUCTION SHEET IS INTENDED TO PROVIDE A SPECIFIC GUIDE TO FOLLOW FOR THE INSTALLATION OF THIS. CONTAINED

More information

Replacement Installation Instructions

Replacement Installation Instructions Sliding Door Replacement Installation Instructions Please make sure you have: Fixed 1 - Operating (X) Panel (Glazing Bead Inside, Roller Adjustment Holes Outside) 1 - Fixed (O) Panel (For 3-Panel doors,

More information

Composite Stone Veneer

Composite Stone Veneer Composite Stone Veneer Installation Guide Ver 1 Jun 2015 www.compstone.com Composite Stone Veneer Installation Guide Contents Introduction & Overview 3 Required Tools 4 Optional Tools 4 Attachment Guidelines:

More information

Packaged Terminal Air Conditioner Wall Sleeve Installation

Packaged Terminal Air Conditioner Wall Sleeve Installation Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation

More information

Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.

Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling. i This instruction sheet describes the proper methods for installing Eucatex decorative wall paneling. Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in

More information

AAMA 2400-10. Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure

AAMA 2400-10. Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure A M E R I C A N A R C H I T E C T U R A L AAMA 2400-10 Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure M A N U F A C T U

More information

AZEK Rail Install Guide

AZEK Rail Install Guide TRIM MOULDING DECK PORCH RAIL PAVERS AZEK Rail Install Guide Installing AZEK Rail with CableRail by Feeney... 1 Installing CableRail by Feeney for AZEK Rail... 7 Installing AZEK Rail Stairs with CableRail

More information

Cedar Cottage Doghouse Plans

Cedar Cottage Doghouse Plans Overlapping cedar shingles add an element of charm to this medium size doghouse. The walls, floor, and trim are constructed of solid cedar, making it naturally weather resistant and provides excellent

More information

Build a Trade-Show Booth for Under $200!

Build a Trade-Show Booth for Under $200! Build a Trade-Show Booth for Under $200! This corner booth, with a seven foot front and sweeping 4x8 backdrop, assembles in less than 20 minutes and can be built in one weekend. Materials Tools 4 x8 x3/4

More information

Wren Kitchens Installation Tips... 3. Carefully check your kitchen delivery... 4. Measuring out and marking up... 5. Fitting the base cabinets...

Wren Kitchens Installation Tips... 3. Carefully check your kitchen delivery... 4. Measuring out and marking up... 5. Fitting the base cabinets... tra 1 Index Wren Kitchens Installation Tips... 3 Carefully check your kitchen delivery... 4 Measuring out and marking up... 5 Fitting the base cabinets... 6 Fitting the corner cabinets... 7 The 972mm or

More information

CLAIM FORM APPENDIX. I. Photographs Identifying The Windows

CLAIM FORM APPENDIX. I. Photographs Identifying The Windows CLAIM FORM APPENDIX I. Photographs Identifying The Windows The Settlement provides compensation for MIWD Products that are glazed with Glazing Tape and were manufactured or sold between July 1, 2000 and

More information

Installation Instructions

Installation Instructions Installation Instructions 1. Position the unit onto bridging packers. These keep the unit away from any water sitting inside the frame. 2. Centralise the unit within the frame and pack the edges with appropriate

More information

Gate Leg Drop Leaf Table Plans

Gate Leg Drop Leaf Table Plans Preparing the table top blanks: Cut and glue enough 3/4 stock to make three panels 40 long by 24 wide (they will be cut to final size at a later time). While the glue dries we will work on the legs. Preparing

More information

ILLUSION FRAMELESS SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

ILLUSION FRAMELESS SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS PREPARATION Approximate Installation Time: Tools Required for Installation: 60 minutes Hacksaw Electric Drill 3/16 Masonry Bit Pencil/Felt tip pen Safety Glasses Measuring Tape Masking Tape Standard Screw

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nail fin. Not all window types may be installed into every wall

More information

Hollow or Cinder Block Wall Mount Job Aid

Hollow or Cinder Block Wall Mount Job Aid Summary This Job Aid covers: Hollow or Cinder Block Wall Mount Job Aid Hollow or Cinder Block wall Mount Bracket Installing the Mount Bracket into Cinder Block This Job Aid supports the Technician audience.

More information

Horizontal Mini Blinds Installation Guide

Horizontal Mini Blinds Installation Guide Horizontal Mini Blinds Installation Guide We make it easy! BTG 468298 EN_ rev0614 For more safety information: 1-866-662-0666 or.www.healthcanada.gc.ca/blindcords Before starting Your new Blinds To Go

More information

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................

More information

How to Build a Poker Table

How to Build a Poker Table How to Build a Poker Table www.pokertablematerials.com 10-Person Poker Table- 96 x 48 These are step by step instructions for building a poker table. The table will measure 48" x 96" and have a 4" wide

More information

Guidelines for Earthquake Bracing Residential Water Heaters

Guidelines for Earthquake Bracing Residential Water Heaters Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the

More information

HfHMD uses LP SmartSide siding and trim.

HfHMD uses LP SmartSide siding and trim. HfHMD uses LP SmartSide siding and trim. These products are: More durable than cement fiber board. Much more volunteer-friendly to install. When installed correctly, have a 5/50- year pro-rated warranty.

More information

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE BUILDINGS CONTRACTOR SERIES 2 X 4 FRAMES

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE BUILDINGS CONTRACTOR SERIES 2 X 4 FRAMES UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE BUILDINGS CONTRACTOR SERIES 2 X 4 FRAMES Our unique assembly process quickly transforms the individual pieces into a finished structure that will give you

More information

Installation Guide. Bath and Wall Surrounds SERIES 7104 1021861-2-B

Installation Guide. Bath and Wall Surrounds SERIES 7104 1021861-2-B Installation Guide and Wall Surrounds SERIES 7104 1021861-2-B Thank You For Choosing Sterling We appreciate your commitment to Sterling value. Please take a few minutes to review this manual before you

More information

FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction... 2 Components... 3 Step 1 Marking out the Perimeter of the Carport... 3 Step 2a Footing Set-Out for Concrete Block Pad

More information

Installation Instructions

Installation Instructions READ BEFORE INSTALLING UNIT For Slider Casement Air Conditioners To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed:

More information

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2

More information

Calvert USA, Inc. Attic Stairs

Calvert USA, Inc. Attic Stairs Calvert USA, Inc. Attic Stairs Instructions for installation of vertical opening access stairs Model numbers: 7035 through 7047 Calvert USA, Inc., P.O. Box 841, Solomons, MD 20688, Tel. (410) 286-1430,

More information

VA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD

VA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board, vapor retarder and air and moisture barrrier. 1.2 RELATED WORK A. Installation

More information