Vinyl Greenhouse Window Page 2 of 6 New Contruction Installation Instructions
|
|
- Reynard Chapman
- 7 years ago
- Views:
Transcription
1 New Construction Installation Instructions EPLACEMENT Installation Instructions
2 Page 2 of 6 New Contruction Installation Instructions 1. Frame rough opening equal to window call out size. ough opening should be plumb & square and the sill should be level. For custom size Simonton Windows Greenhouse Windows, the suggested rough opening size is: Width: 7 less Fin-to-Fin Dimension Height: 4-1/8 less Fin-to-Fin Dimension Note: (For existing construction) emove enough exterior wall ns must lay at against existing studs. Figure 1 2. ashing paper in the normal manner. First, apply to the ashing goes on after n (see Figure 2). Must be installed per AAMA Figure 2 3. Center the Simonton Windows Greenhouse Window in rough opening allowing equal clearance on both sides and top. Bottom pan should line up with the finished sill height, allowing for any inside additional material such as tile (see Figure 3). Attach window to jambs, sill and header with screws long enough to penetrate through any furring strips and at least 1-1/2 into framing, every 12. A ribbon of caulking between the frame and flashing is a must. Figure 3 Bottom Pan 16 Bracket 19 Finished Sill On 5-0 to 6-0 wide windows, support bracing is required on each end of the window (Warranty will be void without proper support). These supports can be constructed as part of the wall framing or metal support brackets may be fabricated to adequately support the window. Fasteners to be supplied by installer (1/4 x 3 lag screws are suggested for wall mounting). Brackets must attach to the vertical studs below the window (see Figure 3). 5. Fastening the bracket to the bottom pan is not necessary. If fasteners are desired, the MAXIMUM screw length will be 3/4 as shown in Figure 3. Use caution when attaching as not to penetrate the inside pan surface. Figure 4 Header Patent No D Patent No 6,588,146B1 ev: 08/20/09 Tel: SIMONTON ( )
3 ev: 08/20/09 IMPOTANT: EVIEW ALL INSTUCTIONS THOOUGHLY BEFOE STATING STEP 1 Page 1 of 6 Tools & Materials TOOLS & materials required equired Tape Measure Drill Motor & 3/16 Drill Bit Caulking Gun Countersink Level Stud Finder Flat Head Screws Framing Square Caulk Parts Included parts included 1/4 x 3 Lag Bolts Hack or Chop Saw KV2061 KV2060 K series Window J1010 Bracket (2) Step 1 Verify Verify the Window the Window Dimensions Dimensions 1 The window width should be 1/8 smaller than the opening width. The window height should be 1/8 less than the opening height. (Figures 1 and 2) OPENING WIDTH OPENING HEIGHT OPENING WIDTH - 1/8" OPENING HEIGHT - 1/8" FIGUE 1 FIGUE 2
4 Prepare the Opening Vinyl eplacement Greenhouse Window Installation Instructions Page 2 of 6 Step 2 Prepare the Opening emove the existing sash and meeting rail. Insure the opening is clear of any obstructions. Clean the exterior sur- Step 2 2 face Prepare where the the radial Opening flange will touch. The radial flange will extend approximately 2 1/2 beyond the opening. (Figure emove 3) the existing sash and meeting rail. Insure the opening is clear of any obstructions. Clean the exterior surface where the radial flange will touch. The radial flange will extend approximately 2 1/2 beyond the opening. (Figure 3) Page 2 of 6 FIGUE 3 Determine screw location FIGUE and 3 size Step 3 Determine Screw Location and Size 3 Step 3 Measure Determine from the Screw face of Location the opening and to a Size point you are sure your screws will engage the Measure framing around in from the existing face of the window. opening It to a may point be necessary you are sure to go your through screws the will existing engage frame. the framing It is recommended around the that existing you select window. It screws may at be least necessary #10 in to diameter go through and the long existing enough frame. to It penetrate is recommended the framing that by you at select least one screws inch. (Figure at least 4) #10 in diameter and long enough to penetrate the framing by at least one inch. (Figure 4) Face of opening to screw center Face of opening to screw center Face of opening to screw center Face of opening to screw center FIGUE 4 FIGUE 4
5 Step 4 Predrill the Flange 4 Step 4 Vinyl Greenhouse eplacement Window Installation Instructions Predrill the Flange Using the dimension obtained in Step 3, on 12 inch centers, drill clearance holes for your Predrill screws the the Flange complete perimeter of the horizontal Using the dimension flange. Countersink obtained in the Step holes 3, so on that 12 inch the screw centers, heads drill are clearance flush with holes the for surface your of screws the horizontal the complete flange. perimeter (Figure of 5) the horizontal flange. Countersink the holes so that the screw heads are flush with the surface of the horizontal flange. (Figure 5) Your Dimension Page 3 of 6 Page 3 of 6 Your Dimension Your Dimension Your Dimension FIGUE 5 Step 5caulk Caulk the Flange the Flange Liberally apply caulking in at least 3/16" diameter bead to the radial flange, paying Step 5 Caulk particular the attention Flange to the corners where the flanges Liberally come apply together. caulking Make in at sure least all 3/16" the joints are diameter covered. bead (Figure to the radial 6) flange, paying NOTE: particular The attention weatherability to corners of the where installation flanges is the come responsibility together. Make of the sure installer. the joints the Simonton are covered. Windows (Figure 6) will NOT be liable for damages NOTE: The related weatherability to a poor or of incorrect the installation is the responsibility of the installer. installation. Simonton Windows will NOT be liable for damages related to a poor or incorrect installation. FIGUE 5 FIGUE 6 FIGUE 6
6 Step 6 Install the Window in the Opening Note: This operation will require at least three people. Two people lift the window into the opening, and the third screws the window into place, insuring the window is plumb, level, and square. It is important to tighten the screws only enough to hold the window in place. Do not tighten so much the flange is distorted. (Figure 7) Vinyl Greenhouse eplacement Window Installation Instructions Install the window in the opening 6 Page 4 of 6 FIGUE 7 Step 7 Install the support brackets 7 Install the Support Brackets Using the stud finder or other method, locate studs as close to the outside edges of the window as possible. Butt the horizontal leg of the bracket against the underside of the window, and mark the locations of the mounting holes. Drill pilot holes at these locations, and install the support brackets using the 1/4 x 3 lag bolts. (Figure 8) Note: Interior and exterior walls removed for clarity FIGUE 8
7 Optional. Install the Trim Strips. Note: The Trim Step 8 Optional. Strips are Install provided the Trim for your convenience. You may wish to finish Strips. out the interior Note: opening The Trim in another Strips are provided for your convenience. You manner. may wish to finish out the interior opening in another manner. 8.a Locate the KV2060. Note which of the KV2061 pieces is the same length as the KV2060. (Figures 9 and 10) This is the head trim. Cut the sill and head trim to the same width as the interior opening. (Figure 11) Measure the opening at both head and sill before cutting the trim. Notch the trim to fit inside the vertical flanges. (Figures 12 and 13) Vinyl eplacement Greenhouse Window Installation Instructions FIGUE 9 FIGUE 10 KV2061 Head and Jambs KV2060 Sill Page 5 of 6 INTEIO OPENING WIDTH FIGUE 11 Step 8 8.b FIGUE 12 Continued. Install the Trim Strips. Determine the height of the trim flange and cut to size. (Figure 14) Install the horizontal trim, and cut the vertical trim to fit. Determine the height of the vertical trim flange, cut and install. Your installation is complete. FIGUE 13 Vertical trim dimension Cut here Cut here FIGUE 14
8 Vinyl Greenhouse eplacement Window Installation Instructions Page 6 of 6 DO NOT USE Petroleum, Aromatic, Aliphatic, Acetone, or Ammonia based cleaners or solvents on any surface of the Simonton Windows. The use of these cleaners on any surface will void the warranty on the window and materials. The factory recommends the use of warm soapy water to clean vinyl surfaces. This window is covered under one or more of the following U.S. Patents: D320,952 6,588,146. The retro-fin system is patent pending.
9
10 SIM2233 / 0809 Publication No
Window Installation Instructions
Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for
More informationBasement Window Installation Guide Hopper and Sliding
Basement Window Installation Guide Hopper and Sliding americancraftsmanwindows.com Project Requirements: Installation must comply with all applicable building codes. Existing window frame, wall and weatherresistant
More informationClad Direct Glaze Window Installation Instructions
Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully
More informationVinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows
Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows Viewed from the exterior. IMPORTANT: Please read before you begin installation. TABLE OF CONTENTS AND TOOL / MATERIAL
More informationReplacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin
Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin americancraftsmanwindows.com Project Requirements: Failure to follow these instructions may void product
More informationSun Windows General Information Sun New Construction Window Installation Instructions
Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten
More informationWe urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.
Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden
More informationWe urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.
Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden
More informationWHI 90-Minute Rated Veneered Door Frame Installation Instructions
No. 940-03-10 INSTALLATION INSTRUCTIONS 90 MINUTE RATED VENEERED DOOR FRAME DOOR REQUIREMENTS: Consult the door manufacturer to make sure that the doors are qualified for the hardware to be installed,
More informationInstallation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows
Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read
More informationBrick Veneer Construction
Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power
More informationTundra Series Windows January 2016
Tundra Series Windows January 2016 New Construction Installation Instructions Nail Fin, J-Fin and Brickmold Aplications product. ATTENTION! Read and understand all installation instructions before installing
More information4 5/16 Subframe Installation
4 5/16 Subframe Installation The subframe system is a great installation tool for installing windows in masonry conditions. Typically subframes are used in masonry openings so that windows can be anchored
More informationINSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW
Vinyl Windows and Doors Manufactured by Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW Lea las instrucciones en español en el reverso.
More informationImportant Information for Installer & Homeowner
Important Information for Installer & Homeowner Homeowner: Please keep this information for your records, do not discard! Installation Instructions for Wood Frame Construction Replacement (See other side
More informationREDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES
REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES Tools Required Tape Measure Hammer Slotted Screw Driver #2 & #3 Philips Screw Driver 3-4 Foot Level 12 Pry Bar Cold Chisel
More informationINSTALLATION INSTRUCTIONS for Premium Pocket Windows (JII022) IMPoRtaNt INFoRMatIoN & glossary. safety & HaNdlINg
Thank you for selecting JeLd-weN products. Attached are JeLd-weN s recommended installation instructions for pocket (replacement) double-hung, casement, awning, picture or transom windows, designed to
More informationWINDOW PANNING AND TRIMS
OCTOBER, 2010 PANNING AND TRIMS GENERAL INFORMATION 1 EXTERIOR PANNING Panning is primarily used to cover the perimeters of existing building openings prior to the installation of replacement windows.
More informationAll-Season Sunroom Sliding Glass Door Installation Instructions
ASRESGD-08 All-Season Sunroom Sliding Glass Door Installation Instructions Panel Frame Door Frame Left Side Foam Insulator IE241 H Bar Assembly Door Frame Top Track Panel Frame Door Frame Right Side Stationary
More informationINSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions
More informationPANELIZED HOME INSTALLATION GUIDELINE
PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.
More informationWINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING
WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements
More informationMarch 14, 2007. Installation of Bay, Bow and Garden Windows
March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed
More informationINSTALLATION INSTRUCTIONS for Vinyl Windows without Nailing Fin (JII011) ImPOrTANT INFOrmATION & GlOssAry. rough OPeNINGs
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for vinyl windows without a nailing fin (including finless, flush fin and flange). Read these instructions
More informationQWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS
QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS IMPORTANT DreamLine TM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical
More informationHOW TO INSTALL A BEAUTIFUL NEW KITCHEN
HOW TO INSTALL A BEAUTIFUL NEW KITCHEN Easy to follow step-by-step kitchen cabinet installation TOOL AND MATERIAL LIST Hammer Pry bar Screwdriver Phillips Flathead Level Tape measure Pencil Straight edge
More informationPremier & Deluxe 3-Season Room Sliding Glass Door
DTSSGD-11 Premier & Deluxe 3-Season Room Sliding Glass Door Installation Instructions Screen Door Seal Left Side Track Top Track Assembly Right Side Track Right Side Trim Sliding Glass Door Sliding Screen
More informationDE Frame with C Series Sidelight
TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder
More informationHow To Install Your Frameless Shower Enclosure
How To Install Your Frameless Shower Enclosure a) Installing Single Frameless Door Side Mounted Wall Hinges b) Installing Frameless Door with In-Line Panel c) Installing Frameless Door Between In-Line
More informationWINDOW INSTALLATION GUIDE
WINDOW INSTALLATION GUIDE is not responsible for or liable for any use or misuse of the information contained in this window installation guide. Window Installation Guide This guide provides basic information
More informationINSTALLATION INSTRUCTIONS
door frames Engineered product systems INSTALLATION INSTRUCTIONS door frames MINIMALIST DOOR FRAME Fry Reglet Flush Door frames are designed for use with 3 5/8 studs with ½ drywall both sides (4 5/8 throat
More informationInsulView Window Installation Instructions
InsulView Window Installation Instructions 1. The entire building is normally sheeted with the 2" 2 ½ OR 3 wall panel and the windows installed at a later time. A window retrofit of an existing building
More informationDECKING INSTALLATION, CARE & MAINTENANCE INSTRUCTIONS. 866.729.2378 MOISTURESHIELD.COM limited lifetime warranty 866.729.2378 WWW.MOISTURESHIELD.
DECKING INSTALLATION, CARE & MAINTENANCE INSTRUCTIONS 866.729.2378 MOISTURESHIELD.COM limited lifetime warranty Welcome To The Even Greater Outdoors. Congratulations on choosing MoistureShield for your
More informationInstallation Guide for Andersen Architectural Wood Inswing Entry Doors
Installation Guide for Andersen Architectural Wood Inswing Entry Doors Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance are
More informationINSTALLATION OF A BAY WINDOW
INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening
More information2.9 WINDOW & DOOR BUCKS
2.9 WINDOW & DOOR BUCKS Bucks provide attachment surfaces for windows and doors while holding back concrete from these openings during concrete placement. Mark the center and edges of openings as you place
More informationwww.cornholesupplies.com
www.cornholesupplies.com How To Build Regulation Cornhole Boards Home of the Original Cornhole Bags and Boards Supply List: 1-4' X 8' Piece of Plywood (pre sanded) 4-2" X 4" X 8' Studs (2 by 4s make sure
More informationCustomer Service 800.780.8889 or visit us online at smithnoble.com. Wood Shutters. Step by Step Installation. Troubleshooting Tips
reflect your style TM Customer Service 800.780.8889 or visit us online at smithnoble.com Wood Shutters Step by Step Installation Troubleshooting Tips Easy Care Instructions STEP 1 Your New Shutter Thank
More informationCHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS
CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,
More informationSLIDING PATIO DOOR INSTALLATION INSTRUCTIONS USING FRAME SCREWS
Vinyl Windows and Doors Manufactured by Pella Corporation Part Number: V984528 2012 Pella Corporation SLIDING PATIO DOOR INSTALLATION INSTRUCTIONS USING FRAME SCREWS Installation Instructions for Typical
More informationGreenGuard Housewrap Installation Guide
000768PACBPHW_Flashing Bro 5/23/03 2:52 PM Page 1 For the most current product information, go to www.green-guard.com. Pactiv Building Products believes the information and recommendations herein to be
More informationINSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS
2009 Pella Corporation INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS Part Number: 80WH0100 Installation Instructions for Typical Wood Frame Construction.
More informationInstalling Window and Door Mouldings
Installing Window and Door Mouldings About Window and Door Mouldings The trim around windows and doors greatly influences the look and style of your interior. They also bridge the gaps and cover spaces
More informationInstallation Instructions For Slider Casement Air Conditioners
Installation Instructions For Slider Casement Air Conditioners NOTE: These instructions describe installation in a typical wood framed window with a wood SLIDE-BY sash, or installation in a metal CASEMENT
More informationIMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION
INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER SEALANT REQUIRED TO COMPLETE THIS INSTALLATION: (Not supplied) Sika Sikasil NG (Arctic White) To seal the WHITE shower door and returns to the shower tray.
More informationBarewood Octagon and Elongated Windows Installation Instructions
Step-by-step instructions to a beautiful window. Measuring and Installation of your new window from Century Specialty Windows couldn't be easier with our step-by-step instructions. Quality, function and
More informationBlack Wolf POCKET BILLIARD TABLE INSTALLATION MANUAL. SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104
Black Wolf TM POCKET BILLIARD TABLE INSTALLATION MANUAL www.brunswickbilliards.com SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104 51-905710-000 SEPTEMBER 2010 NOTE: Please use the instructions in this
More informationInformation Technology Solutions
Information Technology Solutions Aluminum Sliding Door Assembly Instructions Shield Doors & Windows Bi-fold Door Assembly Instructions For Support Please Call 03 8339 2252 Aluminum Sliding Door Assembly
More informationSash Replacement Guide
for Andersen 200/400 Series Awning Windows Read all instructions carefully before attempting this procedure. If you have any questions about your ability to complete this procedure, call Andersen at 1-888-888-7020
More informationAZEK Rail Install Guide
TRIM MOULDING DECK PORCH RAIL PAVERS AZEK Rail Install Guide Installing AZEK Rail with Glass Infill... 2 Installing AZEk Rail Stairs with Glass Infill... 9 Notes...14 Please read all instructions completely
More informationInstallation Instructions
Installation Instructions READ BEFORE INSTALLING UNIT For Low Profile Window Air Conditioner INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step
More informationGuidelines for Earthquake Bracing of Residential Water Heaters
Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)
More informationHALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL
HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL Please read these instructions carefully and completely before attempting to install Hale Pet Doors; they will guide you through the steps
More informationNew Construction Stud Frame Vinyl Window Installation Guide
New Construction Stud Frame Vinyl Window Installation Guide This manual contains procedures based on ASTM E2112 and Installation Masters Installer Training & Certification Program Manual RLC-1 The procedures
More informationInstallation Guide for Andersen Architectural Clad Outswing Commercial Doors
Installation Guide for Andersen Architectural Clad Outswing Commercial Doors Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance
More informationMGB Chrome Bumper Conversion
MGB Chrome Bumper Conversion Installation Instructions For 1974 1/2-1980 MGB This kit requires cutting, welding, and painting. Professional installation recommended. Note: Every MGB body is slightly different
More informationglass & Glazing Products
glass & Glazing Products WallMaker Create an unlimited variety of bright, beautiful and secure interior environments with the easy-to-install Stylmark WallMaker glass wall system. This versatile system
More informationCable Support System Guide for Andersen Bow, Bay, and Box Projecting Window Units
for Andersen Bow, Bay, and Box Projecting Window Units Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance are essential if the
More informationDESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 8 DOORS AND WINDOWS 08 50 00 WINDOWS
SECTION INCLUDES Metal Windows Vinyl/Aluminum Clad Wood Windows Solid Fiberglass and Vinyl Windows Wood Windows (Historic Preservation only) RELATED SECTIONS 02 83 00 Lead Paint Remediation 06 10 00 Rough
More informationHeavy Glass Frameless Shower Door With Return Panel
202 Anderson Ave., elvue, KS 66407 Phone: 800-669-9867 Fax: 800-393-6699 www.onyxcollection.com Heavy Glass Frameless Shower Door With Return Panel Full Showers with Return ench Seat with Return FRLSDRPL-0116
More informationINSTALLATION INSTRUCTIONS for Vinyl Patio Doors with Integral Nailing Fin (JII006)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl Patio Doors with nailing fin. Any local building code requirements supersede the recommended
More informationGarden Window. Montecito Series Vinyl Garden Window Architectural Manual
Montecito Series Vinyl The offers the outstanding insulating properties, low maintenance, and contemporary aesthetic appeal only vinyl can provide. Available in White and Tan homogenous window frames,
More information300mm. 2mm MIN GAP. PLACE 100mm X 100mm. SO THAT IT IS 38mm INTO
INSTALL PEEL & STICK (P&S) GUSSETS WITH PRIMER AS PER MANUFACTURERS INSTRUCTIONS 2mm MIN GAP IN SHEATHING STEP 1 PLACE 100mm X 100mm PIECE OF P&S IN CORNER SO THAT IT IS 38mm INTO THE OPENING EACH WAY
More informationBUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS
BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,
More informationStorage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.
Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. Warning Do not install defective material.
More informationBy SP Partners, LLC. www.rainbowatticstair.com INSTALLATION GUIDE. Prestige
By SP Partners, LLC www.rainbowatticstair.com INSTALLATION GUIDE Prestige IMPORTANT READ THIS FIRST Inspect stair for any damage prior to installation. Stair is NOT to be installed while home is under
More information450 SERIES SLIDING GLASS DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS
450 SERIES SLIDING GLASS DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS Effective 2/12/11 Revised 7/7/15 TACOMA, WA (253) 922-6030 PORTLAND, OR (503) 682-3270 MARYSVILLE, WA (360) 659-0836 SACRAMENTO, CA
More informationK. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11
K. D. FRAME ASSEMBLY FOR MASONRY WALLS...........................Ins 2 FRAME INSTALLATION DETAILS FOR MASONRY WALLS......................Ins 3 INSTALLING EXISTING MASONRY WALL ANCHORS IN FRAME..................Ins
More informationInstaller Training and Certification Overview
Installer Training and Certification Overview Outline of This Presentation The Need for a Training Program The History of the Program Details of the Training Program The Certification Process The Need
More informationSERIES 238 WINDOWS. NOTE: Read instructions completely before attempting any installation.
1 Installation Instructions SERIES 238 WINDOWS Page 2: Page 3-4: Page 5: Page 6: Page 7: Opening Preparation and Wood Buck Installation Installation Instructions for Series 238 WINDOWS Figure 1: Buck preparation
More informationINSTALLATION INSTRUCTIONS for Bifold Doors (JII103)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for premium composite, hollow and solid core molded Bifold Doors. Bifolds are designed for fast
More informationIMPORTANT! READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION. Step 1:
IMPORTANT! READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION. Thank you for purchasing your new replacement windows from Great Lakes Window. The following instructions will help remove the old windows
More informationCRASH RAIL INSTALLATION HEIGHT
PLEASE READ PLEASE READ THESE INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING THE INSTALLATION! THIS INSTRUCTION SHEET IS INTENDED TO PROVIDE A SPECIFIC GUIDE TO FOLLOW FOR THE INSTALLATION OF THIS. CONTAINED
More informationReplacement Installation Instructions
Sliding Door Replacement Installation Instructions Please make sure you have: Fixed 1 - Operating (X) Panel (Glazing Bead Inside, Roller Adjustment Holes Outside) 1 - Fixed (O) Panel (For 3-Panel doors,
More informationComposite Stone Veneer
Composite Stone Veneer Installation Guide Ver 1 Jun 2015 www.compstone.com Composite Stone Veneer Installation Guide Contents Introduction & Overview 3 Required Tools 4 Optional Tools 4 Attachment Guidelines:
More informationPackaged Terminal Air Conditioner Wall Sleeve Installation
Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation
More informationEucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.
i This instruction sheet describes the proper methods for installing Eucatex decorative wall paneling. Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in
More informationAAMA 2400-10. Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure
A M E R I C A N A R C H I T E C T U R A L AAMA 2400-10 Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure M A N U F A C T U
More informationAZEK Rail Install Guide
TRIM MOULDING DECK PORCH RAIL PAVERS AZEK Rail Install Guide Installing AZEK Rail with CableRail by Feeney... 1 Installing CableRail by Feeney for AZEK Rail... 7 Installing AZEK Rail Stairs with CableRail
More informationCedar Cottage Doghouse Plans
Overlapping cedar shingles add an element of charm to this medium size doghouse. The walls, floor, and trim are constructed of solid cedar, making it naturally weather resistant and provides excellent
More informationBuild a Trade-Show Booth for Under $200!
Build a Trade-Show Booth for Under $200! This corner booth, with a seven foot front and sweeping 4x8 backdrop, assembles in less than 20 minutes and can be built in one weekend. Materials Tools 4 x8 x3/4
More informationWren Kitchens Installation Tips... 3. Carefully check your kitchen delivery... 4. Measuring out and marking up... 5. Fitting the base cabinets...
tra 1 Index Wren Kitchens Installation Tips... 3 Carefully check your kitchen delivery... 4 Measuring out and marking up... 5 Fitting the base cabinets... 6 Fitting the corner cabinets... 7 The 972mm or
More informationCLAIM FORM APPENDIX. I. Photographs Identifying The Windows
CLAIM FORM APPENDIX I. Photographs Identifying The Windows The Settlement provides compensation for MIWD Products that are glazed with Glazing Tape and were manufactured or sold between July 1, 2000 and
More informationInstallation Instructions
Installation Instructions 1. Position the unit onto bridging packers. These keep the unit away from any water sitting inside the frame. 2. Centralise the unit within the frame and pack the edges with appropriate
More informationGate Leg Drop Leaf Table Plans
Preparing the table top blanks: Cut and glue enough 3/4 stock to make three panels 40 long by 24 wide (they will be cut to final size at a later time). While the glue dries we will work on the legs. Preparing
More informationILLUSION FRAMELESS SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS
PREPARATION Approximate Installation Time: Tools Required for Installation: 60 minutes Hacksaw Electric Drill 3/16 Masonry Bit Pencil/Felt tip pen Safety Glasses Measuring Tape Masking Tape Standard Screw
More informationINSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nail fin. Not all window types may be installed into every wall
More informationHollow or Cinder Block Wall Mount Job Aid
Summary This Job Aid covers: Hollow or Cinder Block Wall Mount Job Aid Hollow or Cinder Block wall Mount Bracket Installing the Mount Bracket into Cinder Block This Job Aid supports the Technician audience.
More informationHorizontal Mini Blinds Installation Guide
Horizontal Mini Blinds Installation Guide We make it easy! BTG 468298 EN_ rev0614 For more safety information: 1-866-662-0666 or.www.healthcanada.gc.ca/blindcords Before starting Your new Blinds To Go
More informationThe better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................
More informationHow to Build a Poker Table
How to Build a Poker Table www.pokertablematerials.com 10-Person Poker Table- 96 x 48 These are step by step instructions for building a poker table. The table will measure 48" x 96" and have a 4" wide
More informationGuidelines for Earthquake Bracing Residential Water Heaters
Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the
More informationHfHMD uses LP SmartSide siding and trim.
HfHMD uses LP SmartSide siding and trim. These products are: More durable than cement fiber board. Much more volunteer-friendly to install. When installed correctly, have a 5/50- year pro-rated warranty.
More informationUNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE BUILDINGS CONTRACTOR SERIES 2 X 4 FRAMES
UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE BUILDINGS CONTRACTOR SERIES 2 X 4 FRAMES Our unique assembly process quickly transforms the individual pieces into a finished structure that will give you
More informationInstallation Guide. Bath and Wall Surrounds SERIES 7104 1021861-2-B
Installation Guide and Wall Surrounds SERIES 7104 1021861-2-B Thank You For Choosing Sterling We appreciate your commitment to Sterling value. Please take a few minutes to review this manual before you
More informationFLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL
FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction... 2 Components... 3 Step 1 Marking out the Perimeter of the Carport... 3 Step 2a Footing Set-Out for Concrete Block Pad
More informationInstallation Instructions
READ BEFORE INSTALLING UNIT For Slider Casement Air Conditioners To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed:
More informationSECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)
SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2
More informationCalvert USA, Inc. Attic Stairs
Calvert USA, Inc. Attic Stairs Instructions for installation of vertical opening access stairs Model numbers: 7035 through 7047 Calvert USA, Inc., P.O. Box 841, Solomons, MD 20688, Tel. (410) 286-1430,
More informationVA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD
SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board, vapor retarder and air and moisture barrrier. 1.2 RELATED WORK A. Installation
More information