Better Budgeting: Roof Management Plans Help Estimate Costs



Similar documents
Roof Condition Report. Academy International School 8550 Charity Drive. Colorado Springs, Colorado

ABOVE ALL, IT S A ROOF SERVICED BY THE JAMES MYERS COMPANY

Commercial Roof Management

Rooftop Matters Benchmark Report. Executive Summary

Getting The Most Out of Your Roof Asset. Program #099 PM

Roof Inspection Report 3840 Greenway Circle, Lawrence Kansas, Sauer-Danfoss Building

Evaluating Roof Performance and Diagnosing Moisture Intrusion into Roofing Systems

Roof Condition Analysis

Nondestructive Evaluation of. Lockheed Martin Building at Windsor BVLD, Windsor Mill, MD. Provided by: HurleyIR

Nondestructive Evaluation of USCG Hawkins Pt. Road Curtis Bay, MD Provided by: HurleyIR

Photos showing the change in condition from 2006 to 2012 are located in Appendix A.

BLUESTAR INFRARED. Description: Thermal Properties Comparison. Project Location: Client: 759 South Federal Hwy 225 Bayshore Drive

Aerial Infrared Roof Moisture Surveys

TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09

Nondestructive Evaluation of. Outback Steakhouse/Bertucci s Building at Forest Drive, Annapolis, MD. Provided by: HurleyIR

The Perfect Fit For Metal Retrofit

1.0 Introduction. 2.0 Importance of Integrity Testing. 3.0 How Does EFVM Work? 6.0 Conclusion

Exterior Elevated Elements Inspection Guidelines

CITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES

Roof Inspection. Summary Report

Roofing & Waterproofing Forensics for the 21 st Century. Peter Brooks, President

FLAT ROOF REPAIR CUT COST WITHOUT CUTTING CORNERS

Inspection Report. Dream Home Inspections Second Ave. Frisco CO (970)

Non Invasive Roof Leak Detection Using Infrared Thermography

Williamson and Associates, Inc. Report of Building Exterior Condition Evaluation, dated January 2 nd, (68 pages)

Roof Inspection. Summary Report

metal Duil~ing manufacturers Association

Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2

PIMA Technical Bulletin #115. The High R Roof: Guidelines for Energy-Efficient Roofing and Re-Roofing. What is a High R Roof?

Roof Insulation Building. Energy. Environment friendly e-library

CLM 2014 Construction & Environmental Conference August 1, 2014 Boston, MA. Expert Strategies for Managing Construction Defect Litigation

PENNSYLVANIA HOUSING FINANCE AGENCY (2015 UNDERWRITING APPLICATION) Tab 34 Physical/Capital Needs Assessment & Energy Audit

Inspecting to a higher standard.

Water Management & Damage Prevention:

RDH Building Sciences Inc.

HEB 38 BLANCO AND WEST AVENUE FLUID APPLIED EPDM RUBBER ROOF RECOVERY SYSTEM APPLICATION

ABOUT THE AUTHOR Ben T. Hixson, RCI, CCCA, CCS

Facility Manager TM a Computerized Maintenance Management System. Developed by CTL Engineering, Inc.

If you touch buildings, YOU can benefit from the Moisture Encounter Plus

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

Water Damage During Construction

Commercial Roof Inspection Form

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design

REQUEST FOR PROPOSALS

Structure Survey Findings:

Preventing Ice Dams on Roofs

FIND IT! FIX IT! REPORT IT! Resolving Water Loss Claims

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

Waterproofing Problems: A Simple Explanation, A Simple Solution

Block Lofts Condominiums

September 3, Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

Roof Repair Project Report. Fairbank Complex 40 Fairbank Road Sudbury, Massachusetts. February 14, RBA Project No

Exhibit A. SCOPE OF WORK Consulting Services for City of Durham Swimming Pool Facilities Assessment Study

FIELD TESTING SERVICES

Before You Start an Energy Efficiency Retrofit The Building Envelope

Maintenance Matters. Window and Door Replacement

The University of Texas at San Antonio Office of Environmental Health, Safety and Risk Management. Mold & Water Intrusion Safety Plan

CHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS

Assessing Curtain Walls

Property Policyholder Risk Improvement Report and Hurricane Survey

December 24, SEDA Construction Attn: Ted Walker 2120 Corporate Square Boulevard Jacksonville, Florida 32216

INFRARED DIAGNOSTIC REPORT ABLE INSPECTION COMPANY Post Office Box Houston, Texas (713)

UNIVERSITY OF SOUTH CAROLINA BEAUFORT Beaufort Campus Roof Repairs Project No: H PLANS July 30, 2013 ESSEX

Guidelines to Assess Hail Damage to Shingle Roofs

Crescent Valley High School Roof Investigation

FACT SHEET Review of Facility Conditions at the Groton, Connecticut, Main Post Office

WHAT IS INFRARED (IR) THERMOGRAPHY

How To Manage A Building


A Method to Detect and Locate Roof Leaks Using Conductive Tapes

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR A ROOF CONSULTANT

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6e ACTION ITEM Date of Meeting January 12, 2016

NUNAVUT HOUSING CORPORATION. Home Repair Program (HRP)

RECOATING AND RENEWING SPF ROOFING SYSTEMS

School Construction Authority Architecture & Engineering

How To Replace A Roofing System In Florida

Avoiding Air Barrier Pitfalls

A cure for water damage in real estate

Roofing Systems. New Applications / Re-Roofing / Maintenance

PETERSONS WATERFRONT CONDOMINIUMS

BECx& Building Airtightness. Presented by: Eric Amhaus Principal

Structural Assessment Report

The ability to professionally test

Facts on Water Intrusion. Water Intrusion Causes Major Problems Before and After Construction. July 1, 2011

Chignecto-Central Regional School Board. Highland Consolidated Middle School. Indoor Air Quality Issues Mechanical Systems

ELIGIBLE REPAIR PROJECT PARAMETERS

How To Prevent Water Damage To A Home

(4020-NY) ARCHITECTURAL BUILDING INSPECTION ASSESSMENT AND REPORT

Low-slope reroofing guidelines

DOCUMENT RESUME ED EF TITLE

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA

Jagger Enterprises, Inc. dba Buckeye Home Inspections Dorchester Drive Cleveland OH (216) Fax (216)

Analysis II Façade Redesign: Architectural Precast Panels

CZAR Engineering, L.L.C.

INFORMATION TECHNOLOGY ENGINEER V

REPORT OF FLOOR ELEVATIONS On Property Located at: Bordeaux Village Dallas TX JOB #11766

Response, Reliability and Results. for Managed Property

Mario D. Gonçalves, Patenaude-Trempe 1 Pierre Gendron, Patenaude-Trempe 2 Tony Colantonio, PWGSC 3. Abstract

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT

bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls

Transcription:

Better Budgeting: Roof Management Plans Help Estimate Costs Inside ASHE Summer 2015 Depending upon the complexity of a hospital roof, the average cost for a replacement roof can range from $15 to $40 per square foot making it critical for facility managers to maintain this important building asset to avoid premature replacement. Maintaining hospital roofs can be a challenge. Hospitals are often comprised of multiple buildings of all types, configurations, and ages. With so many buildings to oversee and limited personnel, facility managers benefit from using a method for tracking past, current, and future roof replacements and repairs. Organization of this magnitude requires the facilities manager to keep careful track of detailed repair histories and recommended repairs, all while managing current and projected costs. A formal roof management plan (RMP) can assist in this task and help both day-to-day operations and long-term planning. Facility managers are often expected to develop multi-year budgets for maintenance requirements. However, due to the lack of in-depth information on their roofs, funds for roof repairs or replacements are often provided as unanticipated emergency costs. Facility managers seldom have the resources necessary to evaluate their roofs on a yearly basis, so they typically make an educated guess about the types of repairs or replacements needed based on the history and age of their roofs. The ultimate purpose of a well-defined RMP is to establish current and long-term budgeting for roof repairs and replacements. An initial RMP can be developed by an independent consultant specializing in roofing and associated building envelope components. These firms will develop an initial baseline study, which can then be used and maintained by facility managers. Trying to project roof repairs and replacements based on warranties or anticipated service life estimates can be ineffective since roofs fail for a variety of reasons, including issues related to the care given during installation, excessive rooftop traffic, damages from other trades, lack of maintenance or service, and weather conditions. Industry standards note that the service life of an unmaintained roof is half that of a facility that uses periodic maintenance as part of their overall roof asset protection plan. Furthermore, lack of a maintenance plan can void most roof system manufacturers warranties, which stipulate that the owner must maintain the roof assembly. The development and use of an RMP helps hospitals achieve the anticipated service life of a roof with associated cost savings and asset protection. In the development of an RMP, a systematic analysis of the roof assemblies will typically consist of the following components: Building histories: The building history is used as a background for the report and typically includes the name and use of the building, age of the building, type of roof system, and repair history. Most, if not all, of this information is obtained from the facility manager. Knowing the history of the roof is invaluable in understanding its current condition and in anticipating potential repairs and replacement needs. If the roof is 25 years old, one can anticipate that it will require replacement in the near future. If a roof just received repairs, it can be assumed that the service life has been extended. Both of these assumptions should be confirmed with a visual inspection.

Roof warranty information: Roof warranty information is critical for making claims on roof failures and, in some instances, scheduling maintenance checks by the manufacturer s representatives. This information must be provided by the facility manager and can be included as an appendix within the report for easy reference. As stated previously, the age of the roof should not be used as a stand-alone tool for predicting repair or replacement needs since many factors contribute to a roof system s life span. It should not be assumed that if a roof has 10 years remaining on the warranty then the roof will not require repairs or replacement until the end of the warranty. On-site visual evaluations: The condition of roofs cannot be determined without a visual observation of the roof membrane, seams, flashings, transitions, and associated components. Copies of the existing roof area plans should be used if available. If not, a detailed plan that notes all penetrations, parapets, drains, etc. should be developed. Critical defects should be noted on these plans and included within the report. It is helpful to develop a simple number key for noting common defects that can be referenced when reviewing the report. Non-destructive testing (infrared thermography): Infrared thermography can be used to note areas of moisture saturated insulation. The amount of moisture in the roof system can determine whether the roof can be repaired or whether it should be replaced. Measuring the roof drain leaders can help estimate the existing capacity of the leader lines. This will inform facility managers whether any of the roofs are under capacity based on drain size and quantity. Undersized drains can lead to flooding of the roofs and backup of the drain lines, creating leaks or damaging the roof. Destructive testing (roof cuts): Roof cuts can be combined with roof area plans that note the type, quantity, and locations of deficiencies. They can be helpful in verifying energy code requirements based on insulation type and thickness. Adjacent constructions: Often, instances of moisture intrusion into building interiors are not roof-related; interior leak audits combined with evaluations of constructions adjacent to the roof, such as walls and windows, are required. Facility managers do not want to replace a leaking roof only to find out the walls were the source of water entry. Visual inspections will typically provide the owner with a general understanding of overall roof conditions with approximate budgets for roof repairs or replacements. However, it is recommended that indepth analysis, including test cuts, leak audits, material testing or sampling, and leak testing (to confirm the source of leaks) be considered if sensitive budgeting is required. The level of evaluation depends on the particular needs of the facility manager. Determining priorities With the completion of the initial roof evaluation, compilation of historical documents, and a clearer understanding of the conditions of various roof areas, a prioritized list of recommendations is developed. With the input of the facility manager, priorities will be developed after considering a number of issues, including condition, use of underlying occupied space, anticipated interior renovations, and other factors. For example, if a hospital has two roofs that are in equally poor condition, the roof that is above a patient recovery area would be a priority over a roof above a storage area for maintenance supplies.

Developing the report The findings of the plan can be incorporated into a computer-based program that can be updated and maintained by facilities personnel. Components of the program can include the following: Conditions of each roof area Roof area plans with type, location, and quantities of observed defects Repair guidelines to address specific defective conditions Warranty coverage information

Existing system types, configurations, roof access, and deck types Campus plans Photographic documentation

Budget matrix that notes roof repair replacement: immediate (zero to three years), near term (one to five years), and long-term (five to 10 years) An RMP can provide multi-year budget guidelines for roofing that allows facility managers to quickly modify priorities to address changes in building use, maintain the comfort of building occupants, and maintain the valuable roofing asset.