RDH Building Sciences Inc.
|
|
|
- Anthony Eustace Blair
- 10 years ago
- Views:
Transcription
1 MAK LTR Proposal for Building Enclosure Consulting Services RDH Building Sciences Inc. 509 FAIRVIEW AVENUE N SEATTLE WA TEL FAX [email protected] TO Ann-Marie Lindboe Roxanne Navrides Seattle Housing Authority B Leschi House 120 Sixth Avenue North P.O. Box Seattle, WA February [email protected] [email protected] REGARDING Repair Recommendations and Opinions of Probable Costs Dear Ann-Marie and Roxanne, Following is a summary of our recommendations and opinions of probable costs for Leschi House. All recommended repairs contained in this letter require further investigation and repair design prior to implementation. Item Number Summary of Work Item Probable Cost Opinions (See description of condition and work item below.) Opinion of Probable Cost 1 Re-clad entire building with rainscreen cladding assemblies and details. Repair sheathing and framing where required. Contingency for damage included. $1,088,000 2 Replace all windows. $166,000 3 Restore seals of community room skylight. $13,000 Total Near Term Work $1.267,000 PROJECT OVERVIEW Leschi House, located on the south side of S Weller St, east of 10 th Ave S, is a circa 1986, 4- story wood frame multi-family building. The exterior is clad with stucco and accented with pot balconies, and balconies at each floor s common area. The roof is flat with a mineral surface S:\B Leschi House\Report\B Leschi House Report mvh.doc page 1 of 4
2 RDH Building Sciences Inc. cap sheet. All Leschi House facades are exposed, unprotected by adjacent buildings or overhangs. Individual living units have horizontal sliding aluminum framed windows with insulating glass. Large fixed-lite aluminum framed windows exist at the east entrance and around the community room areas. Seattle Housing Authority carpenters assisted RDH on November 7 th and 8 th, 2007 to conduct a limited invasive investigation of the Leschi House building envelope. In addition to this invasive investigation, RDH met with Leschi House staff and discussed reported leaks and maintenance issues. RDH also met with SHA maintenance personnel who reported that problems with leaks at Leschi House are ongoing since the original construction and building occupancy. SITE OBSERVATIONS 1. Moisture related damage exists at 19 of 31 locations where openings were made in the stucco around the building (Photos 1 5). The discovered and reported damage locations are related to approximately 35% of the stucco cladding. In other locations where openings were made, framing lacked damage but water was found between the back of the stucco and the face of the building paper water resistive barrier (WRB) (Photo 6) 2. Sill dam test were conducted on 10 windows; 6 of the 10 windows tested leak. In addition, residents reported, and we observed signs of substantial leaks at 6 other windows at upper and lower levels (Photos 7 & 8). Typically, water damage exists at the lower corners of these leaking windows (Photos 9 & 10). Signs of substantial moisture intrusion exist at unit interiors (Photo 11). 3. Above the entry vestibule, water leaks from upper floor windows and into the roof assembly (Photos 12-14). 4. Evidence of water leaks exists at 4 of the scuppers at the head of downspouts (Photos 15). All scuppers are attached directly to the sheathing before the stucco was applied, allowing moisture intrusion. 5. Leaks exist at the Community Room skylight (Photos 16 & 17). EXTERIOR CLADDING ELEMENTS Lack of Weather Resistive Barrier Continuity Installation of the weather resistive barrier is inconsistent. At areas where water infiltrates or exists behind or under the cladding, rot and other damage exist in the substrate and framing. Cladding penetrations lack protective flashings. S:\B Leschi House\Report\B Leschi House Report mvh.doc page 2 of 4
3 RDH Building Sciences Inc. Stucco The existing stucco was reportedly coated with an elastomeric coating. We do not have any information regarding the nature of this coating. Additional coatings are not recommended at this time as the addition of even a vapor permeable elastomeric coating may unfavorably alter the performance of the walls. While coatings are an effective means of limiting stucco water absorption into the cladding, they can adversely affect the ability of the wall assembly to dry. RDH recommends coordinating cladding replacement with the window replacement, utilizing rainscreen cladding assemblies. Considering the damage that exists in many stucco clad areas, evidence of water infiltration behind the stucco exists and the current condition can only worsen over time. Because proper window replacement requires removal of 4 to 6 inches of stucco surrounding each window, the inherent difficulty of re-installing effective long-term detailing to prevent moisture intrusion, and the probable lack of installer warranty, complete stucco replacement is recommended at the time of window replacement. Windows Windows are 21 years old and nearing the end of their anticipated effective useful life of 20 to 25 years. Windows tested operated smoothly. Ten sill dam tests were conducted and six windows leaked. In addition to windows that leaked when tested, during our site observations residents reported active leaks in six windows. Residents also report drafts from the windows and numerous insulating glass units are fogged. Signs of window leaks exist in several unit interiors. Complete window replacement is recommended in the near term. Condition Assessment Limitations and Basis of Cost Opinions We endeavored to access the current condition of concealed elements by means of selective destructive investigation at locations known to be problematic based on our experience or at areas of the building known to be experiencing problems. Thus, our site reviews are limited to what we directly observe or measure, and that which we can reasonably extrapolate to the rest of the building based on the type, frequency and severity of problems found and our experience investigation hundreds of similar structures. The figures included in the opinion of costs should only be considered as budgetary figures, and could substantially increase or decrease depending on factors outside our observations. The conceptual cost opinions and recommendations provided herein are based on our experience and unit price discussions with contractors specializing in restoration and repair work. The costs include labor and material, general conditions, design fees, overhead and profit, but not taxes that may be assessed. No bids were obtained, and no drawings prepared. Cost opinions include removing and disposing of the original cladding materials, windows and doors. The contractors consulted have not visited the buildings. Accurate costs will require further investigation and preparation of detailed contract documents. Closure S:\B Leschi House\Report\B Leschi House Report mvh.doc page 3 of 4
4 RDH Building Sciences Inc. We trust the information contained herein will be useful in helping to establish work and budget priorities for the properties considered. If you have any questions, comments or concerns, please do not hesitate to contact the writers. Yours truly, RDH Building Sciences Inc. Michael Aoki-Kramer Building Science Specialist Mark V. Hillman, Architect Building Science Specialist S:\B Leschi House\Report\B Leschi House Report mvh.doc page 4 of 4
5 Leschi House Report Photos Photo 1 Photo 2 Photo 3 Photo 4 Photo 5 Photo 6 1 of 3
6 Leschi House Report Photos Photo 7 Photo 8 Photo 9 Photo 10 Photo 11 Photo 12 2 of 3
7 Leschi House Report Photos Photo 13 Photo 14 Photo 15 Photo 16 Photo 17 3 of 3
December 24, 2008. [email protected]. SEDA Construction Attn: Ted Walker 2120 Corporate Square Boulevard Jacksonville, Florida 32216
December 24, 2008 [email protected] SEDA Construction Attn: Ted Walker 2120 Corporate Square Boulevard Jacksonville, Florida 32216 RE: Georgetown Community 2C - Revised Assessment Date: October
Structure Survey Findings:
Structure Survey Findings: Visible portions of the following were observed: foundations; structure to walls, columns, floors, roofs, overhang posts, and columns; attached or firmly abutting decks, balconies,
How To Control Water Penetration In A Window
WATER PENETRATION CONTROL FOR WINDOWS A SERVICE LIFE APPROACH David R. Ricketts, P.Eng. 1 and Silvio Plescia, P.Eng. 2 INTRODUCTION Building envelope performance problems and their close link to poor window
Exterior Elevated Elements Inspection Guidelines
Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code
STRUCTURAL ASSESSMENT
STRUCTURAL ASSESSMENT Project: 1432-1434 East Commerce St. Job. No: 122200 Location: San Antonio, TX Date: Dec. 10, 2012 Weather: Sunny, Windy,60 deg Performed by: Jeff Haughton and Frank Lamas, Alpha
Stucco Moisture Inspection Report
Stucco Moisture Inspection Report For the Property Located At: Sample Inspection St. Report Prepared Ecusively For: Potential Buyer Pace FL. 32571 >< 850.393.6106 >< ofc- 850-941-8600 > Email: [email protected]
PETERSONS WATERFRONT CONDOMINIUMS
CONSULT DESIGN CONSTRUCT PETERSONS WATERFRONT CONDOMINIUMS 103 Park Street Chelan, Washington Findings Summary Report Prepared for: Petersons Waterfront Condominium Association March 21, 2014 J2 Project
Block Lofts Condominiums
Block Lofts Condominiums Building Envelope Condition Assessment 747 Ralph McGill Boulevard Atlanta, Georgia Presented to: Block Lofts Condominium Home Owners Association C/o Heritage Property Management
Water Damage & Repair
Water Damage & Repair Chinatown Preservation Talks 2015 James Engler, P.A Glenn Mason, AIA Mason Architects Program Outline Terminology & Waterproofing Basics Discussion of why this is important Below
10DBMC International Conference On Durability of Building Materials and Components LYON [France] 17 20 April 2005
10DBMC International Conference On Durability of Building Materials and Components Wall Cladding System Durability Lessons Learned from the Premature Deterioration of Wood-Framed Construction Clad with
Assessing Curtain Walls
Assessing Curtain Walls Considerations and Best Practices Paul E Beers GCI Consultants, LLC [email protected] What is a Curtain Wall System? A curtain wall system is an outer covering of a building
Preventing Ice Dams on Roofs
Preventing Ice Dams on Roofs Facility Manager November/December 2005 When a roof leaks, facility managers inevitably receive complaints from building occupants. If it is winter, ice dams are often the
Williamson and Associates, Inc. Report of Building Exterior Condition Evaluation, dated January 2 nd, 2013. (68 pages)
INNOVATIVE BUILDING AND ARCHITECTURE CONSULTANTS Mr. Bud Hall Senior Vice President of construction Turnberry Associates 19501 Biscayne Boulevard, Suite 400 Aventura, FL 33180 Subject: The Nashville Hilton
Photos showing the change in condition from 2006 to 2012 are located in Appendix A.
January 27, 2012 Ms. Theresa Gallavan Economic Development Director City of Lompoc 100 Civic Center Plaza Lompoc, California 93436 RE: Lompoc Theater Limited Visual Condition Assessment Dear Theresa: Representatives
Weather Resistive Barriers: Building Science Makes a Case for Two Layers by Dave Olson Technical Services Manager, Fortifiber Building Systems Group
Weather Resistive Barriers: Building Science Makes a Case for Two Layers by Dave Olson Technical Services Manager, Fortifiber Building Systems Group Since water intrusion is among the most damaging problems
March 14, 2007. Installation of Bay, Bow and Garden Windows
March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed
GreenGuard Housewrap Installation Guide
000768PACBPHW_Flashing Bro 5/23/03 2:52 PM Page 1 For the most current product information, go to www.green-guard.com. Pactiv Building Products believes the information and recommendations herein to be
The Science of Rough Opening Preparation and Window Installation to Minimize Air Leakage
The Science of Rough Opening Preparation and Window Installation to Minimize Air Leakage Sam Hagerman, Hammer and Hand [email protected] Florian Speier, Zola Windows [email protected] Paul Grahovac,
Final inspections are completed by site visit only. Access to fenced yards shall be planned.
ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,
Leaky Homes Financial Assistance Package (FAP) Repair plan example
LEAKY HOMES FINANCIAL ASSISTANCE PACKAGE FACT SHEET Repair Plan Example - June 2014 Page 1 Leaky Homes Financial Assistance Package (FAP) Repair plan example Introduction This repair plan example is intended
Building Condition Assessment: 109-111 North Howard Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
Avoiding Air Barrier Pitfalls
Avoiding Air Barrier Pitfalls Design & Durability November 2013 Air barriers, when correctly installed, help buildings achieve high levels of energy efficiency by decreasing heat loss. For example, great
201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE
STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,
CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.
CLIENT Inspection Report 271 Front St. Alert Bay, B.C. Island Building Inspections 2013 V ANCOUVER I SLAND B. C. Elevation Photos For the Property at 271 Front Street Alert Bay, BC ELEVATION PICTURES Front
Non Invasive Roof Leak Detection Using Infrared Thermography
Non Invasive Roof Leak Detection Using Infrared Thermography Scott Wood Four Star Cleaning and Restoration, Inc. ABSTRACT Residential roofs without attics are typically inspected for leaks by installing
Comment Form on Proposed Gut Rehabilitation Alternatives
Comment Form on Gut Rehabilitation Alternatives Name: Organization: Email: Instructions Submission: Please submit this form to [email protected] by October 10 th, 2012 with the subject line
FIELD TESTING SERVICES
FIELD TESTING SERVICES Chris Leach Director of Testing Baton Rouge, Louisiana Destin, Florida Scott Leach David Nichols Field Testing Representative Field Testing Representative 17485 Opportunity Avenue
bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls
A bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls CE 28 h Exterior finish materials are expected to protect the house from the elements while providing an attractive appearance.
Continuous Insulation Using Polyiso Wall Sheathing
PIMA Technical Bulletin #403 Continuous Insulation Using Polyiso Wall Sheathing What it is, what it does, and why you need it About Polyiso Insulation Polyiso is a rigid foam insulation used in over 70%
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the
Sun Windows General Information Sun New Construction Window Installation Instructions
Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten
PELHAM MEMORIAL HIGH SCHOOL STONE FAÇADE REPORT. November 2007
PELHAM MEMORIAL HIGH SCHOOL STONE FAÇADE REPORT November 2007 PURPOSE OF INVESTIGATION Determine possible locations of moisture intrusion into and through facade. Determine cause of horizontal and vertical
Vision Home Inspection
Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the
3.1 Water Intrusion Problems Related to Unsealed Stucco Penetrations
3.1 Water Intrusion Problems Related to Unsealed Stucco Penetrations Any penetration through the stucco that is left unsealed will allow entry of moisture. Even an average size home can have an extreme
423 NORTH HOWARD ST. VISUAL STRUCTURAL ASSESSMENT
Urgent Needs II City of Baltimore No. 1099 423 NORTH HOWARD ST. 423 North Howard Street (circa 1880) is a multi-story building constructed second in row south of Franklin Street and between the vacant
Repair of Spalling and Leaking Clay Brick Building Walls
B etter buildings Repair of Spalling and Leaking Clay Brick Building Walls Overview A few years after being built in Waterloo in 1980, a condominium of three, six-storey buildings showed severe spalling
SG Series 65mm Frame Windows (Fixed Lite Window Illustrated)
(Fixed Lite Window Illustrated) SINGLE LEAF CLADDING / CORRUGATED STEEL (Awning Window Illustrated) SINGLE LEAF CLADDING / FOAM BOARD (Casement Window Illustrated) BRICK VENEER CONSTRUCTION (Horizontal
Building Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland
KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,
Maintenance Matters. Window and Door Replacement
Number 13 Maintenance Matters building maintenance bulletin Window and Door Replacement As part of the ongoing maintenance of your home or multi-unit residential building, windows and doors will eventually
HomeSpec REPORT SUMMARY
HomeSpec 04/25/2007 Ms. Rachel Trujeque Re: 13038 West Plum Road Lot #1225 - Peoria, AZ. 85383 - Pre Drywall Inspection Dear Ms. Trujeque, At your request, a visual pre drywall inspection of the above
Tundra Series Windows January 2016
Tundra Series Windows January 2016 New Construction Installation Instructions Nail Fin, J-Fin and Brickmold Aplications product. ATTENTION! Read and understand all installation instructions before installing
CONDENSATION IN REFRIDGERATED BUILDINGS
CONDENSATION IN REFRIDGERATED BUILDINGS By: Steve Salisbury Nov. 10, 2010 (revised Nov. 14, 2013) Introduction The following discussion reviews the basic causes of condensation in refrigerated buildings
Mark Cramer Inspection Services, Inc.
Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction
Excerpts from the Canadian National Building Code (NBC)
Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more
Moisture Control. System Solutions to Prevent Mold
System Solutions to Prevent Mold How a systems approach to managing moisture is the most effective strategy for minimizing the growth of mold. Moisture Control Architects, designers, contractors and maintenance
Prestige Home Inspection LLC
Cover Page Prestige Home Inspection LLC IAC2/ESA - Mold Assessment and Water Damage Report 555 W. Brook ave., Client's town MI, 48059 Inspection prepared for: Client's name Inspection Date: 10/15/2012
www.citiesinspection.com October 5, 2015 Dear Client,
www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.
From the Office of: MAHLUM ARCHITECTS 71 Columbia Street Floor 4 Seattle, WA 98104
MAHLUM SECTION 00 91 11 ADDENDUM No.1 Date: June 15, 2012 From the Office of: MAHLUM ARCHITECTS 71 Columbia Street Floor 4 Seattle, WA 98104 NOTICE TO ALL CONTRACTORS, SUBCONTRACTORS, AND SUPPLIERS This
SECTION 3 ONM & J STRUCTURAL ANALYSIS
Historic Boynton Beach High School Existing Building Assessment City of Boynton Beach February 10, 2011 SECTION 3 ONM & J STRUCTURAL ANALYSIS STRUCTURAL ENGINEERS SPECIAL INSPECTORS STRUCTURAL CONDITION
University of California - Santa Barbara West Campus Point Faculty Housing
University of California - Santa Barbara West Campus Point Faculty Housing Reconstruction Guidelines and Considerations to Correct Exterior Building Envelope Weatherproofing Defects and Recommended Upgrades
Adding value to the finest homes in Virginia for 52 years! years
52 years Family Owned and Trusted! Adding value to the finest homes in Virginia for 52 years! James Hardie Fiber Cement Siding Insulated Vinyl Windows Insulated Vinyl Siding Vinyl Railings, Columns, Entry
Water Management & Damage Prevention:
Water Management & Damage Prevention: A Guide for Homeowners This article provides homeowners with basic information to make these decisions and take the appropriate actions to keep their homes dry and
NEWPORT CONDOMINIUM ASSOCIATION
NEWPORT CONDOMINIUM ASSOCIATION DATE FEBRUARY 2013 TO: FROM: RE: NEWPORT CONDOMINIUM ASSOCIATION HOMEOWNERS TODD BORLAND, COMMUNITY MANAGER NOTICE OF EMERGENCY RULE CHANGE Pursuant to Civil Code 1357.130,
ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill
ENERGY STAR Qualified New Homes Thermal Enclosure Checklist & Water Management Checklist Eli Caudill ENERGY STAR Version 3 Tighter Standards Whole Home Approach Better, More Sustainable Construction Surpasses
Roof Inspection. Summary Report
www.real-estate-inspections.com Roof Inspection Summary Report Subject Property Prepared for: File Number: Client in Detroit 05-15-RF-004 Inspector: Craig Milliken, PE # 32779 CPM Real Estate Inspections,
HEDDERMAN ENGINEERING, INC. www.heddermanengineering.com Office 281-355-9911, Fax 281-355-9903 [email protected]
HEDDERMAN ENGINEERING, INC. www.heddermanengineering.com Office 281-355-9911, Fax 281-355-9903 [email protected], 2011 TO: Mr. REF: CONDITION OF PROPERTY SURVEY Dear Mr. : At your request,
MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3
TOWN OF SIDNEY Multi-Family, Commercial, Industrial and Institutional Building Permit Guide The information provided is intended as a guide only and does not replace current bylaws and regulations. Complete
Lighthouse Engineering, L.L.C.
Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: [email protected] Thursday, September 04, 2014 TO: Our Client RE: Engineering Evaluation
Consumer Guide to window and Door Replacement
Consumer Guide to window and Door Replacement Even well maintained windows and doors will eventually have to be replaced due to age, wear and tear, and exposure to weather. Rising energy costs, drafts,
CITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES
CITY OF BELL 6330 PINE AVENUE BELL, CA 90201 PH: (323) 588-6211 FAX: (323) 771-9473 CITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES I. INTRODUCTION City of Bell
Georgia State University. Urban Life Building Roof Replacement
ENGINEERING AND ENVIRONMENTAL 140 DECATUR STREET SE, ATLANTA, GA 30303 GEORGIA STATE UNIVERSITY - FACILITIES DESIGN & CONSTRUCTION 34 BROAD STREET, SUITE 100 ATLANTA, GA 30303 DRAWING INDEX A-0 PROJECT
A. Work on this project shall consist of, but is not limited to, the following:
PART 1 - GENERAL CLEANING AND RESTORATION OF SECTION 05900-1 1.1 SUMMARY A. Work on this project shall consist of, but is not limited to, the following: 1. Clean and treat all exposed anodized architectural
INNOVATIVE. ADAPTABLE. ENERGY EFFICIENT.
INNOVATIVE. ADAPTABLE. ENERGY EFFICIENT. awipanels.com From freezing, sub-zero temperatures to Contents dry heat or high humidity, Mother Nature continually tests the limits of building envelopes. That's
Residential Roofing Guide
Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...
WATER LEAKAGE IN GLAZED CURTAIN WALL SYSTEMS:
WATER LEAKAGE IN GLAZED CURTAIN WALL SYSTEMS: BY WILLIAM D. SMITH Figure 1 Four Corporate Center, Franklin, TN. Architect: Little & Associates,Charlotte, NC. Gen. Contractor: Ray Bell Const. Co., Nashville,
Assessment Report for Windmill Rehabilitation Project. Anne Curren, Town Clerk Town of North Castle 15 Bedford Road Armonk, New York 10504
Assessment Report for Windmill Rehabilitation Project Anne Curren, Town Clerk Town of North Castle 15 Bedford Road Armonk, New York 10504 Investigation and Documentation MAP employees measured all three
2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012
2012 Ontario Building Code Requirements for New Construction Bradford West Gwillimbury Building Division March 5, 2012 1 Ontario Building Code changes Applicable to permits applied for after December 31,
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
Exterior Repair Project. By: Kami Farahmandpour, PE, RRC, RWC, CCS, CCCA Alex Szatanek. Building Technology Consultants, PC BTC
Exterior Repair Project Glen Ellyn Public Library By: Kami Farahmandpour, PE, RRC, RWC, CCS, CCCA Alex Szatanek Outline 2010 and 2011 Roof Replacement and Facade Repair Project Review Primary Reasons for
Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders
INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids
How To Prevent Water Damage To A Home
Having inspected about 800 homes in the last four years, I have seen a lot of problems with many homes. Most of these problems are minor; however, there are some problems that are quite serious. One of
Lighthouse Engineering, L.L.C.
Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: [email protected] Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering
SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront
PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system
Finegan Inspection Services, Inc.
Finegan Inspection Services, Inc. Report Prepared For: Phone 513-683-0733 Fa 513-697-0163 Owners Property Address City, State, ZIP Phone FAX Owners Realtor Realty Company Phone FAX OWNER INFORMATION PROPERTY
AAMA 2400-10. Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure
A M E R I C A N A R C H I T E C T U R A L AAMA 2400-10 Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure M A N U F A C T U
TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09
TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09 PMT GUIDE # 10 Book of Order Section G-10.0102o: "The session is responsible for the mission and government of the particular church. It
CZAR Engineering, L.L.C.
CZAR Engineering, L.L.C. Lamont H. Czar, P.E. Phone: (609) 653-9445 5014 Fernwood Avenue Fax:(609)653-2015 Egg Harbor Township, New Jersey 08234 www.czarengineering.com May 3, 2013 Craig Dothe, Architect
CHAPTER 7: Building Systems ROOFING SYSTEMS
ROOFING SYSTEMS Purpose Examples 1. Shingle roof system 2. Metal roof with blanket insulation 3. Metal roof with rigid insulation 4. Built-up asphalt roof system 5. Single-ply roof system 6. Modified Bitumen
Standard Method for Sampling and Analysis of. of Chlorine Containing Bleaches. Soap Products
GUIDE SPECIFICATION FOR GENERAL CLEANING AND REMOVAL OF MOLD AND MILDEW ON EXTERIOR INSULATED AND FINISH SYSTEMS AND STUCCO DIVISION 07240 and DIVISION 09240 8/05 PART I: GENERAL 1.01 DESCRIPTION AND SCOPE
Waterproofing Problems: A Simple Explanation, A Simple Solution
Waterproofing Problems: A Simple Explanation, A Simple Solution The purpose of this paper is to point out the underlying causes of waterproofing problems and simple means of preventing them. Such problems
WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING
WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements
October 30, 2014. Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.
117 S. Market St. Benton, AR 72015 * 501-315-2626 * Fax 501-315-0024 October 30, 2014 Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR Re: Report of Findings,, Benton, Arkansas, Dear Mr. Vick: This
PELLA 350 SERIES VINYL WINDOW & PATIO DOOR LIMITED WARRANTY
PELLA 350 SERIES VINYL WINDOW & PATIO DOOR LIMITED WARRANTY IMPORTANT NOTICE: Read this entire Pella Limited Warranty and Limitation of Liability ( Limited Warranty ) before purchasing or installing this
Barewood Octagon and Elongated Windows Installation Instructions
Step-by-step instructions to a beautiful window. Measuring and Installation of your new window from Century Specialty Windows couldn't be easier with our step-by-step instructions. Quality, function and
Testing Water Penetration Resistance of Window Systems Exposed to Realistic Dynamic Air Pressures
Testing Water Penetration Resistance of Window Systems Exposed to Realistic Dynamic Air Pressures R. A. Van Straaten 1, G. A. Kopp 2, J. F. Straube 3 1 Research Lab for Better Homes, University of Western
research highlight Highly Energy Efficient Building Envelope Retrofits for Houses
research highlight June 2012 Technical Series 12-103 Highly Energy Efficient Building Envelope Retrofits for Houses introduction In Canada approximately 30% of all energy is consumed in buildings, with
VaproShield New Product Announcement
VaproShield New Product Announcement WrapShield RS Rain Screen Vapor Permeable Water Resistive Barrier (WRB) and Air Barrier (AB) Membrane with Built-in Rain Screen Drainage Matrix Contact: Carol Danhof
Inspecting to a higher standard.
Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com [email protected]
+1.877.497.3528 [email protected] www.grscanadainc.com
WORK ORDER AGREEMENT I. Work Site Documentation Quotation / Bid # Core Samples / Infrared Purchase Order # Consultant Report Start Date: II. Work Site Address Building Name Street City Province Postal
GUIDELINES FOR REHABILITATION OF TRADITIONAL COMMERCIAL BUILDINGS DESIGN GUIDELINES
GUIDELINES FOR REHABILITATION OF TRADITIONAL COMMERCIAL BUILDINGS DESIGN GUIDELINES PAGE 13 DESIGN GUIDELINES The following design guidelines have been developed to guide appropriate design in the Downtown
Evaluating the Field Performance of Windows and Curtain Walls of Large Buildings
Best2 Airtightness of Buildings Session WB6-2 Evaluating the Field Performance of Windows and Curtain Walls of Large Buildings Mario D. Gonçalves, Patenaude-Trempe and Robert Jutras, Air-Ins Introduction
Facility Assessment for. 11801 East Main Street, Huntley, IL
Facility Assessment for 11801 East Main Street, Huntley, IL July 12, 2012 Prepared by: Dewberry Architects Inc. 25 S. Grove Avenue, Suite 500 Elgin, IL 60120 (847) 695-5840 The Village of Huntley requested
DRAFT TERMITE PROTECTION IN BUILDINGS
DRAFT TERMITE PROTECTION IN BUILDINGS Protection of homes and businesses from termites in Florida requires the combined efforts of builders, pest management professionals, and building inspectors. The
Water Leak 1: Intrusion Policy
Water Leak 1: Intrusion Policy {Non-Casualty) 1. Determine Source of Leak Roof Leak- 11 See roof leak" Pressured Pipe leak- 11 See pressured pipe leak" Water Intrusion- See 11 see Water Intrusion leak"
HIGH PERFORMANCE BUILDING ENVELOPES. Dave Seifert
Dave Seifert Design Construction Commissioning PRESENTATION OVERVIEW About BCRA How Did We Get Here? What is a High Performance Building Envelope? Energy Conservation Considerations Durability Considerations