A Strategic Plan for Transit in Calgary



Similar documents
Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects

Mount Royal College Transit Service Plan

Traffic Signal Priority (TSP) and Automatic Vehicle Tracking System (AVTS) For Calgary Transit Buses

Calgary LRT Network Plan

Planning for the future. building a great city, great neighbourhoods

THE IMPLICATIONS OF ALTERNATIVE GROWTH PATTERNS ON INFRASTRUCTURE COSTS

Calgary Transit Environmental Stewardship

2016 Transit Service Review CCT Meeting #2. Calgary Transit April 19, 2016

Light Rail Transit in Phoenix

Calgary Transit Funding and Fare Strategy Review February

Transitways and the RouteAhead for Calgary Transit

Integrating GO RER and SmartTrack. Leslie Woo, Chief Planning Officer February 10, 2016

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES

West LRT One Year Review

Rapid Transit Backgrounder

Los Angeles Metro Rapid

Evergreen Line Rapid Transit Project Business Case Executive Summary. February Reviewed by

Bus Priority Measures in Calgary: Past, Present and Future. Chris Jordan, M.Sc., P.Eng., Coordinator, Strategic Transit Planning, Calgary Transit

Presto Fare Card ibus (Automated Stop Announcements, Cameras) Transit Operating System Replacement

When is BRT the Best Option? 1:30 2:40 p.m.

Addendum to the Arterial Transitway Corridors Study

"Ride the Wind!" - A Success Story

Overview of the Travel Demand Forecasting Methodology

Ten Year Local Transit Strategy

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

Sustainable Building Policy

7.0 Transportation Management

Item No Halifax Regional Council January 14, 2014

Questions and Answers about the Orange Bus/Rail Investment Plan

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)

Light Rail Transit in Calgary The First 25 Years

Foothills Area Transmission Development South Calgary - Project Overview

SCHEDULE 12 DBFO AGREEMENT EXECUTION VERSION 4. LANDS

Examples of Transportation Plan Goals, Objectives and Performance Measures

Metro Vancouver s Service Optimization Initiative: Using Evidence-Based Planning to Meet the Needs of a Growing Region Peter Klitz, Senior Planner,

2012 Saskatoon Transit Services Annual Report

Transportation Alternatives

Subject: Presentation - TTC/Transportation Services Joint Surface Transit Initiatives

Ne w J e r s e y Tr a f f i c Co n g e s t i o n :

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013

2013 Flood Recovery Framework

Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas

NORTH RED AND PURPLE MODERNIZATION PROJECT

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City

Proposed Program of High Capacity Transit Improvements City of Atlanta DRAFT

MANAGEMENT PLAN. Fiscal Year

The Mobility Opportunity Improving urban transport to drive economic growth

S-11: Tacoma Link Extension to Tacoma Community College

Frequently Asked Questions (FAQs) about DART

CAPITAL PLAN G CAPITAL PLAN SPENDING G CAPITAL PLAN FINANCING

The Way We move. transportation master plan September 2009

Right of way for mobility. The Bus Rapid Transit (BRT) traffic concept. MAN kann.

This document is part of a series of Building a Stronger South Australia policy initiatives from the Government of South Australia.

Parking Management. Index. Purpose. Description. Relevance for Large Scale Events. Options. Technologies. Impacts. Integration potential

Intelligent Transport for Smart Cities Conference. Bruce McCuaig, President and CEO, Metrolinx

Roads Task Force - Technical Note 10 What is the capacity of the road network for private motorised traffic and how has this changed over time?

2008 TTC OPERATING BUDGET

Improving Access in Florida International University Biscayne Bay Campus Executive Summary

November Transforming Sydney. 60% more trains. Faster, more frequent services. No timetable just turn up and go

CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND)

EPCOR Distribution & Transmission Inc.

TRANSPORTATION MODELLING IN CALGARY

MiWay Business Plan & 2015 Budget

Figure L3: Level 2 SR 99 Elevated Light Rail Alternative Detail - 1 of 4

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015)

RETAIL, OFFICE & MEDICAL SPACE FOR LEASE CONTACT: ABOUT THE BUILDING Elbow Drive SW, Calgary Alberta

Approved Physical Therapy Clinics in Calgary

Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey

2013 Annual Service Plan Five year Service Plan Updates

Chapter VIII: Long-Term Outlook and the Financial Plan

Nanaimo Regional Transit Business Plan. April 2008

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS

WE LOVE EDMONTON. Your ideas to upgrade our city! Energy. City of Edmonton Response

State of Good Repair Assessment Dallas Area Rapid Transit

Goals & Objectives. Chapter 9. Transportation

Melbourne Airport Rail Link Study. Study overview and findings

calgary.ca call 3-1-1


South Florida East Coast Corridor (SFECC) Projects. February 7, 2012

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination Attachment A

Geary Corridor Bus Rapid Transit Conceptual Engineering and Environmental Analysis

2010 METROBUS FLEET MANAGEMENT PLAN

Overarching Benefits of Public Transportation:

Case Study REGIONAL TRANSPORTATION DISTRICT (RTD) DENVER, COLORADO

1 FIXED ROUTE OVERVIEW

Measuring the Street:

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

2014 SFMTA Transit Fleet Management Plan March 2014

Transit in the United States 3. Operating Costs and Performance Measures 13. Quality of Transit Service 19. ADA Compliance Bus 28

The New Mobility: Using Big Data to Get Around Simply and Sustainably

Executive Summary. Transportation Needs CHAPTER. Existing Conditions

Groups & Road Shows. Home. Profile. Since Worldwide. Livery Service. Environmental Contact Leadership

Managing the Transit Network A Primer on Key Concepts

Welcome to the LRT Overview Open House

Fleet Services CORPORATE SERVICES. Branch Manager: Steve Rapanos 57 FLEET SERVICES BUSINESS PLAN

Strategic Regional Transit Plan

COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO.

GTA Cordon Count Program

San Francisco Transportation Initiatives and Workforce Support

Transcription:

A Strategic Plan for Transit in Calgary calgary.ca contact 311 Onward/ Enable public transit, walking and cycling as the preferred mobility choices for more people.

project evaluation criteria The evaluation criteria used in RouteAhead is based on three categories: land use, customer experience and project characteristics. Each category contains a number of sub-categories that were given a value based on the relative merits of the project. 120

LAND USE Supports Activity Centres and Corridors Primary Transit Network Connectivity and Alignment Population and Jobs Intensity CUSTOMER EXPERIENCE Increases Travel Time Advantage Overcomes Issues of Reliability and Delay Increases Passenger Capacity PROJECT CHARACTERISTICS Serves High Ridership Corrider Contributes to Lifecycle Maintenance and Asset Management Capital Cost Improves Overall Mobility of the Transportation Network Other Considerations in Project Evaluation The rating of projects using these criteria is one tool to assist Council and Administration determine which projects including the availability of capital and operating funds, Calgary Transit operational requirements and coordination with and building maintenance, are required to keep the system running. These will be captured as part of the Investing in Mobility plan to construct and when. other business units as well as being identified Many other factors should and City departments. in the RouteAhead plan. be considered when determining a detailed construction timeline Other capital programs, such as bus purchases 121

Description of Evaluation Criteria Evaluation criteria used in the ranking of projects are discussed in detail below. LAND USE Supports Activity Centres and Corridors Primary Transit Network Connectivity and Alignment Population and Jobs Intensity CUSTOMER EXPERIENCE Increases Travel Time Advantage Overcomes Issues of Reliability and Delay Increases Passenger Capacity PROJECT CHARACTERISTICS Serves High Ridership Corrider Contributes to Lifecycle Maintenance and Asset Management Capital Cost Improves Overall Mobility of the Transportation Network Supports Activity Centres and Corridors Each project is evaluated on how much it supports centres (Centre City, major activity centre, community Population and Jobs Intensity The forecast data for 2029 is used to determine the the land use goals of the activity centre, industrial- future population and CTP. The project receives a employee intensive) and jobs intensity. Geographic higher score if it supports a corridors (urban corridor, information systems (GIS) greater number of activity neighbourhood corridor). are used to analyze the forecasted population and Primary Transit Network (PTN) Connectivity and Alignment Projects receive higher scores for intersecting with, and travelling along, a week. When complete, the PTN will provide a grid of frequent transit jobs data in the service area of each of the projects. The sum of the jobs and existing and future PTN services. Implementing population per hectare is corridors. The PTN is a key and supporting the PTN is calculated and compared feature of the CTP and will a high priority to shape the with CTP targets. The 2029 provide customers with land use and travel patterns time horizon was chosen frequent, reliable service for to reach the goals of the because it is approximately most of the day, seven days MDP and CTP. in the middle of the 30-year RouteAhead timeframe. 122 Section 4: The RouteAhead for Calgary Transit's Network project evaluation criteria

LAND USE Supports Activity Centres and Corridors Primary Transit Network Connectivity and Alignment Population and Jobs Intensity CUSTOMER EXPERIENCE Increases Travel Time Advantage Overcomes Issues of Reliability and Delay Increases Passenger Capacity PROJECT CHARACTERISTICS Serves High Ridership Corrider Contributes to Lifecycle Maintenance and Asset Management Capital Cost Improves Overall Mobility of the Transportation Network Increases Travel Time Advantage Projects that are expected to increase the travel category. Projects that run mainly in mixed traffic Increases Passenger Capacity Projects that will increase passenger capacity time advantage for with private vehicles, such over the existing state transit customers (such as BRT running on street, are scored based on as dedicated rights-of- score lower, except for the expected increase way including LRT and locations where on-street provided by the project. transitways) receive delays are minimal. a higher score in this Overcome Issues of Reliability and Delay Transportation Planning provided the data to determine the scoring for this criterion. Projects that provide for a dedicated transit right-of-way or transit priority around areas of congestion receive higher scores. A volume/capacity ratio map, identifying congestion on the network, is used to determine the location of congestion in the 2029 time horizon. 123

LAND USE Supports Activity Centres and Corridors Primary Transit Network Connectivity and Alignment Population and Jobs Intensity CUSTOMER EXPERIENCE Increases Travel Time Advantage Overcomes Issues of Reliability and Delay Increases Passenger Capacity PROJECT CHARACTERISTICS Serves High Ridership Corrider Contributes to Lifecycle Maintenance and Asset Management Capital Cost Improves Overall Mobility of the Transportation Network Serves High Ridership Corridor Calgary Transit ridership data is used to determine the scoring for this criterion. Existing high ridership corridors score higher because improvements to transit service in these corridors would serve existing customers, support existing travel patterns and help alleviate capacity/ overcrowding issues. It should be noted that there is merit to improving transit service in lower ridership corridors to build future ridership and offer Calgarians more transportation choices; that benefit is captured in the customer experience criteria. This can only be successful when transit is competitive with the automobile in terms of cost and travel time. Contributes to Lifecycle Maintenance and Asset Management To analyze this criterion, the assets of the Transportation Department are considered as well as the assets of Calgary Transit. Therefore, projects that include reconstructing existing road segments (e.g. 17 Avenue SE, Centre Street transitway) score higher under this criterion than projects that are primarily new construction (such as the South LRT extension). 124 Section 4: The RouteAhead for Calgary Transit's Network project evaluation criteria

Capital Cost Projects with lower capital costs receive higher scores under this criterion. Based Improves Overall Mobility of the Transportation Network Projects that improve mobility for all modes on the overall transportation on the forecasted capital network receive higher budget for the next decade scores under this criterion. it is important to rate the fit of projects with the available 10-year budget. This approach is not being applied to the 30-year vision in the RouteAhead plan as alternative funding sources are being explored. 125

126 the rapid transit projects

Green Line: Centre Street Transitway Downtown to 24 Ave N PROJECT EVALUATION CRITERIA 6 7 11 24 Land Use Customer Experience Project Characteristics TOTAL Timeline: short-term Mode progression: construct transitway and urban boulevard Estimated construction cost: $60,000,000 Estimated annual operating cost: $7,100,000 Estimated annual ridership: 8,000,000 Length: 3 km Major trip generators: downtown, Centre Street urban corridor, northern communities Additional considerations: project ranked highly in RouteAhead evaluation, however there are a number of steps (community input, functional and detailed design, traffic impact analysis) to be completed before the transitway can be constructed. 127

Green Line: Centre Street Transitway 24 Ave to 78 Ave N PROJECT EVALUATION CRITERIA 3 7 10 20 Land Use Customer Experience Project Characteristics TOTAL Timeline: short-term Mode progression: extend transitway from 24 Avenue N Estimated construction cost: $75,000,000 Estimated annual operating cost: $10,600,000 Estimated annual ridership: 6,000,000 Length: 6 km Major trip generators: Centre Street urban corridor, northern communities Additional considerations: project ranked highly in RouteAhead evaluation; however there are a number of steps (community input, functional and detailed design, traffic impact analysis) to be completed before the transitway can be constructed 128 Section 4: The RouteAhead for Calgary Transit's Network the rapid transit projects

Green Line: LRT Downtown to North Pointe PROJECT EVALUATION CRITERIA 7 9 8 24 Land Use Customer Experience Project Characteristics TOTAL Timeline: long-term Mode progression: construct transitway to 78 Avenue North, convert part of transitway to LRT, construct LRT to North Pointe Estimated construction cost: $2,500,000,000 Estimated annual operating cost: $19,300,000 Estimated annual ridership: 19,000,000 Length: 14 km Major trip generators: downtown, northern communities, Keystone (future community) Additional considerations: pace of development and redevelopment in north communities, mix of uses, density of population and employment, availability of capital budget 129

Green Line: Transitway (SETWAY) Downtown to Douglas Glen PROJECT EVALUATION CRITERIA 6 6 6 18 Land Use Customer Experience Project Characteristics TOTAL Timeline: short-term Mode progression: Complete bus-only transitway from downtown to Douglas Glen Estimated construction cost: $667,000,000 Estimated annual operating cost: $5,200,000 Estimated annual ridership: 4,600,000 Length: 16 km Major trip generators: downtown, Quarry Park, southeast communities and southeast industrial Additional considerations: project is advanced in terms of design and community readiness, Council has identified this corridor as a priority for transit improvements, logical step to construct transitway in the absence of funding for full LRT 130 Section 4: The RouteAhead for Calgary Transit's Network the rapid transit projects

Green Line: LRT Downtown to Quarry Park PROJECT EVALUATION CRITERIA 6 8 6 20 Land Use Customer Experience Project Characteristics TOTAL Timeline: medium-term Mode progression: replace bus-only transitway with LRT Estimated construction cost: $1,650,000,000 Estimated annual operating cost: $22,500,000 Estimated annual ridership: 10,500,000 Length: 15 km Major trip generators: downtown, Quarry Park, SE communities and SE industrial Additional considerations: pace of development in new south communities, mix of uses, density of population and employment, availability of capital budget 131

Green Line: LRT Downtown to Seton PROJECT EVALUATION CRITERIA 7 9 6 22 Land Use Customer Experience Project Characteristics TOTAL Timeline: long-term Mode progression: construct transitway to Douglas Glen, convert transitway to LRT to Quarry Park, extend LRT to Seton Estimated construction cost: $1,800,000,000 Estimated annual operating cost: $38,000,000 Estimated annual ridership: 22,000,000 Length: 26 km Major trip generators: downtown, Quarry Park, Seton and South Health Campus, SE industrial, SE communities Additional considerations: pace of development in new south communities, mix of uses, density of population and employment, availability of capital budget 132 Section 4: The RouteAhead for Calgary Transit's Network the rapid transit projects

Southwest Transitway: Downtown to Woodbine PROJECT EVALUATION CRITERIA 6 7 7 20 Land Use Customer Experience Project Characteristics TOTAL Timeline: short-term Mode progression: existing routes, transitway constructed to southwest communities Estimated construction cost: $40,000,000 Estimated annual operating cost: $5,400,000 Estimated annual ridership: 12,000,000 Length: 18 km Major trip generators: downtown, Rockyview General Hospital, Mount Royal University, Lincoln Park redevelopment, Currie Barracks, southwest communities Additional considerations: pace of development and redevelopment in corridor, availability of capital budget 133

North Crosstown BRT: Brentwood to Saddletowne PROJECT EVALUATION CRITERIA 7 6 8 21 Land Use Customer Experience Project Characteristics TOTAL Timeline: short-term Mode progression: existing route 19/119 connects Sunridge/Rundlehorn to University of Calgary, implement in-street BRT with transit priority Estimated construction cost: $50,000,000 Estimated annual operating cost: $10,600,000 Estimated annual ridership: 14,000,000 Length: 25 km Major trip generators: University of Calgary, McMahon Stadium, Alberta Children s Hospital, Foothills Medical Centre, Southern Alberta Institute of Technology (SAIT), Jubilee Auditorium, northeast communities Additional considerations: pace of development and redevelopment in corridor, availability of capital budget 134 Section 4: The RouteAhead for Calgary Transit's Network the rapid transit projects

West Campus Mobility (U of C area) PROJECT EVALUATION CRITERIA 3 8 8 19 Land Use Customer Experience Project Characteristics TOTAL Timeline: short-term Mode progression: Improve mobility between the Northwest LRT, U of C, Foothills Medical Centre and Alberta Children s Hospital. Review technology to meet travel demand as West Campus develops Estimated construction cost: $30,000,000 Estimated annual operating cost: $2,000,000 Estimated annual ridership: 2,000,000 Length: 5 km Major trip generators: University of Calgary, McMahon Stadium, Alberta Children s Hospital, Foothills Medical Centre, Market Mall Additional considerations: pace of development and redevelopment in corridor, availability of capital budget 135

West Campus Mobility (connect to Westbrook) PROJECT EVALUATION CRITERIA 5 8 8 21 Land Use Customer Experience Project Characteristics TOTAL Timeline: medium-term Mode progression: Improve mobility between the U of C, Foothills Medical Centre and Alberta Children s Hospital. Review technology to meet travel demand as West Campus develops. Connect to Westbrook transit oriented village. Estimated construction cost: $60,000,000 Estimated annual operating cost: $1,000,000 Estimated annual ridership: 4,000,000 Length: 3 km Major trip generators: University of Calgary, McMahon Stadium, Alberta Children s Hospital, Foothills Medical Centre, Market Mall, Westbrook transit oriented development Additional considerations: pace of development and redevelopment in corridor, availability of capital budget 136 Section 4: The RouteAhead for Calgary Transit's Network the rapid transit projects

Southwest Crosstown BRT: Westbrook to 52 Street E. PROJECT EVALUATION CRITERIA 6 6 6 18 Land Use Customer Experience Project Characteristics TOTAL Timeline: short-term Mode progression: in-street BRT with transit priority Estimated construction cost: $40,000,000 Estimated annual operating cost: $5,400,000 Estimated annual ridership: 9,000,000 Length: 22 km Major trip generators: Westbrook, Mount Royal University, Quarry Park, Rockyview General Hospital Additional considerations: pace of development and redevelopment in corridor, availability of capital budget 137

17 Ave SE Transitway (Forest Lawn) Timeline: short-term PROJECT EVALUATION CRITERIA 2 6 9 17 Land Use Customer Experience Project Characteristics TOTAL (Bow River-Deerfoot) Timeline: medium-term PROJECT EVALUATION CRITERIA 3 7 8 18 Land Use Customer Experience Project Characteristics TOTAL Mode progression: existing in-street BRT, phased construction of median transitway and possible conversion to rail in the future Estimated construction cost: $94,000,000 Estimated annual operating cost: $5,200,000 Estimated annual ridership: 3,000,000 Length: 7 km Major trip generators: downtown/inglewood, International Avenue Additional considerations: community involved in a thorough design process, community is ready for this project, pace of redevelopment in corridor, mix of uses, density of population and employment, availability of capital budget 138 Section 4: The RouteAhead for Calgary Transit's Network the rapid transit projects

52 Street East BRT: Saddletowne to Seton PROJECT EVALUATION CRITERIA 6 6 7 19 Land Use Customer Experience Project Characteristics TOTAL Timeline: medium-term Mode progression: existing service is limited, in-street BRT with transit priority Estimated construction cost: $38,000,000 Estimated annual operating cost: $12,400,000 Estimated annual ridership: 16,000,000 Length: 30 km Major trip generators: South Health Campus, Seton, Southeast industrial, Northeast communities Additional considerations: pace of development and redevelopment in corridor, availability of capital budget 139

Route 305 BRT: West PROJECT EVALUATION CRITERIA 6 5 6 17 Land Use Customer Experience Project Characteristics TOTAL Timeline: medium-term Mode progression: upgrade existing in-street BRT, implement transit priority Estimated construction cost: $10,000,000 Estimated annual operating cost: $9,800,000 Estimated annual ridership: 8,000,000 Length: 13 km Major trip generators: downtown, Canada Olympic Park (COP) Additional considerations: pace of development and redevelopment in corridor, availability of capital budget 140 Section 4: The RouteAhead for Calgary Transit's Network the rapid transit projects

South LRT Extension to 210 Avenue S PROJECT EVALUATION CRITERIA 3 7 7 17 Land Use Customer Experience Project Characteristics TOTAL Timeline: medium-term Mode progression: extend LRT from Somerset-Bridlewood to 210 Avenue South Estimated construction cost: $180 million Estimated annual operating cost: $7,000,000 Estimated annual ridership: 4,200,000 Length: 3.5 km Major trip generators: new south communities Additional considerations: pace of development in new south communities, logical mode progression from feeder bus network to LRT, availability of capital budget, may facilitate access to a new LRV maintenance and storage facility 141

Northeast LRT Extension to 128 Avenue N PROJECT EVALUATION CRITERIA 2 7 6 15 Land Use Customer Experience Project Characteristics TOTAL Timeline: medium-term Mode progression: extend existing LRT from Saddletowne to 128 Ave N Estimated construction cost: $355 million Estimated annual operating cost: $11,500,000 Estimated annual ridership: 4,000,000 Length: 7.5 km Major trip generators: new northeast communities, major activity centre at Country Hills Boulevard Additional considerations: pace of development in new northeast communities, logical mode progression from feeder bus network to LRT, availability of capital budget 142 Section 4: The RouteAhead for Calgary Transit's Network the rapid transit projects

Airport Transit PROJECT EVALUATION CRITERIA 2 8 5 15 Land Use Customer Experience Project Characteristics TOTAL Timeline: medium-term Mode progression: existing bus service to Northeast LRT; review appropriate technology; construct rail connection through Airport Trail tunnel Estimated construction cost for rail: $175,000,000 Estimated annual operating cost for rail: $7,700,000 Estimated annual ridership for rail: 3,500,000 Length: 5 km Major trip generators: Calgary International Airport (YYC) travellers and employees Additional considerations: pace of development and redevelopment in corridor, mix of uses, density of population and employment, availability of capital budget 143

8 Avenue Subway PROJECT EVALUATION CRITERIA 6 9 6 21 Land Use Customer Experience Project Characteristics TOTAL Timeline: long-term Mode progression: existing northwest/south LRT shares 7 Avenue with northeast/west LRT; construct tunnel to separate the two routes Estimated construction cost: $800,000,000 Estimated annual operating cost: $8,000,000 Estimated annual ridership: 40,000,000 Length: 2 km Major trip generators: downtown, commercial tie-ins to stations, future transit oriented villages along Northwest and South LRT lines Additional considerations: transit operational improvements throughout the LRT system, availability of capital budget 144 Section 4: The RouteAhead for Calgary Transit's Network the rapid transit projects

Shaganappi HOV: Bowness Road to Stoney Trail PROJECT EVALUATION CRITERIA 6 6 7 19 Land Use Customer Experience Project Characteristics TOTAL Timeline: long-term Mode progression: construct high occupancy vehicle (HOV) lanes to serve growing northern communities, provide cross-town service Estimated construction cost: $35,000,000 Estimated annual operating cost: $5,400,000 Estimated annual ridership: 3,800,000 Length: 14 km Major trip generators: University of Calgary, Market Mall, new northwest communities Additional considerations: pace of development and redevelopment in corridor, logical mode progression, availability of capital budget 145

146

Mode Progression in Rapid Transit Corridors The exhibit below illustrates the mode progression in several significant corridors. MODE PROGRESSION IN RAPID TRANSIT CORRIDORS present (population: 1.1M) short-term (population: 1.3M) medium-term (population: 1.5M) long-term (population: 1.6M) Green Line Mixed traffic Transitway LRT North Central Corridor BRT to Keystone Mixed traffic Transitway to 24 Avenue to 78 Avenue LRT to 16 Ave N LRT to North Pointe SETWAY Mixed traffic BRT to Seton Transitway to Douglas Glen LRT downtown to Quarry Park LRT to Seton Southwest Transitway Feeder bus network Transitway to Mount Royal University and Woodbine North Crosstown BRT Existing bus service (19, 119) BRT from Saddletowne LRT to U of C West Campus Existing service Improved mobility New technology Southwest Crosstown BRT BRT to Mount Royal University BRT to Heritage LRT, Quarry Park and 52 Street E 17 Avenue SE Transitway Mixed traffic Transitway from 9 Ave SE to 52 Street E 52 Street E BRT Existing service Enhanced bus service BRT from Saddletowne LRT to Seton Route 305 BRT (West) Mixed traffic BRT enhancements South LRT Extension Existing service Four-car LRT service LRT extended to 210 Avenue S Northeast LRT Extension Existing service Four-car LRT service LRT extended to 128 Avenue N Airport Transit Existing service Bus service utilizes airport tunnel BRT utilizes airport tunnel Rail connection 8 Avenue Subway Existing service Four-car LRT service 8 Avenue subway Shaganappi HOV Mixed traffic HOV to Stoney Trail Existing/enhanced service ProposedTransitway Proposed BRT Proposed LRT Proposed Rapid Transit (HOV or new technology) 147

Mode Progression in Rapid Transit Corridors in the Longer-term (Beyond RouteAhead) The exhibit below illustrates the mode progression in several significant corridors beyond the timelines of RouteAhead. MODE PROGRESSION IN RAPID TRANSIT CORRIDORS IN THE LONGER TERM (BEYOND ROUTEAHEAD) Green Line present short-term medium-term long-term beyond RouteAhead Mixed traffic Transitway LRT North Central Corridor Mixed traffic Transitway to 24 Avenue to 78 Avenue LRT to 16 Ave N LRT to North Pointe BRT to Keystone LRT extended to Keystone and Airdrie SETWAY Mixed traffic BRT to Seton Transitway to Douglas Glen LRT downtown to Quarry Park LRT to Seton Southwest Transitway North Crosstown BRT Feeder bus network Existing bus service (19, 119) Transitway to Mount Royal University and Woodbine BRT from Saddletowne LRT to U of C West Campus Existing service Improved mobility New technology Southwest Crosstown BRT BRT to Mount Royal University BRT to Heritage LRT and Quarry Park BRT extended to southeast industrial areas and 52 street SE ROUTEAHEAD 17 Avenue SE Transitway 52 Street E BRT Mixed traffic Existing service Transitway from 9 Ave SE to 52 Street E Enhanced bus service BRT from Saddletowne LRT to Seton Transitway to city Extended to Chestermere, converted to Route 305 BRT (West) Mixed traffic BRT enhancements South LRT Extension Existing service Four-car LRT service LRT extended to 210 Avenue S Northeast LRT Extension Existing service Four-car LRT service LRT extended to 128 Avenue N Extended north of Stoney Trail Airport Transit Existing service Bus service utilizes airport tunnel BRT utilizes airport tunnel Rail connection Connected to North Central LRT 8 Avenue Subway Existing service Four-car LRT service 8 Avenue subway Shaganappi HOV Mixed traffic HOV to Stoney Trail Extended to Sage Hill Frequent Transit on the Primary Transit Network Phased implementation throughout the city, including local and rapid transit routes LONGER-TERM RAPID TRANSIT PROJECTS North Regional Context Study BRT 162 Avenue S Transitway West LRT Extension Regional Transit Projects (led by regional municipalities and Calgary Regional Partnership) Sage Hill to North Central LRT Extended to Northeast LRT Extended to Providence Extended to 85 Street West Airdrie Intercity Express Additional regional bus services Commuter rail services from regional municipalities Edmonton-Calgary High Speed Rail (led by Province of Alberta) Existing/enhanced service Proposed BRT Proposed Rapid Transit (HOV or new technology) Station stops in Calgary at 96 AVE N (Airport) and downtown ProposedTransitway Proposed LRT Proposed Heavy Rail (Commuter/High Speed) 148 Section 4: The RouteAhead for Calgary Transit's Network the rapid transit projects

149

special cases for transit service There are a number of situations in Calgary with unique characteristics where the provision of transit service is not straightforward or special agreements are required for service to be initiated. These include the following:» Calgary International Airport: building on the success of the Route 300 BRT Airport/ City Centre and the construction of the Airport Trail tunnel, there is an opportunity to provide improved transit Enhanced transit service to the airport, particularly rail based, is often viewed as a catalyst to becoming a worldclass city. To improve service to the airport will require thoughtful work, coordination of plans and special access agreements between the landowner (the Government of Canada), the tenants (Calgary Airport Authority) and The City of Calgary. service to the airport. 150

» University of Calgary/ Alberta Children s Hospital/Foothills Medical Centre: the construction of the hospital and further development on the» Regional Transit: further work will be required as The City of Calgary continues to work with the Calgary Regional Partnership on transit issues. For example, the» Centre City: Calgary Transit s service has largely converged on the downtown given its importance as the prime employment centre in Calgary. A Special cases for transit service beyond the RouteAhead timeframe:» Regional Transit Projects: Calgary Transit will continue to work with the Calgary Regional Partnership and regional municipalities to integrate transit» Edmonton to Calgary High Speed Rail: The Province of Alberta has identified locations for future high speed rail stations in downtown Calgary and at 96 West Campus of the introduction of service number of projects are services in the city Avenue North. The City University of Calgary by the City of Airdrie or will be ongoing in and the region. This continues to plan land has created a significant required considerable the coming years which will include providing use and transportation employment generator assistance and support will affect the Centre assistance to regional services while in this part of Calgary. from Calgary Transit. City. These include partners on planning and accounting for these Transit service is As the region develops the implementation of service design, providing future station locations. hampered by a road and other adjacent four-car CTrain service, space at bus and LRT network that prevents communities consider or the introduction of terminals, coordinating direct routing, making introduce transit service, the SETWAY into the with future commuter this a difficult area a full range of activities downtown, a proposed rail projects and working to serve. Improving from governance, tunnel under 8 Avenue towards fare integration. transit service to this transit planning, for NW/South LRT area will require access marketing, land use service and a proposed agreements with the and policy development tunnel under 2 Street University of Calgary will continue with W for southeast LRT and Alberta Health the Calgary Regional service. As well, Services. This area Partnership. This will business revitalization could also be suitable occur in the short term will continue in Calgary s for the introduction given the driving factor Beltline, the East Village of transportation of Provincial GreenTRIP and West Village. technology not yet funding to the regional These initiatives will utilized in Calgary municipalities. contribute to the need and further partnering for continued transit agreements to improve planning and network transit service. design as Calgary Transit refines service in the Centre City. 151

benefits to customers and communities The following maps show the projected increase in transit usage from 2006 to 2076. Areas of blue indicate more transit trips occurring. The rapid transit network will provide improved transit service in the city. 152

DE ER FO SHAGA NAPPI LA UR IE BV TRAN S CA NAD AH NW NW METIS TR NE TR AIRPORT TR NE JO HN LA UR IE BV NW IW EE RC SA IW TR EE RC SA W 16 AV NW 16 AV NE 37 ST SW MACLEOD TR S TT R 37 ST SW SW ANDERSON RD SW ANDERSON RD STONEY TR SE PEIGAN TR SE TR SE MARQUIS OF LORNE TR S E TR S E TR S E E TR S OT DE E R FO SW SPRUCE MEADOWS TR S OD CLE MA E TR SARCE SPRUCE MEADOWS TR S OT DE E R FO SW OD CLE MA E TR SARCE TR SE MARQUIS OF LORNE SE GLENMORE TR SE 14 ST SW 14 ST SW SE ILD T RE TR SW GLENMORE TR SE 17 AV R SE BARLOW TR SE GLEN MO PEIGAN TR SE D ME M ORIAL 5 AV SW CROW CH BARLOW TR SE SE SARCEE TR SW SE TT R BL AC KF OO CROW CH RE TR SW STONEY TR SE R SW ILD T SARCEE TR SW 17 AV R SE R SW BOW TR SW D ME M ORIAL 5 AV SW BL AC KF OO W 16 AV NE MACLEOD TR S TR 16 AV NW BOW TR SW GLEN MO GT ON STO NEY TR NE HN STO NEY TR NE TRAN S CA NAD AH JO RN W DE ER FO NW DT OT TR NE ST ON TR AIRPORT TR NE TR NW RN W GT ON TR NW EY BE DD IN SHAGA NAPPI DT CR OW CH IL METIS TR NE BE DD IN TR NW CR OW CH IL TR NW EY OT TR NE ST ON Transit Trips: 2006 Actual Ridership Compared to 2076 Projections Legend 0 5 10 0 00 20 Tran -5 50 Kilometers 1-4 2006 Transit 20 45 1 35 25 1-3 50 Legend represents ridership during weekday AM peak. 50-2 15 1-1 10 1-1 26-5 0 5-2 2-1 Kilometers 50 20 00 10 51 5 0 0 153

scaling our operations The fleet, facilities and services that support the delivery of public transit need to be increased to match the expansion of introductory, base and primary transit networks. In some cases, customer service improvements, such as real-time information, also require maintenance, support and replacement in the future. This section discusses the back end support required for the success of the RouteAhead plan. 154

Maintaining Current Fleet Calgary has experienced steady growth in transit ridership since 1994. In rail vehicles operating longer than originally planned. This is not ideal as 12-Metre Buses The majority of bus service at Calgary Transit is provided using 12-metre which means a vehicle is at the start of its life or has undergone refurbishment 2005, the rate of growth the age of vehicles impacts diesel-fuelled buses. The (vehicles are refurbished accelerated due to a the reliability of service. oldest buses currently in at the midpoint of their booming economy. In 2008, Older vehicles are more operation, purchased in planned life). Refurbishment an economic downtown difficult to maintain; it can 1977, are well beyond usual includes replacing or caused a small contraction even be a challenge to find retirement age and need to reconditioning the engine in overall transit ridership replacement parts for the be replaced to improve both and transmission, extensive following a peak of 95.3 oldest fleet. Regardless of reliability and accessibility. body work and renovating million riders. This period of age, all vehicles Calgary The ideal replacement the interior. high growth put immense pressure on the transit system and the amount of fleet required to meet customer demand. A bus replacement program is in place for current Calgary Transit fleet but service increases due to increased ridership have Transit operates are safe. Purchasing new vehicles to replace older ones will increase the reliability of Calgary Transit service, reduce Calgary Transit s environmental footprint, improve accessibility by eliminating all high-floor buses in the fleet, and add age of a 12-metre bus is 18 years. The chart below shows that 23 per cent of Calgary Transit buses are past retirement and five per cent are approaching retirement (retirement is planned for 2013). Of the remaining fleet, 61 per cent are in good life cycle order Calgary Transit is continuing to purchase new buses to replace vehicles past retirement and by 2014, all 12-metre buses at Calgary Transit will be in good life cycle order or undergoing refurbishment. resulted in buses and light features for customers. 12-metre bus fleet status 23% older than planned life 61% in good life cycle order 11% vehicles at refurbishment age 5% approaching retirement 155

Light Rail Vehicles Calgary Transit is still operating light rail vehicles retirement and 29 per cent are approaching retirement Community Shuttle Buses and 18-Metre Buses The community shuttle fleet and articulated (18-metre) (LRVs) that began service (retirement is planned for bus fleet at Calgary in 1981 on the first CTrain 2015-2018). Transit are all in good life line. These older trains break down three times as often as newer trains. The number of disruptions due to broken down trains could be reduced significantly by retiring older trains earlier and replacing them with new vehicles. Calgary Transit will begin purchasing LRVs to replace vehicles past retirement and vehicles approaching retirement. Initially, Calgary Transit considered refurbishing LRVs at the 30-year mark instead of retiring them but additional cycle order now but will require replacement and/ or refurbishment beginning as soon as 2016. The replacement of these vehicles is included in Investing in Mobility. The ideal replacement age investigation showed that for LRVs is 30 years. The for both financial and chart below shows that reliability reasons, vehicles 13 per cent of Calgary should be retired after 30 Transit LRVs are past years of service. Light rail vehicle fleet status 13% older than planned life 1% vehicles at refurbishment age 57% in good life cycle order 29% approaching retirement 156 Section 4: The RouteAhead for Calgary Transit's Network scaling our operations

Current Facilities Maintenance Facilities Facilities include maintenance garages, CTrain stations, sub stations that provide power to the LRT line, tunnels, and elevated structures such as bridges. All of these components need to be in a state of good repair for customers to feel safe, welcomed and for service to be reliable. The condition and capacity of maintenance facilities impacts service reliability. If maintenance cannot be done effectively or in a timely manner, service reliability and fleet availability will be impacted. Constructing new maintenance facilities and upgrading existing facilities will increase the reliability of bus and CTrain service. For example, if buses are stored indoors, customers waiting for a bus on cold winter mornings will see fewer delays due to cold start-ups and mechanical failures. Almost all of Calgary Transit s maintenance facilities are in need of Current Bus Facilities Calgary Transit has three bus storage and maintenance facilities:» Anderson Garage this maintenance facility was built in 1978 and is used upgrading, refurbishment to store and maintain» Spring Gardens this and/or replacement. Not both 12-metre buses only do existing facilities maintenance facility was and light rail vehicles. built in 1975 and is used need upgrading, new to store and maintain» Victoria Park this facilities are required to 12-metre buses. maintenance facility was address storage shortfall Additional storage was built in 1983 and is used and maintenance demands. constructed in 2003. to store and maintain No additional bus garages 12-metre buses, have been constructed since 1983 when the bus 18-metre buses and shuttle buses. fleet was less than half the current number. 157

All three facilities are aging and are over capacity. The the next day. Garages that are over capacity also result shortage of maintenance facilities will continue has been increasing with the geographical growth Current Light Rail Vehicle (LRV) Facilities Calgary Transit has three garages that store and/or chart below shows the in less efficient operation to escalate. of Calgary and could be maintain LRVs: design capacity and the actual number of buses currently being stored and maintained at each facility. Approximately 185 buses as considerable staff time and fuel is spent shuffling vehicles within the facilities. A building addition to the Spring Gardens bus facility Depending on where they are located, new facilities may also reduce the amount of time transit vehicles are traveling with reduced by constructing new facilities closer to route start/finish locations which are generally located in the outer suburbs.»» Anderson Garage this maintenance facility was built in 1978 and is used to store and maintain LRVs. It also are currently being stored is in the preliminary design no passengers between The strategic decision to stores and maintains outside. In Calgary s stage and will increase the garage and the point move Calgary Transit s 12-metre buses. climate, storing vehicles outside is not desirable or economical because in cold weather (below -15 degrees Celsius) buses must be left running all night to ensure that they will be available for service the interior bus storage capacity at this location by 100 buses. However, this addition will not eliminate all outdoor storage and a new facility will be required within the next five years or the impact of the current where revenue service begins or ends (deadhead times). Currently, deadhead times for 12-metre buses account for approximately 15 per cent of Calgary Transit s 12-metre bus operating hours. This bus fleet to compressed natural gas (CNG) impacts the facilities plan. CNG fuelled buses are not compatible with current facilities. After evaluation, it was determined that a new building is less expensive than modification of existing buildings.»» Haysboro this facility was retrofitted as a temporary storage facility in 1984 and is used only to store LRVs.»» Oliver Bowen Maintenance Facility (OBMF) this maintenance facility was built in 2009 and is used to store and Bus storage and maintenance facilities maintain LRVs. Spring Gardens 375 92 Anderson Garage 160 13 Victoria Park 250 80 0 100 200 300 400 500 Bus capacity at garage Number of buses over garage capacity 158 Section 4: The RouteAhead for Calgary Transit's Network scaling our operations

The chart below shows the design capacity for by the end of 2013. This expansion only addresses Service Delivery of Four-Car Trains To begin four-car CTrain operation, 30 additional four-car trains simply because the length of the Northwest and South lines. Issues with four-car train each LRV facility and the the storage of current LRVs need to be storage facility does not service delivery reiterate actual number of LRVs LRV fleet. As the LRV fleet purchased. The Oliver support four-car operation. the need for, and are a currently being stored and grows to accommodate Bowen Maintenance Additional four-car trains consideration in the location maintained at the garage. service increases and Facility, as the newest could be supplied from of an additional LRV Currently 42 LRVs are being stored outside. LRVs must be left powered up all night in cold weather (below -15 degrees Celsius) to ensure that they will available for service the next day. The Oliver Bowen Maintenance Facility is currently being expanded to increase LRV storage and eliminate outside storage of existing LRVs four-car CTrain service, LRVs will have to be stored outside again. Calgary Transit s LRV fleet has grown by 134 per cent since 1981 and maintenance capacity has only increased by 30 per cent. This has resulted in limited maintenance capacity for LRVs. A new garage will be required by 2020 to maintain and store the growing fleet of LRVs. facility built, was designed to accommodate fourcar trains. However, the majority of four-car service will be required on the 201 route (Northwest and South lines), which is generally supported by Anderson Garage and Haysboro. Four-car service delivery from Anderson Garage will be problematic. It will be extremely labour-intensive and time consuming to Haysboro storage, but that facility is also not configured for four-car train storage. In the future, given the current design and capacity limitations of the garages, most four-car trains will have to originate from OBMF. This will significantly impact daily operating cost due to the deadhead time required for these trains to begin service on the maintenance facility. As a result of this misalignment of storage facility and demand, the construction of a new storage and maintenance facility on the Route 201 will be an infrastructure priority. service and assemble LRV storage and maintenance facilities Anderson Haysboro 60 30 30 6 Helping to fix things to look better OBMF 60 6 0 20 40 60 80 LRV capacity at garage Number of LRVs over garage capacity Keep employing friendly staff! 159

Maintain and improve, i.e. grow with the City. :) Keep LRT stations cleaner to discourage vandalism 160

Current LRT Infrastructure LRT infrastructure includes the track, traction power, communications systems opened in 1987. Although many stations have been upgraded to four-car be upgraded to increase reliability. For example, most of the poles on the Calgary Transit will be focusing on ways to improve operational system. Calgary Transit has identified switch, track and signalling improvements and signals. Some of platforms and traction traction power system are flexibility on the CTrain to retrofit the system to Calgary s LRT infrastructure power upgrades for four-car original and only some system. Passenger minimize disruptions caused is over 30 years old. The trains are taking place, this sections of track have been emergencies, mechanical by stopped trains. first LRT line from Anderson has not addressed the rest replaced over the years. failures and other incidents Road to 7 Avenue S.W. of the aging infrastructure Regular maintenance is can cause CTrains to be opened in 1981, the at most stations. Much of ongoing to ensure the LRT stopped and the ability of northeast line opened in the original buildings, track, system is in a state of good other trains to get around 1985 and the northwest signal and power systems repair but further upgrades a stopped train affects line to University station are still in place and should should be done to increase the operation of the entire the reliability of the system. Fleet and facilities to support new transit service AN ANNUAL INCREASE OF 125,000 HOURS OF SERVICE WILL BE REQUIRED TO MEET TARGETS IN THE CTP ADDITIONAL FLEET AND SERVICE SUPPORT STAFF WILL BE REQUIRED TO PROVIDE CUSTOMER-FOCUSED SERVICE MORE BUS AND LRV FACILITIES AS WELL AS MAINTENANCE STAFF WILL BE REQUIRED TO PROVIDE RELIABLE SERVICE. SERVICE HOUR INCREASES INCREASE IN FLEET INCREASE IN FACILITIES INCREASE IN SERVICE SUPPORT INCREASE IN FLEET AND FACILITIES STAFF 161

The following targets have future targets, substantial Fleet The table below shows the Currently, about half of Calgary Transit s customers been identified in Calgary increases in service hours projected fleet growth by travel emissions-free on the CTrain. 2020 and the CTP: will be required (about vehicle type to support this»» By 2020, 2.6 hours per capita of transit service is provided annually.»» By 2040, 3.7 hours per capita of transit service is provided annually. In 2012, Calgary Transit delivered 2.4 service hours per capita. To meet 125,000 hours per year). These increases will impact all areas of Calgary Transit because additional service hours will require additional support services and fleet. As fleet increases, additional facilities and maintenance staff will also be required. additional service. The total growth shown is for new fleet purchases only. An ongoing fleet replacement program will be required so that vehicles are replaced at the appropriate time to ensure reliability of the fleet. Some of the new LRVs in the fleet projection beyond 2020 will be required to operate the new LRT line (North Central/ SETWAY). This new line will provide Calgary Transit the opportunity to review other types of rail-based technology, such as lowfloor LRVs. 2.4 annual service hours per person is the number of hours all of the trains and buses drive in a year (2.67 million hours) divided by the population of Calgary (1.1 million). Service hours per person is an indicator of the quantity of transit service provided to the community. It is one of many performance measures that Calgary Transit uses to evaluate system performance. Others include: transit trips per capita or person, passengers per hour (of service), net operating cost per hour, etc. Future transit vehicle fleet requirements to achieve 30 year transit service objectives Annual Service Hours 12-Metre Bus 18-Metre Bus Community Shuttle Bus Total Buses LRVs Current 2,673,000 791 63 116 970 192 2020 3,439,000 925 100 190 1,215 240 2030 4,689,000 1,300 145 245 1,690 335 2040 5,939,000 1,650 170 310 2,130 390 Total Growth 3,266,000 859 107 194 1,160 198 162 Section 4: The RouteAhead for Calgary Transit's Network scaling our operations

New Vehicle Technology and Alternative Fuel Transit has a number of positive impacts on the environmental footprint is through alternative fuels. hybrid electric buses are also being investigated. Maintenance Facility Requirements As the number of vehicles increases, Calgary Transit environment including: In addition to the wind Other considerations will require new facilities reduced greenhouse power purchased for the taken into account when and staff to maintain the gas (GHG) emissions, CTrain, alternative fuels purchasing new fleet additional fleet. New bus reduced land consumption are regularly reviewed are cost-effectiveness, facilities will be required and reduced energy by Calgary Transit. impacts on reliability, and to ensure reliable transit consumption. Compressed natural gas net environmental impacts service. One 12-metre bus One of the ways Calgary Transit can reduce its (CNG) buses are being piloted and 12-metre (including maintenance considerations). can provide approximately 2,500 hours of transit service each year, which means that Calgary Calgary Transit projected bus fleet growth and facility requirements (2015 2040) Transit will need to add approximately 45 buses to the fleet annually to 3,000 meet the target of the 2,500 New facility CTP. Each new facility will accommodate New facility approximately 400 buses. 2,000 New facility This means that by 2040, four new maintenance 1,500 New facility facilities will be required to store and maintain the 1,000 Current capacity additional fleet. The blue line in the chart at 500 Spring Gardens Expansion left shows the increase in Calgary Transit buses that 0 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 will be required in the future to support an increase of Bus facility capacity Bus fleet 125,000 service hours per year beginning in 2015 and 163

continuing through to approaches the capacity»» Contribute to the CTP The replacement plan for As the number of service 2040. The green line in the of the garages, Calgary target of 3.7 hours of LRVs cannot be considered hours per capita increases chart shows the current Transit will begin planning transit service per capita. in the same way as a bus and the length and number capacity of Calgary Transit bus facilities. The chart shows that current fleet exceeds the capacity of garages which results in buses having to be stored outside. The required growth of facilities is shown by the red line in the chart. Where the line is flat, there is sufficient capacity in the garages to properly store and maintain all fleet so facility size will and constructing a new facility to accommodate a maximum of 400 buses. This is shown by the sharp increases in the red line. New facilities constructed at the appropriate time will ensure reliable service delivery, resulting in fewer delays for customers and more efficient operations. LRV fleet will need to grow from 192 to approximately 390 in order to:»» Provide four-car CTrain service to address capacity issues.»» Provide fleet for new LRT lines and extensions. Based on a design capacity of 150 LRVs for a new LRV facility, two new facilities will be required in the next 40 years to store and maintain LRVs and to accommodate four-car train service. replacement plan because the lead-time to procure and put new LRVs into service is approximately two years. Fleet growth will need to be completed in steps because there are a limited number of LRV suppliers and most vehicle manufacturers will not initiate a production line for an order less than 40 or 50 vehicles. of LRT lines grow, so does the number of vehicles required to provide the service. Subsequently, as fleet increases, facility requirements will also increase. stay constant. As fleet 164 Section 4: The RouteAhead for Calgary Transit's Network scaling our operations

Location of Facilities Current and future Calgary Transit maintenance facilities N Calgary Transit has already begun planning for new bus and LRV maintenance facilities. Because LRVs and buses are significantly different in terms of operating and maintenance, future bus and LRV facilities should be separate facilities. The map at left shows existing locations of bus, and LRV facilities and the proposed facilities for the next 20 years. At least one additional LRV facility will be required for the new North Central/ SETWAY LRT line. This is not shown on the map as the location of this facility is still being determined. Additional LRV garage required for North Central/SETWAY (Location TBD). 165