Case Study REGIONAL TRANSPORTATION DISTRICT (RTD) DENVER, COLORADO

Size: px
Start display at page:

Download "Case Study REGIONAL TRANSPORTATION DISTRICT (RTD) DENVER, COLORADO"

Transcription

1 Case Study REGIONAL TRANSPORTATION DISTRICT (RTD) DENVER, COLORADO Transit Agency Profile and Reason for Selection of Transit Agency Overview The Regional Transportation District (RTD) in Denver is one of a few transit agencies nationwide that has developed a specific transit-related Design Criteria Manual for its new Light Rail Transit (LRT) systems. What is specifically significant is that the agency introduced and integrated both safety and security design requirements into its LRT Design Criteria Manual. The intent of the LRT Design Criteria Manual is to establish general criteria to be used in the planning and design phases of newly planned LRT capital improvement projects. One of the primary goals of the manual is to provide guidance to project engineers and architects for the initial inclusion of safety and security requirements during the planning and design phases of RTD s LRT projects. RTD developed and modified these safety and security design criteria as a result of lessons learned from earlier LRT projects, safety design criteria from other agencies, and results from security evaluations and Threat and Vulnerability Assessments (TVA). The success of this initiative has not only motivated the agency to expand and improve the LRT Design Criteria Manual for future approved LRT projects, but RTD is now developing new Design Criteria Manuals to cover future bus operations and facilities and commuter rail capital improvement projects. RDT s Public Safety Division has the responsibility of the agency s safety and security requirements. The Public Safety Division is divided into sub-sections that include Safety, Environmental and Security. The Division has 6 employees, 75 contracted security officers, and a contract with the Denver Police Department to provide off-duty Police Officer security assistance. System Description The RTD system has evolved into a transit system that services an area of 2,406 square miles, and includes 41 municipalities in 7 counties. The system has 176 fixed routes, which includes local bus services along major streets, express and regional bus routes providing non-stop services along longer distances, Denver International Airport bus service, a free shuttle on the Sixteenth Street Mall in downtown Denver, and a LRT system service serving Denver and its southwestern suburbs. Basic operations include the following. Bus Operations: The bus fleet currently has 1,074 buses, with an average fleet age of 8.1 years. Eighty-seven buses are leased to private carriers. Annual boardings are now approximately 83 million passengers (279,000 boardings on an average weekday) through a network of over 10,237 bus stops. There are currently six maintenance and storage facilities district-wide, 67 park-n-rides and 17 transfer stations. 29

2 Light Rail Operations: The light rail service operates on the existing 5.3 mile Central Corridor, the 8.7 mile Southwest Corridor and the 1.8 mile Central Platte Valley Spur. The system accommodates two lines, the C and D lines. The Southeast Corridor/T-REX design-build project, adding approximately 19 miles of light rail service, is in construction and will be operating by November Other Services: In addition to the fixed route services, RTD provides services to sporting events and other special events, special services for the disabled and senior citizens, and door-to-door services in limited areas of the District. The population of the Denver metro area grew from 2.1 million in 1995 to more than 2.6 in million in Approximately 95 percent of the population of the region lies within the RTD service area. The area s rate of population increase peaked in 1999 and decreased steadily through While continuing to grow, the region grew at a slower rate. In spite of a five-year slowing trend, the area is forecast by the Denver Regional Council of Governments to grow to 2.87 million in 2010 and to 3.26 million in 2020, an increase of approximate 25 percent in 15 years. Climatic Considerations for Systems Design The Denver metropolitan area, within which RTD operates, is situated at the foot of the eastern slope of the Rocky Mountains in central Colorado. The area has a semi-arid climate that is somewhat characteristic of the High Plains but is modified by the Rocky Mountains to the west. Because of this, Denver lies in a belt where there is a fairly rapid change in climate from the foothills to the plains. This change is largely caused by the increase in elevation as you travel west to the foothills. Denver has an elevation of 5,280 feet. The average annual temperature is about 50 F at this elevation, though this varies a few degrees as elevation changes. The wide average range in daily temperature of 25 to 30 F in the Denver metropolitan area and a wide average range in annual temperature are typical for the High Plains. Temperatures vary from day to day; extremely hot weather in summer and extremely cold weather in the winter normally do not last long and are followed by much more moderate temperatures. System equipment including vehicles, electrification power and distribution system, signal system and fare collection/validation equipment along with track-work, stations and other civil features must be capable of maintaining operation within the unique weather and elevation conditions of the region. Problem Identification and Need for Innovative Security Measures In the transit community as a whole, safety and security requirements have tended to be an afterthought in transit capital improvement projects. This has forced transit agencies to address critical safety and security issues after the projects are designed, during project construction by means of change orders, or even after project completion. One outcome of this approach is that agencies must address un-programmed funding requirements for facility, equipment and or systems changes that could have been avoided if these requirements were initially included. 30

3 Previous Attempts (if any) to Address Problem and Results RTD originally developed an LRT Design Criteria Manual for the design and construction of its initial LRT system, the Central Corridor, which opened for revenue service in October There have been three subsequent extensions: the Southwest Corridor in 2000, the Central Platte Valley Spur in 2001, and the Southeast Corridor scheduled to open in November The LRT Design Criteria Manual went through a number of revisions prior to the design of each subsequent corridor, including a significant revision in 2000 which included a new section dedicated to system safety. The system safety section was originally developed from a combination of RTD s System Safety Program Plan (SSPP), Military Standard 882, APTA guidelines, FTA requirements and recommendations, and a safety criteria model of the Portland, Oregon transit system. In addition, safety revisions were also incorporated from lessons learned from previous RDT LRT projects. In November 2004, the Denver metropolitan area voters approved RTD s FasTracks program, consisting of 6 new rail corridors (119 miles total) including commuter rail, LRT, and possibly Bus Rapid Transit (BRT). To address the ambitious needs of the FasTracks program, the LRT Design Criteria Manual was again revised in This revision not only updated the safety criteria but also introduced security criteria for the first time. RTD developed all of its security criteria based on their System Security Plan (SSP), RTD requirements, FTA requirements and recommendations, and as a result of security assessments and Threat and Vulnerability Assessments (TVA) after the 9/11 terrorist attacks. These assessments were conducted through a number of avenues, which included in-house efforts using the Department of Justice Threat and Vulnerability Assessment (TVA) model, FTA (consulting contracts), State of Colorado Department of Home Land Security (National Guard), and the Transportation Security Administration s Surface Transportation Security Inspectors. As a result of the earlier success with the LRT Design Criteria Manual and the agency s approval of the safety and security design criteria, commuter rail and bus transit facilities Design Criteria Manuals are now under development. Reason for Proposed Solution The primary reason for integrating safety and security design criteria in an initial project design and/or procurement specification is to proactively address these requirements thereby including them in an initial overall project budget. This could potentially save a transit agency hundreds of thousands of dollars. In addition, this process can reduce the number of safety and/or security related project construction and/or procurement change orders, thus preventing potential project and procurement budget overrun. Solution Proposed/Implementation General Implementation RTD developed and implemented the LRT Design Criteria Manual initiative with the General Manager and senior management support and approval. This task was accomplished through an 31

4 integrated approach that involved all staff sections of management as well as supervision of the Executive Safety and Security Committee. The LRT Design Criteria Manual revision and approval process in 2005 were challenging and time consuming. RTD convened a group of subject matter experts from engineering, construction, rail operations, bus operations, planning, facilities maintenance, scheduling, safety and security. An orientation outlining the process, as well as the goals and objectives of the task was presented to the participants to standardize the process. Each section of the manual was assigned to a committee with a lead person responsible for the section revision. Once the sections were initially revised a draft revision was submitted for review and comment. A specific process was developed to allow all disciplines to provide comments, and for all comments to be reviewed and discussed by the entire group for proper disposition of the comments a true systems approach. A final draft was then compiled and received a final review by the senior management from rail operations, engineering, safety and security. The final document was then approved by signature of senior management. Even though the process was arduous, a 6-9 month process of meetings and 4 half day workshops, the end result was a comprehensive document that was well accepted throughout the organization. The newly-developed commuter rail and bus transit facilities Design Criteria Manuals were developed in a similar, but not as comprehensive, fashion, primarily because much of the same design criteria outlined in the LRT Design Criteria Manual carried over to the new manuals. These two new documents are currently in the final review and approval stages. Each Design Criteria manual has a section dedicated to system safety and system security. However, the safety and security section does not capture all the safety and security design criteria established in the manual. Specific system safety and security design criteria have been integrated throughout sections that address landscaping, stations, operations facility, fare collection equipment, and light rail vehicles, to mention a few. The system safety and system security section of the LRT Design Manual establishes the foundation for safety and security designs and detailed criteria are captured and integrated throughout the document. The LRT Design Criteria Manual establishes basic criteria to be used in the design of new RTD LRT systems. In addition, drafting standards, directive or sample drawings and management procedures were prepared to standardize and guide the design activities and the preparation of contract documents. The safety and security design criteria that were included in revisions to the LRT Design Criteria Manual addressed emergency access/egress, station design and walkways. The criteria require the design to identify emergency access and egress locations and provide a list or matrix of the necessary elements to be provided at each exit, such as lighting, signage, lock hardware, intrusion detection, and other elements. 32

5 Evans Light Rail Station, one entrance/ exit, in compliance with NFPA 130 Littleton Downtown Light Rail, non exit, multiple entrances, in compliance with NFPA 130 In addition, the criteria established the requirement for video surveillance equipment into capital projects. The Design Manual requires that video surveillance systems be capable of transmitting real-time (30 frames per second per camera) video to RTD s Security Command Center via a fiber optic transmission backbone. The manual requires all designs to include system elements including communication houses, transmission infrastructure, color cameras, and digital video recorders. The manual establishes that designs must incorporate video surveillance covering station platforms, emergency telephones, elevator waiting areas, stairwell entries, parking structures, pedestrian tunnels and pedestrian bridges. Digital Cameras Union Station, light rail with no video surveillance Littleton Light Rail Station with video surveillance 33

6 RTD Security Command System Console camera placements and coverage, Littleton/ Mineral Park-and-Ride Boeing, Visual Security Operation Console (VSOC), 3-dimensional geographic presentation The LRT Design Criteria Manual also requires the placement of emergency telephones in the design elements of capital projects. The manual requires that all emergency telephones be consistent with existing RTD units and meet the performance requirements of RTD s existing emergency telephone network. Emergency telephones are required in designs for all station platforms, elevator waiting areas, stairwell entries, parking structures, park-nrides, pedestrian bridges and tunnels. Digital Camera Union Station, Light Rail Emergency Phone I-25 & Broadway Light Rail Station, Emergency phones being installed no emergency telephones 34

7 The manual also addresses the design requirements for parking structures, as well as underground and/or below grade transit facilities. Stairwell and elevator designs must maximize the interior visibility of stairwells, elevators and elevator shafts. It also requires that wall construction materials be transparent, such as glass, and must allow visibility from at least three sides. For underground, enclosed and/or below grade facilities, it was recognized that these present unique security challenges. The manual recognizes the importance of maximizing patron safety and security through various counterterrorism measures. Specifically, the design elements of these facilities must include the provision of video surveillance in the perimeter areas, portals, entrances, exits, the interior of the facilities and all fare vending locations. University Park-and-Ride, T-Rex Project, elevators and stairs with no portal protection Market Street Bus Terminal Entrance RTD made a simple change top its new bus facility Design Criteria Manual that has proven to be a significant cost savings. Due to a serious issue with acid etching, graffiti, glass replacement and general maintenance with their glass panel bus shelters, they changed the design criteria to have perforated metal sidings instead of glass and a curved shape roof line. These changes have saved the agency roughly $150,000 in annual maintenance costs with a 3-4 year pay back benefit with their current inventory of bus stop shelters. All new bus shelter procurements must now be in compliance with the new design criteria. Cost/Benefit Analysis RTD did not conduct a cost/benefit analysis on this design criteria initiative. However, RTD s success of integrating safety and security design criteria early in the project planning and design phases and cost requirements included in the project budget will prove to be a significant longterm cost savings to the agency. 35

8 Old design with glass panels One of many new design configuretions with perforated metal siding Measure Effectiveness of Implementation/ Performance Indicators RTD s effectiveness in implementing this initiative has been proven by the continued support of the General Manager and senior management. This includes the success experienced by the agency s staff and the Executive Safety and Security Committee accepting this process and approving the RTD Design Criteria Manual. In addition, just the fact that the agency continues to update the LRT Design Criteria Manual to remain in compliance with accepted practices and applicable codes and develop new Design Criteria Manuals for upcoming capital improvement projects proves that the implementation was successful and effective. Lessons Learned/Conclusion The initiative of having Design Criteria Manuals with safety and security design criteria must have senior management s approval and support. An integrated, horizontal approach with the agency staff is imperative for developing a comprehensive product such as the LRT Design Criteria Manual and the other Design Criteria Manuals. A reasonable and practical approach is essential when developing the framework for identifying specific safety and security design criteria. The difficult part of the process is establishing the right balance between having the essential safety and security requirements in accordance with codes and regulations verses having the latest technology or capability. With the integration of design criteria early in the project, project budget constraints may be a challenge. This can apply during design review and the project Value Engineering process. The establishment of this process which approves changes and/or deviations at 36

9 the RTD Executive Safety and Security Committee level has proven extremely important. This process not only controls changes but can initiate a compromise and/or elevate an issue to the General Manager level for a final decision on project priorities and design criteria changes. To ensure the Design Criteria Manual requirements are included in the projected project costs, a design manual should be given to the engineers and architects as early as the Alternative Analysis (AA) portion of the project system planning phase. This is the phase where the initial foundation of the preliminary project budget forecast is developed and a specific amount is allocated for security requirements. When new safety or security technologies are introduced for consideration, a detailed analysis is needed to identify desired technological configurations, testing and monitoring capabilities, training requirements, routine maintenance, management responsibilities, and long term life cycle costs for sustainability reasons. This analysis and findings are not only essential for the approval process, but once approved and in place, it provides sustainable funding requirements that must be integrated into an agency s long range budget forecast cycles. More information on the LRT Design Criteria Manual and specific fact sheets on LRT corridor projects can be obtained through RTD s website under Light Rail at 37

10 38

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions Evanston Main Street Station TOD Plan and Study Appendix A.1: Station Area Existing Conditions EvanstonMainStreetStation TODPlanandStudy A 1 AppendixA.1: ExistingConditions Table of Contents Station Locations

More information

Case Study CENTRAL FLORIDA REGIONAL TRANSIT AUTHORITY (LYNX) ORLANDO, FLORIDA. Transit Agency Profile and Reason for Selection of Transit Agency

Case Study CENTRAL FLORIDA REGIONAL TRANSIT AUTHORITY (LYNX) ORLANDO, FLORIDA. Transit Agency Profile and Reason for Selection of Transit Agency Case Study CENTRAL FLORIDA REGIONAL TRANSIT AUTHORITY (LYNX) ORLANDO, FLORIDA Transit Agency Profile and Reason for Selection of Transit Agency Overview The Central Florida Regional Transportation Authority

More information

3.09 Public Safety and Security

3.09 Public Safety and Security 3.09 Public Safety and Security Summary This section describes the existing public safety and security resources in the Longmont corridor and estimates the effect of the proposed alternatives on transit

More information

PART II SCHEDULE. Scope of Services. Special Terms and Conditions. Virginia Railway Express

PART II SCHEDULE. Scope of Services. Special Terms and Conditions. Virginia Railway Express PART II SCHEDULE SECTION TITLE D E Scope of Services Special Terms and Conditions 11 SECTION D SCOPE OF SERVICES D.1 OVERVIEW A. The selected firm is referred to herein as either the Consultant or the

More information

GIS Analysis of Population and Employment Centers in Metro Denver Served by RTD s FasTracks

GIS Analysis of Population and Employment Centers in Metro Denver Served by RTD s FasTracks APA Transportation Planning Division 2011 Student Paper Competition GIS Analysis of Population and Employment Centers in Metro Denver Served by RTD s FasTracks Patrick Picard 2208 E. 17 th Ave., Apt. #4

More information

Denver Union Station. Regional Transportation District Denver, Colorado

Denver Union Station. Regional Transportation District Denver, Colorado Denver Union Station Regional Transportation District Denver, Colorado Regional Transportation District Created in 1969 Eight-county service area Service area: 2,340 sq. miles 2.8 million population 15

More information

DIGITAL DISPLAY GUIDE & SPECIFICATIONS

DIGITAL DISPLAY GUIDE & SPECIFICATIONS Where the Arts Come Alive! DIGITAL DISPLAY GUIDE & SPECIFICATIONS Patrick Woods Denver Theatre District 303.800.6172 PWoods@DenverTheatreDistrict.com ABOUT THE DENVER THEATRE DISTRICT The Denver Theatre

More information

Risk Management in the Development of a Penta-P Project

Risk Management in the Development of a Penta-P Project Risk Management in the Development of a Penta-P Project Bill Van Meter Regional Transportation District Denver, CO Julie Skeen Jacobs Engineering Denver, CO Damian Carey Jacobs Engineering Denver, CO Don

More information

TESTIMONY OF DANIEL DUFF VICE PRESIDENT - GOVERNMENT AFFAIRS AMERICAN PUBLIC TRANSPORTATION ASSOCIATION BEFORE THE

TESTIMONY OF DANIEL DUFF VICE PRESIDENT - GOVERNMENT AFFAIRS AMERICAN PUBLIC TRANSPORTATION ASSOCIATION BEFORE THE TESTIMONY OF DANIEL DUFF VICE PRESIDENT - GOVERNMENT AFFAIRS AMERICAN PUBLIC TRANSPORTATION ASSOCIATION BEFORE THE HOUSE COMMITTEE ON GOVERNMENT REFORM ON THE 9/11 COMMISSION RECOMMENDATIONS ******* August

More information

Claret Consulting 18 December 2015

Claret Consulting 18 December 2015 The Denver-based Regional Transport District (RTD) 2004 FasTracks program is a multi-billion dollar regional transportation expansion plan that was designed to meet the Denver metro area s infrastructural

More information

What we build today will create Denver s tomorrow. Signature development projects will strengthen our economy, create jobs and improve neighborhoods.

What we build today will create Denver s tomorrow. Signature development projects will strengthen our economy, create jobs and improve neighborhoods. Mayor Hancock s Vision for Building a World-Class City What we build today will create Denver s tomorrow. Signature development projects will strengthen our economy, create jobs and improve neighborhoods.

More information

Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014)

Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014) Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 15.7 Miles, 17 Stations

More information

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total

More information

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan. 3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation

More information

S-11: Tacoma Link Extension to Tacoma Community College

S-11: Tacoma Link Extension to Tacoma Community College Project Number S-11 Subarea Pierce Primary Mode Light Rail Facility Type Corridor Length 3.65 miles Version ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE ALIGNMENT SHORT

More information

SAFETY & SECURITY NEWSLETTER

SAFETY & SECURITY NEWSLETTER NATIONAL TRANSIT DATABASE SPRING 2004 VOLUME 2 ISSUE 1 SNAP SHOT The most recent NTD data indicate that in 2003 the rates of major safety & security incidents held steady or declined for all major transit

More information

Metro Met..,.u... T,...,...,...,

Metro Met..,.u... T,...,...,..., ~ ""... c,., Metro Met..,.u... T,...,...,..., One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2ooo Tel metro. net 37 EXECUTIVE MANAGEMENT COMMITTEE MARCH 20,2014 SUBJECT: ACTION: INNOVATIVE WAYS TO

More information

When is BRT the Best Option? 1:30 2:40 p.m.

When is BRT the Best Option? 1:30 2:40 p.m. TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? 1:30 2:40 p.m. Paul Larrousse Director, National Transit Institute (NTI) (Moderator) TRB/APTA 2004 Bus Rapid Transit Conference Session

More information

FOR SALE. The Friedman Building 1701 18th Avenue South, Seattle 98144. Nicholas T. Gill 206.505.9410. Allan Friedman. 206.505.

FOR SALE. The Friedman Building 1701 18th Avenue South, Seattle 98144. Nicholas T. Gill 206.505.9410. Allan Friedman. 206.505. FOR SALE FOR MORE INFORMATION PLEASE CONTACT: The Friedman Building 1701 18th Avenue South, Seattle 98144 PRICE: $4,800,000 FEATURES: LAND SF: 40,000 SF + Fantastic Large Townhome Site BUILDING SF: 33,332

More information

Element D Services Electrical

Element D Services Electrical Security Systems PART 1 - GENERAL 1.01 OVERVIEW A. The objective for each security design element is to help MD Anderson meet its mission and vision by promoting an environment in which higher education,

More information

Pima Regional Remote Sensing Program

Pima Regional Remote Sensing Program Pima Regional Remote Sensing Program Activity Orthophoto GIS Mapping and Analysis Implementing Agency Pima Association of Governments (Tucson, Arizona area Metropolitan Planning Organization) Summary Through

More information

Light Rail Transit in Phoenix

Light Rail Transit in Phoenix 4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February

More information

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain Effect on structures Uniform settlement - no concerns Angular distortion - causes damage due to tensile strain 1/500 - safe limit for no cracking of buildings 1/150 - potential structural damage 36 37

More information

State of Good Repair Assessment Dallas Area Rapid Transit

State of Good Repair Assessment Dallas Area Rapid Transit State of Good Repair Assessment Dallas Area Rapid Transit Mike Hubbell Vice President, Maintenance Dallas Area Rapid Transit FTA Roundtable Chicago IL July 23, 2010 1,714 vehicles 232 track miles ROW 63.5M

More information

Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010)

Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010) Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010) Summary Description Proposed Project: Electrified Commuter Rail 30.2 Miles, 13 Stations Total

More information

Automatic Door Selection Guide

Automatic Door Selection Guide Automatic Door Selection Guide AAADM 1300 Sumner Avenue Cleveland, OH 44115 P: 216-241-7333 F: 216-241-0105 aaadm@aaadm.com Automatic Door Selection Guide General: The members of AAADM manufacture an assortment

More information

2015 RISK ASSESSMENT AND PROGRAM EVALUATION AND AUDIT PLAN January 20, 2015

2015 RISK ASSESSMENT AND PROGRAM EVALUATION AND AUDIT PLAN January 20, 2015 2015 RISK ASSESSMENT AND PROGRAM EVALUATION AND AUDIT PLAN January 20, 2015 Requirements of the Standards The Institute of Internal Auditors International Standards for the Professional Practice of Internal

More information

Project Management Oversight Services

Project Management Oversight Services Solicitation Number: Reference-Number-FTA-08-PMOC Project Management Oversight Services Federal Transit Administration Our fundamental business strategy is forging strong, long-term relationships with

More information

Manager of Community Planning and Development

Manager of Community Planning and Development Manager of Community Planning and Development City of Denver: Manager of Community Planning and Development The City and County of Denver is a world-class municipal government that is leading the way with

More information

NEW BLUE LINE CONNECTIONS

NEW BLUE LINE CONNECTIONS Washington Metropolitan Area Transit Authority NEW BLUE LINE CONNECTIONS 3/31/2014 A Major Capital Project of Momentum s Metro 2025 Program In support of its new strategic plan, Metro has considered the

More information

From: HDR Engineering & Oz Engineering Project: AZTech TM Transit Data Integration Concepts of Operation. Date: July 29, 2009 Job No: 105240

From: HDR Engineering & Oz Engineering Project: AZTech TM Transit Data Integration Concepts of Operation. Date: July 29, 2009 Job No: 105240 To: Faisal Saleem, MCDOT James Book, RPTA Technical Memo From: HDR Engineering & Oz Engineering Project: AZTech TM Transit Data Integration Concepts of Operation CC: Tomas Guerra Saroja Devarakonda, File

More information

Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps

More information

ADVERTISING GOLD COAST TRANSIT

ADVERTISING GOLD COAST TRANSIT GOLD COAST TRANSIT ADVERTISING GET YOUR MESSAGE ON THE MOVE! Advertising on Gold Coast Transit buses reaches nearly 400,000 residents within the communities of Ojai, Ventura, Oxnard, and Port Hueneme.

More information

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.1 FINANCIAL ANALYSIS The cost of a transportation investment falls into two categories: capital costs, and operating and maintenance (O&M) costs.

More information

Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey

Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey In its second meeting, the Infrastructure and Growth Leadership Advisory Group expanded and refined the list of approaches/ideas

More information

NORTH RED AND PURPLE MODERNIZATION PROJECT

NORTH RED AND PURPLE MODERNIZATION PROJECT RED AD PURPLE MDERIZATI PRJECT Environmental Impact Statement Scoping Information January 2011 ITRDUCTI The Chicago Transit Authority (CTA) is proposing to make improvements, subject to the availability

More information

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County Building Permit Application Packet The purpose of Building Codes is to establish the minimum requirements to safe guard the public health, safety and general welfare through structural strength, means

More information

FREDericksburg Regional Transit (FRED) REAL-TIME SCHEDULING SOFTWARE, BUS STOP ANNUNCIATOR AND TRANSIT WEBSITE PROCUREMENT

FREDericksburg Regional Transit (FRED) REAL-TIME SCHEDULING SOFTWARE, BUS STOP ANNUNCIATOR AND TRANSIT WEBSITE PROCUREMENT FREDericksburg Regional Transit (FRED) REAL-TIME SCHEDULING SOFTWARE, BUS STOP ANNUNCIATOR AND TRANSIT WEBSITE PROCUREMENT Technical Memorandum and Concept of Operations Prepared for: Prepared by: March

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A ORANGE COUNTY TRANSPORTATION AUTHORITY Final Long-Range Transportation Plan - Destination 2035 Attachment A DESTINATION 2035 DESTINATION 2035 EXECUTIVE SUMMARY ATTACHMENT A Moving Toward a Greener Tomorrow

More information

Metro Rail Gating Study

Metro Rail Gating Study Executive Management & Audit Committee Item # 27 Operations Committee Item # 43 FINAL DRAFT Metro Rail Gating Study Los Angeles, California November 15, 2007 Filename/RPS Number 1 Briefing Contents Executive

More information

SYSTEMWIDE REQUIREMENTS

SYSTEMWIDE REQUIREMENTS SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a

More information

Experts in Rail Maintenance and Infrastructure

Experts in Rail Maintenance and Infrastructure Experts in Rail Maintenance and Infrastructure It is with great people and pride, rooted in a culture of safety, D that Transdev delivers systems, technologies, and business processes to strengthen rail

More information

Security Strategy: A Layered Approach. Anthony Mercogliano Metropolitan Transportation Authority Assistant Director of Security New York, NY

Security Strategy: A Layered Approach. Anthony Mercogliano Metropolitan Transportation Authority Assistant Director of Security New York, NY Security Strategy: A Layered Approach Anthony Mercogliano Metropolitan Transportation Authority Assistant Director of Security New York, NY Protecting the System Operating Components System Overview Policing

More information

Examples of Transportation Plan Goals, Objectives and Performance Measures

Examples of Transportation Plan Goals, Objectives and Performance Measures Examples of Transportation Plan Goals, Objectives and Performance Measures The next step in the Long Range Transportation Plan (LRTP) process is to develop goals, objectives, and performance measures.

More information

Los Angeles Metro Rapid

Los Angeles Metro Rapid Los Angeles Metro Rapid Why BRT In Los Angeles Public dissatisfied with slow bus service Average bus speeds had declined by 10% since late- 1980s LADOT found that 50% of the time a bus is in service it

More information

Transit Technology Alternatives

Transit Technology Alternatives Transit Technology Alternatives Fixed Guideway Systems (see http://www.apta.com/research/info/define/index.cfm) Heavy rail - HR Heavy Rail is a system that is totally separated from its surroundings and

More information

Los Angeles County Metropolitan Transportation Authority. (Metro) Advanced Transportation Management System (ATMS) Overview

Los Angeles County Metropolitan Transportation Authority. (Metro) Advanced Transportation Management System (ATMS) Overview Los Angeles County Metropolitan Transportation Authority Los Angeles County Metropolitan Transportation Authority (Metro) Advanced Transportation Management System (ATMS) Overview June, 2010 ATMS is Supported

More information

APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL

APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL DRAFT APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL Operations and Maintenance Cost Methodology and Results The Colorado Department of Transportation is conducting an Advanced Guideway System

More information

THE SMART CITY OF THE FUTURE

THE SMART CITY OF THE FUTURE THE SMART CITY OF THE FUTURE CONTENTS Introduction Lusail Smart City Vision Lusail Master Plan Focus on Improved Sustainable Living Lusail Smart City Pillars Lusail Smart City Fiber Optic Network Lusail

More information

Triangle Transit Financial Plan. Durham Orange Light Rail Transit Project

Triangle Transit Financial Plan. Durham Orange Light Rail Transit Project Durham Orange Light Rail Transit Project September 2012 TABLE OF CONTENTS LIST OF TABLES... ii LIST OF FIGURES... iii 1. Introduction... 1 1 1.1. DESCRIPTION OF PROJECT SPONSOR... 1 1 1.1.1. Durham Transit

More information

Wisconsin Department of Transportation Beltline Planning and Environmental Linkages Existing Conditions Report

Wisconsin Department of Transportation Beltline Planning and Environmental Linkages Existing Conditions Report SECTION 5 TRANSIT 5.01 SUMMARY A. Summary The Madison metro area is served by an outstanding transit system for an area its size. Madison Metro s ridership increased 30 percent between 2005 and 2011 reaching

More information

Passenger Charter Annual Progress Report April 2010 March 2011

Passenger Charter Annual Progress Report April 2010 March 2011 Passenger Charter Annual Progress Report April 2010 March 2011 Letter from Gary McNeil Dear Passengers, In November 2010, we launched GO Transit s first ever Passenger Charter a set of five promises that

More information

SALT LAKE AND OGDEN/ LAYTON URBAN AREA. Federal Transit Administration (FTA)

SALT LAKE AND OGDEN/ LAYTON URBAN AREA. Federal Transit Administration (FTA) SALT LAKE AND OGDEN/ LAYTON URBAN AREA Public Transit Program Federal Transit Administration (FTA) Section 5307 Urbanized Area Formula Section 5309 Capital Investment Program New Starts Section 5309 Capital

More information

Photo credit: City of Denver DENVER UNION STATION-CHERRY CREEK-GLENDALE CORRIDOR FEASIBILITY STUDY RECOMMENDATIONS REPORT

Photo credit: City of Denver DENVER UNION STATION-CHERRY CREEK-GLENDALE CORRIDOR FEASIBILITY STUDY RECOMMENDATIONS REPORT Photo credit: City of Denver DENVER UNION STATION-CHERRY CREEK-GLENDALE CORRIDOR FEASIBILITY STUDY RECOMMENDATIONS REPORT January 2014 CONTENTS Study Purpose 4 Data Sources 5 Existing Conditions 5 Market

More information

Learn how all this can be achieved. architecture AND save money. exceptional. with the SALT LAKE CITY, UT PERMIT # US POSTAGE PAID FIRST CLASS

Learn how all this can be achieved. architecture AND save money. exceptional. with the SALT LAKE CITY, UT PERMIT # US POSTAGE PAID FIRST CLASS The ONLY horizontal sliding fire-door with these unique features: Spans unlimited widths, heights up to 23 feet Meets fire codes without being seen Approved for egress applications Automatic closing and

More information

Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015)

Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015) Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total Capital

More information

Physical Security Checklist and Inventory

Physical Security Checklist and Inventory Tool 1: Assessing Robbery Risk Physical Security Checklist and Inventory Any assessment of robbery risk begins with an evaluation and inventory of the measures you are already taking as a financial institution.

More information

Transit, Rail, Program, Project & Construction Management Experience

Transit, Rail, Program, Project & Construction Management Experience Point of Contact Peter M. Cipolla Vice President, Rail & Transit Mobile: 925.219.5235 Email: peter.cipolla@hatchmott.com Project Management Oversight Services Introduction & Background Hatch Mott MacDonald

More information

Planning of the Pre-Concept Architectural Design For the McGill University Health Centre, Montreal

Planning of the Pre-Concept Architectural Design For the McGill University Health Centre, Montreal Planning of the Pre-Concept Architectural Design For the McGill University Health Centre, Montreal Robert Hamilton Robert A. Hamilton MRAIC, OAQ Robert Hamilton is Senior Associate responsible for Architectural

More information

time and thought that the buses had a higher on-time arrival rate than the actual on-time arrival rate. 2

time and thought that the buses had a higher on-time arrival rate than the actual on-time arrival rate. 2 TriMet Transit Tracker Implementation Summary Transit Tracker is a real-time bus arrival prediction system that provides information to riders at bus stops and light rail stations with a count down in

More information

CHAPTER 8: INTELLIGENT TRANSPORTATION STSTEMS (ITS)

CHAPTER 8: INTELLIGENT TRANSPORTATION STSTEMS (ITS) CHAPTER 8: INTELLIGENT TRANSPORTATION STSTEMS (ITS) Intelligent Transportation Systems (ITS) enables people and goods to move more safely and efficiently through a state-of-the-art multi-modal transportation

More information

APPLICATION FORM MASS TRANSIT PROGRAM GRANT APPLICATION PROJECT NAME LEAD AGENCY PROJECT TYPE GENERAL PROJECT AREA

APPLICATION FORM MASS TRANSIT PROGRAM GRANT APPLICATION PROJECT NAME LEAD AGENCY PROJECT TYPE GENERAL PROJECT AREA Received by: Date: OFFICIAL USE: MASS TRANSIT PROGRAM GRANT APPLICATION PROJECT NAME LEAD AGENCY PROJECT TYPE GENERAL PROJECT AREA APPLICATION FORM Planning/ Project Development Capital/Equipment Amenities/

More information

Customer Satisfaction Index 2014

Customer Satisfaction Index 2014 Customer Satisfaction Index 01 Contents Executive summary Customer satisfaction methodology Initiatives to improve customer satisfaction November 01 results Overall train network Overall bus regions Overall

More information

Transportation Alternatives

Transportation Alternatives 1 Transportation Alternatives Transportation alternatives involve a variety of components: Location Alternatives - when and where service is provided - general location as well as level of service on the

More information

BOARD OF DIRECTORS REPORT

BOARD OF DIRECTORS REPORT BOARD OF DIRECTORS REPORT To: Phil Washington, General Manager Date: From: Bruce Abel, Assistant General Manager of Bus Operations GM Date: April 9, 2012 Board Meeting Date: May 15, 2012 Subject: August

More information

Notice of Public Hearing Washington Metropolitan Area Transit Authority Docket B13-01

Notice of Public Hearing Washington Metropolitan Area Transit Authority Docket B13-01 Notice of Public Hearing Docket B13-01 PROGRAM OF PROJECTS FOR FEDERAL FISCAL YEAR 2013 FUNDS AUTHORIZED UNDER THE MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY ACT (MAP-21) AND THE PASSENGER RAIL INVESTMENT

More information

Performance Goals and Objectives:

Performance Goals and Objectives: Online Briefing Winter 2011 2012 Purpose: The purpose of the Project is to examine and recommend ways of introducing higher passenger train speeds on the Empire Corridor and ways to improve reliability,

More information

URBAN PUBLIC TRANSPORT PLANNING IN TEHRAN AND THE OUTCOME OF THE IMPLEMENTED BRT LINES

URBAN PUBLIC TRANSPORT PLANNING IN TEHRAN AND THE OUTCOME OF THE IMPLEMENTED BRT LINES United Nations Forum on Climate Change Mitigation, Fuel Efficiency and Sustainable Urban Transport URBAN PUBLIC TRANSPORT PLANNING IN TEHRAN AND THE OUTCOME OF THE IMPLEMENTED BRT LINES S. MEHDI TASHAKKORI

More information

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines A. Offices a. Office buildings should be built to the minimum required setback. b. Surface parking should be located towards the

More information

Table of Contents. 3. The Lessons... 19

Table of Contents. 3. The Lessons... 19 Table of Contents Executive Summary... 3 Lessons Learned... 4 FasTracks Program Background... 5 FasTracks 2009 Lessons Learned Master Contact List... 7 Planning/Environmental Studies... 8 1. Overview...

More information

TCRP Report 153: Guidelines for Providing Access to Public Transportation Stations. Part 2: Station Typology and Mode of Access Planning Tool

TCRP Report 153: Guidelines for Providing Access to Public Transportation Stations. Part 2: Station Typology and Mode of Access Planning Tool TCRP Report 153: Guidelines for Providing Access to Public Transportation Stations Part 2: Station Typology and Mode of Access Planning Tool Jamie Parks, AICP Kittelson & Associates, Inc. Acknowledgements

More information

Intelligent Transport for Smart Cities Conference. Bruce McCuaig, President and CEO, Metrolinx

Intelligent Transport for Smart Cities Conference. Bruce McCuaig, President and CEO, Metrolinx Intelligent Transport for Smart Cities Conference Bruce McCuaig, President and CEO, Metrolinx 2 Transportation Trends 2013 2031 82 minutes spent commuting 109 6.6 9 million residents in the GTHA 3 The

More information

MANAGEMENT PLAN. Fiscal Year 2015-2016

MANAGEMENT PLAN. Fiscal Year 2015-2016 MANAGEMENT PLAN Fiscal Year 2015-2016 May 6, 2015 Table of Contents I. Executive Summary... 2 Omnitrans Vision... 5 Omnitrans Mission Statement... 5 II. Strategic Initiatives... 5 Implementation... 6 Strategic

More information

For more information, visit: rethinkingstreets.com

For more information, visit: rethinkingstreets.com For more information, visit: rethinkingstreets.com 37 Arterial Rehab Busy, multi-lane streets, often referred to as arterials, crisscross the landscape of our cities and suburbs. Alongside these wide thoroughfares,

More information

DEPARTMENT OF TRANSPORTATION

DEPARTMENT OF TRANSPORTATION DEPARTMENT OF TRANSPORTATION UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION Funding Highlights: Invests a total of $74 billion in discretionary and mandatory budgetary resources for the Department

More information

Airport Rail Link is gathering speed. Wolfgang Rueprich, Project Manager Airport Rail Link, October 21, 2009

Airport Rail Link is gathering speed. Wolfgang Rueprich, Project Manager Airport Rail Link, October 21, 2009 Airport Rail Link is gathering speed Wolfgang Rueprich, Project Manager Airport Rail Link, October 21, 2009 Integrated Public Transit System for Metropolitan Regions Regional / Long Distance Rail Service

More information

Montgomery County Bus Rapid Transit System Information Technology Needs

Montgomery County Bus Rapid Transit System Information Technology Needs Montgomery County Bus Rapid Transit System Information Technology Needs Department of Technology Services Department of Transportation Montgomery County Government, MD 3/7/2012 2011 by Montgomery County

More information

Public Works and Transportation Bus Service Hub Terminal HVAC, Canopy, AVL Sign Equipment

Public Works and Transportation Bus Service Hub Terminal HVAC, Canopy, AVL Sign Equipment Public Works and Transportation Bus Service Hub Terminal HVAC, Canopy, AVL Sign Equipment 1. Construction of Canopy. The original Request for Bids for the project included a 30-foot canopy extending along

More information

Mainstreaming Incident Management in Design-Build: The T-REX Experience

Mainstreaming Incident Management in Design-Build: The T-REX Experience Mainstreaming Incident Management in Design-Build: The T-REX Experience Patricia B. Noyes Abstract The Colorado Department of Transportation (CDOT) initiated a design-build project on I-25 and I-225 in

More information

10 Aviation Element. 10.1 Introduction. 10.1.1 Purpose of Chapter

10 Aviation Element. 10.1 Introduction. 10.1.1 Purpose of Chapter 10 Aviation Element 10.1 Introduction 10.1.1 Purpose of Chapter This chapter provides the aviation element of the RFATS 2035 Long Range Transportation Plan. It describes the existing conditions and trends

More information

SURVEY OF UNITED STATES TRANSIT SYSTEM SECURITY NEEDS AND FUNDING PRIORITIES SUMMARY OF FINDINGS. April 2004

SURVEY OF UNITED STATES TRANSIT SYSTEM SECURITY NEEDS AND FUNDING PRIORITIES SUMMARY OF FINDINGS. April 2004 SURVEY OF UNITED STATES TRANSIT SYSTEM SECURITY NEEDS AND FUNDING PRIORITIES SUMMARY OF FINDINGS April 2004 American Public Transportation Association 1666 K Street, N.W. Suite 1100 Washington, DC 20006

More information

Financial Plan Status Report

Financial Plan Status Report Financial Plan Status Report Broward MPO Board March 13, 2014 Financial Sub-Committee Membership SFRTA (lead agency) Broward MPO FDOT Miami-Dade MPO Palm Beach MPO South Florida Regional Planning Council

More information

Total Capital Budget Review

Total Capital Budget Review Finance, Administration and Oversight Committee Information Item IV-A May 14, 2009 Total Capital Budget Review Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Adapting to Climate Change Through Asset Management Planning. Tiffany Batac David Rose, PhD Parsons Brinckerhoff

Adapting to Climate Change Through Asset Management Planning. Tiffany Batac David Rose, PhD Parsons Brinckerhoff Adapting to Climate Change Through Asset Management Planning Tiffany Batac David Rose, PhD Parsons Brinckerhoff 1 2 Agenda FTA Transit Climate Change Adaptation Assessment Pilots: MARTA Study Framework

More information

Cisco Mobile Network Solutions for Commercial Transit Agencies

Cisco Mobile Network Solutions for Commercial Transit Agencies Cisco Mobile Network Solutions for Commercial Transit Agencies Overview Commercial transit agencies provide a vital service to our communities. Their goal is to provide safe, affordable, and convenient

More information

2035 Statewide. Transportation Plan. Transit TECHNICAL REPORT. March 2008 DEPARTMENT OF TRANSPORTATION

2035 Statewide. Transportation Plan. Transit TECHNICAL REPORT. March 2008 DEPARTMENT OF TRANSPORTATION 2035 Statewide Transportation Plan Transit TECHNICAL REPORT March 2008 DEPARTMENT OF TRANSPORTATION Colorado 2035 Statewide Transportation Plan Transit Technical Report Table of Contents Introduction...

More information

Financial Plan & Implementation. Matrix

Financial Plan & Implementation. Matrix Financial Plan & Implementation Matrix Revenue Projections and Financial Assumptions 1.0 Context. Background. The development of the financial plan is consistent with requirements regarding the development

More information

2012 King County Metro Transit Peer Agency Comparison on Performance Measures

2012 King County Metro Transit Peer Agency Comparison on Performance Measures 2012 Peer Agency Comparison on Performance Measures Department of Transportation Metro Transit Division King Street Center, KSC-TR-0415 201 S. Jackson St Seattle, WA 98104 206-553-3000 TTY Relay: 711 www.kingcounty.gov/metro

More information

Alternatives Report. October 2015 46

Alternatives Report. October 2015 46 D. Alternative 11 Alternative 11 was developed as a straighter alternative to the large, gradual curve of Alternative 3. Two options for Alternative 11 would provide a straightened alignment that would

More information

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet City of Colleyville Community Development Department Site/Landscape Plan Application Packet Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning

More information

e: info@amco.gr w: www.amco.gr Inspired Technologies

e: info@amco.gr w: www.amco.gr Inspired Technologies Amco SA 25 Amfiaraou str., PO 10442, Athens, Greece Production plant 7th Km Korinthou-Argous Nat. Road PO 20100, Korinthos, Greece t: +30 2105907000 f: +30 2105912711 e: info@amco.gr w: www.amco.gr Inspired

More information

TSA Implementation - Airport Security Initiatives 2011

TSA Implementation - Airport Security Initiatives 2011 Airport Security Initiatives Philadelphia International Airport Secure Exit Lane System Terminals D and E Presented to ACI Public Safety and Security Conference Fall 2011 August 30, 2011 History and Development

More information

Philadelphia County. Land Use and Growth Management Profile

Philadelphia County. Land Use and Growth Management Profile Philadelphia County is located in the southeastern corner of Pennsylvania and is bordered by the Pennsylvania counties of Delaware, Montgomery, and Bucks, and the New Jersey counties of Burlington, Camden,

More information

Executive Summary. Does a Streetcar Make Sense in Anaheim

Executive Summary. Does a Streetcar Make Sense in Anaheim Does a Streetcar Make Sense in Anaheim Streetcar in Portland s Pearl District Anaheim s proposed streetcar compares well with national best practice in Portland, Seattle and Tampa where new streetcars

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of Azerbaijan, the Ministry of Transport and Baku Metro Company requested ADB to help improving its urban transport system and

More information

Addendum to the Arterial Transitway Corridors Study

Addendum to the Arterial Transitway Corridors Study January 2013 1 Addendum to the Arterial Transitway Corridors Study The Arterial Transitway Corridors Study (ATCS) evaluated and prioritized arterial bus rapid transit (BRT) improvements to nine corridors

More information

Newton Public Schools Security Audits Executive Summary

Newton Public Schools Security Audits Executive Summary Newton Public Schools Security Audits Executive Summary February 2013 Security audit process January 3 Email to administrators on school security January 4 Email to all staff on school security January

More information

The Commonwealth of Massachusetts Executive Office of Public Safety Department of Fire Services

The Commonwealth of Massachusetts Executive Office of Public Safety Department of Fire Services MITT ROMNEY GOVERNOR KERRY HEALEY LT. GOVERNOR EDWARD A. FLYNN SECRETARY The Commonwealth of Massachusetts Executive Office of Public Safety Department of Fire Services P.O. Box 1025 State Road Stow, Massachusetts

More information

Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects

Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects C2012-0684 ATTACHMENT 2 The RouteAhead draft 30-year rapid transit plan was developed in coordination with the Investing in

More information