1 Strategic Regional Transit Plan December 2008 Chapter 6: Run Time nalysis (Chapter 6 originally prepared October 2007)
2 RUN TIME NLYSIS TLE OF CONTENTS 1.0 INTRODUCTION SCREEN TWO LTERNTIVES RUN TIME ESTIMTION SSUMPTIONS COMPRISON OF RUN TIMES LTERNTIVE DESCRIPTIONS ND RUN TIME COMPRISONS... 4 South Florida Regional Transportation uthority Page i
3 1.0 INTRODUCTION The purpose of this working paper is to document the analysis of run time estimation for the various corridor alternatives. Corridor alternatives developed for the Strategic Regional Transit Plan (SRTP) have gone through an evaluation process (Screen One and Screen Two) to determine the highest opportunity corridors. Part of the evaluation process criteria includes performance measures related to alternative ridership. lternative ridership is estimated through travel demand model runs. To establish a model run, run time estimates must be developed for each of the alternative alignments and modes of transit (e.g., bus rapid transit, light rail transit, etc). lternative alignment run times (model based run times) where developed for these travel demand model runs using standard alternative development practices for systems level planning (i.e., general assumptions versus specific detailed assumptions). Secondary to the run times developed for the travel demand model runs, run time estimates have been developed for bus mode alternatives using a more detailed set of assumptions. These run time estimates, called assumption specific run times attempt to estimate run times using a bit more detailed level of assumptions. These run times have been developed to gain a better comfort level of the model run times in relation to overall capital and operating cost estimates. The difference in methodology for developing run time estimates between the model based run times and the assumption specific run times only applies to the bus mode alternatives (e.g., rapid bus alternative). Rail mode alternative run times where developed for the travel demand model with more specific assumptions, specifically because they generally operate in exclusive right-of-way. s corridor projects advance, an increased level of knowledge and detail becomes available regarding the nature in which the transit service would operate within a given corridor. This advanced knowledge produces improved assumptions related to alignment, station locations, traffic signal systems, and physical improvements impacting vehicle travel times. This increased knowledge supports the use of assumption specific run time estimation. ssumption specific run time estimates are generally used on corridor projects as they advance through corridor level development, such as lternatives nalysis, Environmental Impact Statement (EIS) and Preliminary Engineering (PE). lthough the corridors under study are not advanced through a higher level of corridor development (e.g., or EIS), some more specific assumptions where applied regarding signal delays, dwell times and travel speeds for each of the bus transit corridors. Further detailed assumptions would be required as individual corridors advance into lternatives nalysis (). brief description of how the two run time estimates were developed is described below. based run time estimates: Run time estimates for the travel demand model where developed for multiple modes. For rail modes, run times where estimated using vehicle performance characteristics, assuming exclusive right-of-way, consistent with modes currently operated in the region (Metrorail heavy rail and Tri-Rail South Florida Regional Transportation uthority Page 1
4 traditional push/pull commuter rail operation). DMU and LRT run times where also developed using typical vehicle performance characteristics. us mode or rapid bus alternative run time estimates where developed using a relationship between existing bus run times (e.g., Dade MX and roward State Road 7 service) and existing roadway level of service (LOS). This relationship is transferred to future year conditions to determine bus run times for the alternatives. run time estimates: These run time estimates are based on assumptions related to 1) vehicle performance (e.g., acceleration/deceleration, maximum speed, doorway configuration and passenger boarding and alighting times), 2) corridor characteristics (e.g., highway, major arterial, local collector roadway, speed limits, traffic signal spacing) and 3) alignment assumptions (e.g., station locations and spacing, exclusive versus non-exclusive right-of-way, signal systems and delays, physical improvements like queue jumper lanes). 2.0 SCREEN TWO LTERNTIVES based run times were developed for each alternative (based on proposed mode of transit). s noted above, run time estimates for rail mode alternatives utilize characteristics consistent with assumption specific based run time estimates, therefore these run times were not estimated again using an assumption specific methodology. dditionally, some of the corridor alternatives are projects that have advanced through a more detailed level of analysis (e.g., lternatives nalysis) which has resulted in a more refined level of run time estimates and thus have been used in the travel demand model runs. Following is a list of Screen Two lternatives for which assumption specific run time estimates were developed. 31 North-South Premium us 31K Wellington Rapid us 31L Military Trail Rapid us 31N Pines Rapid us 31O Oakland Park Rapid us 31Q Kendall Drive Rapid us 31R 137 th venue Rapid us to Palmetto and the MIC 31S Douglas Road Rapid us comparison of travel demand model based run times estimates and assumptions specific based run times in detailed below in section 4. South Florida Regional Transportation uthority Page 2
5 3.0 RUN TIME ESTIMTION SSUMPTIONS run time estimates for bus alternatives are based on assumptions related to: Vehicle performance, Corridor characteristics, and lignment assumptions. With regards to transit travel times, important vehicle performance factors include vehicle acceleration and deceleration; door cycle time and width; and low floor versus standard transit coach. Vehicle performance is typically constant (with minimal influence on travel times) and is dependent on the vehicle type used, such as the vehicle manufacturer and the size of the vehicle. Vehicle manufacturers produce vehicles with similar or identical performance criteria to one another, resulting in little or no impact in corridor travel times related to vehicle performance differences. Corridor characteristics include the type of roadway (e.g., highway / interstate, major arterial, local collector road, etc.), posted travel speed limits, signal spacing and signal timing. Corridor characteristics can vary significant from one corridor to another as well as within a given corridor. Therefore, corridor characteristics are considered variable in nature with significant influence on overall corridor travel times. lignment assumptions include factors such as station location and spacing, type of right-of-way used by the transit service (exclusive versus non-exclusive), signal systems and delays, and physical improvements such as queue jumper lanes or fly over ramps. lignments assumptions have a significant impact on overall corridor travel times. The use of exclusive versus non-exclusive right-of-way can result in half the travel time. Signal systems also impact travel times. Signals that are timed to produce consistent flows along the corridor assist in speeding the travel times whereas signals with priority timing to cross streets increase the overall travel times along a corridor. Lastly, physical improvements like queue jumper lanes, bus only lanes or fly over ramps can speed travel times significantly by allowing the bus rapid transit service to bypass typically traffic congested areas or intersections along a corridor. 4.0 COMPRISON OF RUN TIMES Many of the bus rapid transit corridors identified under this study are conceptually defined. t this level of definition, run time estimates were developed using a relationship between existing bus run times and roadway level of service transferred to 2030 roadway network level of service. These travel times provide consistency between the corridor alternatives and are appropriate for this level of study. More detailed travel times where also developed with specific assumptions (assumption specific). These run times have been developed to gain a better comfort level of the model run times in relation to overall capital and operating cost estimates. These run South Florida Regional Transportation uthority Page 3
6 times provide insight into potential differences in operating and capital costs as these corridor projects advance. Consideration should be given to developing more detailed run time estimates as each project is advanced through project development. Much like capital and O&M cost estimates, as the project is developed further along, refinements to the run times will help provide improved accuracy in ridership estimates, operating costs and capital costs. Corridor run time comparisons made below are done for the purpose of comparison and do not suggest inaccuracy of either method of run time estimation. ssumption specific run times make assumptions regarding signal timing and dwell times that would require further refinement as projects advance. 4.1 LTERNTIVE DESCRIPTIONS ND RUN TIME COMPRISONS 31 North-South Premium us This project consists of the following four service patterns: - Dadeland South to the Miami Intermodal Center - Palmetto rea to the HEFT C Palmetto rea to Sawgrass Mills rea D Sawgrass Mills rea to I-95, oca Town Center and Mizner Park One-Way Travel Time verage Speed (miles 31K Service Pattern C D C D Wellington Rapid us Travel Demand Model ased / / / / / / / / 29.6 This project provides service along Okeechobee oulevard from Wellington in the vicinity of U.S. 441 and Forest Hill oulevard to Downtown West Palm each. verage Speed (miles ased / / 17.1 South Florida Regional Transportation uthority Page 4
7 31L Military Trail Rapid us This project provides service along Military Trail from downtown oca Raton to north of Downtown West Palm each. verage Speed (miles ased / / N Pines Rapid us This project provides service along Pines / Hollywood oulevard with two service patterns: SW 160 th venue (Pembroke Pines West) to Downtown Hollywood / FEC SW 160 th venue (Pembroke Pines West) to NW 215 th Street (Metrorail North Corridor) One-Way Travel Time verage Speed (miles Service Pattern Travel Demand Model ased / / / / O Oakland Park Rapid us This project provides service along Oakland Park oulevard with two service patterns: Sawgrass Mills to FEC Sawgrass Mills to Cypress Creek Tri-Rail Station One-Way Travel Time verage Speed (miles Service Pattern Travel Demand Model ased / / / / 18.8 South Florida Regional Transportation uthority Page 5
8 31Q Kendall Drive Rapid us This project provides service along Kendall Drive from the proposed Sunset KT Metrorail Extension to Dadeland South. verage Speed (miles 31R ased / / th venue Rapid us to Palmetto and the MIC This project provides service along SW 137 th venue and 8 th Street from Kendall to Palmetto and the MIC. verage Speed (miles ased / / S Douglas Road Rapid us This project provides service along Douglas Road between the MIC and the Douglas Road Metrorail Station verage Speed (miles ased / / 14.9 South Florida Regional Transportation uthority Page 6
South Florida East Coast Corridor (SFECC) Projects. February 7, 2012
Project Update to City of Ft. Lauderdale Central lbroward deast West ttransit it& South Florida East Coast Corridor (SFECC) Projects February 7, 2012 Transit Studies Building a network of premium transit.
Light Rail Transit in Phoenix
4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February
BENEFITS TO THE CITIES. May 11, 2006
BENEFITS TO THE CITIES May 11, 2006 What Does Coconut Creek Receive with the Sales Tax Initiative? Annual direct distribution of over $740,000 to be spent at their discretion on transit and 10-Minute headways
Jess Linn Principal Planner, Development Services Division Miami-Dade Regulatory and Economic Resources
Eric Silva, AICP Assistant Director, Development Services Division Miami-Dade Regulatory and Economic Resources Albert Hernandez, P.E. Deputy Director, Planning and Engineering Miami-Dade Transit Jess
Mount Royal College Transit Service Plan
Mount Royal College Transit Service Plan Background In 2007 November response to Council Report C2007-78 West LRT Alignment, Budget and Project Delivery, Council directed the Administration to report back
Los Angeles Metro Rapid
Los Angeles Metro Rapid Why BRT In Los Angeles Public dissatisfied with slow bus service Average bus speeds had declined by 10% since late- 1980s LADOT found that 50% of the time a bus is in service it
CAPACITY AND LEVEL-OF-SERVICE CONCEPTS
CHAPTER 2 CAPACITY AND LEVEL-OF-SERVICE CONCEPTS CONTENTS I. INTRODUCTION...2-1 II. CAPACITY...2-2 III. DEMAND...2-2 IV. QUALITY AND LEVELS OF SERVICE...2-2 Service Flow Rates...2-3 Performance Measures...2-3
Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects
Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects C2012-0684 ATTACHMENT 2 The RouteAhead draft 30-year rapid transit plan was developed in coordination with the Investing in
Transportation Alternatives
1 Transportation Alternatives Transportation alternatives involve a variety of components: Location Alternatives - when and where service is provided - general location as well as level of service on the
Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011
Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for
MIAMI-DADE METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE EXPRESSWAY AUTHORITY (MDX)
XA10016 10016 SR 112 Toll System Conversion LeJeune Road I-95 4.1 Toll System Conversion 4,811 1,723 Activity - - DSB MDX 3,088 0 0 0 0 XA10017 10017 SR 836 Toll System Conversion NW 137th Avenue I-95
When is BRT the Best Option? 1:30 2:40 p.m.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? 1:30 2:40 p.m. Paul Larrousse Director, National Transit Institute (NTI) (Moderator) TRB/APTA 2004 Bus Rapid Transit Conference Session
Executive Summary. Transportation Needs CHAPTER. Existing Conditions
CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in
Downtown Tampa Transportation Vision
Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org
Overview of the Travel Demand Forecasting Methodology
Overview of the Travel Demand Forecasting Methodology Prepared by the Central Transportation Planning Staff (CTPS) Authors: Scott A. Peterson, Manager Ian Harrington, Chief Planner March 29, 2008 1 OVERVIEW
Section 6 Traffic Analysis
Section 6 Traffic Analysis Traffic Operations of the Preferred Network Alternative After the Preferred Network was identified and confirmed by local policy makers and area residents, detailed traffic analysis
Introduction to Station Area Planning The Charlotte Story
Introduction to Station Area Planning The Charlotte Story Boston 2009 Steve Hamwey - Sasaki Associates, Inc. Troy Russ - Glatting Jackson, Inc. October 31 st, 2009 Station Area Planning October 15th History
002400 - Miami/Ft. Lauderdale
002400 - Miami/Ft. Lauderdale Description: US 1 ES 185ft S/O SW 104 St F/N - 1 TAB Panel ID: 30740199 City: PINECREST Latitude: 25.674 Media Type: Bulletin State: FL Longitude: -80.32 Display Dimensions:
Executive Summary. Literature/Community Review. Traffic Flows and Projections. Final Report Truck Route System for Miami-Dade County CORRADINO
Executive Summary The Miami-Dade County Metropolitan Planning Organization (MPO) has prepared a Truck Route System Plan for Miami-Dade County. The MPO and its consultants have worked closely with the MPO
FLC 4th Annual Summer Research Symposium: Planes, Trains, Ports & Highways What Keeps Florida Moving?
FLC 4th Annual Summer Research Symposium: Planes, Trains, Ports & Highways What Keeps Florida Moving? Jose Gonzalez SVP - Florida East Coast Industries Wednesday, August 12, 2015 1 Florida East Coast Industries
TRANSIT CONNECTION STUDY
MIAMI-DADE MPO FLORIDA EAST COAST (FEC) TRANSIT CONNECTION STUDY FROM DADELAND NORTH METRORAIL STATION TO MIAMI INTERNATIONAL AIRPORT (MIA) Prepared by Study Purpose The Florida East Coast (FEC) Ludlam
MAKING TRACKS. A Primer for Implementing Transit Fixed Guideway Projects
MAKING TRACKS A Primer for Implementing Transit Fixed Guideway Projects Introduction Demand for new fixed guideway projects is strong nationwide. Each year hundreds of new fixed guideway projects across
ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A
ORANGE COUNTY TRANSPORTATION AUTHORITY Final Long-Range Transportation Plan - Destination 2035 Attachment A DESTINATION 2035 DESTINATION 2035 EXECUTIVE SUMMARY ATTACHMENT A Moving Toward a Greener Tomorrow
Addendum to the Arterial Transitway Corridors Study
January 2013 1 Addendum to the Arterial Transitway Corridors Study The Arterial Transitway Corridors Study (ATCS) evaluated and prioritized arterial bus rapid transit (BRT) improvements to nine corridors
National Bus Rapid Transit Institute (NBRTI) At the University of South Florida
National Bus Rapid Transit Institute (NBRTI) At the University of South Florida History of the NBRTI In January 2001, the National BRT Institute was created at USF s Center for Urban Transportation Research
7.0 Transportation Management
7.0 Transportation Management I. Introduction The Kansas City region has invested considerable effort and resources in the design and implementation of its regional multimodal transportation system. As
FTP/SIS/FMTP Regional Workshop - Miami
FTP/SIS/FMTP Regional Workshop - Miami September 24, 2015 FDOT District 6 Auditorium 1000 N.W. 111 Avenue Miami, Florida 33172 Meeting Highlights Welcome and Introductions Gus Pego, FDOT District 6 Secretary,
The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.
3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation
Comment #1: Provide an interchange at Route 7 and Farm Market Road/White Gate Road. This was studied in the late 1990 s.
Proposed Truck Climbing Lane Route 7 Westbound Between West Market Street and Route 9 UPC# 58599, Project # 6007-053-133, P101 Date of Meeting: August 24, 2010 Time: 6:00PM to 8:00PM Location: Rust Library
2013 QUALITY/ LEVEL OF SERVICE HANDBOOK
2013 QUALITY/ LEVEL OF SERVICE HANDBOOK STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 2013 TABLE OF CONTENTS 1 Executive Summary... 1 2 Q/LOS Handbook Purpose and Scope... 3 2.1. Levels of Analysis...4
MEMORANDUM. Robert Nichols, Acting Corridor Design Manager Northgate Link Extension
MEMORANDUM DATE: September 23, 2014 TO: Robert Nichols, Acting Corridor Design Manager Northgate Link Extension FROM: SUBJECT: COPIES: Katherine Casseday, PE, PTOE, Casseday Consulting Tony Lo, PE, Parsons
General Obligation Bond Projects FYE 2013-2018
General Obligation Bond Projects FYE 2013-2018 2009 City of Norman Community Survey Final Report 2011 CTP Survey Results Storm Drainage and Street Widening Projects Combined Storm Water/Transportation
LRT LIGHT RAIL TRANSIT SERVICE GUIDELINES
LRT LIGHT RAIL TRANSIT SERVICE GUIDELINES LIGHT RAIL TRANSIT SERVICE GUIDELINES LIGHT RAIL TRANSIT SERVICE GUIDELINES TABLE OF CONTENTS 1. Vision Statement...1 2. Modal Overview...1 3. Planning and Implementation
Goals & Objectives. Chapter 9. Transportation
Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system
Partnering for 21 st Century Prosperity
Partnering for 21 st Century Prosperity UniversityCity, A Catalytic Local Project of Regional Significance FLORIDA INTERNATIONAL UNIVERSITY F L O R I D A I N T E R N A T I O N A L U N I V E R S I T Y F
Technical Memorandum PERFORMANCE MEASURES. Prepared by:
Technical Memorandum PERFORMANCE MEASURES Prepared by: March 2014 TABLE OF CONTENTS Executive Summary... 1 1. Introduction... 2 1.1 Performance Measures and the Public Sector... 2 1.2 National Focus: MAP
The Northwest Arkansas Travel Demand Model
The Northwest Arkansas Travel Demand Model Creation and Results John McLarty Northwest Arkansas Regional Planning Commission Cristina Scarlat Center for Advanced Spatial Technologies What is a Travel Demand
Financial Plan Status Report
Financial Plan Status Report Broward MPO Board March 13, 2014 Financial Sub-Committee Membership SFRTA (lead agency) Broward MPO FDOT Miami-Dade MPO Palm Beach MPO South Florida Regional Planning Council
Multi Modal Roadway Transportation Impact Fees and Asset Value
January 2010 SB 360 Article Series: Factors to be Considered in Transitioning from a Road Impact Fee to a Mobility Fee Contributing Authors: Steven A. Tindale, P.E., AICP Robert P. Wallace, P.E., AICP
Strategic Economic Development Assets: Infrastructure in the East Valley
: Infrastructure in the East Valley Presented by: February 2013 1 INFRASTRUCTURE Moving People, Goods and Services In today s global economy, success belongs to the well-connected, especially in the movement
Our Capabilities The EAC Advantage. May 20, 2008
May 20, 2008 Mr. John Bardwell, Contracting Officer Federal Transit Administration 1200 New Jersey Avenue, SE, Room E-42-331 Washington, D.C. 20590 RE: Project Management Oversight (PMO) (Reference No.
Chapter Forty-seven. RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL
Chapter Forty-seven RURAL TWO-LANE/MULTILANE STATE HIGHWAYS (New Construction/Reconstruction) BUREAU OF DESIGN AND ENVIRONMENT MANUAL Illinois RURAL TWO-LANE/MULTILANE STATE HIGHWAYS December 2009 2 Illinois
Proposed Service Design Guidelines
Proposed Service Design Guidelines July 2015 I. Introduction During Phase II of the Reimagining CityBus project, feedback from public outreach and data analysis conducted during Phase I of the project
Citizen s Version 20-THIRTEEN
20-THIRTEEN TRANSPORTATION IMPROVEMENT PROGRAM FISCAL YEARS 2012/2013 to 2016/2017 Citizen s Version METROPOLITAN PLANNING ORGANIZATION FOR THE MIAMI URBANIZED AREA April, 2012 This document was prepared
Chapter 4 TRANSPORTATION A BACKGROUND AND ANALYSIS
Chapter 4 TRANSPORTATION A lthough the Virginia Department of Transportation (VDOT) has primary responsibility for the highway system, Tappahannock is a strong partner in transportation planning. This
Transit Technology Alternatives
Transit Technology Alternatives Fixed Guideway Systems (see http://www.apta.com/research/info/define/index.cfm) Heavy rail - HR Heavy Rail is a system that is totally separated from its surroundings and
AIR QUALITY TECHNICAL MEMORANDUM
AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM GOLDEN GLADES INTERCHANGE PD&E STUDY Miami-Dade County, Florida Financial Management Number: 428358-1-22-01 Efficient Transportation Decision
The LYNX Transit Master Plan. METROPLAN Orlando Presentation
2030 Paw Print: The LYNX Transit Master Plan D b 2010 December 2010 METROPLAN Orlando Presentation Project Partners Project Overview 18 Corridors Bridge between 5 Year Service Plan and Long Range Transportation
Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013
Near Westside Neighborhood and University Avenue Corridor Transportation Study Public Workshop #2 September 12 and 23, 2013 Presentation Outline: Brief Review of Study Scope, Background, and Current Conditions
Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey
Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey In its second meeting, the Infrastructure and Growth Leadership Advisory Group expanded and refined the list of approaches/ideas
2009-3. The Preservation of Local Truck Routes: A Primary Connection between Commerce and the Regional Freight Network
2009-3 The Preservation of Local Truck Routes: A Primary Connection between Commerce and the Regional Freight Network July 2009 This Goods Movement Challenges and Opportunities Report was prepared jointly
Section 2 Alternatives
Section 2 Alternatives 2.1 Introduction As part of the planning process, and in accordance with NEPA and FHWA guidelines, various alternatives were considered for meeting transportation needs within the
2.1 Prior Richmond to South Hampton Roads Rail Service
2.0 BACKGROUND 2.1 Prior Richmond to South Hampton Roads Rail Service The Norfolk and Western (N&W), now NS, the Seaboard Air Line (SAL) and the Atlantic Coast Line (ACL), both now CSXT, previously operated
EPA Technical Assistance for Sustainable Communities Building Blocks
EPA Technical Assistance for Sustainable Communities Technical Assistance Tool: Complete Streets Deerfield Beach, Florida February 16, 2012 To: CC: Amanda Martinez, City of Deerfield Beach Roger Millar,
Chapter 5. Transportation. Decatur County Comprehensive Plan. Introduction. Goals and Objectives. Goal. Objectives. Goal.
Chapter 5 Transportation Chapter 5: Transportation Introduction The transportation system forms the backbone of a community. I-74 connects Decatur County with the large metropolitan areas of Cincinnati
FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005
FHWA Colorado Division Control of Access to the Interstate and its Right-of-Way February 2005 Background: It is in the national interest to maintain the Interstate System to provide the highest level of
Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)
Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total
Surface Transportation Program (STP)
Project Name: Project Sponsor: FEDERAL FUNDS PROJECT APPLICATION TRANSPORTATION IMPROVEMENT PROGRAM 2008-2013 SALT LAKE and OGDEN/ LAYTON URBAN AREAS Surface Transportation Program (STP) Urban Surface
CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND)
Regional Transportation Plan 2035 28 CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND) The Cache Transportation Vision Plan shows roadway, bicycle, transit and pedestrian projects that attempt
Linking Planning and Operations Initiative A Data Driven Approach. Chris Francis Transportation Statistics
Linking Planning and Operations Initiative A Data Driven Approach Chris Francis Transportation Statistics Data Symposium - Traffic Data, Orlando, FL, Oct 23-24, 2014 Outline 2 Emerging Transportation Scene
HERS_IN. HIGHWAY ECONOMIC REQUIREMENTS SYSTEM (for) INDIANA. AASHTO Transportation Estimator Association Conference October 16, 2001
AASHTO Transportation Estimator Association Conference October 16, 2001 HERS_IN HIGHWAY ECONOMIC REQUIREMENTS SYSTEM (for) INDIANA OVERVIEW HERS Background System Planning Tool Development HERS_IN Structure
THE INTEGRATION OF FUNCTION ANALYSIS AND VIRTUAL REALITY SIMULATION
THE INTEGRATION OF FUNCTION ANALYSIS AND VIRTUAL REALITY SIMULATION Richard L. Johnson, PE, CVS, John Dovel, Del Younker, CVS, Chuck Hixon, Craig Miller, PE PMA Consultants LLC 4901 Vineland Road, Suite
URBAN PUBLIC TRANSPORT PLANNING IN TEHRAN AND THE OUTCOME OF THE IMPLEMENTED BRT LINES
United Nations Forum on Climate Change Mitigation, Fuel Efficiency and Sustainable Urban Transport URBAN PUBLIC TRANSPORT PLANNING IN TEHRAN AND THE OUTCOME OF THE IMPLEMENTED BRT LINES S. MEHDI TASHAKKORI
Greg Stuart, Executive Director, Broward MPO
Diana Alarcon, Director, Transportation & Mobility Dept. Darlene Pfeiffer, CAPP, Business Manager Renee Cross, AICP, LEED AP, Principal Planner Kevin Walford, Transportation Planner Greg Stuart, Executive
TRAFFIC IMPACT ANALYSIS
TRAFFIC IMPACT ANALYSIS Presenter Gerry Harter, PE, Area Traffic Engineer Acting Transportation and Land Use Director Why a TIA? Roads are a critical public resource and a major investment of public funds
Who is implementing managed lanes with pricing strategies? Operational Under Construction/ Development
Who is implementing managed lanes with pricing strategies? Operational Under Construction/ Development Managed Lane Facilities in the U.S. Operational Under Construction Under Development I-10 (Katy Freeway),
Walkable Communities Florida Department of Transportation State Safety Office Pedestrian and Bicycle Program April 1995 www.dot.state.fl.us/safety Twelve Steps for an Effective Program Page 1 Twelve Steps
TRAFFIC IMPACT ANALYSIS HANDBOOK VOLUME I METHODOLOGIES & REQUIREMENTS
TRAFFIC IMPACT ANALYSIS HANDBOOK VOLUME I METHODOLOGIES & REQUIREMENTS Downtown panoramic photo provided by 1stACT Silicon Valley (blank below this line) Volume I Methodologies and Requirements TABLE OF
FLORIDA S STRATEGIC INTERMODAL SYSTEM THE
FLORIDA S STRATEGIC INTERMODAL SYSTEM THE at 10 A TEN-YEAR ANNIVERSARY REVIEW 2004-2014 at 10 2004-2014 table of contents Message from the Secretary of Transportation Message from the Manager Florida s
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA. RSTP Funds Joint Application FOR
CITY OF ROANOKE AND TOWN OF VINTON, VIRGINIA RSTP Funds Joint Application FOR Tinker Creek Pedestrian Bridge: Tinker Creek and Glade Creek Greenways Connection Date: September 15, 2014 RSTP Project Profile
Examples of Transportation Plan Goals, Objectives and Performance Measures
Examples of Transportation Plan Goals, Objectives and Performance Measures The next step in the Long Range Transportation Plan (LRTP) process is to develop goals, objectives, and performance measures.
Route Development Plan
WSDOT Northwest Washington Division, Planning and Policy Office Route Development Plan State Route 99 North/Aurora Avenue North From the North end of the Battery Street Tunnel (Mile Post 32.44) to N. 145th
Miami-Dade County s Freight System:
Miami-Dade County s Freight System: Implications for the Commercial Real Estate Industry presented to Miami Association of Realtors' Annual Commercial Conference presented by Michael Williamson, Cambridge
Dallas-Fort Worth Area Major Transportation Projects
Dallas-Fort Worth Area Major Transportation Projects Presented by: Jeffrey C. Neal Program Manager Transportation North Central Texas Council of Governments (NCTCOG) August 14, 2014 Texas Society of Professional
Dallas ICM Conception to Implementation
Dallas ICM Conception to Implementation Transit ITS Best Practices Workshop November 13-14, 2013 Agenda Background Conception Procurement -Deployment Q&A Background-DFW Region 5 th most congested region
Traffic Signal Priority (TSP) and Automatic Vehicle Tracking System (AVTS) For Calgary Transit Buses
Traffic Signal Priority (TSP) and Automatic Vehicle Tracking System (AVTS) For Calgary Transit Buses (Project #2001-06) Calgary Transit Transit Planning 2004 July Introduction The purpose of this report
Highway 138 Corridor Solutions Study Roseburg, Oregon. Technical Memorandum #4: Concept Development and Screening DRAFT
Highway 138 Corridor Solutions Study Roseburg, Oregon Technical Memorandum #4: DRAFT Prepared for Oregon Department of Transportation, Region 3 3500 NW Stewart Parkway Roseburg, Oregon 97470 Prepared by
Evergreen Line Rapid Transit Project
Evergreen Line Rapid Transit Project Preliminary Design November 2009 www.evergreenline.gov.bc.ca Evergreen Line Connecting Coquitlam, Port Moody, Burnaby and Vancouver What is the Evergreen Line Project?
Simulating Traffic for Incident Management and ITS Investment Decisions
1998 TRANSPORTATION CONFERENCE PROCEEDINGS 7 Simulating Traffic for Incident Management and ITS Investment Decisions MICHAEL D. ANDERSON AND REGINALD R. SOULEYRETTE UTPS-type models were designed to adequately
GEOMETRIC DESIGN CIVL 3161
GEOMETRIC DESIGN CIVL 3161 Reading Assignment: p. 45-72 (4 th ed.) p.45-75 (previous ed.) in Mannering textbook. Geometric design of highway facilities deals with the proportion of physical elements of
Access Management Manual
Access Management Manual July 2011 2011 by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2011-1 From: Manual: Mark A Marek, P.E. Access Management Manual Effective
Subject: Presentation - TTC/Transportation Services Joint Surface Transit Initiatives
INFORMATION Subject: Presentation - TTC/Transportation Services Joint Surface Transit Initiatives Date: May 27, 2015 Stephen Buckley, General Manager, Transportation Services has been invited by the Chair
TERMINAL 91 TRAFFIC MONITORING STUDY
REVISED DRAFT TERMINAL 9 TRAFFIC MONITORING STUDY Prepared for: Port of Seattle Prepared by: 6544 NE 6st Street, Seattle, WA 985 ph: (26) 523-3939 fx: (26) 523-4949 NOVEMBER 22, 2 TABLE OF CONTENTS. INTRODUCTION...