1 TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? 1:30 2:40 p.m. Paul Larrousse Director, National Transit Institute (NTI) (Moderator)

2 TRB/APTA 2004 Bus Rapid Transit Conference Session Presentations FlexBRT Project Briefing, Randall Farwell When is BRT the Best Option The LA Experience, Rex Gephart Lane Transit District BRT Decision Process, Stefano Viggiano

3 TRB/APTA 2004 Bus Rapid Transit Conference Rex Gephart Masters Degree in Architecture and Urban Planning, University of California, Los Angeles Director of Regional Transit Planning for the LA MTA Manages the MetroRapid Service program

4 When is BRT the Best Option? Rex Gephart Director, Regional Transit Planning Los Angeles County Metropolitan Transportation Authority Russell Chisholm President Transportation Management & Design, Inc. APTA Bus Operations/BRT Conference May 5, 2004

5 Decision Process for Modal Selection Regional Transit Alternatives Analysis (1998) Metro Rapid Demonstration (2000) Transit Corridor Study (2000) Metro Rapid Expansion Program (2002) Page 5

6 Regional Transit Alternatives Analysis Purpose of RTAA: Identify regional transit corridors Identified major regional demand patterns Defined areas with high transit dependency Defined areas with high transit demand Defined origin and destination trip patterns Identified five candidate corridors San Fernando Valley Corridor Wilshire Corridor East Los Angeles Corridor Exposition Corridor Pasadena Corridor Supported Metro Rapid arterial concept Page 6

7 Los Angeles County Transit Dependency Index (By Traffic Analysis Zone) September 1998 Page 7

8 Transit Ridership by Line Community Statistical Areas with high transit dependency Page 8 September 1998

9 Mid-Wilshire & Koreatown CSA Work Trip Destinations September 1998 Page 9

10 Metro Rapid Program Frequent Service Bus Signal Priority Headway-based Schedules Simple Route Layout Less Frequent Stops Integrated with Local Bus Service Level Boarding and Alighting Color-coded Buses and Stations High Capacity Buses Exclusive R-O-W and Arterial Lanes Off-vehicle Fare Payment Bus Feeder Network Page 10

11 Pasadena Gold Line Downtown Los Angeles Legend Metro Rapid Station Rapid & Rail Station Metro Rapid Line Metro Red Line Metro Blue Line Lines Blue/Gold Demonstration Lines Page 11 Implemented June 2000

12 Metro Rapid Demonstration Two-line arterial demonstration implemented in 2000 to determine if people would ride higher speed bus Reduced Passenger Travel Times Wilshire/Whittier Corridor up to 29% Ventura Corridor up to 23% Increased Corridor Ridership Wilshire/Whittier Corridor ridership up 42% Ventura Corridor ridership up 38% Attracted New Riders 1/3 of ridership increase are new riders Page 12

13 Metro Rapid/BRT Becomes Option Metro Rapid/BRT added as Major Investment Study option MTA develops mobility toolbox for assessing BRT as a transit option Page 13

14 No rth Ho lyw ood M No rth Ho lyw ood M No rth Ho lyw ood M No rth Ho lyw ood M Los Angeles Mobility Toolbox 50 MPH Commuter Rail Operating Speed Range 40 MPH 30 MPH 20 MPH 10 MPH Heavy Rail Light Rail (Exclusive Right-Of-Way) Bus Rapid Transit Rapid Bus Light Rail (Arterial) 0 MPH 5,000 10,000 15,000 20,000 25,000 30,000 35,000 Peak Directional Capacity (Passengers per Hour)

15 Transit Corridor Study Major Investment Study was performed on four of the five RTAA corridors Identified preferred corridor modes San Fernando Valley Corridor - BRT Wilshire Corridor - BRT Exposition Corridor - BRT/LRT East Los Angeles Corridor - LRT Pasadena Corridor Independent Study (JPA) - LRT Page 15

16 San Fernando Valley Corridor BRT Statistics 14 miles, 13 stations, 7 minute headway Project construction/vehicle cost = $330 million Issues At-grade corridor with many street crossings (against signal progression) Connects Red Line (HRT) with Warner Center (50,000 jobs) Originally planned as heavy rail extension (too costly) BRT selected over LRT Expected demand (22,000 daily boardings) did not meet LRT economies of scale BRT required for flexible on-street operation at Warner Center Page 16

17 San Fernando Valley Corridor BRT Page 17

18 Wilshire Corridor BRT Statistics 13 miles, 15 stations, 3-4 minute headways Project construction/vehicle cost = $182 million Issues At grade corridor in 3 jurisdictions; many major street crossings Very high arterial traffic with bottlenecks Existing Metro Rapid arterial BRT; extends beyond study corridor Potential future extension of Red Line (HRT) BRT selected over LRT Existing BRT-light successful; only need to add exclusive lanes Avoid mode complexity and unnecessary transfers Minimizes short term investment until Red Line extended Page 18

19 Wilshire Corridor BRT Rendering Page 19

20 Exposition Corridor LRT Statistics 9.4 miles (7.9 new/1.5 shared), stations, 7.5 minute headway Project construction/vehicle cost = $426 million Issues Exclusive railroad right-of-way with street crossings Alignment options include partial arterial operation & grade seps Opportunity to connect with existing Blue Line LRT Serves several jurisdictions LRT selected over BRT Expected demand (43,600 daily boardings) provides LRT economies of scale LRT allows shared use of Blue Line LRT tracks & LACBD tunnel Page 20

21 Exposition Corridor LRT Page 21

22 East Los Angeles Corridor LRT Statistics 6 miles (1.8 miles in tunnel), 8 new + 1 existing station, 7.5 min hdwy Project construction/vehicle cost = $898 million Issues Initially HRT extension (too costly) Desire to link with regional hub (Union Station) and existing LRT Station locations not on continuous street or right-of-way Surface streets narrow (built in 1800s); active community street life Surface operation requires numerous turns across traffic LRT selected over BRT Minimize community impacts (mix of tunnel and surface ops) Through service w/ existing Gold Line LRT at Union Station Page 22

23 East Los Angeles Corridor LRT Page 23

24 Metro Rapid Arterial Expansion Based on the success of the Metro Rapid Demonstration, the program was approved for expansion Improved travel speeds (up to 29% faster) Increase in ridership (up to 40%) Relatively low capital cost ($200,000 per mile) Easy implementation (12 months to start-up) FY 2008: 28 corridors and 450 miles of service Page 24

25 Page 25

26 Summary BRT allows for greater flexibility Allows for easy mix of on-street and exclusive right-ofway operation Easier to fit in challenging corridors Allows for incremental upgrading Lower cost for both capital and operations until economy of scale threshold is reached for LRT Over 5,000 passengers per peak hour, peak direction Over 25,000 passengers per day Each corridor requires a unique decision Page 26

Los Angeles Metro Rapid

Los Angeles Metro Rapid Los Angeles Metro Rapid Why BRT In Los Angeles Public dissatisfied with slow bus service Average bus speeds had declined by 10% since late- 1980s LADOT found that 50% of the time a bus is in service it

More information

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.1 FINANCIAL ANALYSIS The cost of a transportation investment falls into two categories: capital costs, and operating and maintenance (O&M) costs.

More information

National Bus Rapid Transit Institute (NBRTI) At the University of South Florida

National Bus Rapid Transit Institute (NBRTI) At the University of South Florida National Bus Rapid Transit Institute (NBRTI) At the University of South Florida History of the NBRTI In January 2001, the National BRT Institute was created at USF s Center for Urban Transportation Research

More information

Light Rail Transit in Phoenix

Light Rail Transit in Phoenix 4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A ORANGE COUNTY TRANSPORTATION AUTHORITY Final Long-Range Transportation Plan - Destination 2035 Attachment A DESTINATION 2035 DESTINATION 2035 EXECUTIVE SUMMARY ATTACHMENT A Moving Toward a Greener Tomorrow

More information

Addendum to the Arterial Transitway Corridors Study

Addendum to the Arterial Transitway Corridors Study January 2013 1 Addendum to the Arterial Transitway Corridors Study The Arterial Transitway Corridors Study (ATCS) evaluated and prioritized arterial bus rapid transit (BRT) improvements to nine corridors

More information

Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects

Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects C2012-0684 ATTACHMENT 2 The RouteAhead draft 30-year rapid transit plan was developed in coordination with the Investing in

More information

Lone Star Regional Rail Project - Update. Joseph Black Rail Director, Lone Star Rail District Joseph Lessard Planning Director, Knudson LP

Lone Star Regional Rail Project - Update. Joseph Black Rail Director, Lone Star Rail District Joseph Lessard Planning Director, Knudson LP Lone Star Regional Rail Project - Update Joseph Black Rail Director, Lone Star Rail District Joseph Lessard Planning Director, Knudson LP August 20, 2015 Lone Star Regional Rail Project - Update Presentation

More information

Transit Technology Alternatives

Transit Technology Alternatives Transit Technology Alternatives Fixed Guideway Systems (see http://www.apta.com/research/info/define/index.cfm) Heavy rail - HR Heavy Rail is a system that is totally separated from its surroundings and

More information

A Review of Transit Technology Specifications

A Review of Transit Technology Specifications . Transit Technologies Worksheet A Review of Transit Technology Specifications 1 2 3 4 5 6 1. Heavy Rail Transit 2. Commuter Rail Transit 3. Light Rail Transit 4. Modern Streetcar 5. Heritage Trolley 6.

More information

Mount Royal College Transit Service Plan

Mount Royal College Transit Service Plan Mount Royal College Transit Service Plan Background In 2007 November response to Council Report C2007-78 West LRT Alignment, Budget and Project Delivery, Council directed the Administration to report back

More information

Transportation Alternatives

Transportation Alternatives 1 Transportation Alternatives Transportation alternatives involve a variety of components: Location Alternatives - when and where service is provided - general location as well as level of service on the

More information

7.0 Transportation Management

7.0 Transportation Management 7.0 Transportation Management I. Introduction The Kansas City region has invested considerable effort and resources in the design and implementation of its regional multimodal transportation system. As

More information

PAPS- LA. http://discoverlosangeles.com/ http://en.wikipedia.org/wiki/los_angeles

PAPS- LA. http://discoverlosangeles.com/ http://en.wikipedia.org/wiki/los_angeles PAPS- LA Know more about the City of Los Angeles at : http://www.lacity.org/index.htm http://discoverlosangeles.com/ http://en.wikipedia.org/wiki/los_angeles 1. Which official documents do you need to

More information

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013

Near Westside Neighborhood and University Avenue Corridor Transportation Study. Public Workshop #2. September 12 and 23, 2013 Near Westside Neighborhood and University Avenue Corridor Transportation Study Public Workshop #2 September 12 and 23, 2013 Presentation Outline: Brief Review of Study Scope, Background, and Current Conditions

More information

Date August 28, 2013

Date August 28, 2013 Date August 28, 2013 To From Subject San Fernando Valley Service Council Scott Page, Service Planning Manager Staff s Review of Past Chair Kymberleigh Richards Email, Proposed Resource Recovery Strategies

More information

Dallas-Fort Worth Area Major Transportation Projects

Dallas-Fort Worth Area Major Transportation Projects Dallas-Fort Worth Area Major Transportation Projects Presented by: Jeffrey C. Neal Program Manager Transportation North Central Texas Council of Governments (NCTCOG) August 14, 2014 Texas Society of Professional

More information

STOP CONSOLIDATION TRANSIT STRATEGIES

STOP CONSOLIDATION TRANSIT STRATEGIES TRANSIT STRATEGIES STOP CONSOLIDATION Transit stops are the places where people access transit service, and greatly impact many elements of passengers transit experiences. They are typically thought of

More information

Passenger Rail Service

Passenger Rail Service Passenger Rail Service Bill Sproule Michigan Tech University REES Module #5 - Transit, Commuter and Intercity Passenger Rail 1 Passenger Rail Service Intercity Passenger Rail trains that move passengers

More information

MANAGEMENT PLAN. Fiscal Year 2015-2016

MANAGEMENT PLAN. Fiscal Year 2015-2016 MANAGEMENT PLAN Fiscal Year 2015-2016 May 6, 2015 Table of Contents I. Executive Summary... 2 Omnitrans Vision... 5 Omnitrans Mission Statement... 5 II. Strategic Initiatives... 5 Implementation... 6 Strategic

More information

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total

More information

BRT BUS RAPID TRANSIT SERVICE DESIGN GUIDELINES

BRT BUS RAPID TRANSIT SERVICE DESIGN GUIDELINES BRT BUS RAPID TRANSIT SERVICE DESIGN GUIDELINES TABLE OF CONTENTS 1. Vision Statement...1 2. Modal Overview...1 3. Planning and Implementation Process...4 4. BRT Policies...4 4.1 BRT System Performance

More information

Bus Rapid Transit Service Design

Bus Rapid Transit Service Design APTA STANDARDS DEVELOPMENT PROGRAM RECOMMENDED PRACTICE American Public Transportation Association 1666 K Street, NW, Washington, DC, 20006-1215 APTA BTS-BRT-RP-004-10 Approved October, 2010 APTA Bus Rapid

More information

transit service policy july 2012

transit service policy july 2012 transit service policy july 2012 TABLE OF CONTENTS SECTION 1: INTRODUCTION, PURPOSE & BACKGROUND 3 1.1 Introduction 3 1.2 Purpose 4 1.3 Background 5 SECTION 2: DESIGNING A REGIONAL TRANSIT NETWORK 7 2.1

More information

Strategic Economic Development Assets: Infrastructure in the East Valley

Strategic Economic Development Assets: Infrastructure in the East Valley : Infrastructure in the East Valley Presented by: February 2013 1 INFRASTRUCTURE Moving People, Goods and Services In today s global economy, success belongs to the well-connected, especially in the movement

More information

SYSTEMWIDE REQUIREMENTS

SYSTEMWIDE REQUIREMENTS SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a

More information

Metropolitan Setting l

Metropolitan Setting l Metropolitan Setting l GENERAL CHARACTERISTICS Los Angeles lies at the heart of one of the most complex metropolitan regions in the United States. As a major center of commerce, finance, and industry in

More information

ExpressLanes CAG Summit. March 2, 2010

ExpressLanes CAG Summit. March 2, 2010 ExpressLanes CAG Summit March 2, 2010 1 Project Goals Move More People, Not More Vehicles > Increase Throughput of HOT lanes > Effectiveness (Mode Shift) > Efficiency (Cost of Project Relative to Benefits)

More information

Transit Service Assessment

Transit Service Assessment Technical Memorandum #1 Transit Service Assessment June 213 Table of Contents 1. Existing Service Summary... 1 1.1 Service Overview... 1 1.2 Service Characteristics... 1 2. Ridership and Productivity...

More information

Integrating GO RER and SmartTrack. Leslie Woo, Chief Planning Officer February 10, 2016

Integrating GO RER and SmartTrack. Leslie Woo, Chief Planning Officer February 10, 2016 Integrating GO RER and SmartTrack Leslie Woo, Chief Planning Officer February 10, 2016 Purpose and Scope To present update on development of options for integrating SmartTrack and GO RER based on the following

More information

TRAIN WRAPS TIMETABLE ADS TICKETS STATION POSTERS METROLINK MATTERS NEWSLETTER STATION SAMPLING WEBSITE: METROLINKTRAINS.COM

TRAIN WRAPS TIMETABLE ADS TICKETS STATION POSTERS METROLINK MATTERS NEWSLETTER STATION SAMPLING WEBSITE: METROLINKTRAINS.COM METROLINK MATTERS TIMETABLES METROLINKTRAINS.COM HOW-TO-RIDE GUIDE DESTINATION GUIDE TICKETS TRAIN WRAPS STATION POSTERS ON-BOARD BANNERS & POSTERS STATION SAMPLING ADVERTISING RATES & INFORMATION METROLINK

More information

Questions and Answers about the Orange Bus/Rail Investment Plan

Questions and Answers about the Orange Bus/Rail Investment Plan Why are transit improvements needed? Questions and Answers about the Orange Bus/Rail Investment Plan The Triangle Region is now home to 1.5 million people. The U.S. Census and the 2035 Joint Long Range

More information

Memo. Date: January 18, 2013. StarTran Advisory Board. From: Brian Praeuner. Review of Peer Transit Systems

Memo. Date: January 18, 2013. StarTran Advisory Board. From: Brian Praeuner. Review of Peer Transit Systems Memo Date: January 18, 2013 To: StarTran Advisory Board From: Brian Praeuner Re: Review of Peer Transit Systems This memo is in response to the StarTran Advisory Board s request for additional information

More information

Project Status Update Open House West End Corridor

Project Status Update Open House West End Corridor Project Status Update Open House West End Corridor The Exposition Construction Authority cordially invites you to a Project Status Update Open House for the Exposition Light Rail Line At this meeting we

More information

Transit, Rail, Program, Project & Construction Management Experience

Transit, Rail, Program, Project & Construction Management Experience Point of Contact Peter M. Cipolla Vice President, Rail & Transit Mobile: 925.219.5235 Email: [email protected] Project Management Oversight Services Introduction & Background Hatch Mott MacDonald

More information

Where Do We Want to Go? How Can We Get There?

Where Do We Want to Go? How Can We Get There? Where Do We Want to Go? How Can We Get There? The BRTB has adopted nine goals, with supporting strategies, performance measures, and performance targets. Together, these goals, strategies, measures, and

More information

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates SANTA MONICA TRAVEL DEMAND FORECASTING MODEL TRIP GENERATION RATES SUBMITTED BY: 201 Santa Monica Blvd., Suite 500 Santa Monica,

More information

Proposed Service Design Guidelines

Proposed Service Design Guidelines Proposed Service Design Guidelines July 2015 I. Introduction During Phase II of the Reimagining CityBus project, feedback from public outreach and data analysis conducted during Phase I of the project

More information

Executive Summary. Does a Streetcar Make Sense in Anaheim

Executive Summary. Does a Streetcar Make Sense in Anaheim Does a Streetcar Make Sense in Anaheim Streetcar in Portland s Pearl District Anaheim s proposed streetcar compares well with national best practice in Portland, Seattle and Tampa where new streetcars

More information

LRT LIGHT RAIL TRANSIT SERVICE GUIDELINES

LRT LIGHT RAIL TRANSIT SERVICE GUIDELINES LRT LIGHT RAIL TRANSIT SERVICE GUIDELINES LIGHT RAIL TRANSIT SERVICE GUIDELINES LIGHT RAIL TRANSIT SERVICE GUIDELINES TABLE OF CONTENTS 1. Vision Statement...1 2. Modal Overview...1 3. Planning and Implementation

More information

Photo credit: City of Denver DENVER UNION STATION-CHERRY CREEK-GLENDALE CORRIDOR FEASIBILITY STUDY RECOMMENDATIONS REPORT

Photo credit: City of Denver DENVER UNION STATION-CHERRY CREEK-GLENDALE CORRIDOR FEASIBILITY STUDY RECOMMENDATIONS REPORT Photo credit: City of Denver DENVER UNION STATION-CHERRY CREEK-GLENDALE CORRIDOR FEASIBILITY STUDY RECOMMENDATIONS REPORT January 2014 CONTENTS Study Purpose 4 Data Sources 5 Existing Conditions 5 Market

More information

Welcome to the LRT Overview Open House

Welcome to the LRT Overview Open House Welcome to the LRT Overview Open House Please sign-in so that we may provide you with updates on future events. TORONTO LRT OVERVIEW Importance of Transit to Cities Increase City s competitiveness (World

More information

Los Angeles County Metropolitan Transportation Authority. (Metro) Advanced Transportation Management System (ATMS) Overview

Los Angeles County Metropolitan Transportation Authority. (Metro) Advanced Transportation Management System (ATMS) Overview Los Angeles County Metropolitan Transportation Authority Los Angeles County Metropolitan Transportation Authority (Metro) Advanced Transportation Management System (ATMS) Overview June, 2010 ATMS is Supported

More information

2012 King County Metro Transit Peer Agency Comparison on Performance Measures

2012 King County Metro Transit Peer Agency Comparison on Performance Measures 2012 Peer Agency Comparison on Performance Measures Department of Transportation Metro Transit Division King Street Center, KSC-TR-0415 201 S. Jackson St Seattle, WA 98104 206-553-3000 TTY Relay: 711 www.kingcounty.gov/metro

More information

Strategic Regional Transit Plan

Strategic Regional Transit Plan Strategic Regional Transit Plan December 2008 Chapter 6: Run Time nalysis (Chapter 6 originally prepared October 2007) RUN TIME NLYSIS TLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 SCREEN TWO LTERNTIVES...

More information

College of Southern Maryland. Hughesville Transportation Study

College of Southern Maryland. Hughesville Transportation Study College of Southern Maryland Project Overview Existing Conditions Transit Service Land Use CSM Student Demographics Recommendations Methodology Transit Recommendations Transportation Demand Management

More information

Tier 1 Strategies. WV Route 14 Corridor Management Plan

Tier 1 Strategies. WV Route 14 Corridor Management Plan 1.1 1.2 1.3 1.4 Signal timing optimization system improvements. Improve geometry traffic control at high crash intersections. Construct intersection capacity improvement projects. Widen longer sections

More information

Ne w J e r s e y Tr a f f i c Co n g e s t i o n :

Ne w J e r s e y Tr a f f i c Co n g e s t i o n : Ne w J e r s e y Tr a f f i c Co n g e s t i o n : A Growing Crisis January 2008 Cover photo : Route 3, Passaic County introduction A rising tide of traffic congestion threatens to increase roadway gridlock,

More information

30 Years of Smart Growth

30 Years of Smart Growth 30 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor A Presentation by the Arlington County Department of Community Planning,

More information

Downtown Tampa Transportation Vision

Downtown Tampa Transportation Vision Downtown Tampa Transportation Vision Executive Summary August 1, 2006 Hillsborough County Metropolitan Planning Organization County Center, 18 th Floor Tampa, Florida 33602 813-272-5940 www.hillsboroughmpo.org

More information

Overview of the Travel Demand Forecasting Methodology

Overview of the Travel Demand Forecasting Methodology Overview of the Travel Demand Forecasting Methodology Prepared by the Central Transportation Planning Staff (CTPS) Authors: Scott A. Peterson, Manager Ian Harrington, Chief Planner March 29, 2008 1 OVERVIEW

More information

Experts in Rail Maintenance and Infrastructure

Experts in Rail Maintenance and Infrastructure Experts in Rail Maintenance and Infrastructure It is with great people and pride, rooted in a culture of safety, D that Transdev delivers systems, technologies, and business processes to strengthen rail

More information

VRE SYSTEM PLAN SUMMARY

VRE SYSTEM PLAN SUMMARY VRE System Plan Summary January 2014 VRE SYSTEM PLAN SUMMARY VRE A Cost-Effective Contributor to Regional Mobility During the last decade, VRE has demonstrated its ability to accommodate a rapid and substantial

More information

Frequently Asked Questions (FAQs) about DART

Frequently Asked Questions (FAQs) about DART Frequently Asked Questions (FAQs) about DART What is DART? Where can I take the bus? Where can I take the train? How much does it cost to park at a station? Can I take a train to American Airlines Center?

More information

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS

CAPACITY AND LEVEL-OF-SERVICE CONCEPTS CHAPTER 2 CAPACITY AND LEVEL-OF-SERVICE CONCEPTS CONTENTS I. INTRODUCTION...2-1 II. CAPACITY...2-2 III. DEMAND...2-2 IV. QUALITY AND LEVELS OF SERVICE...2-2 Service Flow Rates...2-3 Performance Measures...2-3

More information

Technical Memorandum PERFORMANCE MEASURES. Prepared by:

Technical Memorandum PERFORMANCE MEASURES. Prepared by: Technical Memorandum PERFORMANCE MEASURES Prepared by: March 2014 TABLE OF CONTENTS Executive Summary... 1 1. Introduction... 2 1.1 Performance Measures and the Public Sector... 2 1.2 National Focus: MAP

More information

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan. 3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation

More information

Introduction to Station Area Planning The Charlotte Story

Introduction to Station Area Planning The Charlotte Story Introduction to Station Area Planning The Charlotte Story Boston 2009 Steve Hamwey - Sasaki Associates, Inc. Troy Russ - Glatting Jackson, Inc. October 31 st, 2009 Station Area Planning October 15th History

More information

Sustainable urban mobility: visions beyond Europe. Brest. Udo Mbeche, UN-Habitat

Sustainable urban mobility: visions beyond Europe. Brest. Udo Mbeche, UN-Habitat Sustainable urban mobility: visions beyond Europe 2 nd October 2013 Brest Udo Mbeche, UN-Habitat The Global Report for Human Settlements Published every two years under a UN General Assembly mandate. Aims

More information

SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development

SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development Draft 06162009 SCOPE OF WORK for High Speed Rail and Intercity Passenger Rail Program Federal Grant Application Development The Minnesota Department of Transportation (Mn/DOT) requires the services of

More information

Proposed Capital Improvement Program (CIP) for FY 2015-2019

Proposed Capital Improvement Program (CIP) for FY 2015-2019 RELATED TO AGENDA ITEM 17 Proposed Capital Improvement Program (CIP) for FY 2015-2019 February 20, 2014 Presentation Overview Planning Agency roles District s capital needs Bridge funding plan Capital

More information

Transit in the United States 3. Operating Costs and Performance Measures 13. Quality of Transit Service 19. ADA Compliance Bus 28

Transit in the United States 3. Operating Costs and Performance Measures 13. Quality of Transit Service 19. ADA Compliance Bus 28 1999 National Transit Summaries and Trends Introduction 1 Introduces the transit modes discussed throughout the NTST. Transit in the United States 3 National statistics and trends in ridership, miles of

More information

ROUTE OVERVIEW. Comprehensive Route Evaluation ROUTE 3 WARWICK AVE

ROUTE OVERVIEW. Comprehensive Route Evaluation ROUTE 3 WARWICK AVE Comprehensive Route Evaluation ROUTE 3 WARWICK AVE ROUTE OVERVIEW Route 3 operates between Warwick and downtown Providence, primarily via Warwick Avenue. Other principal arterials include Oakland Beach

More information

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain Effect on structures Uniform settlement - no concerns Angular distortion - causes damage due to tensile strain 1/500 - safe limit for no cracking of buildings 1/150 - potential structural damage 36 37

More information

Metro Met..,.u... T,...,...,...,

Metro Met..,.u... T,...,...,..., ~ ""... c,., Metro Met..,.u... T,...,...,..., One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2ooo Tel metro. net 37 EXECUTIVE MANAGEMENT COMMITTEE MARCH 20,2014 SUBJECT: ACTION: INNOVATIVE WAYS TO

More information

CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND)

CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND) Regional Transportation Plan 2035 28 CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND) The Cache Transportation Vision Plan shows roadway, bicycle, transit and pedestrian projects that attempt

More information

7.0 TRANSPORTATION MANAGEMENT

7.0 TRANSPORTATION MANAGEMENT 7.0 TRANSPORTATION MANAGEMENT The Kansas City region has invested considerable effort and resources in the design and implementation of its regional multimodal transportation system. As a result of this

More information

Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010)

Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010) Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010) Summary Description Proposed Project: Electrified Commuter Rail 30.2 Miles, 13 Stations Total

More information

Intelligent Transport for Smart Cities Conference. Bruce McCuaig, President and CEO, Metrolinx

Intelligent Transport for Smart Cities Conference. Bruce McCuaig, President and CEO, Metrolinx Intelligent Transport for Smart Cities Conference Bruce McCuaig, President and CEO, Metrolinx 2 Transportation Trends 2013 2031 82 minutes spent commuting 109 6.6 9 million residents in the GTHA 3 The

More information

~ Metro Metrapolita Tnnsportation Authority

~ Metro Metrapolita Tnnsportation Authority ~ Metro Metrapolita Tnnsportation Authority One Gateway Plaza Los Angeles, CA 90012-2952 213-922.2000 Tel metro. net EXECUTIVE MANAGEMENT COMMITTEE OCTOBER 16, 2014 SUBJECT: ACTION: CUSTOMER EXPERIENCE

More information

From: HDR Engineering & Oz Engineering Project: AZTech TM Transit Data Integration Concepts of Operation. Date: July 29, 2009 Job No: 105240

From: HDR Engineering & Oz Engineering Project: AZTech TM Transit Data Integration Concepts of Operation. Date: July 29, 2009 Job No: 105240 To: Faisal Saleem, MCDOT James Book, RPTA Technical Memo From: HDR Engineering & Oz Engineering Project: AZTech TM Transit Data Integration Concepts of Operation CC: Tomas Guerra Saroja Devarakonda, File

More information