FRONT STREET & MUD ISLAND Interceptor Rehab



Similar documents
RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY

Summary 7/11/2012. Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort


Rehabilitation or Replacement? That Is The Question

APPENDIX M-2 SANITARY SEWER TECHNICAL MEMORANDUM. Stadium Reconstruction EIR

Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

McGOEY, HAUSER and EDSALL CONSULTING ENGINEERS D.P.C.

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report

SEWER LINE EXTENSION DESIGN CHECKLIST

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

FY15 Gravity Sewer and Manhole Rehabilitation

Beacon Hill Sewer District Standard Specifications

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount

Elev. A = , Elev. B = , horizontal distance = 1625 feet a. 7.7 b..077 c d. 1.28

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

VDI Mixer/Amplifier/Multiplier Chains (MixAMCs)

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline

Platte River Interceptor Slipline Rehabilitation

Amendment 1 Preliminary Engineering Report for the City of Salida

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y. Kansas City, Missouri s Trenchless Program

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

FY08 SEWER POINT REPAIRS BID TABULATION

12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA.

2015 Calendar Year. Residential Accounts. Residential Accounts. Department of Water Resources (DWR) Rates & Fees

PUBLIC NOTICE. Federal Aid Project MO F-54-D-20 May 1, 2016 December 31, Project Description

Emerging Technologies in Wastewater Collection Systems

TOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION

SECTION 3 SANITARY SEWER DESIGN

Using Frequent Sewer Inspection to Prioritize Asset Management. May 1, John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E.

BRUCE TOWNSHIP 32 MILE ROAD VILLAGE OF ROMEO 30 MILE ROAD CENTRAL SANITARY SEWER DISTRICT CAMPGROUND ROAD 28 MILE ROAD MOUND ROAD VAN DYKE AVENUE

CLEANING, INSPECTION, AND TESTING OF SEWERS

Waste Management. Infrastructure Rehabilitation in the U.S. Virgin Islands

Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation

Sanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention

Sewer Rehabilitation Design Requirements

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION

City of Balch Springs, Texas. Request for Proposal (RFP ) Pipe Bursting Sewer Line Replacement

GIS in Wastewater Collection System Master Planning

Setting Priorities for Stormwater Infrastructure to Achieve Best Results Using a Risk Analysis

SOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33, Mile: Population: 80,200 Median HH Income: $34,900

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Civil. Topographical Survey. Design Evaluation. Construction Submittals

TENDER DOCUMENT FOR. AMC for repairing of lining in tanks/vessels/pipe/headers with FRP/PP in NRL Utility Plant Area. Tender No.

Water CIPP What to Do When You re Between a Fence and a Hard Place

Sanitary Sewer Overflow (SSO) Incident Report Form

GRAVITY SEWER REPAIR MARINE DRIVE CONSTRUCTION COMPLETION REPORT

Wauwatosa Lateral Rehabilitation Pilot Project. CSWEA Annual Meeting Madison, WI May 15, 2013

Collection Systems Technology Fact Sheet Sewers, Conventional Gravity

DESIGN STANDARDS MANUAL

CHALLENGES IN LINING A 100 YR OLD BRICK SEWER

2.1 Development of Risk-Based Asset Management Framework

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

Ship Repair, Maintenance & Modernization Cost Model. March 2014

Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan

SECTION 802 GRAVITY SEWER PIPE

San Antonio, TX July 28, 2011

SECTION 5 DRAFTING STANDARDS

Free Pre-Algebra Lesson 55! page 1

PLANNING CAREFUL NORTH VANCOUVER PIPE BURST REQUIRES

B.S. in Environmental Engineering, minor in Chemistry, Oregon State University, Corvallis, Oregon, 2001

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006

THAT FIT SOLUTIONS. profile COVER STORY INLAND WATERS POLLUTION CONTROL, INC., DETROIT, MICH.

CHAPTER 2 HYDRAULICS OF SEWERS

Math. Finding Perimeter and Area. Answers. Name: Solve the problems.

Daniel Kenny, Jonathan Shapiro, Tyler Rumler, Austin Tokarski

City of Virginia Beach Public Utilities HRPDC Regional Construction Standards, 5 TH Edition Amendments May 19, 2014

SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS

ENVIRONMENTAL ASSESSMENT (EA) VILLAGE OF EAU CLAIRE - BERRIEN COUNTY INFILTRATION/INFLOW REMOVAL PROJECT APRIL 2015

For Construction of the Sandy Suburban Improvement District 2013 Pipeline Rehabilitation Project

Bulletin. Gerard D. Perry, Director of Accounts. DATE: August Sewer Rate Relief Fund FY2015

Basis of Cost Estimates

Construction Management

Onsite Wastewater Concepts, Materials, Regulations & The Application Process Part I

LOWER NORTH OUTFALL SEWER AND NORTH OUTFALL SEWER REHABILITATION USING AMERON S T HAB METHOD

Appendix S Pump Station Evaluation

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

SANITARY SEWER SYSTEM ASSESSMENT

VersaRack Installation Instructions. masterack. Tools Required:

VOLTAGE/CURRENT CALIBRATOR ISO-TECH ILC-421

Apr 17, 2000 LAB MANUAL

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan

Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E.

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

SANITARY SEWER SPECIFICATIONS

TRAFFIC ACCIDENT STUDY GUIDE 2010

CITY OF POWAY REQUEST FOR PROPOSALS (RFP) FOR GEOGRAPHIC INFORMATION SYSTEM (GIS) WATER / WASTEWATER SYSTEM DATA CONVERSION PROJECT ADDENDUM SIX

Let Us Give Utilities the Respect that they Deserve.

MUNI OWNER S CHRONICLE OF REPLACING 35 MILES OF ASBESTOS CEMENT WATER MAIN UTILIZING PRE-CHLORINATED WATER MAIN BURSTING

Master Anamorphic T1.9/35 mm

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

Project Scoping Document. Sherman Terrace Condominium Association Proposed Water Main Replacement Project

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

Transcription:

± 1!(!( 2!(!(!(!( 3!(!( 4!(!( 5!(!(!( 7!(!(!(!(!( 6!(!( 8!(!( 9!( Legend!( Manhole Rehab Mud IslandInterceptor (CIPP) Front St Interceptor (No Rehab) Gravity Main (No Rehab) Manhole (No Rehab) Sheet Boundary FRONT STREET & MUD ISLAND Interceptor Rehab

#*FS030721 Legend!( Standard Structure, Coat Entire Manhole Mud Island Interceptor (CIPP) ± 0 50 100 Feet ") Standard Structure, Coat to Water Level Manhole (No Rehab) 1 inch = 100 feet #* Standard Structure, Coat to Water Level, Cut for Dive ") Special Structure*, Coat to Water Level #* Special Structure*, Coat to Water Level, Cut for Dive Front St Interceptor (No Rehab) Gravity Main (No Rehab) *Plan Drawings for all Special Structures are included in bid package for reference Page 1 of 9 FRONT STREET & MUD ISLAND Interceptor Rehab

FS031213 ") FS031211 ") FS031014 ") Legend!( Standard Structure, Coat Entire Manhole Mud Island Interceptor (CIPP) ± 0 50 100 Feet ") Standard Structure, Coat to Water Level Manhole (No Rehab) 1 inch = 100 feet #* Standard Structure, Coat to Water Level, Cut for Dive ") Special Structure*, Coat to Water Level #* Special Structure*, Coat to Water Level, Cut for Dive Front St Interceptor (No Rehab) Gravity Main (No Rehab) *Plan Drawings for all Special Structures are included in bid package for reference Page 2 of 9 FRONT STREET & MUD ISLAND Interceptor Rehab

FS031000 ") FS020129.01 ") FS020129 ") Legend!( Standard Structure, Coat Entire Manhole Mud Island Interceptor (CIPP) ± 0 50 100 Feet ") Standard Structure, Coat to Water Level Manhole (No Rehab) 1 inch = 100 feet #* Standard Structure, Coat to Water Level, Cut for Dive ") Special Structure*, Coat to Water Level #* Special Structure*, Coat to Water Level, Cut for Dive Front St Interceptor (No Rehab) Gravity Main (No Rehab) *Plan Drawings for all Special Structures are included in bid package for reference Page 3 of 9 FRONT STREET & MUD ISLAND Interceptor Rehab

FS020108 ") FS020107 ") FS020105 ") Legend!( Standard Structure, Coat Entire Manhole Mud Island Interceptor (CIPP) ± 0 50 100 Feet ") Standard Structure, Coat to Water Level Manhole (No Rehab) 1 inch = 100 feet #* Standard Structure, Coat to Water Level, Cut for Dive ") Special Structure*, Coat to Water Level #* Special Structure*, Coat to Water Level, Cut for Dive Front St Interceptor (No Rehab) Gravity Main (No Rehab) *Plan Drawings for all Special Structures are included in bid package for reference Page 4 of 9 FRONT STREET & MUD ISLAND Interceptor Rehab

#*FS020104 Legend!( Standard Structure, Coat Entire Manhole Mud Island Interceptor (CIPP) ± 0 50 100 Feet ") Standard Structure, Coat to Water Level Manhole (No Rehab) 1 inch = 100 feet #* Standard Structure, Coat to Water Level, Cut for Dive ") Special Structure*, Coat to Water Level #* Special Structure*, Coat to Water Level, Cut for Dive Front St Interceptor (No Rehab) Gravity Main (No Rehab) *Plan Drawings for all Special Structures are included in bid package for reference Page 5 of 9 FRONT STREET & MUD ISLAND Interceptor Rehab

FS020103 #* FS020102 #* FS020101 ") Legend!( Standard Structure, Coat Entire Manhole Mud Island Interceptor (CIPP) ± 0 50 100 Feet ") Standard Structure, Coat to Water Level Manhole (No Rehab) 1 inch = 100 feet #* Standard Structure, Coat to Water Level, Cut for Dive ") Special Structure*, Coat to Water Level #* Special Structure*, Coat to Water Level, Cut for Dive Front St Interceptor (No Rehab) Gravity Main (No Rehab) *Plan Drawings for all Special Structures are included in bid package for reference Page 6 of 9 FRONT STREET & MUD ISLAND Interceptor Rehab

WO010176S 60'', 778' MI010100 Depth: 28'!( MI010100S 60'', 228'!(!( MI010109S 24'', 90' WO010176 Depth: 30' MI010109 Depth: 25' MI010110S 24'', 385' MI010101S 60'', 527' MI010110 Depth: 27'!( MI010101 Depth: Unknown!( MI010111S 24'', 287' MI010111 Depth: 26'!( Legend!( Standard Structure, Coat Entire Manhole Mud Island Interceptor (CIPP) ± 0 50 100 Feet ") Standard Structure, Coat to Water Level Manhole (No Rehab) 1 inch = 100 feet #* Standard Structure, Coat to Water Level, Cut for Dive ") Special Structure*, Coat to Water Level #* Special Structure*, Coat to Water Level, Cut for Dive Front St Interceptor (No Rehab) Gravity Main (No Rehab) *Plan Drawings for all Special Structures are included in bid package for reference Page 7 of 9 FRONT STREET & MUD ISLAND Interceptor Rehab

WO010174.01 Depth: Unknown!( WO010174.01S 60'', 609' WO010175S 60'', 1001' WO010175 Depth: Unknown!( WO010176S 60'', 778' Legend!( Standard Structure, Coat Entire Manhole Mud Island Interceptor (CIPP) ± 0 50 100 Feet ") Standard Structure, Coat to Water Level Manhole (No Rehab) 1 inch = 100 feet #* Standard Structure, Coat to Water Level, Cut for Dive ") Special Structure*, Coat to Water Level #* Special Structure*, Coat to Water Level, Cut for Dive Front St Interceptor (No Rehab) Gravity Main (No Rehab) *Plan Drawings for all Special Structures are included in bid package for reference Page 8 of 9 FRONT STREET & MUD ISLAND Interceptor Rehab

WO010174 Depth: 25'!( WO010174.01S 60'', 609' WO010174.01 Depth: Unknown!( WO010175S 60'', 1001' Legend!( Standard Structure, Coat Entire Manhole Mud Island Interceptor (CIPP) ± 0 50 100 Feet ") Standard Structure, Coat to Water Level Manhole (No Rehab) 1 inch = 100 feet #* Standard Structure, Coat to Water Level, Cut for Dive ") Special Structure*, Coat to Water Level #* Special Structure*, Coat to Water Level, Cut for Dive Front St Interceptor (No Rehab) Gravity Main (No Rehab) *Plan Drawings for all Special Structures are included in bid package for reference Page 9 of 9 FRONT STREET & MUD ISLAND Interceptor Rehab